CN215335458U - On-site surveying and mapping device for urban construction cost - Google Patents
On-site surveying and mapping device for urban construction cost Download PDFInfo
- Publication number
- CN215335458U CN215335458U CN202122080420.3U CN202122080420U CN215335458U CN 215335458 U CN215335458 U CN 215335458U CN 202122080420 U CN202122080420 U CN 202122080420U CN 215335458 U CN215335458 U CN 215335458U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- mapping
- surveying
- sides
- threaded rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000013507 mapping Methods 0.000 title claims abstract description 60
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 230000007246 mechanism Effects 0.000 claims abstract description 14
- 238000005259 measurement Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
The utility model discloses a site mapping device for urban construction cost, which comprises a mapping box, wherein the bottom of the inner cavity of the mapping box is movably connected with a threaded rod through a bearing, the surface of the threaded rod is sleeved with a driven gear, the right side of the bottom of the inner cavity of the mapping box is fixedly connected with a motor, the output shaft of the motor is fixedly connected with a driving gear which is meshed with a driven gear, the utility model constructs a site surveying and mapping device for urban construction cost through the arrangement of the surveying and mapping box, the threaded rod, the driven gear, the motor, the driving gear, the supporting plate, the threaded sleeve, the supporting column, the placing plate and the clamping mechanism, wherein through the setting of threaded rod, driven gear, motor and driving gear, can drive and inlay the backup pad rebound that is equipped with the thread bush, and then can drive the support column and place the board rebound and go out outside the survey and drawing case.
Description
Technical Field
The utility model relates to the technical field of engineering surveying and mapping, in particular to a field surveying and mapping device for urban construction engineering cost.
Background
At present, the building engineering survey and drawing is to measure and draw the building, the existing characteristic points and boundary lines of the ground are measured by a measuring means to obtain the figure and position information reflecting the current situation of the ground, the figure and position information is used for planning design and administrative management of engineering construction, the surveying instrument is indispensable in the survey and drawing work, the surveying instrument is simply the instrument and device for data acquisition, processing and output and the like designed and manufactured for surveying and drawing work, various orientation, distance measurement, angle measurement, height measurement, mapping, photogrammetry and other aspects required by the measurement work are carried out in the planning design, construction and operation management stages in the engineering construction, and the surveying instrument needs to be arranged on a positioning frame in the use process.
Surveying instrument generally all installs on the A-frame, fixes surveying instrument through the bolt, and surveying instrument's installation is all comparatively troublesome with the dismantlement, and surveying instrument needs the survey and drawing position of many times conversion in the use, and at this moment surveying instrument is direct naked placing mostly, and this kind of mode easily makes the surveying instrument cause the damage under the unexpected condition, and the protectiveness is relatively poor, for this reason we propose the on-the-spot mapping device that city construction cost used, solve the problem that proposes above.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a field surveying and mapping device for urban construction cost, which has the advantages of convenience in installation and disassembly and good protection, and solves the problems that a surveying and mapping instrument is generally installed on a triangular bracket, is fixed through a bolt and is troublesome to install and disassemble, and the surveying and mapping instrument is easily damaged due to poor protection of the triangular bracket.
In order to achieve the purpose, the utility model provides the following technical scheme: on-spot mapping device that city building engineering cost was used, including the survey and drawing case, there is the threaded rod bottom of survey and drawing incasement chamber through bearing swing joint, the surface cover of threaded rod is equipped with driven gear, the right side fixedly connected with motor of survey and drawing incasement chamber bottom, the output shaft fixedly connected with driving gear of motor, driving gear and driven gear meshing, the equal sliding connection in both sides of survey and drawing incasement chamber has the backup pad, the inner chamber of backup pad inlays and is equipped with the thread bush, threaded rod and thread bush threaded connection, the equal sliding connection in both sides at backup pad top has the support column, the board is placed to the top fixedly connected with of support column, place the equal fixedly connected with clamping mechanism in both sides at board top.
Preferably, the clamping mechanism comprises two fixing plates, the bottom of each fixing plate is fixedly connected with the placing plate, one side, opposite to the other side, of each fixing plate is fixedly connected with an electric push rod, and the telescopic end of each electric push rod is fixedly connected with a clamping plate.
Preferably, the spout has all been seted up to the both sides of survey and drawing case inner chamber, the equal fixedly connected with slider in both sides of backup pad, and the inner chamber sliding connection of slider and spout.
Preferably, the two sides of the top of the supporting plate are provided with ring grooves, the two sides of each ring groove are connected with sliding seats in a sliding mode, and the tops of the sliding seats are fixedly connected with the supporting columns.
Preferably, the top fixedly connected with stopper of threaded rod, equal fixedly connected with universal wheel all around of survey and drawing bottom of the case portion, the left side fixedly connected with battery of survey and drawing bottom of the case portion.
Preferably, the top at the back of the surveying and mapping box is movably connected with a box cover through a hinge, and the front of the surveying and mapping box and the box cover are movably connected through a clamping lock.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, through the arrangement of the surveying and mapping box, the threaded rod, the driven gear, the motor, the driving gear, the supporting plate, the threaded sleeve, the supporting column, the placing plate and the clamping mechanism, the on-site surveying and mapping device for urban construction project cost is jointly constructed, wherein the supporting plate embedded with the threaded sleeve can be driven to move upwards through the arrangement of the threaded rod, the driven gear, the motor and the driving gear, the supporting plate embedded with the threaded sleeve can be driven to move upwards, the supporting column and the placing plate can be further driven to move upwards out of the surveying and mapping box, at the moment, the electric push rod in the clamping mechanism is started to push the clamping plate to clamp the surveying and mapping equipment, so that a user can conveniently install the surveying and mapping equipment, and the surveying and mapping box is arranged, the protection performance of the surveying and mapping instrument can be improved, and the service life is prolonged.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the structure of the present invention;
FIG. 3 is a cross-sectional view of a threaded sleeve in the construction of the present invention;
FIG. 4 is an enlarged view of a portion of A in the structure of the present invention;
FIG. 5 is a top view of a support plate in the construction of the present invention.
In the figure: 1. a surveying and mapping box; 2. a threaded rod; 3. a driven gear; 4. a motor; 5. a driving gear; 6. a support plate; 7. a threaded sleeve; 8. a support pillar; 9. placing the plate; 10. a clamping mechanism; 101. a fixing plate; 102. an electric push rod; 103. a splint; 11. a ring groove; 12. a slide base; 13. and a box cover.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the on-site mapping device for urban construction cost comprises a mapping box 1, wherein the bottom of the inner cavity of the mapping box 1 is movably connected with a threaded rod 2 through a bearing, the surface of the threaded rod 2 is sleeved with a driven gear 3, the right side of the bottom of the inner cavity of the mapping box 1 is fixedly connected with a motor 4, the output shaft of the motor 4 is fixedly connected with a driving gear 5, the driving gear 5 is meshed with the driven gear 3, two sides of the inner cavity of the mapping box 1 are respectively and slidably connected with a supporting plate 6, a threaded sleeve 7 is embedded in the inner cavity of the supporting plate 6, the threaded rod 2 is in threaded connection with the threaded sleeve 7, two sides of the top of the supporting plate 6 are respectively and slidably connected with a supporting column 8, the top of the supporting column 8 is fixedly connected with a placing plate 9, two sides of the top of the placing plate 9 are respectively and fixedly connected with clamping mechanisms 10, and the two sides of the top of the placing plate 9 are respectively and pass through the mapping box 1, the threaded rod 2, the driven gear 3, the motor 4, the driving gear 5, Backup pad 6, thread bush 7, the support column 8, place board 9 and clamping mechanism 10's setting, the on-the-spot mapping device that a city building engineering cost was used has been found jointly, wherein through threaded rod 2, driven gear 3, motor 4 and driving gear 5's setting, can drive and inlay the backup pad 6 upwards removal that is equipped with thread bush 7, and then can drive support column 8 and place board 9 rebound and go out mapping box 1 outside, at this moment, start electric putter 102 among clamping mechanism 10 and promote splint 103 and press from both sides tight mapping equipment, thereby can the person of facilitating the use install mapping equipment, and mapping box 1 sets up, can improve the barrier propterty to the surveying instrument, service life is prolonged.
Referring to fig. 2, the clamping mechanism 10 includes two fixing plates 101, the bottom of the two fixing plates 101 is fixedly connected to the placing plate 9, one side of each of the two fixing plates 101 opposite to each other is fixedly connected to an electric push rod 102, and a clamp plate 103 is fixedly connected to a telescopic end of the electric push rod 102.
Please refer to fig. 2, the sliding grooves are formed on both sides of the inner cavity of the surveying and mapping box 1, the sliding blocks are fixedly connected to both sides of the supporting plate 6, and the sliding blocks are slidably connected with the inner cavity of the sliding grooves, so that the supporting plate 6 can be limited and moved by the sliding grooves and the sliding blocks.
Referring to fig. 2 and 4, the two sides of the top of the supporting plate 6 are both provided with a ring groove 11, the two sides of the ring groove 11 are both connected with a sliding seat 12 in a sliding manner, the top of the sliding seat 12 is fixedly connected with the supporting column 8, and the arrangement of the ring groove 11 and the sliding seat 12 facilitates the angle adjustment of the surveying instrument by a user.
Please refer to fig. 2, the top of the threaded rod 2 is fixedly connected with a limiting block, the periphery of the bottom of the surveying and mapping box 1 is fixedly connected with universal wheels, and the left side of the bottom of the inner cavity of the surveying and mapping box 1 is fixedly connected with a storage battery.
Referring to fig. 1 and 2, a cover 13 is movably connected to the top of the back of the surveying and mapping box 1 through a hinge, and the fronts of the surveying and mapping box 1 and the cover 13 are movably connected through a latch.
When in use, the surveying and mapping box 1 is moved to a required position through the universal wheel, then the starting motor 4 drives the driving gear 5 to rotate, the driving gear 5 drives the threaded rod 2 and the driven gear 3 to rotate, the rotation of the threaded rod 2 can drive the supporting plate 6 embedded with the threaded sleeve 7 to move upwards, and further can drive the supporting column 8 and the placing plate 9 to move upwards until the clamping mechanism 10 is moved out of the surveying and mapping box 1, then the surveying and mapping instrument is placed on the placing plate 9, then the electric push rod 102 in the clamping mechanism 10 is started to push the clamping plate 103 to clamp the surveying and mapping equipment, so that a user can conveniently install the surveying and mapping equipment, meanwhile, the ring groove 11 and the sliding seat 12 are arranged, the user can conveniently adjust the angle of the surveying and mapping instrument during surveying and mapping operation, when the position needs to be converted, the surveying and mapping instrument can be firstly recovered to be arranged in the surveying and mapping box 1, the protection performance of the surveying instrument is improved, and the damage of the surveying instrument caused by accidents in the moving process is avoided.
The control mode of the present application is controlled by an external controller, and the control circuit of the controller can be realized by simple circuit connection of those skilled in the art, which belongs to the common knowledge in the art, and the present application mainly protects the mechanical device, so the control mode and the circuit connection are not explained in detail in the present application.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. On-spot mapping device that city construction cost was used, including survey and drawing case (1), its characterized in that: the bottom of the inner cavity of the mapping box (1) is movably connected with a threaded rod (2) through a bearing, the surface of the threaded rod (2) is sleeved with a driven gear (3), the right side of the bottom of the inner cavity of the surveying and mapping box (1) is fixedly connected with a motor (4), the output shaft of the motor (4) is fixedly connected with a driving gear (5), the driving gear (5) is meshed with a driven gear (3), two sides of the inner cavity of the surveying and mapping box (1) are both connected with a supporting plate (6) in a sliding way, the inner cavity of the supporting plate (6) is embedded with a threaded sleeve (7), the threaded rod (2) is in threaded connection with the threaded sleeve (7), two sides of the top of the supporting plate (6) are both connected with supporting columns (8) in a sliding way, the top fixedly connected with of support column (8) places board (9), place equal fixedly connected with clamping mechanism (10) in both sides at board (9) top.
2. The on-site mapping apparatus for urban construction costs according to claim 1, characterized in that: clamping mechanism (10) are including fixed plate (101), the quantity of fixed plate (101) is two, and bottom and place board (9) fixed connection, two equal fixedly connected with electric putter (102) in the relative one side of fixed plate (101), the flexible end fixedly connected with splint (103) of electric putter (102).
3. The on-site mapping apparatus for urban construction costs according to claim 1, characterized in that: the spout has all been seted up to the both sides of survey and drawing case (1) inner chamber, the equal fixedly connected with slider in both sides of backup pad (6), and the inner chamber sliding connection of slider and spout.
4. The on-site mapping apparatus for urban construction costs according to claim 1, characterized in that: circle groove (11) have all been seted up to the both sides at backup pad (6) top, the equal sliding connection in both sides of circle groove (11) has slide (12), the top and support column (8) fixed connection of slide (12).
5. The on-site mapping apparatus for urban construction costs according to claim 1, characterized in that: the top fixedly connected with stopper of threaded rod (2), equal fixedly connected with universal wheel all around of survey and drawing case (1) bottom, the left side fixedly connected with battery of survey and drawing case (1) inner chamber bottom.
6. The on-site mapping apparatus for urban construction costs according to claim 1, characterized in that: survey and drawing case (1) the top at the back has case lid (13) through hinge swing joint, the front of survey and drawing case (1) and case lid (13) is through kayser swing joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122080420.3U CN215335458U (en) | 2021-08-31 | 2021-08-31 | On-site surveying and mapping device for urban construction cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122080420.3U CN215335458U (en) | 2021-08-31 | 2021-08-31 | On-site surveying and mapping device for urban construction cost |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215335458U true CN215335458U (en) | 2021-12-28 |
Family
ID=79578331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122080420.3U Expired - Fee Related CN215335458U (en) | 2021-08-31 | 2021-08-31 | On-site surveying and mapping device for urban construction cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215335458U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114484231A (en) * | 2022-01-27 | 2022-05-13 | 王娟 | Territorial space planning device based on GIS |
-
2021
- 2021-08-31 CN CN202122080420.3U patent/CN215335458U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114484231A (en) * | 2022-01-27 | 2022-05-13 | 王娟 | Territorial space planning device based on GIS |
CN114484231B (en) * | 2022-01-27 | 2023-04-14 | 王娟 | Territorial space planning device based on GIS |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215335458U (en) | On-site surveying and mapping device for urban construction cost | |
CN211203367U (en) | Equidistance elevating gear for construction | |
CN219263818U (en) | Geographic information survey and drawing target | |
CN215950845U (en) | Digital bridge BIM data measurement auxiliary device | |
CN215371877U (en) | Adjustable total powerstation settles device | |
CN206989926U (en) | A kind of servicing unit of subway deformation monitoring | |
CN214579710U (en) | Novel drainage pipeline creeping detector | |
CN218819108U (en) | Pipe network non-excavation restoration multi-range detection device | |
CN220228533U (en) | Building construction distance measuring device | |
CN220908350U (en) | Highway foundation monitoring devices that sinks | |
CN215417252U (en) | Sand table model mother board bottom sprag structure | |
CN215952530U (en) | Distance measuring device for building structure engineering | |
CN219795280U (en) | Tunnel waterproof cloth laying device | |
CN215491651U (en) | Level gauge for railway engineering measurement | |
CN218863649U (en) | Steel case roof beam elevation adjusting device | |
CN219996156U (en) | Theodolite is used in municipal garden survey and drawing location | |
CN220579813U (en) | Novel road bridge construction support device | |
CN218324205U (en) | Electric pole correcting device for power engineering | |
CN218327038U (en) | Outdoor engineering distancer with collision protection | |
CN219890465U (en) | Measuring instrument for bridge construction | |
CN220186422U (en) | Combined drawing and surveying device for electric power construction | |
CN220777981U (en) | Municipal works water supply and drainage model display device | |
CN116066689B (en) | Survey device for urban road traffic planning and design | |
CN213481349U (en) | A centering leveling device for engineering survey | |
CN220506404U (en) | A survey and drawing auxiliary device for geotechnical engineering reconnaissance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211228 |