CN215367663U - Inspection well for municipal administration runner band formula plastics drainage - Google Patents

Inspection well for municipal administration runner band formula plastics drainage Download PDF

Info

Publication number
CN215367663U
CN215367663U CN202120497481.7U CN202120497481U CN215367663U CN 215367663 U CN215367663 U CN 215367663U CN 202120497481 U CN202120497481 U CN 202120497481U CN 215367663 U CN215367663 U CN 215367663U
Authority
CN
China
Prior art keywords
shaft
well
pipe
hollow
municipal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120497481.7U
Other languages
Chinese (zh)
Inventor
胡正根
晏田古
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Huifeng Pipe Industry Co ltd
Original Assignee
Jiangxi Huifeng Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Huifeng Pipe Industry Co ltd filed Critical Jiangxi Huifeng Pipe Industry Co ltd
Priority to CN202120497481.7U priority Critical patent/CN215367663U/en
Application granted granted Critical
Publication of CN215367663U publication Critical patent/CN215367663U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a municipal runner type inspection well for plastic drainage, which belongs to the field of inspection wells and comprises a shaft and a bottom plate, wherein the bottom end of the shaft is provided with a solid wall, a wall part between the bottom end and a port is provided with a hollow cavity, and a plurality of small reinforcing pipes are arranged in the hollow cavity; in addition, the reinforcing small pipe is arranged in the hollow cavity, the strength of the shaft can be effectively enhanced, the hollow shape also has the advantages of reducing raw materials and reducing cost, and meanwhile, the PE hollow bidirectional socket joint is adopted to be combined with the flexible connection of the sealing ring, so that the construction is more convenient and faster, and the sealing property is also greatly improved.

Description

Inspection well for municipal administration runner band formula plastics drainage
Technical Field
The utility model relates to an inspection well, in particular to a municipal runner type inspection well for plastic drainage.
Background
The construction of municipal infrastructure is an image project of a city, and the construction of municipal infrastructure is increasingly important in the development of the city as a carrier of a modern city, and can reflect the modern development level of the city.
Wherein the inspection shaft plays essential effect in municipal drainage, it generally establishes at drainage pipe intersection, the turn, pipe diameter or slope change department, drop department etc. in order to facilitate regular inspection, the plastics of inspection usefulness of cleaning and mediation or operation of going into the well are integrative moulds plastics, the rotational moulding forms or the well form structure that the brick was built, but the inspection shaft of traditional brick mode of building is unfavorable for dismantling the installation, mould plastics, the interface part of rotational moulding is hollow, be unfavorable for with other pipeline between be connected, riveting empty phenomenon appears easily, intensity is also unsatisfactory relatively.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve at least one technical problem in the prior art and provides a municipal runner type plastic drainage inspection well.
The technical solution of the utility model is as follows:
the utility model provides a municipal administration flowing groove formula inspection shaft for plastics drainage which characterized in that: the device comprises a well body, wherein a hollow cavity is arranged on the wall of the well body, and a plurality of small reinforcing pipes are arranged in the hollow cavity.
As a preferable scheme of the utility model, the well body comprises a shaft and a bottom plate, and a ladder stand is arranged in the shaft.
As a preferable scheme of the utility model, the ladder stands are arranged in the shaft in a staggered mode.
In a preferred embodiment of the present invention, the shaft is provided with a second pipe, and the second pipe located inside the shaft is provided with a flow groove to communicate with the shaft.
In a preferred embodiment of the present invention, the second pipe body is connected to the shaft by hot melting using the same material as the shaft.
As a preferred embodiment of the present invention, the wellbore is made using a spooling process.
As a preferable aspect of the present invention, a PE hollow bidirectional female joint for elongating the second pipe body is further included.
As the preferable scheme of the utility model, the pipe joint further comprises a sealing ring positioned between the PE hollow bidirectional socket joint and the second pipe body, and the sealing ring is provided with anti-stripping teeth.
The utility model has at least one of the following beneficial effects:
according to the inspection well for municipal runner type plastic drainage, the solid walls are arranged at the two ends of the shaft with the hollow cavity, so that the inspection well is convenient to process, the problem of unstable installation performance caused by the fact that the connection is not firm (rivet empty) when the bottom plate is connected with the shaft through bolts is solved, and meanwhile, the problem of poor sealing performance caused by the fact that the hollow cavity is exposed when the inspection well is connected with the shaft or is in sealing processing is solved; in addition, the reinforcing small pipe is arranged in the hollow cavity, so that the strength of the shaft can be effectively enhanced, and the hollow shape also has the advantages of reducing raw materials and reducing cost.
Drawings
FIG. 1 is a schematic structural view of a preferred embodiment of the present invention;
FIG. 2 is a schematic top view of FIG. 1;
FIG. 3 is a front cross-sectional view of FIG. 1;
FIG. 4 is a schematic diagram of another application scenario;
FIG. 5 is a schematic view of the internal structure of the wellbore wall;
FIG. 6 is a schematic view of the second tube extension;
FIG. 7 is a schematic diagram of the structure of different application scenarios;
FIG. 8 is a schematic top view of FIG. 7;
FIG. 9 is a schematic diagram of an inspection well with a chute;
FIG. 10 is a top view of FIG. 9;
in the figure, 100-shaft, 101-solid wall, 102-reinforcing small pipe, 200-second pipe body, 201-launder, 300-ladder, 400-bottom plate, 500-PE hollow bidirectional socket joint and 600-sealing ring.
Detailed Description
Reference will now be made in detail to the present preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to like elements throughout.
In the description of the present invention, it should be understood that the orientation or positional relationship referred to in the description of the orientation, such as the upper, lower, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, the meaning of a plurality of means is one or more, the meaning of a plurality of means is two or more, and larger, smaller, larger, etc. are understood as excluding the number, and larger, smaller, inner, etc. are understood as including the number. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless otherwise explicitly limited, terms such as arrangement, installation, connection and the like should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above terms in the present invention in combination with the specific contents of the technical solutions.
Referring to fig. 1 to 6, a preferred embodiment of the present invention:
the inspection well comprises a well body, wherein the wall of the well body is provided with a hollow cavity, a plurality of small reinforcing pipes 102 are arranged in the hollow cavity, specifically, the well body comprises a well shaft 100 and a well base 400, solid walls 101 are arranged at two ports of the well shaft 100, the wall between the ports is provided with a hollow cavity, and a plurality of small reinforcing pipes 102 are arranged in the hollow cavity.
According to the inspection well for municipal runner type plastic drainage, the solid walls 101 are arranged at the two ends of the shaft 100 with the hollow cavity, so that the inspection well is convenient to process, the problem that the connection is not firm when the bottom plate 400 is connected with the shaft 100 by adopting a bolt is solved, the instable installation performance is caused, and meanwhile, the problem that the sealing performance is poor due to the hollow exposure phenomenon during the connection or sealing processing of the shaft 100 is solved; meanwhile, the reinforcing small pipe 102 is arranged in the hollow cavity, so that the strength of the shaft can be effectively enhanced, and the hollow shape also has the advantages of reducing raw materials and reducing cost.
As a preferred embodiment of the present invention, it may also have the following additional technical features:
be provided with cat ladder 300 in the pit shaft 100, make things convenient for the maintainer to scramble, more specifically, cat ladder 300 crisscross the setting is in the pit shaft 100, more do benefit to the maintainer and watch the maintenance from top to bottom.
The shaft 100 is provided with a second pipe 200, and the second pipe 200 inside the shaft 100 is provided with a flow groove 201 to communicate with the shaft 100.
The second pipe body 200 and the shaft 100 are connected through hot melting by adopting the same material as the shaft, so that the sealing performance is improved.
The wellbore 100 is made using a winding process, but is not limited thereto, for example, in some applications, the wellbore 100 may use MUHDPE wound structural wall a-tubes that perform the group standard T/GDC 29-2019; HDPE winding structure wall A type pipe implements national standard GB/T19472.2-2017. Hereinafter referred to as MUHDPE pipe and HDPE pipe. The rigidity of the MUHDPE pipe ring can reach 20KN/m2The rigidity of HDPE pipe ring is generally 6KN/m2. The requirement of the impact property of the MUHDPE pipe is higher than that of the HDPE pipe, the impact height smaller than DN500 is 1000mm, the impact height larger than or equal to DN500 is 2000mm, and the mass of the impact hammer is uniformly 5 KG. The requirement of the ring flexibility of the MUHDPE pipe is higher than that of the HDPE pipe, the deformation amount of the flexible outer diameter of the HDPE pipe ring is 30%, and the deformation amount of the flexible outer diameter of the MUHDPE pipe ring is 40%. One more technical parameter of MUHDPE pipes is the recovery rate. The outer diameter of the pipe is deformed by 30 percent and unloaded, and can be recovered by 95 percent or more after 2 hours. Therefore, more preferably, MUHDPE pipe is used.
The height of the solid wall 101 is 3-20cm, but is not limited thereto, and the height of the solid wall may be selected according to the specific implementation.
Also included is a bottom plate 400 that is bolted to the solid wall of the wellbore 100, which arrangement improves safety during normal use.
In some applications, referring to fig. 4, the inner wall of the shaft 100 has a thickness of 5mm, the outer wall is less than or equal to 5mm, both ends are solid walls, and the shaft should be cut flat, and the outer diameter of the inlet and outlet water should be the same as that of the mating pipe.
In still other embodiments, referring to fig. 7-8, the shaft 100 is made of solid walls 101 at both ends, the two ends are cut flat, the bottom plate 400 and the second tube 200 are screwed and the screw caps are covered with plastic, so that they are not exposed. The bottom plate 400 and the second pipe 200 are welded firmly, smoothly and smoothly without leakage. Wellbore 100 employs PP tubing stiffeners. Other requirements are detailed in the standard CJ/T326-2010, the second tube is detailed in the standard GB/T19472.2-2017, and in FIGS. 9-10, the second tube 200 located inside the shaft 100 is provided with a flow groove 201 for communicating with the shaft 100.
Specifically, because the connection mode of the winding structure wall A-shaped pipe in the current market mostly adopts flaring, heat shrinkage sleeve, stainless steel clamping ring, hot melting joint and the like for connection, the water leakage phenomenon exists in all the pipes, and the connection is not reliable. (1) The flaring connection needs to perform secondary heating on the pipe and then expand from inside to outside to form a pipe bell mouth, the flaring process is the process of pipe deformation, the structure of the bell mouth is damaged, the inner surface of the bell mouth is rough and not smooth, in addition, the inclination of the flaring is large, water leakage can occur when the bell mouth is loosened a little, in addition, the precision cannot be achieved in installation on a construction site, and most of the installed pipe is leaked. (2) The installation process of the heat shrinkable sleeve needs to be baked by fire, so that the heat shrinkable sleeve is not safe, has technical difficulty and operation difficulty, is easy to be heated unevenly and not firmly attached, and has the defects of high water discharge or rupture when the ground surface is settled because only one thin layer is arranged. (3) The stainless steel clamping turn connection is unreliable, and water leakage is very serious. (4) the hot-melt joint is connected, namely the joint and the pipe body are connected for the second time, so that the connection is not firm, and even if the joint and the pipe body are protected by a heat shrinkable sleeve, the problems of falling, cracking and the like exist; therefore, when the inspection well is specifically installed and connected, the extension mode of the second pipe body adopts the PE hollow bidirectional socket joint connector 500 for connection, a sealing ring 600 is further arranged between the connector and the second pipe body 200, the sealing ring 600 is further provided with anti-disengagement teeth, the sealing performance is improved, the PE double-layer bidirectional socket air pressure type elastic sealing connection belongs to a flexible connection mode, in addition, when the outer wall of the connector deforms under pressure, the hollow part of the connector generates reverse air pressure to act on the inner wall of the connector, the inner wall is enabled to be more tightly attached to the pipe and the sealing ring, and the sealing effect is better. Meanwhile, the connecting extensibility is good, and the sealing performance is good under the conditions of earthquake resistance, ground settlement, expansion with heat and contraction with cold and the like. The PE hollow bidirectional socket joint 500 is flexibly connected with the L-shaped multi-peak sealing ring 600, so that the characteristics of sealing performance and flexibility can be fully exerted, and the PE hollow bidirectional socket joint is suitable for geological changes. In the area with unstable geology, the connection mode has strong shock resistance by buried laying under the action of frequent heavy load. The connection mode is really convenient and fast to construct, and when underground water is in existence and difficult to drain, areas easy to collapse and long-term excavation can affect the safety of traffic, buildings and personnel, the PE hollow bidirectional socket joint 500 is adopted for connection, so that the purposes of excavating, coating pipes and backfilling can be achieved.
The above additional technical features can be freely combined and used in superposition by those skilled in the art without conflict.
The above description is only a preferred embodiment of the present invention, and the technical solutions that achieve the objects of the present invention by basically the same means are all within the protection scope of the present invention.

Claims (4)

1. The utility model provides a municipal administration flowing groove formula inspection shaft for plastics drainage which characterized in that: the reinforced cement well comprises a well body, wherein the wall of the well body is provided with a hollow cavity, a plurality of small reinforcing pipes (102) are arranged in the hollow cavity, the well body comprises a well shaft (100) and a bottom plate (400), two ends of the well shaft (100) are made into solid walls (101), and the bottom plate (400) is connected with the solid walls of the well shaft (100) through bolts.
2. The inspection well for municipal runner type plastic drainage according to claim 1, wherein: the shaft (100) is provided with a second pipe body (200), and the second pipe body (200) positioned in the shaft (100) is provided with a flow groove (201) to be communicated with the shaft (100).
3. The inspection well for municipal runner type plastic drainage according to claim 2, wherein: the second pipe body (200) and the shaft (100) are connected in a hot melting mode by adopting the same material as the shaft (100).
4. The inspection well for municipal runner type plastic drainage according to claim 1, wherein: also included is a PE hollow bi-directional socket joint (500) for lengthening the second pipe body (200).
CN202120497481.7U 2021-03-09 2021-03-09 Inspection well for municipal administration runner band formula plastics drainage Active CN215367663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120497481.7U CN215367663U (en) 2021-03-09 2021-03-09 Inspection well for municipal administration runner band formula plastics drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120497481.7U CN215367663U (en) 2021-03-09 2021-03-09 Inspection well for municipal administration runner band formula plastics drainage

Publications (1)

Publication Number Publication Date
CN215367663U true CN215367663U (en) 2021-12-31

Family

ID=79623978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120497481.7U Active CN215367663U (en) 2021-03-09 2021-03-09 Inspection well for municipal administration runner band formula plastics drainage

Country Status (1)

Country Link
CN (1) CN215367663U (en)

Similar Documents

Publication Publication Date Title
CN204343330U (en) A kind of plastic drain-pipe and manhole sealing and connecting device
CN215367663U (en) Inspection well for municipal administration runner band formula plastics drainage
CN112555522A (en) Steel socket composite reinforced concrete lining glass fiber reinforced plastic drain pipe and preparation method thereof
CN211622280U (en) Inclined hole type grouting sleeve for connecting steel bars
CN208136954U (en) Precast splice type Pipe rack
CN205224232U (en) Sewage pipeline connecting pipe
CN205101771U (en) Be used for prosthetic attach fitting of FRP pipe on -line interlude
CN205938218U (en) Compound pipe lining structure of fibre reinforced plastic concrete
CN205479791U (en) Enhancement mode HDPE double -walled bellows
CN210888942U (en) Earth pressure balance shield constructs quick-witted sediment water system
CN210341889U (en) Prefabricated energy pile heat exchange tube joint
CN215721329U (en) Interim plugging device of sleeve pipe
CN218152861U (en) Self-anchoring type nodular cast iron pipe
CN207247602U (en) A kind of U-shaped heat exchange structure of mid-deep strata geothermal energy
CN218493119U (en) Be used for pre-buried sleeve pipe of underground side wall
CN207919734U (en) A kind of concrete filled steel tube transition section structure
CN215759116U (en) Plugging structure of precipitation well pipe
CN213268227U (en) Inspection well grouting system
CN201129585Y (en) Bidirectional socket pipe parts
CN216715551U (en) Modified high-density polyethylene double-wall corrugated pipe for underground burying
CN108915158A (en) A kind of Separated type combination grout sleeve and connection method
CN219796479U (en) Flexible joint reinforced concrete drain pipe
CN218787367U (en) Anti device that subsides of pipeline of going out to house
CN216479418U (en) High-temperature-resistant plastic pipe
CN209099639U (en) A kind of Separated type combination grout sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant