CN215362791U - Pipeline piling bin for municipal works - Google Patents

Pipeline piling bin for municipal works Download PDF

Info

Publication number
CN215362791U
CN215362791U CN202121857992.1U CN202121857992U CN215362791U CN 215362791 U CN215362791 U CN 215362791U CN 202121857992 U CN202121857992 U CN 202121857992U CN 215362791 U CN215362791 U CN 215362791U
Authority
CN
China
Prior art keywords
fixedly arranged
hanging
baffle
winding drum
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121857992.1U
Other languages
Chinese (zh)
Inventor
徐广源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121857992.1U priority Critical patent/CN215362791U/en
Application granted granted Critical
Publication of CN215362791U publication Critical patent/CN215362791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model belongs to the technical field of municipal engineering equipment, and particularly relates to a pipeline stacking rack for municipal engineering, which comprises a base and a hanging pipe, wherein a first baffle and a second baffle are fixedly arranged at the upper end of the base, a roller, a stop block and a fixed block are fixedly arranged on the first baffle, a fixed seat is fixedly arranged on the second baffle, a rocker, a connecting rod and a fixed frame are arranged on the fixed seat, a first pulley and a second pulley are fixedly arranged on the fixed frame, a hanging rope is wound on the first pulley and the second pulley in a surrounding manner, one end of the hanging rope is fixedly connected with the tail end of a hanging hook, a first hanging ring is fixedly arranged at the side end of the hanging pipe, and through the arrangement of the hanging rope, a constructor can conveniently insert the hanging pipe into a cavity channel in the middle part of the pipeline firstly, then respectively buckle and hang two hanging hooks on the first hanging rings fixedly arranged at the left end and the right end of the hanging pipe, and then drive the connecting rod to rotate anticlockwise through the rocker, the lifting rope can be continuously contracted and wound to the connecting rod, so that the lifting pipe carries the pipeline to move upwards.

Description

Pipeline piling bin for municipal works
Technical Field
The utility model belongs to the technical field of municipal engineering equipment, and particularly relates to a pipeline stacking rack for municipal engineering.
Background
Lay the pipeline to the underground is the indispensable construction project in municipal works field, at fields such as drainage, heat supply network, all need lay the pipeline to the underground, and before the pipe laying, need unload the pipeline to the next door of ditch, just, the drawback of the mode of this kind of uninstallation lies in, the pipeline is directly put not only easily can lead to the pipeline to put the confusion to subaerial, and when the uninstallation position of pipeline was close to the road surface of going, also caused the influence to the safety of going of vehicle on every side very easily.
SUMMERY OF THE UTILITY MODEL
At present, although the market has been designed and developed the pipeline piling bin to the chaotic problem of pipeline placement, however, because the pipeline can constantly be folded high at stacking in-process, and the support has not been installed on the current pipeline piling bin, hang the auxiliary device of pipeline, thereby make constructor when adopting the manpower to lift the mode upwards and pile up the pipeline, not only there is the difficulty of piling up, the problem of wasting time and energy produces, simultaneously, if constructor is upwards lifting the in-process of pipeline, lead to the pipeline from the top to fall because of the error, then can cause serious threat for its life safety. The utility model provides a pipeline stacking rack for municipal engineering, which has the characteristics of multiple functions, convenience in operation and movement, and convenience in use of constructors.
The utility model provides the following technical scheme: a pipeline stacking rack for municipal engineering comprises a base and a lifting pipe, wherein a first baffle and a second baffle are fixedly arranged at the upper end of the base, a roller, a stop block and a fixed block are fixedly arranged on the first baffle, the fixed block is in inserted connection with a pin block through a pin hole formed in the middle of the fixed block, a fixed seat is fixedly arranged on the second baffle, a rocker, a connecting rod and a fixed frame are arranged on the fixed seat, a first pulley and a second pulley are fixedly arranged on the fixed frame, a lifting rope is wound on the first pulley and the second pulley in a surrounding manner, one end of the lifting rope is fixedly connected with the tail end of a lifting hook, a first hanging ring is fixedly arranged at the side end of the lifting pipe, a second hanging ring, a first winding drum and a second winding drum are fixedly arranged at the side end of the base, rain cloth is wound inside the first winding drum and the second winding drum, the rain cloth is fixedly connected with a supporting rod, and a hook is fixedly arranged on the supporting rod, and a traveling wheel is fixedly arranged at the bottom end of the base.
The side wall of the left end and the side wall of the right end of the first baffle plate are fixedly provided with a stop block and two fixed blocks, and the lower end of the first baffle plate is hinged with the upper end of the first baffle plate through a hinge; the first baffle is in a foldable state, so that when a constructor takes the pin block out of the pin hole in the lower end fixing block, the upper end of the first baffle can be folded after the vertical fixing state of the first baffle is removed, and when the pipeline is continuously stacked upwards, the upper end of the first baffle only needs to be lifted up to be erected, the pin block is inserted back into the pin hole in the fixing block, and the high-altitude pipeline at the inner end of the pin block can be blocked after the vertical fixing operation of the first baffle is finished.
The number of the fixed seats is two, the two fixed seats are fixedly arranged on two sides of the lower end of the baffle II respectively, and a rocker is arranged in the middle of the outer side of the left-end fixed seat; through the establishment of rocker, can be convenient for when constructor rocks the rocker, the rocker can drive the connecting rod through the pivot and rotate at the middle part of two fixing bases.
The two fixing frames, the first pulleys and the second pulleys are respectively fixed at the rear parts of the upper ends of the two fixing frames, the first pulleys are fixedly arranged at the bottoms of the upper ends of the two fixing frames, and the second pulleys are fixedly arranged at the middle parts of the frame bodies of the two fixing frames; through the fixed frame and the arrangement of the first pulley and the second pulley on the fixed frame, the lifting rope can be used for carrying out height lifting operation on the pipeline through the assistance of the fixed frame, the first pulley and the second pulley.
The lifting pipe comprises two lifting ropes, two fixing seats and two hanging rings, wherein the two lifting ropes are two in number, the tail ends of the two lifting ropes are respectively and fixedly connected with connecting rods in the middle of the two fixing seats, and the two lifting hooks fixedly connected with the head ends of the two lifting ropes are respectively and fixedly connected with the two hanging rings I fixedly arranged at the two ends of the lifting pipe in a buckling and hanging manner; through the establishment of lifting rope, can be convenient for constructor only need insert the hanging pipe earlier to pipeline middle part chamber way in, detain two lifting hooks respectively with the hanging ring one that hangs that both ends were fixed to be installed about the hanging pipe back, the rocker drives the anticlockwise rotation of connecting rod, can make the hanging rope constantly shrink, twine to the in-process of connecting rod, make the hanging pipe carry the pipeline and move up.
The number of the rollers is a plurality, and the rollers are all arranged on the outer wall of the positive end of the first baffle at equal intervals; through the establishment of gyro wheel, the gyro wheel of can being convenient for can enough carry the pipeline at the drop tube and move up when moving, give the process of moving up of a pipeline laminating baffle outer wall and reduce the resistance, simultaneously, also because of gyro wheel protrusion baffle surface to can also protect a baffle outer wall, avoid the pipeline to lead to the fact a large amount of wearing and tearing to a baffle outer wall with a baffle outer wall direct contact for a long time.
The first winding drum is fixedly arranged at the left end of the base, the second winding drum is fixedly arranged at the rear end of the base, and retraction assemblies are arranged in the first winding drum and the second winding drum; the winding drum I is fixedly arranged at the left end of the base, the winding drum II is fixedly arranged at the rear end of the base, so that in rainy and snowy weather, a constructor can draw out the waterproof cloth fixedly connected with the supporting rods from the interiors of the winding drum I and the winding drum II only by respectively pulling the supporting rods arranged at the outer end of the winding drum I and the outer end of the winding drum, the front rear end, the left right end and the upper end of the waterproof cloth winding drum are wrapped and covered, and the retraction assemblies are arranged in the winding drum I and the winding drum II, so that the waterproof cloth can be automatically retracted into the interiors of the winding drum I and the winding drum II after being used.
The second hanging ring is fixedly arranged in the middle and two sides of the right end of the base and in the middle and two sides of the positive end of the base respectively, and the second hanging ring is connected with a hook fixedly arranged at the outer end of the supporting rod in a buckling and hanging manner; the middle part and two sides of the right end of the base and the middle part and two sides of the positive end of the base are fixedly provided with the second hanging ring, and the second hanging ring is in buckling and hanging connection with the hook fixedly arranged at the outer end of the supporting rod, so that when the waterproof cloth wraps and covers the waterproof cloth, the supporting rod of the first winding drum is in buckling and hanging connection with the second hanging ring at the right end of the base, and after the supporting rod of the second winding drum is in buckling and hanging connection with the second hanging ring at the positive end of the base, the supporting rod can be fixed in position, and therefore the waterproof cloth cannot retract into the first winding drum and the second winding drum in the using process.
The utility model has the beneficial effects that: the first baffle is in a foldable state, so that the first baffle can be conveniently folded and can be conveniently lifted by a constructor, the lifting device is arranged on the lifting pipe, the constructor can be conveniently prevented from upwards stacking the pipeline in a manual lifting mode, the problems of difficult stacking, time consuming and labor consuming are solved, meanwhile, if the constructor falls off from the top due to errors in the process of upwards lifting the pipeline, the life safety of the constructor is seriously threatened, the rollers can be conveniently arranged, when the lifting pipe carries the pipeline to move upwards, the resistance is reduced in the upwards moving process of the pipeline attaching baffle outer wall, and meanwhile, the rollers are protruded out of the surface of the first baffle, so that the first baffle outer wall can be protected, the pipeline is prevented from being in direct contact with the first baffle outer wall for a long time, and a large amount of abrasion is easily caused to the first baffle outer wall, the rain shielding device is arranged on the pipeline, so that the pipeline and the pipeline corrosion prevention device can be prevented from being easily corroded by rain and snow exposed for a long time in rainy and snowy weather, and the service lives of the pipeline and the pipeline corrosion prevention device are shortened.
The parts of the device not involved are the same as or can be implemented using prior art.
Drawings
FIG. 1 is a schematic diagram of the positive terminal structure of the present invention;
FIG. 2 is a schematic rear end view of the present invention;
FIG. 3 is a schematic diagram of the right end structure of the present invention;
FIG. 4 is a schematic left end view of the present invention;
FIG. 5 is a detail view of the positive end of the holder of the present invention;
FIG. 6 is a schematic view of the drawing-out structure of the waterproof cloth of the present invention;
in the figure: 1. a base; 2. a first baffle plate; 3. a second baffle plate; 4. a roller; 5. a stopper; 6. a fixed block; 7. a pin block; 8. a fixed seat; 9. a rocker; 10. a connecting rod; 11. a fixed mount; 12. a first pulley; 13. a second pulley; 14. a lifting rope; 15. a hook; 16. hanging a ring I; 17. hanging a pipe; 18. a second hanging ring; 19. a first winding drum; 20. a second winding drum; 21. a rain cloth; 22. a bracing rod; 23. hooking; 24. and (5) traveling wheels.
Detailed Description
Referring to fig. 1-6, the present invention provides the following technical solutions: a pipeline stacking rack for municipal engineering comprises a base 1 and a hanging pipe 17, wherein a first baffle plate 2 and a second baffle plate 3 are fixedly arranged at the upper end of the base 1, a roller 4, a stop block 5 and a fixed block 6 are fixedly arranged on the first baffle plate 2, the fixed block 6 is connected with a pin block 7 in an inserting manner through a pin hole formed in the middle of the fixed block 6, a fixed seat 8 is fixedly arranged on the second baffle plate 3, a rocker 9, a connecting rod 10 and a fixed frame 11 are arranged on the fixed seat 8, a first pulley 12 and a second pulley 13 are fixedly arranged on the fixed frame 11, a hanging rope 14 is wound on each of the first pulley 12 and the second pulley 13, one end of the hanging rope 14 is fixedly connected with the tail end of a lifting hook 15, a first hanging ring 16 is fixedly arranged at the side end of the hanging pipe 17, a second hanging ring 18, a first reel 19 and a second reel 20 are fixedly arranged at the side end of the base 1, and a rain cloth 21 is wound inside each of the first reel 19 and the second reel 20, the waterproof cloth 21 is fixedly connected with the supporting rod 22, a hook 23 is fixedly arranged on the supporting rod 22, and a walking wheel 24 is fixedly arranged at the bottom end of the base 1.
A stop block 5 and two fixed blocks 6 are fixedly arranged on the side wall of the left end and the side wall of the right end of the first baffle plate 2, and the lower end of the first baffle plate 2 is hinged with the upper end of the first baffle plate 2 through a hinge; be collapsible state through baffle 2, can be convenient for upwards take out from the pinhole of lower extreme fixed block 6 inside with round pin piece 7 when constructor, can be after removing the vertical fixed state of baffle 2, carry out folding operation to the upper end of baffle 2, and when the pipeline lasts upwards piling up, only need to lift up the upper end of baffle 2 and make its back of erectting, insert round pin piece 7 back in the pinhole of fixed block 6 inside, can accomplish behind the vertical fixed operation of baffle 2, block its inner end eminence pipeline.
The number of the fixed seats 8 is two, the two fixed seats 8 are fixedly arranged on two sides of the lower end of the baffle II 3 respectively, and a rocker 9 is arranged in the middle of the outer side of the left fixed seat 8; through the establishment of rocker 9, can be convenient for when constructor rocks rocker 9, rocker 9 can drive connecting rod 10 through the pivot and rotate at the middle part of two fixing bases 8.
The quantity of the fixed frames 11, the first pulleys 12 and the second pulleys 13 is two, the lower ends of the two fixed frames 11 are respectively and fixedly arranged at the rear parts of the upper ends of the two fixed seats 8, the first pulleys 12 are fixedly arranged at the bottoms of the upper ends of the two fixed frames 11, and the second pulleys 13 are fixedly arranged in the middle parts of the frame bodies of the two fixed frames 11; through the fixed frame 11 and the arrangement of the first pulley 12 and the second pulley 13 on the fixed frame 11, the lifting rope 14 can perform height lifting operation on the pipeline through the assistance of the fixed frame 11, the first pulley 12 and the second pulley 13.
The number of the lifting ropes 14 is two, the tail ends of the two lifting ropes 14 are respectively and fixedly connected with the connecting rods 10 in the middle of the two fixed seats 8, and the two lifting hooks 15 fixedly connected with the head ends of the two lifting ropes 14 are respectively and fixedly connected with the two hanging rings I16 fixedly arranged at the two ends of the lifting pipe 17 in a buckling and hanging manner; through the establishment of the lifting rope 14, a constructor can conveniently insert the lifting pipe 17 into the middle cavity channel of the pipeline, and then respectively buckle and hang the two lifting hooks 15 on the hanging rings 16 fixedly arranged at the left end and the right end of the lifting pipe 17, and the rocker 9 drives the connecting rod 10 to rotate anticlockwise, so that the lifting rope 14 can continuously contract and wind the connecting rod 10, and the lifting pipe 17 carries the pipeline to move upwards.
The number of the rollers 4 is a plurality, and the rollers 4 are all arranged on the outer wall of the positive end of the baffle plate I2 at equal intervals; through the establishment of gyro wheel 4, can be convenient for gyro wheel 4 can enough carry the pipeline at drop tube 17 and move up when moving, give the process that shifts up of 2 outer walls of pipeline laminating baffle and reduce the resistance, simultaneously, also because of 4 salient baffles 2 surfaces of gyro wheel to can also protect 2 outer walls of baffle, avoid the pipeline to contact with 2 outer walls of baffle direct contacts for a long time, easily can cause a large amount of wearing and tearing to baffle 2 outer walls.
The first winding drum 19 is fixedly arranged at the left end of the base 1, the second winding drum 20 is fixedly arranged at the rear end of the base 1, and retraction assemblies are arranged inside the first winding drum 19 and the second winding drum 20; through the fixed installation of the first winding drum 19 at the left end of the base 1 and the fixed installation of the second winding drum 20 at the rear end of the base 1, in rainy and snowy weather, a constructor can draw out the waterproof cloth 21 fixedly connected with the supporting rods 22 from the first winding drum 19 and the second winding drum 20 only by respectively pulling the supporting rods 22 arranged at the outer end of the first winding drum 19 and the outer end of the second winding drum 20 outwards, and then wrap and cover the front rear end, the left right end and the upper end of the waterproof cloth machine, and through the retraction assemblies arranged in the first winding drum 19 and the second winding drum 20, the waterproof cloth 21 can be automatically retracted into the first winding drum 19 and the second winding drum 20 after being used.
The number of the second hanging rings 18 is six, the six second hanging rings 18 are respectively fixedly arranged in the middle and two sides of the right end of the base 1 and in the middle and two sides of the positive end of the base 1, and the second hanging rings 18 are connected with hooks 23 fixedly arranged at the outer ends of the supporting rods 22 in a buckling and hanging manner; the middle part and two sides of the right end of the base 1 and the middle part and two sides of the positive end of the base 1 are fixedly provided with the second hanging ring 18, the second hanging ring 18 is in buckling and hanging connection with the hook 23 fixedly arranged at the outer end of the supporting rod 22, when the waterproof cloth 21 wraps and covers the waterproof cloth packaging box, the supporting rod 22 of the first winding drum 19 is in buckling and hanging connection with the second hanging ring 18 at the right end of the base 1, and after the supporting rod 22 of the second winding drum 20 is in buckling and hanging connection with the second hanging ring 18 at the positive end of the base 1, the supporting rod 22 can be fixed in position, so that the waterproof cloth 21 cannot retract into the first winding drum 19 and the second winding drum 20 in the using process.
The working principle and the using process of the utility model are as follows: the arrangement of the first baffle plate 2 and the second baffle plate 3 can conveniently block the pipeline stacked at the upper end of the base 1, the first baffle plate 2 is in a foldable state, so that when a constructor upwards pulls the pin block 7 out of the pin hole in the lower end fixing block 6, the upper end of the first baffle plate 2 can be folded after the vertical fixing state of the first baffle plate 2 is released, when the pipeline is continuously upwards stacked, the upper end of the first baffle plate 2 is lifted to be erected, the pin block 7 is inserted back into the pin hole in the fixing block 6, the pipeline at the high position at the inner end of the first baffle plate 2 can be blocked after the vertical fixing operation of the first baffle plate 2 is completed, the arrangement of the rocker 9 can be convenient, when the constructor shakes the rocker 9, the rocker 9 can drive the connecting rod 10 to rotate at the middle parts of the two fixing seats 8 through the rotating shaft, and the arrangement of the first fixing frame 11 and the first pulley 12 and the second pulley 13 on the fixing frame 11, the lifting rope 14 can be conveniently assisted by the fixing frame 11, the first pulley 12 and the second pulley 13 to perform height lifting operation on the pipeline, the lifting rope 14 is arranged, a constructor can conveniently insert the lifting pipe 17 into a cavity channel in the middle of the pipeline firstly and then buckle and hang the two lifting hooks 15 on the hanging rings 16 fixedly arranged at the left end and the right end of the lifting pipe 17 respectively, the rocker 9 drives the connecting rod 10 to rotate anticlockwise, the lifting rope 14 can be continuously contracted and wound to the connecting rod 10, the lifting pipe 17 carries the pipeline to move upwards, the roller 4 is arranged, the roller 4 can conveniently reduce resistance in the upwards moving process of the outer wall of the first pipeline attaching baffle 2 when the lifting pipe 17 carries the pipeline to move upwards, meanwhile, the roller 4 protrudes out the surface of the first baffle 2, the outer wall of the first baffle 2 can also be protected, and the first reel 19 is arranged at a fixed part, a fixed part and a fixed part, a fixed part, a fixed part, a fixed part, a part, the second winding drum 20 is fixedly arranged at the rear end of the base 1, so that in rainy and snowy weather, a constructor only needs to pull the supporting rods 22 arranged at the outer ends of the first winding drum 19 and the second winding drum 20 respectively to draw out the waterproof cloth 21 fixedly connected with the supporting rods 22 from the interiors of the first winding drum 19 and the second winding drum 20, the front rear end, the left right end and the upper end of the waterproof device are wrapped and covered, retraction assemblies are arranged in the first winding drum 19 and the second winding drum 20, the waterproof cloth 21 can automatically retract into the interiors of the first winding drum 19 and the second winding drum 20 after use, the second hanging rings 18 are fixedly arranged in the middle and two sides of the right end of the base 1 and in the middle and two sides of the front end of the base 1, the second hanging rings 18 are connected with hooks 23 fixedly arranged at the outer ends of the supporting rods 22 in a buckling manner, and hanging connection between the supporting rods 22 of the first winding drum 19 and the second hanging rings 18 at the right end of the base 1 can be conveniently achieved when the waterproof device is wrapped and covered by the waterproof cloth 21, After the supporting rod 22 of the second winding drum 20 is connected with the second hanging ring 18 at the positive end of the base 1 in a buckling mode, the supporting rod 22 can be fixed in position, so that the waterproof cloth 21 cannot retract into the first winding drum 19 and the second winding drum 20 in the using process, and the walking wheels 24 are arranged, so that a constructor can conveniently push the pipeline lifting device to move in position, and the physical force of the constructor for removing the pipeline at different positions is saved.

Claims (8)

1. The utility model provides a pipeline piling bin for municipal works which characterized in that: comprises a base and a hanging pipe, wherein a first baffle and a second baffle are fixedly arranged at the upper end of the base, a roller, a stop block and a fixed block are fixedly arranged on the first baffle, the fixed block is connected with the pin block in an inserting way through a pin hole arranged in the middle of the fixed block, the second baffle plate is fixedly provided with a fixed seat, the fixed seat is provided with a rocker, a connecting rod and a fixed frame, the fixed frame is fixedly provided with a first pulley and a second pulley, a lifting rope is wound on the first pulley and the second pulley, one end of the lifting rope is fixedly connected with the tail end of the lifting hook, a first hanging ring is fixedly arranged at the side end of the hanging pipe, a second hanging ring, a first winding drum and a second winding drum are fixedly arranged at the side end of the base, the novel rain-proof winding machine is characterized in that the first winding drum and the second winding drum are all wound with rain cloth, the rain cloth is fixedly connected with the supporting rod, a hook is fixedly arranged on the supporting rod, and the bottom fixing of the base is provided with a traveling wheel.
2. The pipe piling bin for municipal engineering according to claim 1, wherein: and the left end side wall and the right end side wall of the first baffle plate are fixedly provided with a stop block and two fixed blocks, and the lower end of the first baffle plate is hinged with the upper end of the first baffle plate through a hinge.
3. The pipe piling bin for municipal engineering according to claim 1, wherein: the number of the fixing seats is two, the two fixing seats are fixedly arranged on two sides of the lower end of the second baffle respectively, and a rocker is arranged in the middle of the outer side of the left-end fixing seat.
4. The pipe piling bin for municipal engineering according to claim 1, wherein: the quantity of the fixed frame, the first pulleys and the second pulleys is two, the lower ends of the two fixed frames are fixedly arranged at the rear parts of the upper ends of the two fixed seats respectively, the first pulleys are fixedly arranged at the bottoms of the upper ends of the two fixed frames, and the second pulleys are fixedly arranged in the middle parts of the frame bodies of the two fixed frames.
5. The pipe piling bin for municipal engineering according to claim 1, wherein: the lifting pipe comprises two lifting ropes, wherein the tail ends of the two lifting ropes are fixedly connected with the connecting rods in the middle of the two fixing seats respectively, and the two lifting hooks fixedly connected with the head ends of the two lifting ropes are respectively connected with the two hanging rings fixedly arranged at the two ends of the lifting pipe in a buckling and hanging mode.
6. The pipe piling bin for municipal engineering according to claim 1, wherein: the number of the rollers is a plurality, and the rollers are arranged on the outer wall of the positive end of the first baffle at equal intervals.
7. The pipe piling bin for municipal engineering according to claim 1, wherein: the first winding drum is fixedly arranged at the left end of the base, the second winding drum is fixedly arranged at the rear end of the base, and retraction assemblies are arranged in the first winding drum and the second winding drum.
8. The pipe piling bin for municipal engineering according to claim 1, wherein: the number of the second hanging rings is six, the six second hanging rings are fixedly arranged in the middle and on two sides of the right end of the base and in the middle and on two sides of the positive end of the base respectively, and the second hanging rings are connected with hooks fixedly arranged at the outer ends of the supporting rods in a buckling and hanging manner.
CN202121857992.1U 2021-08-10 2021-08-10 Pipeline piling bin for municipal works Expired - Fee Related CN215362791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121857992.1U CN215362791U (en) 2021-08-10 2021-08-10 Pipeline piling bin for municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121857992.1U CN215362791U (en) 2021-08-10 2021-08-10 Pipeline piling bin for municipal works

Publications (1)

Publication Number Publication Date
CN215362791U true CN215362791U (en) 2021-12-31

Family

ID=79617336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121857992.1U Expired - Fee Related CN215362791U (en) 2021-08-10 2021-08-10 Pipeline piling bin for municipal works

Country Status (1)

Country Link
CN (1) CN215362791U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106986099A (en) * 2017-04-17 2017-07-28 国网山东省电力公司威海供电公司 A kind of electric industry wall pipe reservoir

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106986099A (en) * 2017-04-17 2017-07-28 国网山东省电力公司威海供电公司 A kind of electric industry wall pipe reservoir
CN106986099B (en) * 2017-04-17 2023-01-20 国网山东省电力公司威海供电公司 Electric industry wall penetrating pipe storage device

Similar Documents

Publication Publication Date Title
CN215362791U (en) Pipeline piling bin for municipal works
CN216155171U (en) Automatic cable pay-off device
CN217076861U (en) Storage box straight and vertical turnover device
CN215974325U (en) Antiwind capstan winch device that can even rolling
CN214295535U (en) Floor type hand-operated vehicle cover folding and unfolding device
CN215797549U (en) Emergency repair cable laying device for cable
CN110805576B (en) Automatic coupling device of submersible electric pump
CN104947637B (en) Blocking sluice gate of diversion tunnel detecting system and detection method
CN212129862U (en) Tool type hanging basket for mounting cable on anti-collision wall of bridge
CN210178266U (en) Emergency maintenance auxiliary device for workshop control daily line
CN209852640U (en) Packing device convenient for polyethylene pipe transportation
CN110657330A (en) Topography record auxiliary device for power grid planning
CN216889542U (en) Suspension type cable winding and unwinding device
CN221070890U (en) Fork truck goods prevent empting fixed knot and construct
CN111851321B (en) Novel folding type externally-hung basket for construction of wet joint of highway bridge
CN210732317U (en) Quick change device for parallel pulling battery pack
CN218991106U (en) Liftable safety measure fence for power transformation operation and maintenance
CN210950628U (en) Topography record auxiliary device for power grid planning
CN212893270U (en) Cable removes strutting arrangement
CN220095558U (en) Gas pipeline lifting frame
CN217838314U (en) Climbing vehicle for outdoor dismantling
CN217602441U (en) Movable inflatable automatic lifting door and greenhouse applying same
CN218152683U (en) Pipeline laying hoisting frame
CN214993193U (en) Hanging basket for construction of suspension casting box girder
CN210822367U (en) Workshop charging trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211231