CN215364465U - Special steel wire rope with fixed adjusting mechanism for bridge - Google Patents
Special steel wire rope with fixed adjusting mechanism for bridge Download PDFInfo
- Publication number
- CN215364465U CN215364465U CN202120932872.7U CN202120932872U CN215364465U CN 215364465 U CN215364465 U CN 215364465U CN 202120932872 U CN202120932872 U CN 202120932872U CN 215364465 U CN215364465 U CN 215364465U
- Authority
- CN
- China
- Prior art keywords
- wire rope
- hole
- steel wire
- screw thread
- threaded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a special steel wire rope with a fixed adjusting mechanism for a bridge, which comprises a steel wire rope, wherein the fixed adjusting mechanism is arranged at two ends of the steel wire rope and comprises a fixed adjusting box, a first steel wire rope channel and a second steel wire rope channel are arranged in the fixed adjusting box, a roller wheel placing cavity penetrates through the first steel wire rope channel and the second steel wire rope channel, two first limiting holes are formed in the side wall of the left side of the first steel wire rope channel, two second limiting holes are formed in the side wall of the right side of the second steel wire rope channel, two opposite clamping blocks are arranged on the inner wall of the first limiting hole, and the inner structures of the first limiting hole and the second limiting hole are consistent; the steel wire rope fixing and adjusting mechanism is simple in structure and novel in design, the fixing and adjusting mechanism on the steel wire rope is not easy to adjust, the stability is good, looseness is not easy to occur after fixing, and the stability during connection is effectively improved.
Description
Technical Field
The utility model relates to the technical field of steel wire ropes, in particular to a special steel wire rope for a bridge, which is provided with a fixed adjusting mechanism.
Background
The steel wire rope is a spiral rope which is formed by twisting a plurality of layers of steel wires into strands, and then twisting a certain number of strands by taking a rope core as a center; are often used in the construction of bridges for lifting, hauling, tensioning and carrying purposes.
When the existing steel wire rope special for the bridge is used for connecting and dragging between bridges, the steel wire rope generally penetrates through the bridge, and the steel wire rope is locked and then fixed by components such as fixing screws.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a special bridge steel wire rope with a fixed adjusting mechanism, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a special wire rope of bridge with fixed adjustment mechanism, includes wire rope, wire rope's both ends are equipped with fixed adjustment mechanism, fixed adjustment mechanism is including fixed regulating box, be equipped with first wire rope passageway and second wire rope passageway in the fixed regulating box, it has a gyro wheel to place the chamber to run through between first wire rope passageway and the second wire rope passageway, be equipped with two first spacing holes on the left side lateral wall of first wire rope passageway, be equipped with the spacing hole of two seconds on the right side lateral wall of second wire rope passageway, be equipped with two relative fixture blocks on the inner wall in first spacing hole, first spacing hole is unanimous with the spacing downthehole part structure of second.
Preferably, the intracavity is placed to the gyro wheel and is equipped with the pivot, the gyro wheel is being connected in the pivot, be equipped with the through-hole in the pivot, the upper end that the chamber was placed to the gyro wheel is equipped with the recess, the lower extreme that the chamber was placed to the gyro wheel is equipped with the screw thread through-hole, recess and screw thread through-hole all are on same vertical line, be equipped with the screw thread ejector pin in the screw thread through-hole, screw thread ejector pin and through-hole, recess and screw thread through-hole phase-match.
Preferably, a first threaded through hole is formed in the right side wall of the first steel wire rope channel, a first threaded mandril is arranged in the first threaded through hole, the first threaded mandril is connected with a first connecting rod, the first connecting rod is connected with a first U-shaped clamping ring, and two ends of the first U-shaped clamping ring are matched with the first limiting hole;
and a second threaded through hole is formed in the side wall of the left side of the second steel wire rope channel, a second threaded ejector rod is arranged in the second threaded through hole and connected with a second connecting rod, the second connecting rod is connected with a second U-shaped clamping ring, and two ends of the second U-shaped clamping ring are matched with the second limiting hole.
Compared with the prior art, the utility model has the beneficial effects that: the steel wire rope fixing and adjusting mechanism is simple in structure and novel in design, the fixing and adjusting mechanism on the steel wire rope is not easy to adjust, the stability is good, looseness is not easy to occur after fixing, and the stability during connection is effectively improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic front cross-sectional view of the present invention;
FIG. 3 is a schematic bottom cross-sectional view of the present invention;
FIG. 4 is a schematic side sectional view of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a special steel wire rope with a fixed adjusting mechanism for a bridge comprises a steel wire rope 1, wherein the two ends of the steel wire rope 1 are provided with the fixed adjusting mechanisms 2, the fixed adjusting mechanisms 2 are arranged on the fixed adjusting mechanism 2, the fixed adjusting mechanism 2 comprises a fixed adjusting box 21, a first steel wire rope channel 22 and a second steel wire rope channel 23 are arranged in the fixed adjusting box 21, after the steel wire rope passes through the second steel wire rope channel, the end of the steel wire rope passes through the second steel wire rope channel again, so that two ends of the steel wire rope form a rope buckle which can be connected to a steel wire rope buckle in a penetrating manner, a roller placing cavity 24 penetrates through the space between the first steel wire rope channel 22 and the second steel wire rope channel 23, two first limiting holes 25 are arranged on the left side wall of the first steel wire rope channel 22, the two first limiting holes 25 are positioned on the same horizontal line, two second limiting holes 26 are arranged on the right side wall of the second steel wire rope channel 23, the two second limiting holes 26 are located on the same horizontal line, two opposite clamping blocks 27 are arranged on the inner wall of the first limiting hole 25, and the internal structures of the first limiting hole 25 and the second limiting hole 26 are consistent.
In this embodiment, a rotating shaft 241 is arranged in the roller placing cavity 24, the rotating shaft 241 is connected with a roller 242, when the end of a steel wire rope is pulled and then moves in a first steel wire rope channel, the roller plays a role of auxiliary pushing and is convenient to adjust, a through hole 243 is arranged on the rotating shaft 241, a groove 244 is arranged at the upper end of the roller placing cavity 24, a threaded through hole 245 is arranged at the lower end of the roller placing cavity 24, the through hole 243, the groove 244 and the threaded through hole 245 are all on the same vertical line, a threaded mandril is arranged in the threaded through hole 245, and the threaded mandril is matched with the through hole, the groove and the threaded through hole; after the connection between the rope buckle and the steel wire rope buckle is adjusted, the threaded ejector rod is adjusted to penetrate through the through hole, the groove and the threaded through hole in the roller placing cavity to be fixed.
In this embodiment, a first threaded through hole 221 is formed in the right side wall of the first steel wire rope channel 22, a first threaded mandril 222 is arranged in the first threaded through hole 221, the first threaded mandril 222 is connected with a first connecting rod 223, the first connecting rod 223 is connected with a first U-shaped clamping ring 224, and two ends of the first U-shaped clamping ring 224 are matched with the first limiting hole 25;
a second threaded through hole 231 is formed in the left side wall of the second steel wire rope channel 23, a second threaded mandril 232 is arranged in the second threaded through hole 231, the second threaded mandril 232 is connected with a second connecting rod 233, the second connecting rod 233 is connected with a second U-shaped clamping ring 234, and two ends of the second U-shaped clamping ring 234 are matched with the second limiting hole 26;
in the above embodiment, after adjusting the connection between rope fastening and the wire rope hasp, then adjust first screw thread ejector pin and second screw thread ejector pin respectively again, make first U-shaped snap ring and second U-shaped snap ring tightly block wire rope, two ends of first U-shaped snap ring and second U-shaped snap ring have all blocked corresponding first spacing hole and the spacing hole of second respectively after the top is tight, the fixture block in first spacing hole and the spacing hole of second can all be the chucking respectively with two ends of first U-shaped snap ring and second U-shaped snap ring, make fastening more of its joint, difficult not hard up.
The working principle is as follows: after the end heads at the two ends of the steel wire rope respectively penetrate through the corresponding steel wire rope lock catches, the end heads penetrate into the first steel wire rope channel, so that the end heads of the steel wire rope form a rope buckle which is connected to the steel wire rope lock catch in a penetrating manner, the end heads of the steel wire rope are pulled to move in the first steel wire rope channel, and then the purpose of contracting the rope buckle is achieved, so that the connection between the rope buckle and the steel wire rope lock catch is tighter; then adjusting the threaded mandril to enable the threaded mandril to penetrate through the through hole, the groove and the threaded through hole in the roller wheel placing cavity for fixing, then adjusting the first threaded mandril and the second threaded mandril respectively to enable the first U-shaped clamp ring and the second U-shaped clamp ring to clamp the steel wire rope tightly, and after the two ends of the first U-shaped clamp ring and the second U-shaped clamp ring are tightly pushed, clamping the two ends of the first U-shaped clamp ring and the second U-shaped clamp ring into the corresponding first limiting hole and the second limiting hole respectively; the connection through the steps is fixed, the stability is good, looseness is not easy to occur after fixation, and the stability during connection is effectively improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (3)
1. The utility model provides a special wire rope of bridge with fixed adjustment mechanism, includes wire rope (1), its characterized in that: the both ends of wire rope (1) are equipped with fixed adjustment mechanism (2), fixed adjustment mechanism (2) are including fixed regulating box (21), be equipped with first wire rope passageway (22) and second wire rope passageway (23) in fixed regulating box (21), it has a gyro wheel to place chamber (24) to run through between first wire rope passageway (22) and second wire rope passageway (23), be equipped with two first spacing holes (25) on the left side lateral wall of first wire rope passageway (22), be equipped with two spacing holes of second (26) on the right side lateral wall of second wire rope passageway (23), be equipped with two relative fixture block (27) on the inner wall of first spacing hole (25), first spacing hole (25) and spacing hole of second (26) inner structure are unanimous.
2. The special steel wire rope for the bridge with the fixed adjusting mechanism according to claim 1, wherein: the utility model discloses a roller wheel, including gyro wheel placing cavity (24), gyro wheel placing cavity (24) is equipped with pivot (241), gyro wheel (242) are being connected in pivot (241), be equipped with through-hole (243) on pivot (241), the upper end that cavity (24) were placed to the gyro wheel is equipped with recess (244), the lower extreme that cavity (24) were placed to the gyro wheel is equipped with screw thread through-hole (245), through-hole (243), recess (244) and screw thread through-hole (245) all are on same vertical line, be equipped with the screw thread ejector pin in screw thread through-hole (245), screw thread ejector pin and through-hole, recess and screw thread through-hole phase-match.
3. The special steel wire rope for the bridge with the fixed adjusting mechanism according to claim 1, wherein: a first threaded through hole (221) is formed in the side wall of the right side of the first steel wire rope channel (22), a first threaded mandril (222) is arranged in the first threaded through hole (221), the first threaded mandril (222) is connected with a first connecting rod (223), the first connecting rod (223) is connected with a first U-shaped clamping ring (224), and two ends of the first U-shaped clamping ring (224) are matched with the first limiting hole (25);
be equipped with second screw thread through-hole (231) on the left side lateral wall of second wire rope passageway (23), be equipped with second screw thread ejector pin (232) in second screw thread through-hole (231), second connecting rod (233) is connected in second screw thread ejector pin (232), second U-shaped snap ring (234) is connected in second connecting rod (233), the both ends and the spacing hole of second (26) phase-match of second U-shaped snap ring (234).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120932872.7U CN215364465U (en) | 2021-04-30 | 2021-04-30 | Special steel wire rope with fixed adjusting mechanism for bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120932872.7U CN215364465U (en) | 2021-04-30 | 2021-04-30 | Special steel wire rope with fixed adjusting mechanism for bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215364465U true CN215364465U (en) | 2021-12-31 |
Family
ID=79628962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120932872.7U Active CN215364465U (en) | 2021-04-30 | 2021-04-30 | Special steel wire rope with fixed adjusting mechanism for bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215364465U (en) |
-
2021
- 2021-04-30 CN CN202120932872.7U patent/CN215364465U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208803602U (en) | A kind of curtain wall mounting structure | |
CN215364465U (en) | Special steel wire rope with fixed adjusting mechanism for bridge | |
CN205637555U (en) | A fixing device for coiling detain external safety net of formula scaffold frame | |
CN210393406U (en) | Steel rope clamp | |
CN113725795A (en) | Universal conversion type composite insulator combined strain insulator string device for power distribution tower | |
CN206374927U (en) | Adjustable sincere chain device | |
CN205472108U (en) | Villa ladder car stand | |
CN111827651A (en) | Assembly type building external hanging platform | |
CN217000826U (en) | Device for obliquely pulling telescopic rod of disk-type scaffold | |
CN206466888U (en) | Stainless steel wire rope double end rigging | |
CN205502707U (en) | Turn -buckle and excellent connecting device that acts as go -between | |
CN219351201U (en) | Spool protection mechanism of electrical equipment | |
CN216196029U (en) | Steel bar connecting equipment for building engineering | |
CN214036696U (en) | Quick connection type lock joint | |
CN220285189U (en) | Honeycomb skylight frame and honeycomb skylight | |
CN212959697U (en) | Interpolation type steel wire rope rigging with rope clamp | |
CN220395363U (en) | High-strength building railing with high stability | |
CN209742772U (en) | assistor for electric power maintenance | |
CN219998921U (en) | Winding displacement device and weak current security protection construction equipment | |
CN215626029U (en) | Connecting buckle for elevator shaft steel wire rope | |
CN212226681U (en) | Novel combined aluminum profile structure | |
CN218602178U (en) | Fixing device for cabling machine | |
CN206928798U (en) | A kind of sliding window position limiter quick for installation | |
CN218644002U (en) | Adjustable guy wire fixing device | |
CN219431322U (en) | Combined single-chain hoist mounting structure for climbing frame lifting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |