CN215331306U - Building climbing frame for building - Google Patents
Building climbing frame for building Download PDFInfo
- Publication number
- CN215331306U CN215331306U CN202121874018.6U CN202121874018U CN215331306U CN 215331306 U CN215331306 U CN 215331306U CN 202121874018 U CN202121874018 U CN 202121874018U CN 215331306 U CN215331306 U CN 215331306U
- Authority
- CN
- China
- Prior art keywords
- building
- supporting plate
- lifting platform
- telescopic rod
- hydraulic telescopic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 25
- 230000001681 protective effect Effects 0.000 claims abstract description 20
- 238000010276 construction Methods 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 2
- 230000001965 increasing effect Effects 0.000 abstract description 7
- 230000002633 protecting effect Effects 0.000 abstract description 3
- 230000000630 rising effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000001012 protector Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a building climbing frame for a building, which comprises a base, supporting legs, a first supporting plate, a second supporting plate, a third supporting plate, a lifting platform and a protective net, wherein the first supporting plate is installed in the base, a first hydraulic telescopic rod is installed on the first supporting plate, the top end of the first hydraulic telescopic rod is connected with the third supporting plate, a third hydraulic telescopic rod is installed on the third supporting plate, the top end of the third hydraulic telescopic rod is connected with the bottom of the lifting platform, a second hydraulic telescopic rod is installed on the second supporting plate, the top end of the second hydraulic telescopic rod is connected with the bottom of the lifting platform, and the protective net is installed on the side surface of the lifting platform. This building of building is climbed and is made things convenient for the staff to carry out the operation to low-rise building, can realize automatic rising according to the demand, has increased the efficiency of building operation, can also play better protecting effect, and stability is higher, has increased staff's security.
Description
Technical Field
The utility model relates to the technical field of building equipment, in particular to a building climbing frame for a building.
Background
The climbing frame is also called a lifting frame, is a novel scaffold system developed in recent years, is a tool for assisting people in climbing operation, and is widely applied to daily life. Particularly in the field of buildings, the climbing frame is often used for operating some high buildings, can ascend or descend along the buildings, does not need to be detached frequently, and is popular with building personnel.
The building that the building on the existing market was used climbs the frame and has following problem:
1 most of building climbing frames for the existing buildings assist high-rise buildings to operate, the climbing frames are troublesome to install for the low-rise buildings, the advantages of the climbing frames cannot be fully utilized, and the efficiency of building operation is reduced;
2 there is certain potential safety hazard in the use most of building climbing frame that the current building was used, does not have better protector when using, leads to staff's security lower, has certain limitation when using.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a building climbing frame for a building, which solves the problems that most of the building climbing frames for the buildings on the market assist high-rise buildings to operate, the mounting of the climbing frame for low-rise buildings is troublesome, the advantages of the climbing frame cannot be fully utilized, and the building operation efficiency is reduced; the building that current building was used climbs frame mostly has certain potential safety hazard in the use, does not have better protector when using, leads to staff's security lower, has the problem of certain limitation when using.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a building that building was used climbs frame, includes base, supporting leg, first backup pad, second backup pad, third backup pad, lift platform and protection network, install first backup pad in the base, install first hydraulic telescoping rod in the first backup pad, the third backup pad is connected on first hydraulic telescoping rod's top, install third hydraulic telescoping rod in the third backup pad, lift platform's bottom is connected on third hydraulic telescoping rod's top, install second hydraulic telescoping rod in the second backup pad, lift platform's bottom is connected on the top of second hydraulic telescoping rod, lift platform's side-mounting has the protection network, pass through bolted connection between protection network and the lift platform, the supporting leg is installed to the bottom of base, the supporting leg bottom is equipped with the rubber pad.
Preferably, four groups of first screw holes are formed in two sides of the lifting platform, and an anti-skid plate is fixed on the lifting platform.
Preferably, four groups of U-shaped fixing blocks are arranged on the protective net, two groups of second screw holes are formed in the four groups of U-shaped fixing blocks, and the two groups of second screw holes are identical to the first screw holes in size.
Preferably, two sides of the lifting platform are embedded in the four groups of U-shaped fixing blocks, the first screw holes and the second screw holes are fixed through bolts, and the first screw holes and the second screw holes are the same as the bolts in size.
Preferably, a fixed plate is fixed on the lifting platform, a clamping groove is formed in the top end of the fixed plate, and a clamping plate is embedded in the clamping groove.
Preferably, the bottom of the first supporting plate is hinged to the base, the bottom of the first hydraulic telescopic rod is hinged to the first supporting plate, the second hydraulic telescopic rod is hinged to the second supporting plate, and the bottom of the third hydraulic telescopic rod is hinged to the third supporting plate.
(III) advantageous effects
The utility model provides a building climbing frame for a building. The method has the following beneficial effects:
(1) according to the building climbing frame for the building, the first supporting plate, the second supporting plate, the third supporting plate and the lifting platform are additionally arranged, so that the operation of a low-rise building is facilitated for workers, the automatic lifting can be realized according to the requirement, the dismounting is not needed, and the building operation efficiency is improved;
(2) this building of building usefulness climbs frame through increasing protection network, U type fixed block, fixed plate, cardboard, can play better protecting effect, and the protection network passes through U type fixed block and fixed with lift platform, and stability is higher, has increased staff's security, and is comparatively convenient when using.
Drawings
FIG. 1 is a schematic structural view of the present invention as a whole;
FIG. 2 is a schematic structural view of the elevating platform of the present invention;
fig. 3 is a schematic structural view of the protection net of the present invention;
fig. 4 is a schematic structural view of the fixing plate of the present invention.
In the drawing, a base-1, support legs-2, a rubber pad-3, a first support plate-4, a first hydraulic telescopic rod-5, a second support plate-6, a second hydraulic telescopic rod-7, a third support plate-8, a third hydraulic telescopic rod-9, a lifting platform-10, a protective net-11, first screw holes-12, an anti-skid plate-13, a U-shaped fixed block-14, second screw holes-15, bolts-16, a fixed plate-17, a clamping groove-18 and a clamping plate-19.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention provides a technical solution: a building climbing frame for a building comprises a base 1, supporting legs 2, a first supporting plate 4, a second supporting plate 6, a third supporting plate 8, a lifting platform 10 and a protective net 11, wherein the first supporting plate 4 is installed in the base 1, a first hydraulic telescopic rod 5 is installed on the first supporting plate 4, the top end of the first hydraulic telescopic rod 5 is connected with the third supporting plate 8, a third hydraulic telescopic rod 9 is installed on the third supporting plate 8, the top end of the third hydraulic telescopic rod 9 is connected with the bottom of the lifting platform 10, a second hydraulic telescopic rod 7 is installed on the second supporting plate 6, the top end of the second hydraulic telescopic rod 7 is connected with the bottom of the lifting platform 10, the protective net 11 is installed on the side surface of the lifting platform 10, the protective net 11 is connected with the lifting platform 10 through bolts 16, and the supporting legs 2 are installed at the bottom of the base 1, and a rubber pad 3 is arranged at the bottom of the supporting leg 2.
Four groups of first screw holes 12 are formed in two sides of the lifting platform 10, and an anti-skid plate 13 is fixed on the lifting platform 10. The anti-skid plate 13 added on the lifting platform 10 can play a good anti-skid effect to prevent workers from slipping under feet when working aloft.
Four groups of U-shaped fixing blocks 14 are arranged on the protective net 11, two groups of second screw holes 15 are formed in the four groups of U-shaped fixing blocks 14, and the two groups of second screw holes 15 are identical to the first screw holes 12 in size. The four groups of U-shaped fixing blocks 14 are provided with second screw holes 15, and the second screw holes 15 are matched with the first screw holes 12, so that the protective screening 11 can be conveniently installed on the lifting platform 10.
Two sides of the lifting platform 10 are embedded in four groups of U-shaped fixing blocks 14, the first screw holes 12 and the second screw holes 15 are fixed through bolts 16, and the first screw holes 12 and the second screw holes 15 are the same as the bolts 16 in size. U type fixed block 14 card is comparatively firm in the both sides of lift platform 10, fixes through bolt 16, has increased high altitude construction's security, plays better protective effect to staff's rear side.
A fixed plate 17 is fixed on the lifting platform 10, a clamping groove 18 is arranged at the top end of the fixed plate 17, and a clamping plate 19 is embedded in the clamping groove 18. Install fixed plate 17 on lift platform 10, through fixed plate 17 and cardboard 19's cooperation, conveniently get and put cardboard 19, can play better protective effect to staff's front side simultaneously.
The bottom of the first supporting plate 4 is hinged to the base 1, the bottom of the first hydraulic telescopic rod 5 is hinged to the first supporting plate 4, the second hydraulic telescopic rod 7 is hinged to the second supporting plate 6, and the bottom of the third hydraulic telescopic rod 9 is hinged to the third supporting plate 8. Through mutually supporting of first hydraulic telescoping rod 5, second hydraulic telescoping rod 7 and third hydraulic telescoping rod 9, can realize lift platform 10's lift, conveniently be under construction the bottom building, avoid putting up and climb a wasting of resources.
The working principle is as follows: when the building climbing frame for the building is used, the first supporting plate 4 is fixed in the base 1, the first supporting plate 4 can be driven to lift through the extension and retraction of the first hydraulic telescopic rod 5, the third supporting plate 8 can be driven to lift through the extension and retraction of the third hydraulic telescopic rod 9, the second supporting plate 6 can be driven to lift through the extension and retraction of the second hydraulic telescopic rod 7, so that the automatic lifting of the lifting platform 10 on the base 1 can be realized, the building operation of a lower layer is facilitated, the protective screen 11 is installed on the side surface of the lifting platform 10, the U-shaped fixing block 14 is fixed on the protective screen 11, two sides of the lifting platform 10 are embedded in the U-shaped fixing block 14, the U-shaped fixing block 14 and the side surface of the lifting platform 10 are fixed through the bolts 16, the rear side of the lifting platform has a good protective effect, the fixing plate 17 and the clamping plate are installed on the lifting platform 10, and the protective effect can be achieved on the front side, supporting legs 2 are installed at the bottom of the base 1, and rubber pads 3 are arranged at the bottoms of the supporting legs 2, so that an anti-skidding effect can be achieved on the base 1.
The building climbing frame comprises a base 1, supporting legs 2, a rubber pad 3, a first supporting plate 4, a first hydraulic telescopic rod 5, a second supporting plate 6, a second hydraulic telescopic rod 7, a third supporting plate 8, a third hydraulic telescopic rod 9, a lifting platform 10, a protective net 11, a first screw hole 12, an anti-skid plate 13, a U-shaped fixed block 14, a second screw hole 15, a bolt 16, a fixed plate 17, a clamping groove 18 and a clamping plate 19, wherein the parts are all universal standard parts or parts known by technicians in the field; the building climbing frame for the existing building has certain potential safety hazard in the use process, does not have a better protection device when in use, leads to lower safety of workers, and has certain limitation when in use; through increasing protection network, U type fixed block, fixed plate, cardboard, can play better protecting effect, the protection network passes through U type fixed block and fixed with lift platform, and stability is higher, has increased staff's security, and is comparatively convenient when using.
While there have been shown and described what are at present considered the fundamental principles and essential features of the utility model and its advantages, it will be apparent to those skilled in the art that the utility model is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. The utility model provides a building of building climbs frame which characterized in that: comprises a base (1), supporting legs (2), a first supporting plate (4), a second supporting plate (6), a third supporting plate (8), a lifting platform (10) and a protective net (11), wherein the first supporting plate (4) is installed in the base (1), a first hydraulic telescopic rod (5) is installed on the first supporting plate (4), the top end of the first hydraulic telescopic rod (5) is connected with the third supporting plate (8), a third hydraulic telescopic rod (9) is installed on the third supporting plate (8), the top end of the third hydraulic telescopic rod (9) is connected with the bottom of the lifting platform (10), a second hydraulic telescopic rod (7) is installed on the second supporting plate (6), the top end of the second hydraulic telescopic rod (7) is connected with the bottom of the lifting platform (10), the protective net (11) is installed on the side surface of the lifting platform (10), the protective screening (11) is connected with the lifting platform (10) through bolts (16), the supporting legs (2) are installed at the bottom of the base (1), and rubber pads (3) are arranged at the bottoms of the supporting legs (2).
2. The building climbing frame for building according to claim 1, wherein: four groups of first screw holes (12) are formed in two sides of the lifting platform (10), and anti-skid plates (13) are fixed on the lifting platform (10).
3. The building climbing frame for building according to claim 1, wherein: four groups of U-shaped fixing blocks (14) are arranged on the protective net (11), two groups of second screw holes (15) are formed in the four groups of U-shaped fixing blocks (14), and the size of the two groups of second screw holes (15) is the same as that of the first screw holes (12).
4. A construction creel as claimed in claim 3, in which: the two sides of the lifting platform (10) are embedded in four groups of U-shaped fixing blocks (14), the first screw holes (12) and the second screw holes (15) are fixed through bolts (16), and the first screw holes (12) and the second screw holes (15) are the same as the bolts (16) in size.
5. The building climbing frame for building according to claim 1, wherein: a fixing plate (17) is fixed on the lifting platform (10), a clamping groove (18) is formed in the top end of the fixing plate (17), and a clamping plate (19) is embedded in the clamping groove (18).
6. The building climbing frame for building according to claim 1, wherein: the bottom of first backup pad (4) is articulated between base (1), the bottom of first hydraulic telescoping rod (5) articulates on first backup pad (4), second hydraulic telescoping rod (7) articulates on second backup pad (6), the bottom of third hydraulic telescoping rod (9) articulates on third backup pad (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121874018.6U CN215331306U (en) | 2021-08-11 | 2021-08-11 | Building climbing frame for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121874018.6U CN215331306U (en) | 2021-08-11 | 2021-08-11 | Building climbing frame for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215331306U true CN215331306U (en) | 2021-12-28 |
Family
ID=79577304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121874018.6U Expired - Fee Related CN215331306U (en) | 2021-08-11 | 2021-08-11 | Building climbing frame for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215331306U (en) |
-
2021
- 2021-08-11 CN CN202121874018.6U patent/CN215331306U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215331306U (en) | Building climbing frame for building | |
CN211548658U (en) | Novel scaffold for building construction | |
CN205532243U (en) | Electric power overhauls with support of ascending a height | |
CN214329828U (en) | Effectual frame of climbing of antiskid | |
CN213654429U (en) | Safety device for construction | |
CN212336174U (en) | Fire hydrant that stability is high | |
CN205277282U (en) | Novel power maintenance device | |
CN210885045U (en) | Tower crane with vertical ladder anti-falling device | |
CN209924416U (en) | Multifunctional scaffold foot board for building | |
CN214575550U (en) | Full-steel climbing frame with good protection effect | |
CN212002150U (en) | Scaffold frame for construction with safeguard function | |
CN219569519U (en) | Scaffold for building construction | |
CN216196517U (en) | Scaffold for building engineering | |
CN214834993U (en) | Building installation has protector of stability | |
CN212295547U (en) | Steel construction assembled operation platform | |
CN220704324U (en) | Road bridge construction ladder | |
CN210340254U (en) | Overhead line overhauls operation with ascending a height frame | |
CN217627411U (en) | Electric power supporting device for electric power installation | |
CN211257752U (en) | Environment-friendly construction steel construction scaffold | |
CN211422495U (en) | Insulating ladder for electric power rush-repair | |
CN220117693U (en) | Safety protection device | |
CN210855184U (en) | Lift with sunshade function | |
CN214364802U (en) | New forms of energy lighting apparatus is with installation auxiliary device | |
CN213838477U (en) | Vertical lift is convenient for inboard device for processing of pipeline | |
CN217420457U (en) | Multifunctional suspension bridge type walkway plate structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211228 |