CN215407751U - Steel construction iron tower that stability is high - Google Patents

Steel construction iron tower that stability is high Download PDF

Info

Publication number
CN215407751U
CN215407751U CN202121497182.XU CN202121497182U CN215407751U CN 215407751 U CN215407751 U CN 215407751U CN 202121497182 U CN202121497182 U CN 202121497182U CN 215407751 U CN215407751 U CN 215407751U
Authority
CN
China
Prior art keywords
steel
welded
embedded part
iron tower
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121497182.XU
Other languages
Chinese (zh)
Inventor
白晓娟
冷亨
雷静静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Shuaiyi Steel Structure Co ltd
Original Assignee
Qingdao Shuaiyi Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Shuaiyi Steel Structure Co ltd filed Critical Qingdao Shuaiyi Steel Structure Co ltd
Priority to CN202121497182.XU priority Critical patent/CN215407751U/en
Application granted granted Critical
Publication of CN215407751U publication Critical patent/CN215407751U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a steel structure iron tower with high stability, which comprises a cement foundation, a first steel frame, a first embedded part and a second embedded part, wherein the upper end surface of the cement foundation is provided with three installation seats, each installation seat is internally provided with an installation groove, the second embedded part is fixed in the installation groove, the first steel frame is welded on the upper end surface of the embedded part, each first steel frame is welded with a first connecting block and a second connecting block, the first connecting block is connected with a connecting rod, the second connecting block is connected with a pull rope, the cement foundation is fixedly provided with the second embedded parts, the other ends of the connecting rods are hinged on the first embedded part, and the other ends of the pull ropes are fixed on the first embedded part; compared with the prior art, the utility model has the following beneficial effects: the stability of electric power iron tower bottom foundation is effectively improved to further improve the stability of bottom, make the steelframe can be firm install on the cement ground.

Description

Steel construction iron tower that stability is high
Technical Field
The utility model belongs to the technical field of iron towers, and particularly relates to a steel structure iron tower with high stability.
Background
Along with modern society's development, electric power resource has obtained more and more use, in order to carry out remote transmission to electric power, need use the iron tower, current iron tower can not carry out the stable connection with ground when the installation construction for the situation that rocks appears easily after the installation of iron tower is accomplished, thereby leads to the iron tower to appear using unstable problem, greatly reduced the practicality of iron tower.
Therefore, a steel structure iron tower with high stability is needed to solve the problem.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a steel structure iron tower with high stability so as to solve the problems in the background technology.
The technical scheme of the utility model is realized as follows: a steel structure iron tower with high stability comprises a cement foundation, first steel frames, first embedded parts and second embedded parts, wherein the upper end surface of the cement foundation is provided with three installation seats, each installation seat is internally provided with an installation groove, the second embedded parts are fixed in the installation grooves, the first steel frames are welded on the upper end surface of the embedded parts, a plurality of first bracing supports are welded between every two first steel frames, a supporting cross rod is welded between every two first steel frames, a connecting top plate is welded at the top ends of the three first steel frames, three second steel frames are welded on the upper end surface of the connecting top plate, a plurality of second bracing supports are welded between every two second steel frames, a fixing plate is welded on the upper end surface of the three second steel frames, transmission porcelain bottles are installed on the surface of the lower end of the fixing plate, and a first connecting block and a second connecting block are welded on each first steel frame, the cement foundation is characterized in that the first connecting block is connected with a connecting rod, the second connecting block is connected with a pull rope, a plurality of second embedded parts are fixed on the cement foundation, the other ends of the connecting rod are hinged to the first embedded parts, and the other ends of the pull rope are fixed on the first embedded parts.
As a preferred embodiment, a plurality of fixing holes are formed in the surface of the upper end of the two embedded parts, and the two embedded parts are fixed in mounting grooves formed in the mounting seat through the fixing holes and the expansion bolts.
As a preferred embodiment, a plurality of triangular reinforcing blocks are welded between the first steel frame and the second embedded part.
As a preferred embodiment, a plurality of connecting rods are arranged between the first embedded part and the first steel frame in a crossed manner, and the connecting rods are arranged in the vertical direction.
As a preferred embodiment, a layer of galvanized steel is disposed on the outer surface of the first steel frame and the outer surface of the second steel frame.
In a preferred embodiment, cement is poured into the mounting seat and submerges the triangular reinforcing blocks.
After the technical scheme is adopted, the utility model has the beneficial effects that: through the built-in fitting one, the connecting rod that set up for the bottom of a plurality of steelframes one forms a whole, can effectively improve the stability of electric power iron tower bottom foundation, thereby further improve the stability of bottom, through built-in fitting two, the mount pad that sets up, make the installation that steelframe one can be firm on the cement ground, when in-service use, more be applicable to iron tower technical field.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of a steel structure iron tower with high stability.
Fig. 2 is an enlarged schematic view of a position a of a steel structure iron tower with high stability.
Fig. 3 is a top view of a cement foundation of a steel structure iron tower with high stability according to the present invention.
In the figure, 1-cement foundation, 2-first embedded part, 3-pull rope, 4-connecting rod, 5-first connecting block, 6-first steel frame, 7-first inclined support bracket, 8-second connecting block, 9-connecting top plate, 10-power transmission porcelain bottle, 11-fixing plate, 12-second steel frame, 13-second inclined support bracket, 14-supporting cross rod, 15-connecting rod, 16-cement, 17-mounting seat, 18-second embedded part, 19-mounting groove and 20-expansion bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: a steel structure iron tower with high stability comprises a cement foundation 1, first steel frames 6, first embedded parts 2 and second embedded parts 18, wherein the upper end surface of the cement foundation 1 is provided with three mounting seats 17, each mounting seat 17 is internally provided with a mounting groove 19, the second embedded parts 18 are fixed in the mounting grooves 19, the first steel frames 6 are welded on the upper end surface of each embedded part, a plurality of first bracing supports 7 are welded between every two first steel frames 6, a supporting cross rod 14 is welded between every two first steel frames 6, the top ends of the three first steel frames 6 are welded with a connecting top plate 9, the upper end surface of the connecting top plate 9 is welded with three second steel frames 12, a plurality of second bracing supports 13 are welded between every two second steel frames 12, the upper end surfaces of the three second steel frames 12 are welded with a fixing plate 11, the surface of the lower end of the fixing plate 11 is provided with a porcelain insulator 10, each first steel frame 6 is welded with a first connecting block 5 and a second connecting block 8, the connecting rod 4 is connected to the first connecting block 5, the pull rope 3 is connected to the second connecting block 8, a plurality of second embedded parts 18 are fixed to the cement foundation 1, the other ends of the connecting rods 4 are hinged to the first embedded parts 2, and the other ends of the pull ropes 3 are fixed to the first embedded parts 2.
A plurality of fixing holes are formed in the surface of the upper end of the second embedded part 18, and the second embedded part 18 is fixed in a mounting groove 19 formed in the mounting seat 17 through the fixing holes and the expansion bolts 20, so that the first steel frame 6 can be fixed for the first time, and adjustment is facilitated.
A plurality of triangular reinforcing blocks are welded between the first steel frame 6 and the second embedded part 18, so that the first steel frame 6 and the second embedded part 18 are welded more firmly.
Connecting rods 15 are arranged between the first embedded part 2 and the first steel frame 6 in a crossed mode, and the connecting rods 15 are arranged in a plurality in the vertical direction, so that the stability of the iron tower is further improved.
The outer surface of the first steel frame 6 and the outer surface of the second steel frame 12 are both provided with a layer of galvanized steel, so that the steel frame is not easy to corrode and has long service life.
The mounting seat 17 is internally poured with cement 16, and the cement 16 submerges the triangular reinforcing block, so that the steel frame I6 is more firmly fixed on the cement foundation 1.
As an embodiment of the present invention: during the in-service use, after steelframe one 6 and two 18 welding of built-in fitting are in the same place, fix two 18 of built-in fitting in mounting groove 19, finely tune angle and distance between three steelframe one 6, then pour cement 16 in mount pad 17, make steelframe one 6 fixed completely, can make steelframe one 6 more firm solid on cement ground 1, through install a plurality of alternately arranged connecting rods 15 between built-in fitting one 2 and steelframe one 6, make the bottom of a plurality of steelframe one 6 form a whole, can effectively improve the stability of electric power iron tower bottom root base, thereby further improve the stability of bottom, thereby ensure the firm degree to iron tower support.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (6)

1. The utility model provides a steel construction iron tower that stability is high, includes cement foundation (1), steelframe (6), built-in fitting (2) and two (18) of built-in fitting, its characterized in that: the concrete foundation is characterized in that three mounting seats (17) are arranged on the surface of the upper end of the concrete foundation (1), a mounting groove (19) is formed in each mounting seat (17), an embedded part II (18) is fixed in the mounting groove (19), a steel frame I (6) is welded on the surface of the upper end of the embedded part, a plurality of inclined strut supports I (7) are welded between every two steel frames I (6), a supporting cross rod (14) is welded between every two steel frames I (6), a connecting top plate (9) is welded at the top end of the three steel frames I (6), three steel frames II (12) are welded on the surface of the upper end of the connecting top plate (9), a plurality of inclined strut supports II (13) are welded between every two steel frames II (12), a fixing plate (11) is welded on the surface of the upper ends of the three steel frames II (12), and a power transmission porcelain bottle (10) is mounted on the surface of the lower end of the fixing plate (11), every all weld on steelframe (6) and have a connecting block (5) and connecting block two (8), be connected with connecting rod (4) on connecting block (5), be connected with stay cord (3) on connecting block two (8), be fixed with a plurality of built-in fitting two (18) on cement ground (1), the other end of connecting rod (4) articulates on built-in fitting (2), the other end of stay cord (3) is fixed on built-in fitting (2).
2. The steel structure iron tower with high stability as claimed in claim 1, wherein: the surface of the upper end of the second embedded part (18) is provided with a plurality of fixing holes, and the second embedded part (18) is fixed in a mounting groove (19) arranged in the mounting seat (17) through the fixing holes and the expansion bolts (20).
3. The steel structure iron tower with high stability as claimed in claim 1, wherein: a plurality of triangular reinforcing blocks are welded between the first steel frame (6) and the second embedded part (18).
4. The steel structure iron tower with high stability as claimed in claim 1, wherein: connecting rods (15) are arranged between the first embedded part (2) and the first steel frame (6) in a crossed mode, and a plurality of connecting rods (15) are arranged in the vertical direction.
5. The steel structure iron tower with high stability as claimed in claim 1, wherein: and the outer surfaces of the first steel frame (6) and the second steel frame (12) are respectively provided with a layer of galvanized steel.
6. The steel structure iron tower with high stability as claimed in claim 1, wherein: and cement (16) is poured in the mounting seat (17), and the triangular reinforcing block is submerged by the cement (16).
CN202121497182.XU 2021-07-02 2021-07-02 Steel construction iron tower that stability is high Active CN215407751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121497182.XU CN215407751U (en) 2021-07-02 2021-07-02 Steel construction iron tower that stability is high

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121497182.XU CN215407751U (en) 2021-07-02 2021-07-02 Steel construction iron tower that stability is high

Publications (1)

Publication Number Publication Date
CN215407751U true CN215407751U (en) 2022-01-04

Family

ID=79646397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121497182.XU Active CN215407751U (en) 2021-07-02 2021-07-02 Steel construction iron tower that stability is high

Country Status (1)

Country Link
CN (1) CN215407751U (en)

Similar Documents

Publication Publication Date Title
CN215407751U (en) Steel construction iron tower that stability is high
CN213898375U (en) Pole tower in-situ lifting device
CN212132653U (en) Base and vertical sliding support for heating overhead pipeline
CN215859365U (en) Typhoon-resistant light steel iron tower structure
CN216751595U (en) Prestressed cable photovoltaic supporting structure
CN218217122U (en) Inverter horizontal mounting bracket for color steel tile roof
CN214463095U (en) Build firm electric power iron tower
CN217760338U (en) Anti-corrosion concrete pole
CN212799303U (en) Large-span steel truss integral lifting device
CN213869186U (en) Wind-resistant electric power iron tower
CN212535272U (en) Electric power iron tower that stability is high
CN212078696U (en) Novel combination formula building templates fixed knot constructs
CN214695654U (en) Prestressed supporting rod for foundation pit enclosure
CN218449961U (en) High-strength photovoltaic support
CN217232973U (en) Be suitable for steel pylons of precipitous topography
CN216276505U (en) Steel construction large-span siphon drainage suspension pipe prevents shaking support
CN211736608U (en) Device for installing iron tower
CN212773709U (en) Communication tower
CN214246744U (en) H shaped steel bottom fixed bolster
CN214479482U (en) Assembled cable termination platform
CN220754719U (en) Photovoltaic vertical pole installation distribution structure
CN219826293U (en) Three-pipe tower reinforcing structure
CN210535805U (en) Antenna fixing device for communication tower
CN211286578U (en) Dysmorphism support frame of encorbelmenting
CN215055658U (en) Temporary steel support assembly for lifting water tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant