CN215344066U - Fast switching structure for uninterrupted operation - Google Patents
Fast switching structure for uninterrupted operation Download PDFInfo
- Publication number
- CN215344066U CN215344066U CN202121435968.9U CN202121435968U CN215344066U CN 215344066 U CN215344066 U CN 215344066U CN 202121435968 U CN202121435968 U CN 202121435968U CN 215344066 U CN215344066 U CN 215344066U
- Authority
- CN
- China
- Prior art keywords
- change
- switch
- current sensor
- tse1
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
The utility model relates to a quick switching structure, in particular to a quick switching structure for uninterrupted operation, and belongs to the technical field of power supply protection. The system comprises a transformer, a low-voltage distribution box, a mobile generator car, a breaker Q1, a breaker Q2, a change-over switch TSE1, a change-over switch TSE2, a solid-state electronic switch G1, a main control unit M1, a current sensor CT1 and a current sensor CT 2. Therefore, the load of the platform area is synchronously rearranged between the commercial power and the mobile power generation car in a non-grid-connected mode, and the uninterrupted stable transition of the load is ensured, so that the platform area has the remarkable advantages of high synchronism, flexible conversion, low breaking electric arc, small impact current, stable phase transition and the like.
Description
Technical Field
The utility model relates to a quick switching structure, in particular to a quick switching structure for uninterrupted operation, and belongs to the technical field of power supply protection.
Background
The national grid company has vigorously promoted 'canceling of power failure operation of distribution network planning', and the power failure operation of power loads in low-voltage transformer areas has been popularized and applied in various places, and at present, the main implementation schemes of the method are classified into the following two types: 1. the scheme of detecting synchronization grid-connection loop-closing power conversion can realize uninterrupted switching, but needs a power generation vehicle and a power grid to carry out grid-connection operation, has grid-connection tide impact, can cause fault protection of a mobile power generation vehicle when serious, and is easy to cause arc burning loss of a mechanical contact due to tide, so that the electrical service life of a grid-connection mechanical switch is greatly shortened. 2. The rapid switching of the hybrid rapid change-over switch is realized (generally, the switching time of a contact is required to be less than or equal to 5ms), grid-connected operation is not needed, the risk of grid-connected tide impact is avoided, millisecond-level short-time power failure exists, uninterrupted switching cannot be really realized, the power consumption experience of a user is reduced, phase jump phenomenon exists before and after power supply switching because the scheme does not need grid-connected operation, the power consumption load cannot realize stable transition, and the fault risk of the load caused by phase jump is increased.
In order to solve the problems of the existing uninterrupted operation of the load in the low-voltage transformer area from the technical innovation point of view, further simplify the steps of live working, increase the application scene of the uninterrupted operation and improve the reliability and safety of the uninterrupted switching, a novel uninterrupted switching scheme is provided, so that the scheme can overcome the defects of grid-connected switching, and simultaneously avoids phase jump and short-time power failure in the switching process, thereby realizing the uninterrupted fast switching and stable transition of the load.
SUMMERY OF THE UTILITY MODEL
The utility model mainly solves the defects in the prior art, and provides a switching system which is realized by adopting a synchronous phase prejudgment non-grid-connected fast switching technology; the switching system mainly applies a power supply synchronization degree pre-judging technology and a solid-state electronic switch short-time bypass switching-on and switching-off technology to the switching system, so that the platform load is synchronously switched between the commercial power and the mobile power generation car in a non-grid-connected mode, the uninterrupted stable transition of the load is ensured, and the uninterrupted fast switching structure for the uninterrupted operation has the remarkable advantages of high synchronism, flexible conversion, low disjunction electric arc, small impact current, stable phase transition and the like.
The technical problem of the utility model is mainly solved by the following technical scheme:
a fast switching system for uninterrupted power operation comprises a transformer, a low-voltage distribution box, a mobile generator car, a breaker Q1, a breaker Q2, a change-over switch TSE1, a change-over switch TSE2, a solid electronic switch G1, a main control unit M1, a current sensor CT1 and a current sensor CT 2.
Preferably, one end of the master control unit M1 is connected to a transfer switch TSE1, the other end of the master control unit M1 is connected to a transfer switch TSE2, an outlet of the transfer switch TSE2 is connected in series to a solid-state electronic switch G1, and a solid-state electronic switch G1 is connected to an outlet of the transfer switch TSE 1.
Preferably, a current sensor CT2 is connected in series with an outlet terminal of the solid-state electronic switch G1, a current sensor CT1 is connected in series with an outlet terminal of the change-over switch TSE1, an outlet terminal of the current sensor CT2 is connected in series with an outlet terminal of the current sensor CT1, and the current sensor CT1 and the current sensor CT2 are respectively connected with the main control unit M1.
Preferably, the incoming line end of the transformer is connected with a breaker Q1, the breaker Q1 is connected with the incoming line end of a change-over switch TSE1 in series, the other end of the transformer is connected with a low-voltage distribution box, and the outgoing line end of the low-voltage distribution box is arranged between a current sensor CT1 and a current sensor CT 2; the incoming line end of the mobile generator car is connected with a breaker Q2 in series, one end of the breaker Q2 is connected with the incoming line end of a change-over switch TSE1, and the other end of the breaker Q2 is connected with the incoming line end of a change-over switch TSE 2.
Preferably, the main control unit M1 includes an excitation control circuit i, an excitation control circuit ii, an electronic switch driving circuit, a voltage sensor PT1, a voltage sensor PT2, and a voltage sensor PT3, where the excitation control circuit i is configured to drive an excitation coil of the transfer switch TSE1, the excitation control circuit ii is configured to drive an excitation coil of the transfer switch TSE2, the electronic switch driving circuit is configured to drive the solid-state electronic switch G1 to be turned on and off rapidly, the voltage sensor PT1 is configured to monitor electrical parameters of voltage, phase sequence, and phase at the commercial power side, the voltage sensor PT2 is configured to monitor electrical parameters of voltage, phase sequence, and phase at the generator side, and the voltage sensor PT3 is configured to monitor electrical parameters of voltage, phase sequence, and phase at the load side.
The working principle is as follows:
firstly, the circuit breakers Q1 and Q2 are in the brake separating position in the initial state, when the load needs to be transferred from the commercial power side to the mobile power generation vehicle, the main control unit M1 judges whether the output voltage values of the commercial power and the power generator are in the error range and whether the phase sequence is consistent or not through voltage signals monitored by voltage sensors PT1 and PT3, if the conditions are met, an excitation control loop is controlled through the main control unit M1, the excitation Coil1 and Coil2 are driven to act, and the change-over switches TSE1 and TSE2 are switched to the commercial power side; then a breaker Q1 is switched on to penetrate through the mains supply bypass power supply loop; at the moment, the main incoming line switch of the manual opening low-voltage distribution box P1 is adopted, and at the moment, the load is powered by a bypass through a circuit breaker Q1 and a change-over switch TSE 1;
after the bypass is completed, a breaker Q2 is switched on, the voltage sensors PT1 and PT2 monitor the voltage of the commercial power and the voltage of the generator side in real time, the synchronization degree of the two power supplies is pre-judged through the main control unit M1, the optimal time of the driving command of the excitation coil of the TSE1 is predicted by combining the action time characteristic of a change-over switch TSE1, so that when the TSE1 contact is switched to the power supply of the generator, the phase difference between the commercial power side and the generator is close to zero, the phase jump caused by switching is avoided, and the stable load transition is ensured;
thirdly, in order to avoid contact arcing and short-time power failure caused by separation of mechanical contacts in the switching process of the change-over switch TSE1, the main control unit M1 sends a driving command through the excitation control loop I and controls the conduction of the solid-state electronic switch G1 through the electronic switch driving loop at the same time, and when the contact of the change-over switch TSE1 is separated, the load is powered by a bypass through the change-over switch TSE2 and the solid-state electronic switch G1;
fourthly, when the change-over switch TSE1 is changed to the generator side instantly (less than or equal to 1ms), the main control unit M1 instantly judges that the change-over of the TSE1 is completed through the characteristic value of the current sensor CT1, at the moment, the electronic switch driving circuit immediately controls the solid-state electronic switch G1 to break, so that the phenomenon that the power grids on two sides are connected in a grid mode to cause tide impact is avoided, meanwhile, the change-over switch TSE2 is controlled to be switched to the position of the generator through the excitation Coil2, and at the moment, the load is transferred to the mobile generator car to supply power; .
Similarly, when the load needs to be returned to the mains supply from the generator side, the voltage sensors PT1 and PT2 monitor the mains supply and the voltage of the generator side in real time, the synchronism of the two power supplies is pre-judged through the main control unit M1, and the optimal time of the TSE1 excitation coil driving command is predicted by combining the action time characteristic of the change-over switch TSE1, so that when the TSE1 contact returns to the mains supply, the phase difference between the generator side and the mains supply is close to zero, phase jump caused by switching is avoided, and stable load transition is ensured;
sixthly, simultaneously, in order to avoid contact arcing and short-time power failure caused by separation of mechanical contacts in the switching process of the TSE1, the main control unit M1 sends a driving command through the excitation control loop I and controls the conduction of the solid-state electronic switch G1 through the electronic switch driving loop, at the moment, the TSE1 contacts are separated, and the load is powered by a bypass way through the TSE2 and the G1;
when the change-over switch TSE1 returns to the mains supply side instantly (not more than 1ms), the main control unit M1 instantly judges that the TSE1 is converted through the characteristic value of the current sensor CT1, at the moment, the solid-state electronic switch G1 is controlled to be disconnected through the electronic switch driving circuit, so that the load impact caused by grid connection of two side power grids is avoided, meanwhile, the change-over switch TSE2 is controlled to be switched to the mains supply position through the excitation Coil Coil2, and at the moment, the load returns to the mains supply;
and finally manually closing the low-voltage distribution box P1 main incoming line switch and the separating circuit breakers Q1 and Q2, returning to the initial state, and finishing the uninterrupted operation of the load.
The change-over switch TSE1 is used as a two-way power supply main change-over switch to supply power to the load, wherein two incoming line ends are respectively connected with the commercial power side and the generator side through a breaker Q1 and a breaker Q2, and the outgoing line end of the change-over switch TSE1 is directly connected with the low-voltage bus at the load side.
The circuit breakers Q1 and Q2 are mainly used for overload short-circuit protection, including overload short-circuit protection of loads, short-circuit protection of two paths of power supplies in a switching process, fault short-circuit protection of solid-state electronic switches and the like.
The change-over switch TSE2 is mainly used for short-time bypass power supply selection of the solid-state electronic switch G1 and is mainly used for short-time bypass power supply with separated contacts of the change-over switch TSE1, wherein two incoming line ends are respectively connected to a breaker Q1 and a breaker Q2, and an outgoing line end of a TSE2 is connected with the solid-state electronic switch G1 in series, as shown in FIG. 1.
The solid-state electronic switch G1 is connected in series with the TSE2 outlet end and then connected in parallel to the change-over switch TSE1 outlet end, and the short-time power supply is carried out by bypassing the change-over switch TSE1 to the load by utilizing the rapid conduction characteristic of the electronic switch, so that the short-time power failure and contact arcing caused by the breaking of mechanical contacts in the change-over process of the TSE1 are avoided; and the rapid breaking characteristic of the electronic switch is utilized to avoid the tidal current impact caused by the grid connection of the two power supplies after the switching of the TSE1 is completed, so that the non-grid connection high-synchronism switching of the two power supplies is realized, and the stable transition of the load is realized.
The current sensors CT1 and CT2 are connected with the master control unit M1, and current monitoring is performed through the master control unit, wherein the CT1 is mainly used for monitoring the current of the outlet terminal of the change-over switch TSE1, and the CT2 is mainly used for monitoring the bypass conduction current of the solid-state electronic switch G1; in addition, the main control unit M1 is used for detecting the on-off time of the change-over switch TSE1 through current characteristic extraction by current signals collected by the current sensor CT 1.
The main control unit M1 mainly comprises the following components: the device comprises an excitation control circuit 1, an excitation control circuit 2, an electronic switch driving circuit, voltage sensors PT1, PT2 and PT 3; the excitation control loop I and the excitation control loop II are respectively used for driving excitation coils of the change-over switch TSE1 and the change-over switch TSE2, so that the change-over action of the change-over switch is realized; the electronic switch driving loop is used for driving the solid-state electronic switch G1 to be switched on and off rapidly; the voltage sensors PT1, PT2, and PT3 are used for monitoring electric parameters such as voltage, phase sequence, and phase on the commercial power side, the generator side, and the load side, respectively.
The utility model provides a fast switching structure for uninterrupted operation.A main control unit M1 controls a change-over switch TSE2 through an excitation control loop II and selects a power supply needing a bypass; through the monitoring and the contemporaneous prejudgment of the electrical parameters of the two power supplies, the switching time of the change-over switch TSE1 is controlled through the excitation control loop 1, the current characteristic value is extracted through the current sensor CT1, the on-off time of the change-over switch TSE1 is monitored, the on-off of the solid-state electronic change-over switch G1 is controlled, and the uninterrupted switching and the steady transition of the load between the commercial power and the generator are completed.
Drawings
FIG. 1 is an electrical schematic diagram of a fast switching system for uninterrupted operation;
fig. 2 is a schematic diagram of the bypass power supply of the mains supply through Q1 and TSE 1;
fig. 3 is a schematic diagram of short-time power supply of commercial power by the TSE2 and G1 in the contact separation stage of the TSE 1;
FIG. 4 is a schematic diagram of the load transfer to the generator car power supply;
fig. 5 is a schematic diagram of a short-time power supply of the generator in the TSE1 contact separation stage through the TSE2 and G1 bypass circuit.
Detailed Description
The technical scheme of the utility model is further specifically described by the following embodiments and the accompanying drawings.
Example 1: as shown in the figure, the non-power-off operation fast switching system comprises a transformer 1, a low-voltage distribution box 2, a mobile generator car 3, a circuit breaker Q14, a circuit breaker Q25, a change-over switch TSE16, a change-over switch TSE27, a solid-state electronic switch G18, a main control unit M19, a current sensor CT110 and a current sensor CT 211.
One end of the master control unit M19 is connected with a change-over switch TSE16, the other end of the master control unit M19 is connected with a change-over switch TSE27, an outlet end of the change-over switch TSE27 is connected with a solid-state electronic switch G18 in series, and a solid-state electronic switch G18 is connected to an outlet end of the change-over switch TSE 16.
The outlet end of the solid-state electronic switch G18 is connected in series with a current sensor CT211, the outlet end of the change-over switch TSE16 is connected in series with a current sensor CT110, the outlet end of the current sensor CT211 is connected in series with the outlet end of the current sensor CT110, and the current sensor CT110 and the current sensor CT211 are respectively connected with the main control unit M19.
The incoming line end of the transformer 1 is connected with a circuit breaker Q14, the circuit breaker Q14 is connected with the incoming line end of a change-over switch TSE16 in series, the other end of the transformer 1 is connected with a low-voltage distribution box 2, and the outgoing line end of the low-voltage distribution box 2 is arranged between a current sensor CT110 and a current sensor CT 211; the incoming line end of the mobile generator car 3 is connected in series with a breaker Q25, one end of the breaker Q25 is connected with the incoming line end of a change-over switch TSE16, and the other end of the breaker Q25 is connected with the incoming line end of the change-over switch TSE 27.
The main control unit M19 includes excitation control circuit I12, excitation control circuit II 13, electronic switch drive circuit 14, voltage sensor PT115, voltage sensor PT216 and voltage sensor PT317, excitation control circuit I12 be used for driving change over switch TSE 16's excitation coil, excitation control circuit II 13 be used for driving change over switch TSE 27's excitation coil, electronic switch drive circuit 14 be used for driving solid-state electronic switch G18's quick break-make, voltage sensor PT115 be used for the electric parameter monitoring of voltage, phase sequence and the phase place of commercial power side, voltage sensor PT216 be used for the electric parameter monitoring of voltage, phase sequence and the phase place of generator side, voltage sensor PT317 be used for the electric parameter monitoring of voltage, phase sequence and the phase place of load side.
Claims (3)
1. The utility model provides a not operation fast switch over structure that cuts off power supply which characterized in that: the system comprises a transformer (1), a low-voltage distribution box (2), a mobile power generation vehicle (3), a circuit breaker Q1(4), a circuit breaker Q2(5), a transfer switch TSE1(6), a transfer switch TSE2(7), a solid-state electronic switch G1(8), a main control unit M1(9), a current sensor CT1(10) and a current sensor CT2 (11);
one end of the master control unit M1(9) is connected with a change-over switch TSE1(6), the other end of the master control unit M1(9) is connected with a change-over switch TSE2(7), an outlet end of the change-over switch TSE2(7) is connected with a solid-state electronic switch G1(8) in series, and the solid-state electronic switch G1(8) is connected with an outlet end of the change-over switch TSE1 (6);
the outlet end of the solid-state electronic switch G1(8) is connected in series with a current sensor CT2(11), the outlet end of the change-over switch TSE1(6) is connected in series with a current sensor CT1(10), the outlet end of the current sensor CT2(11) is connected in series with the outlet end of the current sensor CT1(10), and the current sensor CT1(10) and the current sensor CT2(11) are respectively connected with a main control unit M1 (9).
2. The fast switching structure of claim 1, wherein:
the incoming line end of the transformer (1) is connected with a circuit breaker Q1(4), the circuit breaker Q1(4) is connected with the incoming line end of a change-over switch TSE1(6) in series, the other end of the transformer (1) is connected with a low-voltage distribution box (2), and the outgoing line end of the low-voltage distribution box (2) is arranged between a current sensor CT1(10) and a current sensor CT2 (11); the incoming line end of the mobile generator car (3) is connected with a breaker Q2(5) in series, one end of the breaker Q2(5) is connected with the incoming line end of a change-over switch TSE1(6), and the other end of the breaker Q2(5) is connected with the incoming line end of a change-over switch TSE2 (7).
3. The non-stop operation fast switching structure according to claim 1 or 2, wherein: the main control unit M1(9) comprises an excitation control loop I (12), an excitation control loop II (13), an electronic switch driving loop (14), a voltage sensor PT1(15), a voltage sensor PT2(16) and a voltage sensor PT3(17), wherein the excitation control loop I (12) is used for driving an excitation coil of a transfer switch TSE1(6), the excitation control loop II (13) is used for driving the excitation coil of a transfer switch TSE2(7), the electronic switch driving loop (14) is used for driving the solid-state electronic switch G1(8) to be switched on and off rapidly, the voltage sensor PT1(15) is used for monitoring electric parameters of voltage, phase sequence and phase at the city power side, the voltage sensor PT2(16) is used for monitoring electric parameters of voltage, phase sequence and phase at the generator side, and the voltage sensor PT3(17) is used for monitoring electric parameters of voltage, phase sequence and phase at the load side, And monitoring the electrical parameters of the phase sequence and the phase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121435968.9U CN215344066U (en) | 2021-06-25 | 2021-06-25 | Fast switching structure for uninterrupted operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121435968.9U CN215344066U (en) | 2021-06-25 | 2021-06-25 | Fast switching structure for uninterrupted operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215344066U true CN215344066U (en) | 2021-12-28 |
Family
ID=79562006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121435968.9U Active CN215344066U (en) | 2021-06-25 | 2021-06-25 | Fast switching structure for uninterrupted operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215344066U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113452076A (en) * | 2021-06-25 | 2021-09-28 | 嘉兴市恒创电力设备有限公司 | Uninterrupted power operation fast switching system and method thereof |
-
2021
- 2021-06-25 CN CN202121435968.9U patent/CN215344066U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113452076A (en) * | 2021-06-25 | 2021-09-28 | 嘉兴市恒创电力设备有限公司 | Uninterrupted power operation fast switching system and method thereof |
CN113452076B (en) * | 2021-06-25 | 2022-05-13 | 嘉兴市恒创电力设备有限公司 | Uninterrupted power operation fast switching system and method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104332989B (en) | The active distribution network voltage dip administering method of fast chopper is driven based on eddy current | |
CN101702360B (en) | Pre-magnetizing device of power supply transformer and pre-magnetizing method thereof | |
CN113595227B (en) | Low-voltage transformer area load uninterrupted switching system and working method thereof | |
CN113765211B (en) | Uninterrupted power supply method for direct-current emergency bus bar in aviation power distribution system | |
CN111162605A (en) | Low-voltage transformer area uninterrupted switching system and method based on mobile power generation car | |
CN215344066U (en) | Fast switching structure for uninterrupted operation | |
CN113452076B (en) | Uninterrupted power operation fast switching system and method thereof | |
CN215300162U (en) | Low-voltage transformer area load uninterrupted switching system | |
CN107769195B (en) | Forced flow conversion type mechanical switch based on LC oscillation, device and control method | |
CN206977148U (en) | It is a kind of that civil power and the circuit of oil machine switching are controlled using PLC and touch-screen | |
CN111863465B (en) | Double-station circuit breaker, direct-current combined electrical apparatus applying same and working method | |
CN205666679U (en) | UPS of bypass automatic switch -over type | |
CN202749184U (en) | Pre-magnetizing device for transformer of high-power wind power complete machine test bench | |
CN110896247A (en) | Automatic control system of bus coupler switch | |
CN108695972B (en) | Switching circuit, system and method for controlling power supply of power changing station, controller and medium | |
CN211046559U (en) | Intelligent spare power automatic switching device for direct-current power supply of transformer substation | |
CN217824268U (en) | Intelligent anti-shaking electric control device | |
CN220895443U (en) | Direct current breaker | |
CN219833764U (en) | Power grid fault metallic grounding transfer device | |
CN111130081B (en) | System and method for reducing electric energy loss by additionally arranging current-limiting reactor bypass switch | |
CN216774368U (en) | Power supply device of gas cogeneration control system | |
CN218161918U (en) | Hybrid dual-power conversion device | |
CN218603397U (en) | Soft start control circuit | |
CN110299725B (en) | Thyristor fast switch and protection control circuit and control method thereof | |
CN216056453U (en) | Anti-interference circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |