CN215326390U - Auxiliary device for hoisting steel structure corridor part - Google Patents

Auxiliary device for hoisting steel structure corridor part Download PDF

Info

Publication number
CN215326390U
CN215326390U CN202121393407.7U CN202121393407U CN215326390U CN 215326390 U CN215326390 U CN 215326390U CN 202121393407 U CN202121393407 U CN 202121393407U CN 215326390 U CN215326390 U CN 215326390U
Authority
CN
China
Prior art keywords
connecting plate
steel structure
auxiliary device
hydraulic jack
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121393407.7U
Other languages
Chinese (zh)
Inventor
陈志刚
王鹏
程加良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Original Assignee
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang 20 Smelter Construction Co ltd, China MCC20 Group Corp Ltd filed Critical Zhejiang 20 Smelter Construction Co ltd
Priority to CN202121393407.7U priority Critical patent/CN215326390U/en
Application granted granted Critical
Publication of CN215326390U publication Critical patent/CN215326390U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model belongs to the field of corridor assistance, and provides an auxiliary device for hoisting a steel structure corridor component, which comprises: a first connecting plate; the second connecting plate is hinged to the first connecting plate; the hydraulic jack is positioned between the first connecting plate and the second connecting plate, one end of the hydraulic jack is connected with the first connecting plate, and the other end of the hydraulic jack is connected with the second connecting plate; a plurality of guard plate, a plurality of the guard plate evenly set up in on the second connecting plate, the guard plate is used for fixed work piece. Compared with the prior art, the truck has the advantages that when the truck unloads the steel structure corridor, the steel structure corridor can be placed in the clamping groove, when the steel structure corridor is hoisted by adopting hoisting machinery, the lifting hook of the hoisting machinery is connected with one end of an external steel wire rope, and the other end of the steel wire rope is connected with the steel structure corridor.

Description

Auxiliary device for hoisting steel structure corridor part
Technical Field
The utility model belongs to the field of corridor assistance, and particularly relates to an auxiliary device for hoisting a steel structure corridor component.
Background
Along with the rapid increase of high-rise buildings in recent years, a steel structure corridor is widely loved by people, has light self weight and short construction period, has better shock resistance advantage, and is often applied to high-rise building engineering.
On-the-spot steel vestibule part is placed subaerially, need lift by crane machinery when installation steel vestibule part upwards from ground lift by crane, there is the phenomenon that the part rocked easily after steel vestibule part directly lifts by crane, and then can harm steel vestibule part, all can exert an influence to the next assembling of steel vestibule part.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem of the prior art and provides an auxiliary device for hoisting components of a steel structure corridor, which is convenient to use and can prevent the steel structure corridor from colliding and deforming.
The technical scheme adopted by the utility model for solving the technical problems is as follows: the utility model provides an auxiliary device for hoist and mount of steel construction vestibule part, includes:
a first connecting plate;
the second connecting plate is hinged to the first connecting plate;
the hydraulic jack is positioned between the first connecting plate and the second connecting plate, one end of the hydraulic jack is connected with the first connecting plate, and the other end of the hydraulic jack is connected with the second connecting plate;
a plurality of guard plate, a plurality of the guard plate evenly set up in on the second connecting plate, the guard plate is used for fixed work piece.
In foretell an auxiliary device for hoist and mount of steel construction vestibule part, hydraulic jack's one end is fixed set up in on the first connecting plate, jack's the other end articulated set up in on the second connecting plate.
In the above-mentioned auxiliary device for hoisting of steel structure vestibule component, the hydraulic jack is respectively hinged with the first connecting plate and the second connecting plate.
In the above-mentioned auxiliary device for hoisting of steel structure vestibule part, the guard plate with be provided with the draw-in groove between the second connecting plate.
In foretell an auxiliary device for hoist and mount of steel construction vestibule part, be provided with the gasket on the guard plate, gasket one side with the second connecting plate supports against.
In foretell an auxiliary device for steel construction vestibule part hoist and mount, be provided with the rubber pad on the second connecting plate, the rubber pad with first connecting plate activity is supported and is leaned on.
In the above-mentioned auxiliary device for hoisting of steel structure vestibule component, be provided with a plurality of gyro wheel on the first connecting plate.
Compared with the prior art, the auxiliary device has the advantages that when the truck unloads the steel structure corridor, the steel structure corridor can be placed in the clamping groove, when the steel structure corridor is hoisted by the hoisting machinery, the lifting hook of the hoisting machinery is connected with one end of an external steel wire rope, the other end of the steel wire rope is connected with the steel structure corridor, after the steel wire rope is tensioned upwards under stress, the hydraulic jack is started, the jack jacks the second connecting plate upwards, the steel structure corridor is hoisted away from the clamping groove by the hoisting machinery, and the auxiliary device can effectively play a protection role, is simple in structure and is convenient to use.
Drawings
FIG. 1 is a schematic structural diagram of the auxiliary device for hoisting the steel structure corridor component;
FIG. 2 is a schematic structural diagram of the auxiliary device for hoisting the steel structure corridor component;
fig. 3 is a schematic structural diagram of the auxiliary device for hoisting the steel structure corridor component.
In the figure, 1, a first connecting plate; 2. a second connecting plate; 3. a hydraulic jack; 4. a protection plate; 5. a card slot; 6. a gasket; 7. a rubber pad; 8. and a roller.
Detailed Description
The following are specific embodiments of the present invention and are further described with reference to the drawings, but the present invention is not limited to these embodiments.
As shown in fig. 1-3, this an auxiliary device for hoist and mount of steel construction vestibule part includes: a first connecting plate 1; the second connecting plate 2 is hinged to the first connecting plate 1; the hydraulic jack 3 is positioned between the first connecting plate 1 and the second connecting plate 2, one end of the hydraulic jack 3 is connected with the first connecting plate 1, and the other end of the hydraulic jack 3 is connected with the second connecting plate 2; a plurality of guard plate 4, a plurality of guard plate 4 evenly set up in on the second connecting plate 2, guard plate 4 is used for fixed work piece.
In placing draw-in groove 5 with the steel construction vestibule, when adopting hoist and mount machinery hoist and mount steel construction vestibule, hoist and mount machinery's lifting hook is connected with outside wire rope one end, and the wire rope other end links to each other with the steel construction vestibule, after wire rope atress upwards is taut, opens hydraulic jack 3, and the jack upwards pushes up second connecting plate 2, and the steel construction vestibule is upwards hung from the device by hoist and mount machinery.
Preferably, one end of the hydraulic jack 3 is fixedly arranged on the first connecting plate 1, and the other end of the hydraulic jack is hinged to the second connecting plate 2.
Hydraulic jack 3 is certain angle and fixes on first connecting plate 1, and the other end of hydraulic jack 3 is located the articulated activity of second connecting plate 2, and is articulated through first connecting plate 1 and second connecting plate 2, and second connecting plate 2 is articulated with hydraulic jack 3, makes two angle actions and then makes things convenient for the steel construction vestibule to place and hang from in the triangle.
Preferably, the hydraulic jack 3 is hinged to the first connecting plate 1 and the second connecting plate 2, respectively.
The first connecting plate 1 is hinged to the second connecting plate 2, the second connecting plate 2 is hinged to the hydraulic jack 3, the first connecting plate 1 is hinged to the hydraulic jack 3, a hinged triangle is formed, and follow-up auxiliary actions can be effectively carried out.
Preferably, a clamping groove 5 is arranged between the protection plate 4 and the second connecting plate 2.
Set up the steel construction vestibule in draw-in groove 5, the second connecting plate 2 and the guard plate 4 of both sides are fixed with the steel construction vestibule, prevent that the steel construction vestibule from breaking away from to shine into the damage.
Preferably, a gasket 6 is arranged on the protection plate 4, and one side of the gasket 6 abuts against the second connecting plate 2.
Protection plate 4 is "L" shape, and gasket 6 sets up on the bottom surface of protection plate 4, and when steel construction vestibule card was gone into in draw-in groove 5, prevent that steel construction vestibule direct and protection plate 4 from colliding and shine into the damage, the effect of protection is made to gasket 6.
Preferably, a rubber pad 7 is arranged on the second connecting plate 2, and the rubber pad 7 is movably abutted against the first connecting plate 1.
When auxiliary device used the end, need reset hydraulic jack 3 to with second connecting plate 2 downstream, make first connecting plate 1 parallel with second connecting plate 2, set up rubber pad 7 on the second connecting plate 2 and put below second connecting plate 2 and make, second connecting plate 2 causes the damage through inertia dive collision first connecting plate 1 each other.
Preferably, the first connecting plate 1 is provided with a plurality of rollers 8.
Be provided with 4 gyro wheels 8 on first connecting plate 1's the bottom surface, be provided with the locking ware on every gyro wheel 8, press the locking ware and die four gyro wheels 8 locks, when preventing follow-up steel construction vestibule hoist and mount, first connecting plate 1 slides suddenly, when auxiliary device need use or use the end, can loosen the locking ware, and gyro wheel 8 can drive auxiliary device and remove, conveniently drags the transport.
It should be noted that all the directional indicators (such as up, down, left, right, front, and rear … …) in the embodiment of the present invention are only used to explain the relative position relationship between the components, the movement situation, etc. in a specific posture (as shown in the drawing), and if the specific posture is changed, the directional indicator is changed accordingly.
Moreover, descriptions of the present invention as relating to "first," "second," "a," etc. are for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicit ly indicating a number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "connected," "secured," and the like are to be construed broadly, and for example, "secured" may be a fixed connection, a removable connection, or an integral part; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In addition, the technical solutions in the embodiments of the present invention may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination of technical solutions should not be considered to exist, and is not within the protection scope of the present invention.

Claims (7)

1. The utility model provides an auxiliary device for hoist and mount of steel construction vestibule part which characterized in that includes:
a first connecting plate;
the second connecting plate is hinged to the first connecting plate;
the hydraulic jack is positioned between the first connecting plate and the second connecting plate, one end of the hydraulic jack is connected with the first connecting plate, and the other end of the hydraulic jack is connected with the second connecting plate;
a plurality of guard plate, a plurality of the guard plate evenly set up in on the second connecting plate, the guard plate is used for fixed work piece.
2. The auxiliary device for hoisting the steel structure corridor component as claimed in claim 1, wherein one end of the hydraulic jack is fixedly arranged on the first connecting plate, and the other end of the hydraulic jack is hinged to the second connecting plate.
3. The auxiliary device for hoisting the steel structure corridor component as claimed in claim 1, wherein the hydraulic jacks are respectively hinged to the first connecting plate and the second connecting plate.
4. The auxiliary device for hoisting the steel structure corridor part according to the claim 2 or 3, wherein a clamping groove is arranged between the protection plate and the second connecting plate.
5. The auxiliary device for hoisting the steel structure corridor part according to the claim 4, wherein a gasket is arranged on the protection plate, and one side of the gasket abuts against the second connecting plate.
6. The auxiliary device for hoisting the steel structure corridor component as claimed in claim 3, wherein a rubber pad is arranged on the second connecting plate, and the rubber pad is movably abutted against the first connecting plate.
7. The auxiliary device for hoisting the steel structure corridor component as claimed in claim 4, wherein the first connecting plate is provided with a plurality of rollers.
CN202121393407.7U 2021-06-22 2021-06-22 Auxiliary device for hoisting steel structure corridor part Active CN215326390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121393407.7U CN215326390U (en) 2021-06-22 2021-06-22 Auxiliary device for hoisting steel structure corridor part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121393407.7U CN215326390U (en) 2021-06-22 2021-06-22 Auxiliary device for hoisting steel structure corridor part

Publications (1)

Publication Number Publication Date
CN215326390U true CN215326390U (en) 2021-12-28

Family

ID=79560299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121393407.7U Active CN215326390U (en) 2021-06-22 2021-06-22 Auxiliary device for hoisting steel structure corridor part

Country Status (1)

Country Link
CN (1) CN215326390U (en)

Similar Documents

Publication Publication Date Title
CN215326390U (en) Auxiliary device for hoisting steel structure corridor part
CN209988942U (en) Assembled building superimposed sheet lifting device
CN211597634U (en) Movable scaffold
CN205500566U (en) From gravity locking formula H shaped steel special lifting device
CN206126699U (en) Multi -functional portable lifting machine
CN210825159U (en) Collision prevention device for crane hook
CN204752012U (en) Wall -hanging miniature hoist
CN207774605U (en) A kind of unit module hoisting fixture for outfititem
CN216863572U (en) Anti-falling protection device for lifting operation platform
CN213923760U (en) Lifting appliance for high-rise prefabricated composite slab construction
CN204689351U (en) A kind of H profile steel structural elements suspender
CN2199176Y (en) Chain protection type rolled steel sling
CN216105702U (en) Hoisting equipment for high-rise building construction
CN218201855U (en) Safety height limiting device for hoisting machinery
CN201914834U (en) Special hanger for total cement truck
CN205873591U (en) Integral type wire rope fixing device
CN206328027U (en) The multi-functional mounting platform of elevator hoistways part
CN212609058U (en) Lifting hook assembly with protection function
CN208631978U (en) A kind of positive extension is counter to mention electric block
CN211687945U (en) Hook group for crane
CN215558611U (en) Hoist reel with promote top-rushing protection architecture
CN217458471U (en) Steel plate hoisting tool structure
CN204778302U (en) Aluminium alloy transport frock
CN216235592U (en) Special lifting device for iron drum
CN215160524U (en) Hoisting accessory for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant