CN215364477U - Material hoisting device - Google Patents

Material hoisting device Download PDF

Info

Publication number
CN215364477U
CN215364477U CN202120779046.3U CN202120779046U CN215364477U CN 215364477 U CN215364477 U CN 215364477U CN 202120779046 U CN202120779046 U CN 202120779046U CN 215364477 U CN215364477 U CN 215364477U
Authority
CN
China
Prior art keywords
fixed
lifting
wedge
hoisting
hanging scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120779046.3U
Other languages
Chinese (zh)
Inventor
郑伯强
邵永平
闫古龙
王延超
岳康
王昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN202120779046.3U priority Critical patent/CN215364477U/en
Application granted granted Critical
Publication of CN215364477U publication Critical patent/CN215364477U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a material hoisting device, which comprises a fixed hanging scaffold for limiting and fixing hoisted materials and a hanging bucket for placing the hoisted materials; the fixed hanging scaffold is connected with a hoisting device; the fixed hanging scaffold is connected with the hanging bucket through a hanging rope; the device can realize placing the material upright in the device under the limited condition of conveying space, ensures that the material has no safety risks such as scattering, falling from high altitude, instability and the like in the hoisting and conveying process, improves the hoisting and conveying efficiency of the material, and facilitates the site construction operation.

Description

Material hoisting device
Technical Field
The application belongs to the technical field of civil engineering, concretely relates to material hangs and send device.
Background
In the shaft construction, because of the space limitations of the sealing plate, the hanging scaffold and the like, when the length of the materials such as the semi-finished product of the steel bar, the steel pipe and the like is long, the materials cannot be transversely dropped into the shaft, and the materials such as the semi-finished product of the steel bar, the steel pipe and the like are generally required to be vertically dropped, so that the safety risks of material scattering, high-altitude dropping and instability are high in the operation process. If a method of reducing the hoisting number is adopted, the operation efficiency is lower.
Disclosure of Invention
The utility model aims to provide a material hoisting device, which solves the defects in the prior art.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides a material hoisting device, which comprises a fixed hanging scaffold for limiting and fixing hoisted materials and a hanging bucket for placing the hoisted materials;
the fixed hanging scaffold is connected with a hoisting device;
the fixed hanging scaffold is connected with the hanging bucket through a hanging rope.
Preferably, the fixed hanging scaffold is of a sleeve locking structure.
Preferably, the fixed hanging scaffold comprises a first fixed hanging scaffold body and a second fixed hanging scaffold body, wherein the first fixed hanging scaffold body and the second fixed hanging scaffold body are semi-elliptical components; the first fixed hanging scaffold body and the second fixed hanging scaffold body are in butt joint connection; end lifting holes used for being connected with a lifting device are formed in the end parts of the two ends of the first fixed hanging scaffold body and the second fixed hanging scaffold body; and the middle parts of the first fixed hanging scaffold body and the second fixed hanging scaffold body are provided with middle hanging holes connected with the hanging ropes.
Preferably, the two ends of the first fixed hanging scaffold body are both provided with sleeve lock holes; both ends of the second fixed hanging scaffold body are provided with shaft diameter structures, and the shaft diameter structures are installed in the sleeve lock holes in a matched mode as sleeve lock rods.
Preferably, the lifting rope comprises two lifting rope bodies, and one ends of the two lifting rope bodies are respectively connected with two middle lifting holes formed in the fixed hanging scaffold; the other ends of the two lifting rope bodies are fixed on the bucket.
Preferably, the lifting rope body comprises a D-shaped shackle, a steel wire rope and a wedge-shaped connecting piece, wherein one end of the D-shaped shackle is installed in the middle lifting hole in a matched mode; the other end of the D-shaped shackle is connected with a steel wire rope; the free end of the steel wire rope is fixed on the wedge-shaped connecting piece, and the wedge-shaped connecting piece is connected with the bucket.
Preferably, a lantern ring is arranged between the steel wire rope and the D-shaped shackle.
Preferably, the wedge-shaped connecting piece comprises a wedge-shaped sleeve and a wedge core, wherein the top of the wedge-shaped sleeve is provided with an inverted conical flat hole; the wedge core is sleeved in the inverted conical flat hole in a matching manner; the wedge core is connected with the steel wire rope in a sleeved mode; and hoisting holes are formed in the bottoms of the wedge-shaped sleeves and are connected with the lifting lugs on the lifting bucket.
Preferably, the bucket comprises a barrel body and two lifting lugs, wherein the two lifting lugs are symmetrically arranged at the top of the barrel body and are respectively connected with the wedge-shaped connecting piece at the bottom of the lifting rope.
Compared with the prior art, the utility model has the beneficial effects that:
according to the material hoisting device, one end of a material to be hoisted is placed in the hoisting bucket, and the other end of the material is clamped and fixed through the fixed hoisting plate.
Drawings
Fig. 1 is a schematic structural diagram of a material hoisting device according to an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a fixed platform according to an embodiment of the present invention;
FIG. 3 is a schematic illustration of a dovetail connector provided in accordance with an embodiment of the present invention;
wherein, 1, fixing a hanging scaffold; 11. a first fixed platform hanger body; 12. a second fixed platform main body; 111. a lock sleeve hole; 112. a first end suspension hole; 113. a first middle lifting eye; 122. a second end hang hole; 123 second middle lifting eye; 121. a lock sleeve rod; 2. a lifting rope; 21. d-type shackle; 22. a wire rope; 221. a collar; 23. a wedge connector; 231. a wedge-shaped sleeve; 232. a wedge core; 233. hoisting holes; 3. a bucket; 31. a barrel; 31. and (7) lifting lugs.
Detailed Description
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments of the present invention will be briefly described below, and it is apparent that the described embodiments are a part of the embodiments of the present invention, not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
As shown in fig. 1, the material hoisting device provided by the utility model comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials, and a bucket 3 for placing the hoisted materials; the fixed hanging scaffold 1 is connected with a hoisting device; the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2.
Example 2
The utility model provides a material hoisting device, which comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials and a hanging bucket 3 for placing the hoisted materials; the fixed hanging scaffold 1 is connected with a hoisting device; the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2; the fixed hanging scaffold 1 is of a sleeve locking structure.
Example 3
As shown in fig. 2, the material hoisting device provided by the utility model comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials, and a bucket 3 for placing the hoisted materials; the fixed hanging scaffold 1 is connected with a hoisting device; the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2.
The fixed platform sling 1 comprises a first fixed platform sling body 11 and a second fixed platform sling body 12; the first fixed hanging scaffold body 11 is a semi-elliptical component, sleeve locking holes 111 and first end hanging holes 112 are formed in two ends of the first fixed hanging scaffold body 11, the sleeve locking holes 111 are far away from the end portion of the first fixed hanging scaffold body 11, and the first end hanging holes 112 are close to the end portion of the first fixed hanging scaffold body 11.
A first middle hanging hole 113 is formed in the middle of the first fixed hanging scaffold body 11.
The second fixed hanging scaffold body 12 is a semi-elliptical component, shaft diameter structures are arranged at two ends of the second fixed hanging scaffold body 12, the shaft diameter structures are used as the sleeve locking rods 121 and are installed in the sleeve locking holes in a matched mode, and slipping cannot occur in the hoisting operation process; the second fixed hanging scaffold body 12 has second end hanging holes 122 formed at both ends thereof.
A second middle hanging hole 123 is formed in the middle of the second fixed hanging scaffold body 12.
The first end hang hole 112 and the second end hang hole 122 are both connected to the hoisting means.
The first middle lifting hole 113 and the second middle lifting hole 123 are both connected with the lifting rope 2.
Example 4
The utility model provides a material hoisting device, which comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials and a hanging bucket 3 for placing the hoisted materials; the fixed hanging scaffold 1 is connected with a hoisting device; the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2.
The lifting rope 2 comprises two lifting rope bodies, and one ends of the two lifting rope bodies are respectively connected with the first middle lifting hole 113 and the second middle lifting hole 123; the other ends of the two lifting rope bodies are respectively fixed on the lifting bucket 3.
Example 5
As shown in fig. 3, the material hoisting device provided by the utility model comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials, and a bucket 3 for placing the hoisted materials; the fixed hanging scaffold 1 is connected with a hoisting device; the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2.
The lifting rope 2 comprises two lifting rope bodies, and one ends of the two lifting rope bodies are respectively connected with the first middle lifting hole 113 and the second middle lifting hole 123; the other ends of the two lifting rope bodies are respectively fixed on the lifting bucket 3.
The lifting rope body comprises a D-shaped shackle 21, a steel wire rope 22 and a wedge-shaped connecting piece 23, wherein one end of the D-shaped shackle 21 is installed in the middle lifting hole in a matched mode; the other end of the D-shaped shackle 21 is connected with a steel wire rope 22; the free end of the wire rope 22 is fixed to a wedge connector 23, which wedge connector 23 is fixed to the bucket 3.
A sleeve ring 221 is arranged between the steel wire rope 22 and the D-shaped shackle 21.
The wedge-shaped connecting piece 23 comprises a wedge-shaped sleeve 231 and a wedge core 232, wherein the top of the wedge-shaped sleeve 231 is provided with an inverted conical flat hole; the wedge core 232 is sleeved in the inverted conical flat hole in a matching manner; the bottom of the wedge-shaped sleeve 231 is provided with a hoisting hole 233.
The hoisting hole 233 is connected with the bucket 3.
The wedge core 232 is connected with the steel wire rope 22 in a sleeved mode; the side surface of the wedge core 232 is provided with an arc-shaped groove, the steel wire rope 22 is assembled in the groove, and the end part of the steel wire rope passes through the inverted-cone-shaped flat hole and is fixed on the steel wire rope through at least three steel wire rope clamp assemblies.
Example 6
The utility model provides a material hoisting device, which comprises a fixed hanging scaffold 1 for limiting and fixing hoisted materials and a hanging bucket 3 for placing the hoisted materials;
the fixed hanging scaffold 1 is connected with a hoisting device;
the fixed hanging scaffold 1 is connected with the hanging bucket 3 through a hanging rope 2.
The bucket 3 comprises a barrel 31 and two lifting lugs 32, wherein the two lifting lugs 32 are symmetrically arranged at the top of the barrel 31 in the middle and are respectively connected with the wedge-shaped connecting piece 23 at the bottom of the lifting rope 2.
The middle lifting hole, the lifting rope body and the lifting lug 32 which are arranged on the same side are coaxially arranged.
The use process of the utility model is as follows:
one end of a material to be sent is placed in the bucket, the other end of the material to be sent is fixed through the first fixed hanging scaffold body 11 and the second fixed hanging scaffold body 12, meanwhile, the hanging scaffold 1 is connected with a lifting device through a hanging hole at the end part, and under the stress state, the material is clamped and fixed by the hanging scaffold 1; the structure realizes vertical hoisting and conveying of materials under the condition of limited space, and can ensure the operation safety in the hoisting and conveying process.
The length of the lifting rope 2 can be adjusted through the wedge-shaped connecting piece 23 according to the size of the lifting member, so that the length of the lifting rope 2 is ensured, and the requirements of the fixed hanging scaffold 1 on limiting and fixing materials are further ensured.
The lifting lug 32 is made of round steel.

Claims (9)

1. A material hoisting device is characterized by comprising a fixed hanging scaffold (1) for limiting and fixing hoisted materials and a hanging bucket (3) for placing the hoisted materials;
the fixed hanging scaffold (1) is connected with a hoisting device;
the fixed hanging scaffold (1) is connected with the hanging bucket (3) through a hanging rope (2).
2. A material hoist according to claim 1, characterized in that the fixed platform (1) is a lock-in construction.
3. A material handling device according to claim 1 or 2, characterised in that the fixed platform (1) comprises a first fixed platform body (11) and a second fixed platform body (12), wherein both the first fixed platform body (11) and the second fixed platform body (12) are semi-elliptical members; the first fixed hanging scaffold body (11) and the second fixed hanging scaffold body (12) are in butt joint connection; end lifting holes used for being connected with a lifting device are formed in the end parts of the two ends of the first fixed hanging scaffold body (11) and the second fixed hanging scaffold body (12); and middle lifting holes connected with lifting ropes are formed in the middle parts of the first fixed lifting disk body (11) and the second fixed lifting disk body (12).
4. The material hoisting device according to claim 3, wherein both ends of the first fixed platform body (11) are provided with sleeve locking holes (111); both ends of the second fixed hanging scaffold body (11) are provided with shaft diameter structures which are used as sleeve locking rods (121) to be installed in the sleeve locking holes in a matched mode.
5. The material hoisting device according to claim 1, wherein the hoisting rope (2) comprises two hoisting rope bodies, and one ends of the two hoisting rope bodies are respectively connected with two middle hoisting holes formed in the fixed hoisting platform (1); the other ends of the two lifting rope bodies are fixed on the lifting bucket (3).
6. A material lifting device according to claim 5, characterized in that the lifting rope body comprises a D-shaped shackle (21), a steel wire rope (22) and a wedge connector (23), wherein one end of the D-shaped shackle (21) is fittingly mounted in the middle lifting hole; the other end of the D-shaped shackle (21) is connected with a steel wire rope (22); the free end of the steel wire rope (22) is fixed on the wedge-shaped connecting piece (23), and the wedge-shaped connecting piece (23) is connected with the bucket (3).
7. A material handling device according to claim 6, characterised in that a collar (221) is provided between the wire rope (22) and the D-shackle (21).
8. A material handling device according to claim 6, characterised in that the wedge connector (23) comprises a wedge sleeve (231) and a wedge core (232), wherein the top of the wedge sleeve (231) is provided with an inverted conical flat hole; the wedge core (232) is sleeved in the inverted conical flat hole in a matching manner; the wedge core (232) is connected with the steel wire rope (22) in a sleeved mode; hoisting holes (233) are formed in the bottoms of the wedge-shaped sleeves (231), and the hoisting holes (232) are connected with the lifting lugs on the lifting bucket (3).
9. A material hoist according to claim 1, characterized in that the bucket (3) comprises a barrel (31) and two lifting lugs (32), wherein the two lifting lugs (32) are symmetrically arranged on the top of the barrel (31) and are respectively connected with the wedge-shaped connecting piece (23) at the bottom of the lifting rope (2).
CN202120779046.3U 2021-04-15 2021-04-15 Material hoisting device Expired - Fee Related CN215364477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120779046.3U CN215364477U (en) 2021-04-15 2021-04-15 Material hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120779046.3U CN215364477U (en) 2021-04-15 2021-04-15 Material hoisting device

Publications (1)

Publication Number Publication Date
CN215364477U true CN215364477U (en) 2021-12-31

Family

ID=79627165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120779046.3U Expired - Fee Related CN215364477U (en) 2021-04-15 2021-04-15 Material hoisting device

Country Status (1)

Country Link
CN (1) CN215364477U (en)

Similar Documents

Publication Publication Date Title
CN210193173U (en) Large-scale H shaped steel stand hoist and mount hoist that breaks off relations fast
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN201890717U (en) Special hanger for H-shaped steel
CN215364477U (en) Material hoisting device
CN207684788U (en) Hand pulling block frame
CN205241057U (en) Simple and easy grapple is used in pipeline hoist and mount
CN215399341U (en) Sling device for helicopter
CN107082361A (en) A kind of locomotive damper special hanger
CN205442379U (en) Balanced sling
CN208916602U (en) Cement electric pole boom hoisting
CN103264953B (en) Butt-joint adjusting device of steel bar cage
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN210438268U (en) Balance hoist subassembly with adjustable multiple spot for nuclear power equipment
CN106516970B (en) A kind of quick handling apparatus of air-entrained concrete building block
CN211110667U (en) Hook for hoisting large-diameter pipeline
CN207090786U (en) A kind of locomotive damper special hanger
CN202561404U (en) Hoisting device
CN205892517U (en) Two cable compensating beam hoists of weighing
CN205616430U (en) Railway T beam mold board dismouting hoist and hang and move device
CN201099586Y (en) Crane lifting device
CN216471715U (en) 150TON multipurpose hanging bar
CN219333007U (en) Suspension device of safety rope
CN110077962A (en) One kind passing around raising tackle pulley wirerope fixing end for single head and returns rope device automatically
CN212450267U (en) Large-scale PC component of assembled installation lifts by crane and turns over board frock equipment
CN217377089U (en) Drill rod hoisting and moving device of raise boring machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211231