CN215326735U - Based on BIM pipeline support frame for construction - Google Patents

Based on BIM pipeline support frame for construction Download PDF

Info

Publication number
CN215326735U
CN215326735U CN202121834401.9U CN202121834401U CN215326735U CN 215326735 U CN215326735 U CN 215326735U CN 202121834401 U CN202121834401 U CN 202121834401U CN 215326735 U CN215326735 U CN 215326735U
Authority
CN
China
Prior art keywords
fixedly connected
lead screw
frame
base
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121834401.9U
Other languages
Chinese (zh)
Inventor
严伟伟
王紫田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121834401.9U priority Critical patent/CN215326735U/en
Application granted granted Critical
Publication of CN215326735U publication Critical patent/CN215326735U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a BIM-based pipeline support frame for building construction, which comprises a base plate, wherein two groups of slide rails are symmetrically and fixedly connected to the top of the base plate, two slide blocks are connected to the slide rails in a sliding manner, a support mechanism is arranged at the top of each slide rail, a base is fixedly connected to the top of each support mechanism, a fixing clamp is arranged at the top of each base, a first cross brace and a second cross brace are arranged between the support mechanisms, a pipeline is placed on the base, the pipeline is fixed on the base through the fixing clamps, the pipeline is transported to a corresponding position through universal wheels fixedly connected with four corners at the bottom of the base plate, the difficulty in moving the pipeline is reduced, when the position is determined, a second rotary disc is rotated, a second screw rod sleeve is driven to move, the second screw rod sleeve drives the support mechanism to slide on the base plate through the first cross brace, the position of the pipeline is adjusted, the installation of the pipeline is convenient.

Description

Based on BIM pipeline support frame for construction
Technical Field
The utility model relates to the technical field of building construction devices, in particular to a pipeline support frame for building construction based on BIM.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. During building construction, a pipeline is generally installed, and a pipeline support frame is generally used during installation of the pipeline.
However, the pipeline support frame based on the BIM for building construction in the market at present can not adjust the position of the pipeline on the support frame, so that the pipeline installation is troublesome.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pipeline support frame for building construction based on BIM (building information modeling), which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a pipeline support frame for construction based on BIM, includes the base plate, two sets of slide rails of fixedly connected with of base plate top symmetry, sliding connection has two sliders on the slide rail, the slide rail top is provided with supporting mechanism, supporting mechanism top fixedly connected with base, the base top is provided with the fixing clip, be provided with first stull and second stull between the supporting mechanism, the first mounting panel of fixedly connected with and second mounting panel at base plate top between the supporting mechanism, it is connected with the second lead screw to rotate between first mounting panel and the second mounting panel, second lead screw one end runs through second mounting panel fixedly connected with second carousel, the cover is equipped with the second lead screw cover on the second lead screw, second lead screw cover and second lead screw threaded connection, second lead screw cover and first stull bottom fixed connection.
As a further scheme of the utility model: four corners of the base plate are fixedly connected with universal wheels, and brake pads are arranged on the universal wheels.
As a still further scheme of the utility model: the supporting mechanism comprises a supporting frame and a sliding frame, four corners of the bottom of the supporting frame are fixedly connected with a sliding block, supporting legs of the sliding frame penetrate through a top transverse plate of the supporting frame and are slidably connected with the top transverse plate of the supporting frame, a first lead screw is connected in the supporting frame in a rotating mode, a first lead screw sleeve is fixedly connected with the bottom transverse plate of the sliding frame, the first lead screw penetrates through the bottom of the sliding frame and the first lead screw sleeve, the first lead screw is in threaded connection with the first lead screw sleeve, a first helical gear is fixedly connected to the bottom of the sliding frame, a vertical plate is fixedly connected in the supporting frame, a connecting shaft is rotatably connected to the vertical plate, a second helical gear is fixedly connected to one end of the connecting shaft, the second helical gear is meshed with the first helical gear, and a first rotary disc is fixedly connected to the other end of the connecting shaft.
As a still further scheme of the utility model: four limiting blocks are fixedly connected to the inner side of the support frame at four corners of the bottom of the sliding frame and the bottom of the second bevel gear.
As a still further scheme of the utility model: and the second turntable and the first turntable are both rotatably connected with handles.
As a still further scheme of the utility model: the base and the inner wall of the fixing clamp are fixedly connected with rubber pads for protection.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the pipeline is placed on the base, the pipeline is fixed on the base through the fixing clamp, the pipeline is transported to a corresponding position through the universal wheels fixedly connected with the four corners of the bottom of the base plate, the difficulty in moving the pipeline is reduced, when the position is determined, the second turntable is rotated and drives the second screw rod sleeve to move, and the second screw rod sleeve drives the supporting mechanism to slide on the base plate through the first cross arm, so that the position of the pipeline is adjusted, and the pipeline is convenient to install.
2. According to the utility model, by rotating the first turntable, the first turntable drives the second bevel gear to rotate through the connecting shaft, the rotating second bevel gear drives the first screw rod to rotate in the supporting frame through the first bevel gear, and the rotating first screw rod drives the sliding frame to slide in the supporting frame through the first screw rod sleeve, so that the height adjustment of the base fixedly connected with the top of the sliding frame is realized, and the height adjustment of the pipeline in the base is realized.
Drawings
Fig. 1 is a schematic structural diagram of a pipeline support frame for building construction based on BIM.
Fig. 2 is a plan view of a base plate in a BIM-based pipe support frame for building construction.
Fig. 3 is a structural schematic diagram of a support mechanism in a pipeline support frame for building construction based on BIM.
In the figure: the device comprises a base plate 1, a universal wheel 2, a first cross brace 3, a second cross brace 4, a sliding rail 5, a sliding block 6, a supporting mechanism 7, a base 8, a fixing clamp 9, a supporting frame 10, a limiting block 11, a sliding frame 12, a first screw rod 13, a first screw rod sleeve 14, a first helical gear 15, a second helical gear 16, a connecting shaft 17, a first rotary disc 18, a vertical plate 19, a first mounting plate 20, a second screw rod sleeve 21, a second mounting plate 22, a second rotary disc 23 and a second screw rod 24.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, in an embodiment of the present invention, a pipeline support frame for building construction based on BIM includes a substrate 1, two sets of slide rails 5 are symmetrically and fixedly connected to the top of the substrate 1, two slide blocks 6 are slidably connected to the slide rails 5, a support mechanism 7 is disposed on the top of the slide rails 5, a base 8 is fixedly connected to the top of the support mechanism 7, a fixing clip 9 is disposed on the top of the base 8, a first cross brace 3 and a second cross brace 4 are disposed between the support mechanisms 7, a first mounting plate 20 and a second mounting plate 22 are fixedly connected to the top of the substrate 1 between the support mechanisms 7, a second lead screw 24 is rotatably connected between the first mounting plate 20 and the second mounting plate 22, one end of the second lead screw 24 penetrates through the second mounting plate 22 and is fixedly connected to a second rotary table 23, a second lead screw sleeve 21 is sleeved on the second lead screw 24, the second lead screw sleeve 21 is in threaded connection with the second lead screw 24, and the bottom of the first cross brace 3 is fixedly connected to the second lead screw sleeve 21.
Four corners of the base plate 1 are fixedly connected with universal wheels 2, and the universal wheels 2 are provided with brake pads.
The supporting mechanism 7 comprises a supporting frame 10 and a sliding frame 12, four corners of the bottom of the supporting frame 10 are fixedly connected with a sliding block 6, supporting legs of the sliding frame 12 penetrate through a top transverse plate of the supporting frame 10, the supporting frame 10 is slidably connected with the top transverse plate of the supporting frame 10, a first lead screw 13 is rotationally connected with the bottom transverse plate of the sliding frame 12, a first lead screw sleeve 14 is fixedly connected with the bottom transverse plate of the sliding frame 12, the first lead screw 13 penetrates through the bottom of the sliding frame 12 and the first lead screw sleeve 14, the first lead screw 13 is in threaded connection with the first lead screw sleeve 14, a first helical gear 15 is fixedly connected with the bottom of the sliding frame 12 through the first lead screw 13, a vertical plate 19 is fixedly connected with the inside of the supporting frame 10, a connecting shaft 17 is rotationally connected onto the vertical plate 19, a second helical gear 16 is fixedly connected with one end of the connecting shaft 17, the second helical gear 16 is meshed with the first helical gear 15, and a first rotating disc 18 is fixedly connected with the other end of the connecting shaft 17.
Four limit blocks 11 are fixedly connected to four corners of the bottom of the sliding frame 12 and the bottom of the second bevel gear 16 on the inner side of the support frame 10.
The second rotating disk 23 and the first rotating disk 18 are both rotatably connected with handles.
The inner walls of the base 8 and the fixing clip 9 are fixedly connected with rubber pads for protection.
The working principle of the utility model is as follows:
when the pipeline height adjusting device is used, a pipeline is placed on a base 8, the pipeline is fixed on the base 8 through a fixing clamp 9, the pipeline is transported to a corresponding position through universal wheels 2 fixedly connected with four corners at the bottom of a base plate 1, the difficulty of pipeline movement is reduced, when the position is determined, a second rotary table 23 is rotated, the second rotary table 23 drives a second screw rod sleeve 21 to move, the second screw rod sleeve 21 drives a supporting mechanism 7 to slide on the base plate 1 through a first cross brace 3, the position of the pipeline is adjusted, a first rotary table 18 is rotated, the first rotary table 18 drives a second helical gear 16 to rotate through a connecting shaft 17, the rotating second helical gear 16 drives a first screw rod 13 to rotate in a supporting frame 10 through a first helical gear 15, the rotating first screw rod 13 drives a sliding frame 12 to slide in the supporting frame 10 through a first screw rod sleeve 14, and the height adjustment of the base 8 fixedly connected with the top of the sliding frame 12 is realized, thereby the realization is to the pipeline in the base 8 carry out altitude mixture control, makes things convenient for the installation of pipeline.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a based on BIM pipeline support frame for construction, includes base plate (1), its characterized in that: the top of the base plate (1) is symmetrically provided with two groups of slide rails (5), the slide rails (5) are connected with two sliders (6) in a sliding manner, the top of each slide rail (5) is provided with a supporting mechanism (7), the top of each supporting mechanism (7) is fixedly connected with a base (8), the top of each base (8) is provided with a fixing clamp (9), a first cross brace (3) and a second cross brace (4) are arranged between the supporting mechanisms (7), the top of the base plate (1) is fixedly connected with a first mounting plate (20) and a second mounting plate (22) between the supporting mechanisms (7), a second lead screw (24) is rotatably connected between the first mounting plate (20) and the second mounting plate (22), one end of the second lead screw (24) penetrates through the second mounting plate (22) and is fixedly connected with a second turntable (23), and a second lead screw sleeve (21) is sleeved on the second lead screw (24), the second screw rod sleeve (21) is in threaded connection with the second screw rod (24), and the second screw rod sleeve (21) is fixedly connected with the bottom of the first cross brace (3).
2. The BIM-based pipeline support frame for building construction according to claim 1, wherein: four corners of the base plate (1) are fixedly connected with universal wheels (2), and brake pads are arranged on the universal wheels (2).
3. The BIM-based pipeline support frame for building construction according to claim 1, wherein: the supporting mechanism (7) comprises a supporting frame (10) and a sliding frame (12), four corners of the bottom of the supporting frame (10) are fixedly connected with a sliding block (6), supporting legs of the sliding frame (12) penetrate through a top transverse plate of the supporting frame (10) and are in sliding connection with the top transverse plate of the supporting frame (10), a first lead screw (13) is rotationally connected with the supporting frame (10), the bottom transverse plate of the sliding frame (12) is fixedly connected with a first lead screw sleeve (14), the first lead screw (13) penetrates through the bottom of the sliding frame (12) and the first lead screw sleeve (14), the first lead screw (13) is in threaded connection with the first lead screw sleeve (14), a first helical gear (15) is fixedly connected to the bottom of the sliding frame (12), a vertical plate (19) is fixedly connected with the supporting frame (10), a connecting shaft (17) is rotationally connected to the vertical plate (19), and a second helical gear (16) is fixedly connected to one end of the connecting shaft (17), the second bevel gear (16) is meshed with the first bevel gear (15), and the other end of the connecting shaft (17) is fixedly connected with a first rotating disc (18).
4. The BIM-based pipeline support frame for building construction according to claim 1, wherein: the inner side of the support frame (10) is fixedly connected with four limit blocks (11) at four corners of the bottom of the sliding frame (12) and the bottom of the second bevel gear (16).
5. The BIM-based pipeline support frame for building construction according to claim 1, wherein: the second rotating disc (23) and the first rotating disc (18) are both rotatably connected with handles.
6. The BIM-based pipeline support frame for building construction according to claim 1, wherein: the inner walls of the base (8) and the fixing clip (9) are fixedly connected with rubber pads for protection.
CN202121834401.9U 2021-08-07 2021-08-07 Based on BIM pipeline support frame for construction Expired - Fee Related CN215326735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121834401.9U CN215326735U (en) 2021-08-07 2021-08-07 Based on BIM pipeline support frame for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121834401.9U CN215326735U (en) 2021-08-07 2021-08-07 Based on BIM pipeline support frame for construction

Publications (1)

Publication Number Publication Date
CN215326735U true CN215326735U (en) 2021-12-28

Family

ID=79576240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121834401.9U Expired - Fee Related CN215326735U (en) 2021-08-07 2021-08-07 Based on BIM pipeline support frame for construction

Country Status (1)

Country Link
CN (1) CN215326735U (en)

Similar Documents

Publication Publication Date Title
CN208218333U (en) A kind of construction site material lift device
CN214301513U (en) Watering dust device for building
CN213174809U (en) Strutting arrangement is used in building engineering construction
CN215326735U (en) Based on BIM pipeline support frame for construction
CN207495723U (en) Cement section of jurisdiction arc surface receives water floating device automatically
CN203923019U (en) The superimposed equipment of sheet glass
CN217702126U (en) High-efficient steel welding set
CN211203458U (en) communication engineering promotes and uses L ED display screen fixed establishment
CN214532092U (en) A consolidate bearing structure for building engineering
CN2734641Y (en) Production line used supporting board with positioning and locking mechanism
CN113074278A (en) Pipeline auxiliary laying device with limiting function for civil engineering construction
CN220912390U (en) Gas table support frame
CN219011979U (en) Fixing device for rapid construction of steel structure factory building
CN219796368U (en) Building engineering pipeline strutting arrangement
CN218428185U (en) Building engineering pipe strutting arrangement
CN220727357U (en) Pipeline erection device
CN220249153U (en) Supporting mechanism with adjustable water conservancy pipeline
CN220203336U (en) Adjustable construction platform for building construction
CN219080880U (en) Wall mortar laying device for architectural design
CN219691097U (en) Building construction template mounting fixture
CN214364787U (en) High-precision building decoration wall tile pasting and positioning mechanism
CN220973608U (en) Continuous production device for laminated glass
CN220452959U (en) Civil engineering construction pipeline strutting arrangement
CN216740710U (en) Fixing support for building engineering template
CN218109437U (en) Moving tool table for drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211228