CN215404317U - Device system for flushing slag by blast furnace water - Google Patents

Device system for flushing slag by blast furnace water Download PDF

Info

Publication number
CN215404317U
CN215404317U CN202121672951.5U CN202121672951U CN215404317U CN 215404317 U CN215404317 U CN 215404317U CN 202121672951 U CN202121672951 U CN 202121672951U CN 215404317 U CN215404317 U CN 215404317U
Authority
CN
China
Prior art keywords
slag
flushing
slag flushing
pump
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121672951.5U
Other languages
Chinese (zh)
Inventor
邢宝树
王雪原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengde Jianlong Special Steel Co Ltd
Original Assignee
Chengde Jianlong Special Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengde Jianlong Special Steel Co Ltd filed Critical Chengde Jianlong Special Steel Co Ltd
Priority to CN202121672951.5U priority Critical patent/CN215404317U/en
Application granted granted Critical
Publication of CN215404317U publication Critical patent/CN215404317U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model provides a device system for flushing slag by blast furnace water, which comprises a reservoir, a main flushing slag pipe, branch flushing slag pipes, a back flushing pipeline, a flushing slag ditch, a crown block and at least 2 slag pools, wherein the reservoir is arranged in the reservoir; a water outlet of the reservoir is sequentially connected in parallel with the slag flushing ditch and at least 2 slag pools through a slag flushing main pipe; a water inlet of the reservoir is sequentially connected in parallel with at least 2 slag pools through a blowback pipeline; the slag flushing branch pipe connects the slag flushing main pipe with a back flushing pipeline; the slag flushing ditch is sequentially connected with at least 2 slag pools; the overhead traveling crane is suspended over at least 2 slag ponds. By utilizing the device system provided by the utility model, when a fault occurs in a respective pump device, an emergency scheme can be started, the normal operation of the slag flushing system is ensured, the loss caused by shutdown maintenance is avoided, the slag tank can be subjected to back flushing in time, the permeability of the slag tank filter material is improved, and the normal production of the blast furnace is ensured.

Description

Device system for flushing slag by blast furnace water
Technical Field
The utility model belongs to the technical field of iron and steel smelting, and relates to a device system for flushing slag with water, in particular to a device system for flushing slag with water in a blast furnace.
Background
At present, the blast furnace slag treatment method mainly comprises slag water quenching, dry slag discharging, slag flushing cotton or slag expansion production and the like, but the most common method is the slag water flushing treatment method.
The traditional slag flushing system has the following process flow: the slag flushing water is lifted to the head of the slag flushing chute in the workshop from the water storage tank by using a slag flushing pump, liquid slag is scattered by using slag flushing water jet to form slag particles, and the slag in the slag flushing chute is flushed into the slag bath. After the slag is precipitated in the slag pool, the slag is grabbed out by using a grab type gantry crane and then transported outwards. The slag flushing water collected in the slag flushing tank is pumped back to the reservoir by the upper tower pump after being filtered for cyclic utilization.
However, because the temperature and the humidity in the working environment are both high, the process flow generally has the problem that the slag flushing pump or the upper tower pump has frequent faults to cause the normal operation of the slag flushing system. In addition, the slag bath needs to be blowbacked in time to promote the permeability of slag bath filter material, if not blowbacked for a long time, the slag bath filter material will harden, and the water permeability worsens, can cause the pond not to ooze even when serious, makes the blast furnace can't slag tap, and then influences the normal production of blast furnace, need utilize manual work or mechanical clearance slag bath bottom plate knot thing, intensity of labour is big, and the danger coefficient is high.
Therefore, how to provide a device system of blast furnace water towards sediment, can start emergent scheme when individual pump unit breaks down, ensure the normal operating of water towards sediment system, avoid the loss that the maintenance that stops work and causes, and can in time blow back to the slag bath, promote the permeability of slag bath filter material, guarantee the normal production of blast furnace, become the problem that technical staff in the field urgently need solve at present.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a blast furnace water slag flushing device system, by utilizing the device system, when a single pump device fails, an emergency scheme can be started, the normal operation of the water slag flushing system is ensured, the loss caused by shutdown and maintenance is avoided, the slag bath can be subjected to back flushing in time, the permeability of a slag bath filter material is improved, and the normal production of a blast furnace is ensured.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a device system for flushing slag by blast furnace water, which comprises a reservoir, a main flushing slag pipe, a branch flushing slag pipe, a back flushing pipeline, a flushing slag ditch, a crown block and at least 2 slag ponds, such as 2, 3, 4 or 5, but not limited to the enumerated values, and other non-enumerated values in the numerical value range are also applicable.
And the water outlet of the water storage tank is sequentially connected in parallel with the slag flushing ditch and at least 2 slag pools through the slag flushing main pipe.
And a water inlet of the reservoir is sequentially connected with at least 2 slag ponds in parallel through a blowback pipeline.
The slag flushing branch pipe connects the slag flushing main pipe with a back flushing pipeline.
The slag sluiceway is connected with at least 2 slag pools in sequence.
The overhead traveling crane is suspended over at least 2 slag ponds.
The slag flushing branch pipe is arranged, the slag flushing main pipe is connected with the back flushing pipeline by the slag flushing branch pipe, and the slag flushing branch pipe is started when a single pump device fails, so that the normal operation of a water flushing slag system is ensured, the loss caused by shutdown maintenance is avoided, the slag tank can be subjected to back flushing in time, the permeability of a filter material in the slag tank is improved, and the normal production of a blast furnace is ensured.
Preferably, at least 2 slag flushing pumps are uniformly distributed on the slag flushing main pipe, for example, 2, 3, 4 or 5 slag flushing pumps can be uniformly distributed on the slag flushing main pipe, but the slag flushing main pipe is not limited to the enumerated values, and other values in the numerical value range are also applicable.
Preferably, at least 2 upper tower pumps are uniformly distributed on the blowback pipeline, for example, 2, 3, 4 or 5 are possible, but not limited to the recited values, and other values not recited in the range of the recited values are also applicable.
Preferably, 3 slag flushing pumps are uniformly distributed on the slag flushing main pipe, and a first slag flushing pump, a second slag flushing pump and a third slag flushing pump are sequentially arranged in the slag flushing water flow direction.
Preferably, the connecting point of the flushing slag branch pipe and the flushing slag main pipe is arranged between the first flushing slag pump and the second flushing slag pump.
Preferably, a first valve is further arranged between the connection point of the flushing slag branch pipe and the flushing slag main pipe and the second flushing slag pump.
Preferably, the slag flushing branch pipe is also provided with a second valve.
In the utility model, the first slag flushing pump is a standby pump, when the second slag flushing pump and/or the third slag flushing pump fails, the first slag flushing pump is started, the first valve is closed, the second valve is started, slag flushing water in the water storage tank is conveyed to the slag pool through the slag flushing branch pipe, and slag discharged from the blast furnace is flushed; when the upper tower pump has faults, the first slag flushing pump, the second slag flushing pump, the third slag flushing pump, the first valve and the second valve are opened, slag discharged from the blast furnace is flushed, and the slag tank is subjected to back flushing, so that hardening of a slag tank filter material is prevented.
Preferably, the at least 2 slag flushing pumps are each independently a centrifugal pump or a vortex pump.
Preferably, the at least 2 upper tower pumps are each independently a centrifugal pump or a vortex pump.
Preferably, the first valve is a ball valve or a stop valve.
Preferably, the second valve is a ball valve or a stop valve.
The method for flushing the slag by using the device system comprises the steps of flushing the slag, grabbing the slag and back flushing in sequence.
Preferably, the slag flushing comprises the following specific processes: slag flushing water of the reservoir is conveyed to the slag flushing ditch and at least 2 slag pools through the slag flushing main pipe, and the slag discharged from the blast furnace is flushed.
Preferably, the slag grabbing specific process is as follows: and (4) sequentially grabbing the granulated slag in at least 2 slag pools by using a crown block.
Preferably, the specific process of the back flushing is as follows: and conveying the filtered slag flushing water in at least 2 slag pools to a reservoir through a back flushing pipeline, and then recycling.
Preferably, when the pump device on the main flushing slag pipe fails, the flushing slag branch pipe is started to flush the slag discharged from the blast furnace.
Preferably, when the pump device on the back flushing pipeline breaks down, the slag flushing branch pipe is started to carry out back flushing on the slag bath.
The system refers to an equipment system, or a production equipment.
Compared with the prior art, the utility model has the beneficial effects that:
the slag flushing branch pipe is arranged, the slag flushing main pipe is connected with the back flushing pipeline by the slag flushing branch pipe, and the slag flushing branch pipe is started when a single pump device fails, so that the normal operation of a water flushing slag system is ensured, the loss caused by shutdown maintenance is avoided, the slag tank can be subjected to back flushing in time, the permeability of a filter material in the slag tank is improved, and the normal production of a blast furnace is ensured.
Drawings
FIG. 1 is a schematic view of a blast furnace slag flushing device system provided in example 1;
FIG. 2 is a schematic view of a system of a blast furnace slag flushing device provided in example 2;
FIG. 3 is a schematic view of the blast furnace slag flushing device system provided in comparative example 1.
Wherein: 10-a water reservoir; 20-slag flushing main pipe; 30-flushing slag branch pipe; 40-a blowback pipeline; 50-slag flushing; 61-first slag pool; 62-second slag pool; 63-third slag pool; 71-a slag flushing pump; 72-second slag flushing pump; 73-third slag flushing pump; 81-first tower pump; 82-second upper column pump; 83-third upper tower pump; 91-valve number one; 92-valve number two.
Detailed Description
It is to be understood that in the description of the present invention, the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be taken as limiting the present invention.
It should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "disposed," "connected" and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The technical scheme of the utility model is further explained by the specific implementation mode in combination with the attached drawings.
Example 1
The embodiment provides a device system for flushing slag by using blast furnace water, as shown in fig. 1, the device system comprises a water reservoir 10, a main slag flushing pipe 20, a branch slag flushing pipe 30, a back flushing pipeline 40, a slag flushing ditch 50, a crown block (not shown in the figure) and 3 slag pools, namely a first slag pool 61, a second slag pool 62 and a third slag pool 63 in sequence; the water outlet of the water storage tank 10 is sequentially connected with the slag flushing ditch 50 and the 3 slag pools in parallel through the slag flushing main pipe 20; a water inlet of the water storage tank 10 is connected in parallel with the 3 slag pools in sequence through a blowback pipeline 40; the slag flushing branch pipe 30 connects the slag flushing main pipe 20 with a back flushing pipeline 40; the slag sluiceways 50 are sequentially connected with 3 slag pools; the overhead traveling crane is suspended over the 3 slag pools.
In this embodiment, 3 slag flushing pumps are uniformly distributed on the main slag flushing pipe 20, and the first slag flushing pump 71, the second slag flushing pump 72 and the third slag flushing pump 73 are sequentially arranged in the direction of slag flushing water flow; 3 upper tower pumps are uniformly distributed on the back flushing pipeline 40, and a first upper tower pump 81, a second upper tower pump 82 and a third upper tower pump 83 are sequentially arranged in the back flushing water flow direction; the connecting point of the flushing slag branch pipe 30 and the flushing slag main pipe 20 is arranged between the first flushing slag pump 71 and the second flushing slag pump 72; a first valve 91 is further arranged between the connection point of the flushing slag branch pipe 30 and the flushing slag main pipe 20 and the second flushing slag pump 72, and a second valve 92 is further arranged on the flushing slag branch pipe.
In this embodiment, 3 flushing cinder pumps are respectively independent centrifugal pumps, 3 upper tower pumps are respectively independent vortex pumps, and first valve 91 and second valve 92 are respectively independent stop valves.
Example 2
The embodiment provides a device system for flushing slag by using blast furnace water, as shown in fig. 2, the device system comprises a water reservoir 10, a main slag flushing pipe 20, a branch slag flushing pipe 30, a back flushing pipe 40, a slag flushing ditch 50, a crown block (not shown in the figure) and 2 slag pools, namely a first slag pool 61 and a second slag pool 62 in sequence; the water outlet of the water storage tank 10 is sequentially connected with the slag flushing ditch 50 and 2 slag pools in parallel through the slag flushing main pipe 20; a water inlet of the water storage tank 10 is connected in parallel with the 2 slag pools in sequence through a blowback pipeline 40; the slag flushing branch pipe 30 connects the slag flushing main pipe 20 with a back flushing pipeline 40; the slag sluiceway 50 is sequentially connected with 2 slag pools; the overhead traveling crane is suspended over the 2 slag pools.
In this embodiment, 2 slag flushing pumps are uniformly distributed on the slag flushing main pipe 20, and a first slag flushing pump 71 and a second slag flushing pump 72 are sequentially arranged in the direction of slag flushing water flow; 2 upper tower pumps are uniformly distributed on the back flushing pipeline 40, and are a first upper tower pump 81 and a second upper tower pump 82 in sequence according to the back flushing water flow direction; the connecting point of the flushing slag branch pipe 30 and the flushing slag main pipe 20 is arranged between the first flushing slag pump 71 and the second flushing slag pump 72; a first valve 91 is further arranged between the connection point of the flushing slag branch pipe 30 and the flushing slag main pipe 20 and the second flushing slag pump 72, and a second valve 92 is further arranged on the flushing slag branch pipe.
In this embodiment, the 2 slag flushing pumps are respectively and independently vortex pumps, the 2 upper tower pumps are respectively and independently centrifugal pumps, and the first valve 91 and the second valve 92 are respectively and independently ball valves.
Comparative example 1
The comparative example provides a device system for flushing slag by blast furnace water, and as shown in fig. 3, the device system comprises a water reservoir 10, a main slag flushing pipe 20, a back flushing pipeline 40, a slag flushing ditch 50, a crown block (not shown in the figure) and 3 slag pools, namely a first slag pool 61, a second slag pool 62 and a third slag pool 63 in sequence; the water outlet of the water storage tank 10 is sequentially connected with the slag flushing ditch 50 and the 3 slag pools in parallel through the slag flushing main pipe 20; a water inlet of the water storage tank 10 is connected in parallel with the 3 slag pools in sequence through a blowback pipeline 40; the slag sluiceways 50 are sequentially connected with 3 slag pools; the overhead traveling crane is suspended over the 3 slag pools.
In the comparative example, 3 slag flushing pumps are uniformly distributed on the slag flushing main pipe 20, and the slag flushing main pipe is provided with a first slag flushing pump 71, a second slag flushing pump 72 and a third slag flushing pump 73 in sequence according to the direction of slag flushing water flow; 3 tower feeding pumps are uniformly distributed on the blowback pipeline 40 and sequentially comprise a first tower feeding pump 81, a second tower feeding pump 82 and a third tower feeding pump 83 according to the blowback water flow direction.
In the comparative example, the 3 slag flushing pumps are respectively and independently centrifugal pumps, and the 3 upper tower pumps are respectively and independently vortex pumps.
Application example 1
The application example uses the device system provided by the embodiment 1 to carry out blast furnace slag flushing, and the specific method comprises the following steps:
(1) slag flushing: starting a second slag flushing pump 72 and a third slag flushing pump 73, conveying slag flushing water in the water storage tank 10 to the slag flushing ditch 50 and 3 slag pools through the main slag flushing pipe 20, and flushing blast furnace slag;
(2) slag grabbing: sequentially grabbing the granulated slag in the 3 slag pools by using a crown block;
(3) back flushing: and starting the first upper tower pump 81, the second upper tower pump 82 and the third upper tower pump 83, conveying the slag flushing water filtered in the 3 slag pools to the water reservoir 10 through the blowback pipeline 40, and then recycling.
The first slag flushing pump 71 is a standby pump, when the second slag flushing pump 72 or the third slag flushing pump 73 on the slag flushing main pipe 20 fails, the first slag flushing pump 71 is started, the first valve 91 is closed, the second valve 92 is opened, and slag flushing water in the water storage tank 10 is conveyed to 3 slag pools through the slag flushing branch pipes 30 to flush slag discharged from the blast furnace; when the first upper tower pump 81, the second upper tower pump 82 and the third upper tower pump 83 on the back flushing pipeline 40 all have faults, the first slag flushing pump 71, the second slag flushing pump 72, the third slag flushing pump 73, the first valve 91 and the second valve 92 are started, and back flushing is carried out on 3 slag ponds while flushing blast furnace slag, so that hardening of slag pond filter materials is prevented.
Application example 2
The device system provided by the application example 2 is applied to blast furnace slag flushing, and the specific method comprises the following steps:
(1) slag flushing: starting a second slag flushing pump 72, conveying slag flushing water in the water storage tank 10 to the slag flushing ditch 50 and 2 slag pools through the slag flushing main pipe 20, and flushing the slag discharged from the blast furnace;
(2) slag grabbing: sequentially grabbing the granulated slag in the 2 slag pools by using a crown block;
(3) back flushing: and (3) starting the first upper tower pump 81 and the second upper tower pump 82, conveying the slag flushing water filtered in the 2 slag pools to the water reservoir 10 through the blowback pipeline 40, and then recycling.
Wherein, the first slag flushing pump 71 is a standby pump, when the second slag flushing pump 72 on the slag flushing main pipe 20 breaks down, the first slag flushing pump 71 is started, the first valve 91 is closed, the second valve 92 is opened, the slag flushing water of the water storage tank 10 is conveyed to 2 slag pools through the slag flushing branch pipes 30, and the slag discharged from the blast furnace is flushed; when the first upper tower pump 81 and the second upper tower pump 82 on the back flushing pipeline 40 both break down, the first slag flushing pump 71, the second slag flushing pump 72, the first valve 91 and the second valve 92 are opened, so that back flushing is performed on 2 slag ponds while flushing the slag discharged from the blast furnace, and hardening of the slag pond filter material is prevented.
Comparative application example 1
The comparative application example uses the device system provided in comparative example 1 to carry out blast furnace slag flushing, and the specific method comprises the following steps:
(1) slag flushing: starting a second slag flushing pump 72 and a third slag flushing pump 73, conveying slag flushing water in the water storage tank 10 to the slag flushing ditch 50 and 3 slag pools through the main slag flushing pipe 20, and flushing blast furnace slag;
(2) slag grabbing: sequentially grabbing the granulated slag in the 3 slag pools by using a crown block;
(3) back flushing: and starting the first upper tower pump 81, the second upper tower pump 82 and the third upper tower pump 83, conveying the slag flushing water filtered in the 3 slag pools to the water reservoir 10 through the blowback pipeline 40, and then recycling.
Wherein, the first slag flushing pump 71 is a standby pump, and when the second slag flushing pump 72 or the third slag flushing pump 73 on the slag flushing main pipe 20 fails, the first slag flushing pump 71 is started to flush the slag discharged from the blast furnace; but when first tower pump 81, second tower pump 82 and third tower pump 83 on blowback pipeline 40 all broke down, this device system can't carry out the blowback to the slag bath, if long-time operation, the slag bath filter material will harden, and the water permeability worsens, can cause the pond to not seep water even when serious for the unable slag tapping of blast furnace, and then influence the normal production of blast furnace, need utilize manual work or mechanical clearance slag bath bottom board knot thing, and intensity of labour is big, and the danger coefficient is high.
Therefore, the slag flushing branch pipe is arranged, the slag flushing main pipe is connected with the back flushing pipeline by the slag flushing branch pipe, and the slag flushing branch pipe is started when a single pump device fails, so that the normal operation of a water slag flushing system is ensured, the loss caused by shutdown maintenance is avoided, the slag tank can be subjected to back flushing in time, the permeability of a slag tank filter material is improved, and the normal production of a blast furnace is ensured.
The applicant declares that the above description is only a specific embodiment of the present invention, but the scope of the present invention is not limited thereto, and it should be understood by those skilled in the art that any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are within the scope and disclosure of the present invention.

Claims (10)

1. A device system for flushing slag by blast furnace water is characterized by comprising a water storage tank, a main slag flushing pipe, branch slag flushing pipes, a back flushing pipeline, a slag flushing ditch, a crown block and at least 2 slag pools;
a water outlet of the reservoir is sequentially connected in parallel with the slag flushing ditch and at least 2 slag pools through a slag flushing main pipe;
a water inlet of the reservoir is sequentially connected in parallel with at least 2 slag pools through a blowback pipeline;
the slag flushing branch pipe connects the slag flushing main pipe with a back flushing pipeline;
the slag flushing ditch is sequentially connected with at least 2 slag pools;
the overhead traveling crane is suspended over at least 2 slag ponds.
2. The blast furnace water slag flushing device system as claimed in claim 1, wherein at least 2 slag flushing pumps are uniformly distributed on the main slag flushing pipe;
at least 2 upper tower pumps are uniformly distributed on the back flushing pipeline.
3. The blast furnace slag flushing device system with water as claimed in claim 2, wherein the main slag flushing pipe is evenly distributed with 3 slag flushing pumps, which are a first slag flushing pump, a second slag flushing pump and a third slag flushing pump in sequence according to the flow direction of slag flushing water.
4. The blast furnace water slag flushing device system as claimed in claim 3, wherein the connection point of the slag flushing branch pipe and the slag flushing main pipe is arranged between the first slag flushing pump and the second slag flushing pump.
5. The blast furnace slag flushing device system with water as claimed in claim 4, wherein a first valve is further arranged between the connection point of the slag flushing branch pipe and the slag flushing main pipe and the second slag flushing pump.
6. The device system for flushing slag with blast furnace water as claimed in claim 5, wherein a second valve is further arranged on the slag flushing branch pipe.
7. The blast furnace water slag flushing device system of claim 2, wherein the at least 2 slag flushing pumps are respectively and independently a centrifugal pump or a vortex pump.
8. The blast furnace water slag washing device system of claim 2, wherein the at least 2 upper tower pumps are each independently a centrifugal pump or a vortex pump.
9. The blast furnace slag flushing device system according to claim 5, wherein the first valve is a ball valve or a stop valve.
10. The blast furnace slag flushing device system according to claim 6, wherein the second valve is a ball valve or a stop valve.
CN202121672951.5U 2021-07-22 2021-07-22 Device system for flushing slag by blast furnace water Active CN215404317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121672951.5U CN215404317U (en) 2021-07-22 2021-07-22 Device system for flushing slag by blast furnace water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121672951.5U CN215404317U (en) 2021-07-22 2021-07-22 Device system for flushing slag by blast furnace water

Publications (1)

Publication Number Publication Date
CN215404317U true CN215404317U (en) 2022-01-04

Family

ID=79651670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121672951.5U Active CN215404317U (en) 2021-07-22 2021-07-22 Device system for flushing slag by blast furnace water

Country Status (1)

Country Link
CN (1) CN215404317U (en)

Similar Documents

Publication Publication Date Title
CN201648300U (en) Water seal decontamination cycle device of coke furnace raiser
CN207159250U (en) Filter blast furnace grain slag processing system in a kind of hydrocone type bottom
CN100352946C (en) Technique and equipment for processing blast furnace smelting slag
CN113416805A (en) Method and device system for flushing slag by blast furnace water
CN215404317U (en) Device system for flushing slag by blast furnace water
CN218759824U (en) Device for freely switching gas injection modes of drainage gas production gas lift
CN205894042U (en) Discharge system of slurry leakage water
CN108643130A (en) Water dam is blocked at a kind of water conservancy and hydropower station with silt separation function
CN216497669U (en) Combined slag treatment system
CN2900526Y (en) Water storage and supply device for wet quenching coke pump system
CN108014524A (en) A kind of thickener underflow conveying and examination and repair system
CN203429499U (en) Anti-blocking pulping waste water recycling system
CN207998834U (en) Water consolidates separate type ditch water process scupper arrangement
CN206897636U (en) Wet-esp component
CN207278588U (en) Water pump sundries cleaning device
CN206715447U (en) A kind of settlement of sewage filter plant
CN216892479U (en) Foundation pit dewatering and drainage treatment system
CN104478062B (en) A kind of spent acid treatment system and cleaning system thereof
CN103834818A (en) Oxygen adding system and method for reactor iron removing
CN203790708U (en) Filter pressing device of sewage treatment system
CN208897791U (en) Blanking tube is used in a kind of production of clinker regulator
CN215908873U (en) Outer drainage intercommunication system of tower pond circulating water
CN215594287U (en) Circulating water blowdown reinjection device of thermal power plant
CN212610733U (en) Blast furnace sewage recycling system
CN215157576U (en) Outlet anti-blocking device for water glass storage tank in white carbon black production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant