CN215355091U - Substation primary equipment snow removing tool - Google Patents

Substation primary equipment snow removing tool Download PDF

Info

Publication number
CN215355091U
CN215355091U CN202121805496.1U CN202121805496U CN215355091U CN 215355091 U CN215355091 U CN 215355091U CN 202121805496 U CN202121805496 U CN 202121805496U CN 215355091 U CN215355091 U CN 215355091U
Authority
CN
China
Prior art keywords
rod
welding
bevel gear
primary equipment
snow removing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121805496.1U
Other languages
Chinese (zh)
Inventor
邹军
张海燕
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121805496.1U priority Critical patent/CN215355091U/en
Application granted granted Critical
Publication of CN215355091U publication Critical patent/CN215355091U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a tool for removing accumulated snow of primary equipment of a transformer substation, which comprises a supporting plate, wherein two first water tanks are welded on the upper surface of the supporting plate, first water pipes are communicated on the upper surfaces of the first water tanks, a second water tank is communicated on the tops of the two first water pipes, a hydraulic cylinder is installed on the upper surface of the supporting plate, a second rod body is welded on a piston rod of the hydraulic cylinder, a U-shaped plate is welded on the top of the second rod body, an L-shaped plate is welded on the lower surface of the U-shaped plate, a motor is installed on the upper surface of the L-shaped plate, a first rod body is welded on an output shaft of the motor, the output shaft of the motor drives the first rod body to rotate, the first bevel gear drives the first bevel gear to rotate, the first bevel gear drives the second bevel gear to rotate, the second bevel gear drives the first threaded rod to rotate, the first threaded rod drives a fixing block to move, and the fixing block drives a box body to move, the box body drives the fan to move, and therefore large-area blowing of the transformer substation cable is achieved.

Description

Substation primary equipment snow removing tool
Technical Field
The utility model relates to the technical field of snow removal of transformer substations, in particular to a tool for removing accumulated snow of primary equipment of a transformer substation.
Background
The transformer substation changes the place of voltage, in order to carry the electric energy that the power plant sent out to the place far away, must rise the voltage, become high-tension electricity, reduce the voltage as required near the user again, this kind of work of going up and down voltage is accomplished by the transformer substation, and the main equipment of transformer substation is switch and transformer, according to the size difference of scale, and little is called the transformer substation, and the transformer substation is greater than transformer substation, transformer substation: generally, the voltage reduction transformer substation has a voltage grade below 110 KV; a transformer substation: including "step-up, step-down" substations of various voltage classes. But present novel transformer substation snow removing device that opens ice, it can only be single plays snow removing or the function that opens ice, can't combine two functions together, but the snow below often has the ice-cube, so make people in the work that opens ice snow removing, exchange tool that often need not stop, the snow removing work that opens ice of transformer substation for people brings inconvenient scheduling problem, current ice-melt device only singly dissolves the ice and snow on the transformer substation cable simultaneously, and do not carry out recycle to the water after dissolving, the waste of resource has been caused to a certain extent, for this reason, a transformer substation primary equipment snow removing tool is proposed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a tool for removing accumulated snow of primary equipment of a transformer substation, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a substation primary equipment snow clearing tool comprises a supporting plate, wherein two first water tanks are welded on the upper surface of the supporting plate, first water pipes are communicated on the upper surface of each first water tank, a second water tank is communicated on the tops of the two first water pipes, a hydraulic cylinder is installed on the upper surface of the supporting plate, a second rod body is welded on a piston rod of the hydraulic cylinder, a U-shaped plate is welded on the top of the second rod body, an L-shaped plate is welded on the lower surface of the U-shaped plate, a motor is installed on the upper surface of the L-shaped plate, a first rod body is welded on an output shaft of the motor, a first bevel gear is welded on the outer side wall of the first rod body, a first threaded rod is rotatably connected on the inner side wall of the U-shaped plate through a bearing, a second bevel gear is welded on the outer side wall of the first threaded rod, and the outer side wall of the first bevel gear is meshed with the outer side wall of the second bevel gear, the spout has been seted up to the inside wall of U template, the inside sliding connection of spout has the slider, the bottom welding of slider has the fixed block, the lateral wall threaded connection of first threaded rod has the inside wall of fixed block, the front surface welding of fixed block has the box, the internally mounted of box has the fan, the front surface equidistance welding of box has the heat conduction pole.
As further preferable in the present technical solution: the top of the first rod body is rotatably connected to the lower surface of the U-shaped plate through a bearing.
As further preferable in the present technical solution: a triangular plate is welded on the bottom wall of the first water tank.
As further preferable in the present technical solution: a second water pipe is communicated with one side of the outer side wall of the first water tank, and a valve is installed on the outer side wall of the second water pipe.
As further preferable in the present technical solution: the lower surface of the supporting plate is provided with two mutually symmetrical wheels.
As further preferable in the present technical solution: the lower surface welding of backup pad has two sleeves, sheathed tube inside threaded connection has the second threaded rod, the bottom welding of second threaded rod has the supporting shoe.
Compared with the prior art, the utility model has the beneficial effects that:
firstly, blowing heat generated by a heat conducting rod to a transformer substation cable through a fan so as to melt ice and snow accumulated on the transformer substation cable;
an output shaft of the motor drives a first rod body to rotate, the first rod body drives a first bevel gear to rotate, the first bevel gear drives a second bevel gear to rotate, the second bevel gear drives a first threaded rod to rotate, the first threaded rod drives a fixing block to move, the fixing block drives a box body to move, and the box body drives a fan to move, so that large-area blowing is achieved for a cable of the transformer substation;
thirdly, through setting up the second water tank, when the accumulational ice and snow of transformer substation's cable melts into water, water can fall into in the second water tank to inside flowing into first water tank through first water pipe, can realize the reuse of water resource from this, great reduction the waste of water resource.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a connecting structure of a slider and a fixing block according to the present invention;
FIG. 3 is a schematic view of the internal structure of the first water tank according to the present invention;
FIG. 4 is an enlarged view of the area A of FIG. 1 according to the present invention;
FIG. 5 is a schematic view of a connection structure of a slider and a sliding groove according to the present invention.
In the figure: 1. a support plate; 2. a first water tank; 3. a first water pipe; 4. a motor; 5. an L-shaped plate; 6. a U-shaped plate; 7. a first rod body; 8. a slider; 9. a first threaded rod; 10. a second water tank; 11. a second rod body; 12. a hydraulic cylinder; 13. a sleeve; 14. a second threaded rod; 15. a support block; 16. a wheel; 17. a fixed block; 18. a box body; 19. a set square; 20. a second water pipe; 21. a valve; 22. a heat conducting rod; 23. a fan; 24. a chute; 25. a first bevel gear; 26. a second bevel gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides a technical solution: a substation primary equipment snow clearing tool comprises a supporting plate 1, wherein two first water tanks 2 are welded on the upper surface of the supporting plate 1, first water pipes 3 are communicated on the upper surfaces of the first water tanks 2, second water tanks 10 are communicated on the tops of the two first water pipes 3, a hydraulic cylinder 12 is installed on the upper surface of the supporting plate 1, a second rod body 11 is welded on a piston rod of the hydraulic cylinder 12, a U-shaped plate 6 is welded on the top of the second rod body 11, an L-shaped plate 5 is welded on the lower surface of the U-shaped plate 6, a motor 4 is installed on the upper surface of the L-shaped plate 5, a first rod body 7 is welded on an output shaft of the motor 4, a first bevel gear 25 is welded on the outer side wall of the first rod body 7, a first threaded rod 9 is rotatably connected on the inner side wall of the U-shaped plate 6 through a bearing, a second bevel gear 26 is welded on the outer side wall of the first threaded rod 9, and the outer side wall of the first bevel gear 25 is meshed with the outer side wall of the second bevel gear 26, spout 24 has been seted up to the inside wall of U template 6, and the inside sliding connection of spout 24 has slider 8, and the bottom welding of slider 8 has fixed block 17, and the lateral wall threaded connection of first threaded rod 9 has box 18 in the inside wall of fixed block 17, the front surface welding of fixed block 17, and the internally mounted of box 18 has fan 23, and the front surface equidistance welding of box 18 has heat conduction pole 22.
In this embodiment, specifically: the top of the first rod body 7 is rotatably connected to the lower surface of the U-shaped plate 6 through a bearing; first body of rod 7 passes through the bearing and rotates the lower surface at U template 6 to play spacing effect to first body of rod 7, prevent that the angle of first body of rod 7 from taking place the skew.
In this embodiment, specifically: a triangular plate 19 is welded on the bottom wall of the first water tank 2; the water in the first water tank 2 is guided by the triangle 19 so that it can flow out.
In this embodiment, specifically: a second water pipe 20 is communicated with one side of the outer side wall of the first water tank 2, and a valve 21 is arranged on the outer side wall of the second water pipe 20; the water outflow can be effectively controlled by the valve 21.
In this embodiment, specifically: the lower surface of the supporting plate 1 is provided with two mutually symmetrical wheels 16; the device is further conveniently moved by wheels 16.
In this embodiment, specifically: the lower surface of the supporting plate 1 is welded with two sleeves 13, the inner threads of the sleeves 13 are connected with second threaded rods 14, and the bottoms of the second threaded rods 14 are welded with supporting blocks 15; when the device does not need to be moved, the wheels 16 are far away from the ground by rotating the second threaded rod 14, so that the wheels 16 are effectively prevented from moving the device.
In this embodiment, specifically: the motor 4 is model 5IK90RGU-CF, the hydraulic cylinder 12 is model CJT140, and the fan 23 is model DC 12038.
In this embodiment, specifically: and a switch group for controlling the motor 4, the hydraulic cylinder 12 and the fan 23 is installed on one side of the upper surface of the supporting plate 1, and the switch group is connected with an external commercial power and used for supplying power to the motor 4, the hydraulic cylinder 12 and the fan 23.
When the device is used, the hydraulic cylinder 12 is started by using the switch group, the piston rod of the hydraulic cylinder 12 drives the second rod body 11 to ascend and descend, the second rod body 11 drives the U-shaped plate 6 to ascend and descend, and then the device is lifted to the height of a transformer substation cable at which ice and snow need to be dissolved, the fan 23 is started by using the switch group, the fan 23 blows heat generated by the heat conducting rod 22 to the transformer substation cable to melt the ice and snow accumulated on the transformer substation cable, the motor 4 is started by using the switch group, the output shaft of the motor 4 drives the first rod body 7 to rotate, the first rod body 7 drives the first bevel gear 25 to rotate, the first bevel gear 25 drives the second bevel gear 26 to rotate, the second bevel gear 26 drives the first threaded rod 9 to rotate, the first threaded rod 9 drives the fixed block 17 to move, the fixed block 17 drives the box body 18 to move, the box body 18 drives the fan 23 to move, and accordingly large-area blowing of the transformer substation cable is realized, through mutually supporting of slider 8 and spout 24, it is spacing to carry out fixed block 17, prevent that fixed block 17 from rotating along with the rotation of first threaded rod 9, and then unable removal fan 23, through setting up second water tank 10, when the accumulational ice and snow of transformer substation's cable melts into water, water can fall into in the second water tank 10, and flow into first water tank 2 inside through first water pipe 3, from this can realize the reuse of water resource, great reduction the waste of water resource, when 2 inside waters of first water tank are full, through opening valve 21, can take out the water in the first water tank 2, through two wheels 16 of bottom installation at backup pad 1, thereby be convenient for remove this device, when this device need not remove, through rotating second threaded rod 14, make wheel 16 keep away from ground, thereby the effectual wheel 16 that has prevented from driving this device and moving.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a substation's primary equipment snow removing tool, includes backup pad (1), its characterized in that: the upper surface welding of backup pad (1) has two first water tanks (2), the upper surface intercommunication of first water tank (2) has first water pipe (3), two the top intercommunication of first water pipe (3) has second water tank (10), the last surface mounting of backup pad (1) has pneumatic cylinder (12), the piston rod welding of pneumatic cylinder (12) has the second body of rod (11), the top welding of the second body of rod (11) has U template (6), the lower surface welding of U template (6) has L template (5), the last surface mounting of L template (5) has motor (4), the output shaft welding of motor (4) has the first body of rod (7), the lateral wall welding of the first body of rod (7) has first bevel gear (25), the inside wall of U template (6) is connected with first threaded rod (9) through the bearing rotation, the welding of the lateral wall of first threaded rod (9) has second bevel gear (26), the lateral wall meshing of first bevel gear (25) is connected in the lateral wall of second bevel gear (26), spout (24) have been seted up to the inside wall of U template (6), the inside sliding connection of spout (24) has slider (8), the welding of the bottom of slider (8) has fixed block (17), the lateral wall threaded connection of first threaded rod (9) is in the inside wall of fixed block (17), the front surface welding of fixed block (17) has box (18), the internally mounted of box (18) has fan (23), the welding of the front surface equidistance of box (18) has heat-conducting rod (22).
2. The substation primary equipment snow removing tool of claim 1, characterized in that: the top of the first rod body (7) is rotatably connected to the lower surface of the U-shaped plate (6) through a bearing.
3. The substation primary equipment snow removing tool of claim 1, characterized in that: a triangular plate (19) is welded on the bottom wall of the first water tank (2).
4. The substation primary equipment snow removing tool of claim 1, characterized in that: a second water pipe (20) is communicated with one side of the outer side wall of the first water tank (2), and a valve (21) is installed on the outer side wall of the second water pipe (20).
5. The substation primary equipment snow removing tool of claim 1, characterized in that: two mutually symmetrical wheels (16) are arranged on the lower surface of the supporting plate (1).
6. The substation primary equipment snow removing tool of claim 1, characterized in that: the lower surface welding of backup pad (1) has two sleeve pipes (13), the inside threaded connection of sleeve pipe (13) has second threaded rod (14), the bottom welding of second threaded rod (14) has supporting shoe (15).
CN202121805496.1U 2021-08-04 2021-08-04 Substation primary equipment snow removing tool Active CN215355091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121805496.1U CN215355091U (en) 2021-08-04 2021-08-04 Substation primary equipment snow removing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121805496.1U CN215355091U (en) 2021-08-04 2021-08-04 Substation primary equipment snow removing tool

Publications (1)

Publication Number Publication Date
CN215355091U true CN215355091U (en) 2021-12-31

Family

ID=79615311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121805496.1U Active CN215355091U (en) 2021-08-04 2021-08-04 Substation primary equipment snow removing tool

Country Status (1)

Country Link
CN (1) CN215355091U (en)

Similar Documents

Publication Publication Date Title
CN106939997A (en) A kind of adjustable solar street lamp
CN210621660U (en) Water conservancy water and electricity dam floater cleaning device
CN215355091U (en) Substation primary equipment snow removing tool
CN215185961U (en) Portable solar emergency power supply device
CN211667740U (en) Street lamp for urban road with power generation facility and be convenient for transportation
CN211450709U (en) New forms of energy lighting device convenient to use
CN110600225B (en) Rainwater cooling device for pole-mounted transformer
CN210639761U (en) Flow guide device for intelligent traffic
CN215060810U (en) Micro-grid energy coordination monitoring device
CN213746515U (en) New forms of energy street lamp adjusting device
CN112622074B (en) Slotted hole cutting device is used in indoor forceful electric power construction
CN211475785U (en) Intelligent control solar street lamp
CN204593229U (en) Solar energy flashing light with automatic dust removal function
CN209779479U (en) Municipal works warning light
CN209961821U (en) High-voltage intelligent prepayment metering box
CN101054797A (en) Machine for clearing dirt of silk pole of DC electric sluice gates open-close machine and automatically oiling
CN215888556U (en) Sponge city oozes row structure
CN204775353U (en) A dolly for changing terminal box
CN211875955U (en) A wisdom lamp pole for urban road
CN112030891B (en) Mechanical gate for hydraulic engineering for generating electricity by utilizing water pressure difference
CN217556864U (en) River course cleaning device is used in hydraulic and hydroelectric engineering supervision
CN211948299U (en) Lifting gate for hydraulic engineering
CN221713647U (en) Urban and rural water supply efficient sedimentation tank
CN216262130U (en) Solar circulating water cleaning machine for construction enclosure
CN217273855U (en) Rotary lighting structure of solar street lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant