CN215367396U - Bury frame in prefabrication - Google Patents
Bury frame in prefabrication Download PDFInfo
- Publication number
- CN215367396U CN215367396U CN202120546781.XU CN202120546781U CN215367396U CN 215367396 U CN215367396 U CN 215367396U CN 202120546781 U CN202120546781 U CN 202120546781U CN 215367396 U CN215367396 U CN 215367396U
- Authority
- CN
- China
- Prior art keywords
- frame
- wallboard
- lifting
- short
- power device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a bury frame prefabrication, wherein: comprises two frame long wall boards, two frame short wall boards, two frame bottom boards, a lifting fixed frame, a lifting movable frame, a mounting plate and a power device, wherein the frame long wall boards, the frame short wall boards and the frame bottom boards are encircled to form a cuboid box body with an opening on the upper surface, the height of the rectangular box body is adapted to the depth of a foundation pit installed in an underground station, the inner sides of the two frame short wall boards are symmetrically provided with lifting fixed frames, the lifting fixed frames are provided with vertical slide rails, the lifting movable frames are provided with idler wheels, the idler wheels are clamped into the slide rails and can slide up and down in the slide rails, thereby drive the lift adjustable shelf to reciprocate, the mounting panel is fixed on the lift adjustable shelf, power device fixed mounting is on the lift fixed shelf, power device's power shaft and lift adjustable shelf hinged joint, power device can promote the lift adjustable shelf through the power shaft and reciprocate.
Description
Technical Field
The utility model relates to the technical field of underground stations, in particular to a prefabricated underground frame.
Background
In the buried garbage station construction process, a foundation pit with a preset size needs to be dug in a target area, and then structures such as a bottom plate, a side plate and a lifting frame are laid in the foundation pit in sequence, so that the field installation is time-consuming, and various accidents can occur to be treated. If the frame structure of the buried garbage station can be integrally prefabricated, the time can be effectively saved.
SUMMERY OF THE UTILITY MODEL
The object of the present invention is to solve the problems mentioned in the background art by providing a prefabricated underground frame.
In order to achieve the technical purpose, the technical scheme adopted by the utility model is as follows:
a prefabricated inground frame wherein: the lifting movable frame comprises a frame long wallboard, a frame short wallboard, a frame bottom plate, a lifting fixed frame, a lifting movable frame, a mounting plate and a power device, wherein the number of the frame long wallboard is two, the number of the frame short wallboard is two, the frame long wallboard, the frame short wallboard and the frame bottom plate surround to form a cuboid box body with an opening on the upper surface, the height of the cuboid box body is matched with the depth of a foundation pit installed in a buried station, the lifting fixed frame is symmetrically installed on the inner sides of the two frame short wallboards, a vertical sliding rail is arranged on the lifting fixed frame, a roller is installed on the lifting movable frame, the roller is clamped into the sliding rail and can slide up and down in the sliding rail, so that the lifting movable frame is driven to move up and down, the mounting plate is fixed on the lifting movable frame, the power device is fixedly installed on the lifting fixed frame, a power shaft of the power device is hinged with the lifting movable frame, and the power device can push the lifting movable frame to move up and down through the power shaft, when burying the rubbish station and placing in the cuboid box, the mounting panel can bury the detachable fixed connection of rubbish station with ground, and the outside of the long wallboard of frame and the short wallboard of frame is provided with the pinhole that is used for burying a long wallboard of frame and the short wallboard of frame and ground installation foundation ditch lateral wall fixed connection.
In order to optimize the technical scheme, the specific measures adopted further comprise:
the lifting movable frame is provided with a reinforced inclined strut for improving the connection stability of the lifting movable frame.
The frame long wallboard, the frame short wallboard and the frame bottom plate are all made of steel materials.
The outer surfaces of the long frame wallboard, the short frame wallboard and the frame bottom plate are coated with antirust paint layers.
The power device is an oil cylinder.
The lifting fixed frame, the lifting movable frame and the mounting plate are all made of steel materials.
The inner side surface of the mounting plate is provided with a hanging protrusion, one side or two sides of the underground garbage station are provided with hanging rings which can be matched with the hanging protrusion, and the hanging rings are hung on the hanging protrusion, so that the underground garbage station and the mounting plate are positioned.
The utility model discloses a prefabricated underground frame, which is an underground frame structure not assembled on a construction site, and mainly comprises two long frame wallboards, two short frame wallboards and a frame bottom board, wherein a lifting fixed frame, a lifting movable frame, an installation plate and a power device are arranged on the short frame wallboards, after the integral prefabrication is completed, the prefabricated underground frame is only required to be transported to a foundation pit of an underground station, then the underground frame structure is hung in the foundation pit, expansion bolts are inserted into pin holes of the long frame wallboards and the short frame wallboards, and the underground frame structure is fixed in the foundation pit through the expansion bolts. By prefabricating the underground frame, the construction period of the underground garbage station can be effectively shortened, and uncertain factors in the construction process are reduced.
Drawings
Fig. 1 is a schematic structural view of the present invention.
The label names in the figure: the device comprises a frame long wall plate 1, a frame short wall plate 2, a frame bottom plate 3, a lifting fixed frame 4, a sliding rail 41, a lifting movable frame 5, a roller 51, a mounting plate 6, a hanging projection 61 and a power device 7.
Detailed Description
Embodiments of the present invention are described in further detail below with reference to the accompanying drawings.
A prefabricated inground frame of this embodiment wherein: the underground station foundation pit lifting device comprises a frame long wall plate 1, frame short wall plates 2, a frame bottom plate 3, lifting fixed frames 4, lifting movable frames 5, a mounting plate 6 and a power device 7, wherein the number of the frame long wall plates 1 is two, the number of the frame short wall plates 2 is two, the frame long wall plates 1, the frame short wall plates 2 and the frame bottom plate 3 surround to form a cuboid box body with an opening on the upper surface, the height of the cuboid box body is matched with the depth of a ground station mounting foundation pit, the lifting fixed frames 4 are symmetrically arranged on the inner sides of the two frame short wall plates 2, vertical slide rails 41 are arranged on the lifting fixed frames 4, rollers 51 are arranged on the lifting movable frames 5, the rollers 51 are clamped into the slide rails 41 and can slide up and down in the slide rails 41, so that the lifting movable frames 5 are driven to move up and down, the mounting plate 6 is fixed on the lifting movable frames 5, the power device 7 is fixedly arranged on the lifting fixed frames 4, the power shaft of power device 7 is connected with 5 articulations of lift adjustable shelf, and power device 7 can promote lift adjustable shelf 5 through the power shaft and reciprocate, and when burying the rubbish station and placing in the cuboid box, mounting panel 6 can with bury the detachable fixed connection of rubbish station, and the outside of the long wallboard of frame 1 and the short wallboard of frame 2 is provided with and is used for burying the pinhole of a station installation foundation ditch lateral wall fixed connection with frame 1 and the short wallboard of frame 2 with ground.
In the embodiment, the lifting movable frame 5 is provided with a reinforced inclined strut for improving the connection stability of the lifting movable frame.
In the embodiment, the frame long wall plate 1, the frame short wall plate 2 and the frame bottom plate 3 are all made of steel materials.
In the embodiment, the outer surfaces of the frame long wall board 1, the frame short wall board 2 and the frame bottom board 3 are coated with antirust paint layers.
In the embodiment, the power device 7 is a cylinder.
In the embodiment, the lifting fixed frame 4, the lifting movable frame 5 and the mounting plate 6 are all made of steel materials.
In the embodiment, the inner side surface of the mounting plate 6 is provided with a hanging protrusion 61, one side or two sides of the underground garbage station are provided with hanging rings which can be matched with the hanging protrusion 61, and the hanging rings are hung on the hanging protrusion 61, so that the underground garbage station and the mounting plate 6 are positioned.
The prefabricated underground frame is characterized in that structures such as a long frame wallboard 1, a short frame wallboard 2, a frame bottom plate 3, a lifting fixed frame 4 and a lifting movable frame 5 are prefabricated during manufacturing, then the long frame wallboard 1, the short frame wallboard 2, the frame bottom plate 3 and the lifting fixed frame 4 are fixed in a welding mode, a roller 51 of the lifting movable frame 5 is clamped into a sliding rail 41, a hydraulic cylinder is hinged to the lifting fixed frame 4, and after the thrust of an experimental hydraulic cylinder is normal, the prefabricated underground frame is integrally installed. The structure shown in fig. 1 is a schematic view of a prefabricated buried frame with one long wall panel 1 and one short wall panel 2 of the frame omitted.
When the prefabricated underground frame is installed in a foundation pit, the prefabricated underground frame is transported to the side of the foundation pit through a transport vehicle, then the prefabricated underground frame is hoisted to the foundation pit through a crane, a worker fixes the prefabricated underground frame and the side wall of the foundation pit through expansion bolts, and then a hydraulic cylinder is connected with a hydraulic system and an intelligent control system to complete installation.
The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above-mentioned embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the utility model may be made by those skilled in the art without departing from the principle of the utility model.
Claims (7)
1. A prefabricated underground frame is characterized in that: comprises a long frame wallboard (1), a short frame wallboard (2), a frame bottom plate (3), a lifting fixing frame (4), a lifting movable frame (5), a mounting plate (6) and a power device (7), wherein the number of the long frame wallboard (1) is two, the number of the short frame wallboard (2) is two, the long frame wallboard (1), the short frame wallboard (2) and the frame bottom plate (3) surround to form a cuboid box body with an opening on the upper surface, the height of the cuboid box body is adapted to the depth of a ground burying station mounting foundation pit, the lifting fixing frame (4) is symmetrically mounted on the inner sides of the short frame wallboards (2), vertical sliding rails (41) are arranged on the lifting fixing frame (4), rollers (51) are mounted on the lifting movable frame (5), and the rollers (51) are clamped into the sliding rails (41), and can slide from top to bottom in slide rail (41) to drive lift adjustable shelf (5) and reciprocate, mounting panel (6) fix on lift adjustable shelf (5), power device (7) fixed mounting on lift mount (4), the power shaft and the lift adjustable shelf (5) of power device (7) are articulated to be connected, power device (7) can promote lift adjustable shelf (5) through the power shaft and reciprocate, when burying the rubbish station and placing in the cuboid box, mounting panel (6) can bury the detachable fixed connection in rubbish station with ground, the outside of long wallboard of frame (1) and the short wallboard of frame (2) be provided with and be used for burying the pinhole of station installation foundation ditch lateral wall fixed connection with ground with long wallboard of frame (1) and the short wallboard of frame (2).
2. A prefabricated inground frame as claimed in claim 1, wherein: the lifting movable frame (5) is provided with a reinforced inclined strut for improving the connection stability of the lifting movable frame.
3. A prefabricated inground frame as claimed in claim 2, wherein: the long frame wallboard (1), the short frame wallboard (2) and the frame bottom plate (3) are all made of steel materials.
4. A prefabricated inground frame as claimed in claim 3, wherein: the outer surfaces of the long frame wallboard (1), the short frame wallboard (2) and the frame bottom plate (3) are coated with antirust paint layers.
5. A prefabricated inground frame as claimed in claim 4, wherein: the power device (7) is an oil cylinder.
6. A prefabricated inground frame as claimed in claim 5, wherein: the lifting fixed frame (4), the lifting movable frame (5) and the mounting plate (6) are all made of steel materials.
7. A prefabricated inground frame as claimed in claim 1, wherein: mounting panel (6) medial surface on be provided with and hang protruding (61), ground bury rubbish station one side or both sides be provided with can with hang protruding (61) complex link, the link hang on hanging protruding (61), realize burying the location of rubbish station and mounting panel (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120546781.XU CN215367396U (en) | 2021-03-17 | 2021-03-17 | Bury frame in prefabrication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120546781.XU CN215367396U (en) | 2021-03-17 | 2021-03-17 | Bury frame in prefabrication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215367396U true CN215367396U (en) | 2021-12-31 |
Family
ID=79624559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120546781.XU Active CN215367396U (en) | 2021-03-17 | 2021-03-17 | Bury frame in prefabrication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215367396U (en) |
-
2021
- 2021-03-17 CN CN202120546781.XU patent/CN215367396U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107777262B (en) | High-rise building multidimensional material conveying system and installation method thereof | |
CN105401582A (en) | Hanging type unearthing device for bidirectional synchronous reversed construction and construction method | |
CN103628883B (en) | Dark narrow vertical shaft moves without support overlength reinforcing bar binding the method that mould builds | |
CN111139868B (en) | Complete construction method for comprehensive pipe gallery | |
CN202220327U (en) | Moving pulley of side web plate of full space support cast-in-place box beam | |
CN111395395A (en) | Installation process of subway deep foundation pit cover excavation lower supporting system | |
CN215367396U (en) | Bury frame in prefabrication | |
EP4350074A1 (en) | Prefabricated track structure for built-in pump house section in rail transportation and construction method | |
CN209835463U (en) | Prefabricated bridge deck hoisting equipment | |
CN210737607U (en) | A hang braced system for reverse construction method beam slab construction | |
CN211141349U (en) | Track panel well gantry crane foundation fixing structure | |
CN110127520B (en) | Method for installing small-lattice funnel and dust-settling pipe of large sintering machine | |
CN213356779U (en) | Overweight steel column translation transportation installation device | |
CN110761807A (en) | Assembling system and assembling method for prefabricated assembled jacking pipe | |
CN210366711U (en) | Subway station steel bearing structure mounting and dismounting device | |
CN210763974U (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN210682999U (en) | Hoisting and transferring device | |
CN214738249U (en) | Prefabricated piping lane sliding device of adjustable hoisting point of multi-angle | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN106149732B (en) | A kind of deep basal pit faces side large scale hoisting machinery construction method for hanging | |
CN103821110A (en) | Box culvert inner form steel form trolley | |
CN210086301U (en) | Full-composite assembly type subway station prefabricated part mechanized transportation system | |
CN110606435A (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN105735349A (en) | Cast-in-situ bored pile and cast-in-situ subway station integrated construction method | |
CN216475031U (en) | Open cut foundation pit comprehensive operation platform with adjustable span |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |