CN215334832U - Installation device for construction of building drainage vertical pipe - Google Patents
Installation device for construction of building drainage vertical pipe Download PDFInfo
- Publication number
- CN215334832U CN215334832U CN202121005521.8U CN202121005521U CN215334832U CN 215334832 U CN215334832 U CN 215334832U CN 202121005521 U CN202121005521 U CN 202121005521U CN 215334832 U CN215334832 U CN 215334832U
- Authority
- CN
- China
- Prior art keywords
- fixed
- plate
- fixed arc
- arc plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a mounting device for construction of a building drainage riser, which comprises a pore plate, wherein a straight plate is arranged on one side of the pore plate, a first fixed arc plate is arranged on one side of the straight plate, a second fixed arc plate is arranged on one side of the first fixed arc plate, a fixed bolt is arranged on the second fixed arc plate, the second fixed arc plate is fixedly connected with the first fixed arc plate through the fixed bolt, a rubber pad is arranged on one side of the first fixed arc plate and one side of the second fixed arc plate, a bent rod is arranged on the pore plate, a fixed plate is arranged on one side of the bent rod, a fixed screw is arranged on the pore plate, a pipeline can be clamped and fixed through the matching of the arranged first fixed arc plate and the second fixed arc plate, the pipeline can be clamped and fixed through the arranged rubber pad and salient points in the fixing process, the second fixed arc plate can be replaced according to the fixing requirement, thereby facilitating the fixing of different pipelines.
Description
Technical Field
The utility model relates to building drainage, in particular to an installation device for building drainage vertical pipe construction, and belongs to the technical field of building drainage.
Background
The water supply and drainage engineering technology is a technology vigorously advocated by the nation, is beneficial to protecting the environment by municipal development policies, energy conservation, emission reduction and the like, can promote the rapid development of the building industry, and is seriously short of the talents specialized in the water supply and drainage engineering technology at present.
In the prior art, the pipeline cannot be conveniently fixed in the fixing process of the pipeline, and the fixing position of the pipeline cannot be conveniently adjusted according to the actual fixing condition when the pipeline is fixed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an installation device for construction of a building drainage riser, which can clamp and fix a pipeline by matching a first fixed arc plate and a second fixed arc plate, can clamp the pipeline more fixedly by arranging a rubber pad and salient points in the fixing process, and can replace the second fixed arc plate according to the fixing requirement, thereby being convenient for fixing different pipelines.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model relates to a mounting device for building drainage riser construction, which comprises a hole plate, wherein a straight plate is arranged on one side of the hole plate, a first fixed arc plate is arranged on one side of the straight plate, a second fixed arc plate is arranged on one side of the first fixed arc plate, a fixing bolt is mounted on the second fixed arc plate, the second fixed arc plate is fixedly connected with the first fixed arc plate through the fixing bolt, rubber pads are arranged on one sides of the first fixed arc plate and the second fixed arc plate, a bent rod is mounted on the hole plate, a fixing plate is arranged on one side of the bent rod, and a fixing screw is mounted on the hole plate.
As the preferable technical scheme of the mounting device for the construction of the building drainage vertical pipe, two fixing plates and two bent rods are arranged.
As the preferable technical scheme of the mounting device for the construction of the building drainage vertical pipe, one side of the rubber pad is provided with the convex point, and the convex point and the rubber pad are of an integrated structure.
As the preferable technical scheme of the mounting device for the construction of the building drainage vertical pipe, the hole plate is provided with a circular hole.
According to the preferable technical scheme of the mounting device for the construction of the building drainage vertical pipe, the bent rod penetrates through a round hole, and the diameter of the round hole is the same as that of the bent rod.
Compared with the prior art, the utility model has the beneficial effects that:
the pipeline can be clamped and fixed through the cooperation of the first fixed arc plate and the second fixed arc plate, the pipeline can be clamped and fixed more fixedly through the rubber pads and the salient points which are arranged in the fixing process, the second fixed arc plate can be replaced according to the fixing requirement, and therefore different pipelines can be fixed conveniently.
Can remove on the knee through the orifice plate that sets up, can adjust fixed position according to the demand that uses at the fixed in-process of reality to be convenient for fix, and two knee that set up can strengthen fixed stability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the construction of the bending rod of the present invention;
FIG. 3 is a schematic structural diagram of a fixing plate according to the present invention;
in the figure: 1. an orifice plate; 2. a first fixed arc plate; 3. a second fixed arc plate; 4. a rubber pad; 5. a circular hole; 6. salient points; 7. fixing the bolt; 8. a straight plate; 9. a fixing plate; 10. bending a rod; 11. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the installation device for building drainage riser construction comprises a pore plate 1, wherein a straight plate 8 is arranged on one side of the pore plate 1, a first fixed arc plate 2 is arranged on one side of the straight plate 8, a second fixed arc plate 3 is arranged on one side of the first fixed arc plate 2, a fixing bolt 7 is arranged on the second fixed arc plate 3, the second fixed arc plate 3 is fixedly connected with the first fixed arc plate 2 through the fixing bolt 7, a rubber pad 4 is arranged on one side of the first fixed arc plate 2 and one side of the second fixed arc plate 3, a bent rod 10 is arranged on the pore plate 1, a fixing plate 9 is arranged on one side of the bent rod 10, and a fixing screw 11 is arranged on the pore plate 1.
Fixed plate 9 and knee 10 all are provided with two, and one side of rubber pad 4 is provided with bump 6, and bump 6 and rubber pad 4 formula structure as an organic whole have seted up round hole 5 on the orifice plate 1, and knee 10 runs through round hole 5, and the diameter of round hole 5 is the same with the diameter of knee 10.
Specifically, when the pipe fixing device is used, a pipe can be clamped and fixed through the matching of the first fixing arc plate 2 and the second fixing arc plate 3, the pipe can be clamped and fixed more through the arranged rubber pads 4 and the salient points 6 in the fixing process, meanwhile, the arranged pore plates 1 can move on the bent rods 10, the fixing position can be adjusted according to the using requirement in the actual fixing process, so that the fixing is convenient, and the stability of the fixing can be enhanced through the two arranged bent rods 10.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a construction installation device for drainage riser, includes orifice plate (1), its characterized in that, one side of orifice plate (1) is provided with straight board (8), one side of straight board (8) is provided with first fixed arc board (2), one side of first fixed arc board (2) is provided with the fixed arc board of second (3), install fixing bolt (7) on the fixed arc board of second (3), the fixed arc board of second (3) are through fixing bolt (7) and first fixed arc board (2) fixed connection, one side of the fixed arc board of first fixed arc board (2) and second (3) is provided with rubber pad (4), install curved bar (10) on orifice plate (1), one side of curved bar (10) is provided with fixed plate (9), install fixed screw (11) on orifice plate (1).
2. The installation device for construction of a drainage riser of a building as claimed in claim 1, wherein there are two of the fixing plate (9) and the bent rod (10).
3. The mounting device for construction of the building drainage riser as claimed in claim 1, wherein one side of the rubber pad (4) is provided with a convex point (6), and the convex point (6) and the rubber pad (4) are of an integrated structure.
4. The mounting device for construction of the vertical drainage pipe of the building as claimed in claim 1, wherein the hole plate (1) is provided with a circular hole (5).
5. The installation device for construction of a building drainage riser according to claim 2, wherein the bent rod (10) penetrates through a circular hole (5), and the diameter of the circular hole (5) is the same as that of the bent rod (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121005521.8U CN215334832U (en) | 2021-05-12 | 2021-05-12 | Installation device for construction of building drainage vertical pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121005521.8U CN215334832U (en) | 2021-05-12 | 2021-05-12 | Installation device for construction of building drainage vertical pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215334832U true CN215334832U (en) | 2021-12-28 |
Family
ID=79598587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121005521.8U Active CN215334832U (en) | 2021-05-12 | 2021-05-12 | Installation device for construction of building drainage vertical pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215334832U (en) |
-
2021
- 2021-05-12 CN CN202121005521.8U patent/CN215334832U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207504334U (en) | A kind of cable spacing adjustable fixer | |
CN210342860U (en) | Reinforcing apparatus of electric power angle steel iron tower | |
CN215334832U (en) | Installation device for construction of building drainage vertical pipe | |
CN103940090B (en) | Teat pump boiler and heat exchanger thereof | |
CN209213192U (en) | A kind of Pipe installing support frame | |
CN218326687U (en) | Stable connecting device for pipeline | |
CN201460383U (en) | Pole correcting device | |
CN206977878U (en) | PCB fixing devices | |
CN201351842Y (en) | Simple lamp holder for large-sized plants | |
CN101710640B (en) | Power supply terminal antenna erection tower | |
CN208094065U (en) | Gas-filling cabinet and its cabinet | |
CN220711080U (en) | Tower crane cable fixing support device | |
CN213394311U (en) | Portable combined monitoring support arm | |
CN217683632U (en) | Telescopic joint for installing long hard tube | |
CN218758486U (en) | Wallboard keel structure | |
CN213043400U (en) | Anti-seismic support for electrical pipeline | |
CN211818443U (en) | Reinforcing apparatus of electric power angle steel iron tower | |
CN210291058U (en) | Gas pipeline connecting device | |
CN220581856U (en) | U-shaped pipe clamp for preventing support cross arm from punching holes | |
CN218373105U (en) | Town road prevention of seepage project organization | |
CN218494233U (en) | Pipeline positioning support for water supply and drainage engineering | |
CN217631204U (en) | Connecting piece for fixing high supporting leg of electric hanging basket suspension mechanism | |
CN207993358U (en) | Security identifier board holder on offshore platform | |
CN213279105U (en) | Steel pipe pole cable support structure of power transmission tower | |
CN219387125U (en) | Cantilever scaffold diagonal draw bar convenient to assemble |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |