CN215293893U - Pipeline for building heating - Google Patents

Pipeline for building heating Download PDF

Info

Publication number
CN215293893U
CN215293893U CN202120569368.5U CN202120569368U CN215293893U CN 215293893 U CN215293893 U CN 215293893U CN 202120569368 U CN202120569368 U CN 202120569368U CN 215293893 U CN215293893 U CN 215293893U
Authority
CN
China
Prior art keywords
frame
locking
pipe
heating
frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120569368.5U
Other languages
Chinese (zh)
Inventor
钱小龙
刘哲
崔莹
娄保国
弓嵩岭
孙帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Construction Science And Technology Association
Original Assignee
Henan Construction Science And Technology Association
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Construction Science And Technology Association filed Critical Henan Construction Science And Technology Association
Priority to CN202120569368.5U priority Critical patent/CN215293893U/en
Application granted granted Critical
Publication of CN215293893U publication Critical patent/CN215293893U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building heating pipeline, which comprises a mounting plate and a heating pipe, wherein the bottom of the mounting plate is provided with two connecting pieces, the bottoms of the two connecting pieces are respectively articulated with a fixing seat, the bottoms of the two fixing seats are respectively connected with a connecting frame, the opposite end surfaces of the two connecting frames are respectively provided with a first spring, the end part of the first spring is provided with a clamping frame, a heating pipeline is clamped between the two clamping frames, the two clamping frames are provided with locking mechanisms, the building heating pipeline is convenient to protect rubber and plastic heat-insulating materials at the periphery of the heating pipeline by arranging an anti-corrosion layer, a protective layer and an annular protective frame, the heat-insulating effect of the heating pipeline is convenient to improve by arranging a heat-insulating layer, the heating pipeline is convenient to install and disassemble by arranging the locking frame, the first fixing hole, the locking column, the second spring, the second fixing hole and the fixing ring, avoid dismantling to overhaul the back wall body and leave the hole, it is comparatively convenient to use.

Description

Pipeline for building heating
Technical Field
The utility model relates to a heating pipe technical field specifically is a pipeline for building heating.
Background
The pipeline is a device for conveying gas, liquid or fluid with fixed particles, which is formed by connecting pipes, pipe connectors, valves and the like, generally, the fluid flows from a high-pressure part to a low-pressure part of the pipeline after being pressurized by a blower, a compressor, a pump, a boiler and the like, and can also be conveyed by utilizing the pressure or gravity of the fluid, the pipeline has wide application range, and is mainly used in water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, water conservancy engineering and various industrial devices, when the flow of the fluid is known, the pipe diameter is determined, when the flow of the fluid is known, the pipe diameter depends on the allowed flow rate or the allowed friction resistance, when the flow rate is high, the pipe diameter is small, but the pressure drop value is increased, therefore, when the flow rate is high, the construction investment of the pipeline can be saved, but the operation energy consumption cost of power equipment such as the pump, the compressor and the like is increased, and in addition, if the flow rate is too high, other adverse factors can be brought, therefore, the pipe diameter is determined by comprehensively considering construction investment, operating cost and other technical factors, and the pipeline can bear the action of a plurality of external forces.
The rubber and plastic heat-insulating material on the periphery of the existing pipeline for building heating is soft in texture and is very easy to scratch, so that the heat-insulating effect is reduced, the existing pipeline for building heating is fixed by using a hose clamp, and a hole is left in a wall body after disassembly and maintenance.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a pipeline for building heating, be convenient for protect heating pipe outlying rubber and plastic insulation material, be convenient for install and dismantle heating pipe, avoid dismantling to overhaul the back wall body and leave the hole, it is comparatively convenient to use, can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pipeline for building heating comprises a mounting plate and a heating pipe, wherein two connecting pieces are arranged at the bottom of the mounting plate, the bottoms of the two connecting pieces are respectively hinged with a fixed seat, the bottoms of the two fixed seats are respectively connected with a connecting frame, the opposite end surfaces of the two connecting frames are respectively provided with a first spring, the end part of the first spring is provided with a clamping frame, the heating pipe is clamped between the two clamping frames, and locking mechanisms are arranged on the two clamping frames;
the heating pipe comprises a heating pipe, a heat preservation layer wraps the outer surface of the heating pipe, a heat insulation layer wraps the outer surface of the heat preservation layer, an annular protection frame is arranged on the outer surface of the heat insulation layer, a protection layer is connected to the outer surface of the annular protection frame, and a corrosion-resistant layer is arranged on the outer surface of the protection layer.
As a preferred technical scheme of the utility model, be the in-line on the mounting panel and seted up a plurality of mounting holes, install mounting bolt in the mounting hole.
As an optimized technical scheme of the utility model, the holding frame is the arc structure.
As a preferred technical scheme of the utility model, annular fender bracket is including being a plurality of annular frame of in-line parcel at the insulating layer surface, a plurality of be connected with the spliced pole between the annular frame.
As a preferred technical scheme of the utility model, locking mechanical system is including installing the locking frame on one of them link, fixed orifices one has been seted up on the locking frame, sliding connection has the locking post in the fixed orifices one, the global position department that just is located between link and the locking frame of locking post is equipped with solid fixed ring, the global position department that just is located between solid fixed ring and the locking frame of locking post is equipped with spring two, another seted up on the link with locking post complex fixed orifices two.
Compared with the prior art, the beneficial effects of the utility model are that: the heating pipeline heat-insulating material is convenient to protect the rubber and plastic heat-insulating material on the periphery of the heating pipeline by arranging the corrosion-resistant layer, the protective layer and the annular protective frame, the heat-insulating effect of the heating pipeline is convenient to improve by arranging the heat-insulating layer, the heating pipeline is convenient to install and detach by arranging the locking frame, the first fixing hole, the locking column, the second spring, the second fixing hole and the fixing ring, the detachment is avoided, the wall body is maintained after the detachment, and the use is convenient.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the local cross-section structure of the present invention.
In the figure: the heat insulation pipe comprises an installation plate 1, an installation bolt 2, a fixed seat 3, a connecting frame 4, a corrosion-resistant layer 5, a protective layer 6, an annular protective frame 7, a heat insulation layer 8, a heat insulation layer 9, a locking frame 10, a heating pipe 11, a first spring 12, a clamping frame 13, a connecting piece 14, a first fixing hole 15, a locking column 16, a second spring 17, a second fixing hole 18 and a fixing ring 19.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a pipeline for building heating comprises a mounting plate 1 and a heating pipe 11, wherein two connecting pieces 14 are arranged at the bottom of the mounting plate 1, the bottoms of the two connecting pieces 14 are respectively hinged with a fixed seat 3, the bottoms of the two fixed seats 3 are respectively connected with a connecting frame 4, the opposite end surfaces of the two connecting frames 4 are respectively provided with a first spring 12, the end part of the first spring 12 is provided with a clamping frame 13, the heating pipe is clamped between the two clamping frames 13, and the two clamping frames 13 are provided with locking mechanisms;
the heating pipeline comprises a heating pipe 11, a heat preservation layer 9 wraps the outer surface of the heating pipe 11, a heat insulation layer 8 wraps the outer surface of the heat preservation layer 9, an annular protection frame 7 is arranged on the outer surface of the heat insulation layer 8, a protection layer 6 is connected to the outer surface of the annular protection frame 7, an anti-corrosion layer 5 is arranged on the outer surface of the protection layer 6, a plurality of mounting holes are formed in the mounting plate 1 in a straight line shape, mounting bolts 2 are mounted in the mounting holes, a clamping frame 13 is of an arc-shaped structure, the annular protection frame 7 comprises a plurality of annular frames wrapping the outer surface of the heat insulation layer 8 in a straight line shape, connecting columns are connected among the annular frames, a locking mechanism comprises locking frames 10 mounted on one connecting frame 4, fixing holes 15 are formed in the locking frames 10, locking columns 16 are slidably connected in the fixing holes 15, and fixing rings 19 are arranged on the peripheral surfaces of the locking columns 16 and located between the connecting frames 4 and the locking frames 10, a second spring 17 is arranged on the peripheral surface of the locking column 16 and positioned between the fixing ring 19 and the locking frame 10, and a second fixing hole 18 matched with the locking column 16 is formed in the other connecting frame 4.
When in use: the heat insulation layer 8, the annular protection frame 7, the protection layer 6 and the corrosion-resistant layer 5 are sequentially wrapped on the heat insulation layer 9 on the outer surface of the heating pipeline from inside to outside, the heat insulation layer 9 is further protected, the heat insulation layer 9 is prevented from being damaged, the mounting plate 1 is fixed on a wall body through the mounting bolt 2, the heating pipeline penetrates between the two clamping frames 13, the heating pipeline is clamped through the two hinged connecting frames 4, the two clamping frames 13 are pressed against the heating pipeline through the elastic force of the two springs I12, then the locking column 16 is inserted into the fixing hole II 18, the two connecting frames 4 are fixed, the locking column 16 can be prevented from falling off from the fixing hole II 18 through the springs II 17 and the fixing ring 19, when the heating pipeline needs to be disassembled for overhaul, the locking column 16 is pulled, the spring II 17 is compressed, the locking column 16 is pulled out of the fixing hole II 18, the connecting frames 4 are rotated, the clamping frame 13 is separated from the heating pipeline, the heating pipeline can be disassembled and overhauled, the corrosion-resistant layer 5 can be an alloy pipe, the protective layer 6 can be a polyethylene pipe, and the thermal insulation layer 8 can be a thermal insulation extruded sheet.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A pipeline for building heating, includes mounting panel (1) and heating pipe (11), its characterized in that: the bottom of the mounting plate (1) is provided with two connecting pieces (14), the bottoms of the two connecting pieces (14) are respectively hinged with a fixing seat (3), the bottoms of the two fixing seats (3) are respectively connected with a connecting frame (4), the opposite end faces of the two connecting frames (4) are respectively provided with a first spring (12), the end part of the first spring (12) is provided with a clamping frame (13), a heating pipeline is clamped between the two clamping frames (13), and the two clamping frames (13) are provided with locking mechanisms;
heating pipeline includes heating pipe (11), the surface parcel of heating pipe (11) has heat preservation (9), the surface parcel of heat preservation (9) has insulating layer (8), the surface of insulating layer (8) is equipped with annular fender bracket (7), the surface of annular fender bracket (7) is connected with protective layer (6), the surface of protective layer (6) is equipped with corrosion resistant layer (5).
2. A pipe for building heating according to claim 1, characterized in that: a plurality of mounting holes are formed in the mounting plate (1) in a straight line shape, and mounting bolts (2) are mounted in the mounting holes.
3. A pipe for building heating according to claim 1, characterized in that: the clamping frame (13) is of an arc-shaped structure.
4. A pipe for building heating according to claim 1, characterized in that: the annular protection frame (7) comprises a plurality of annular frames which are wrapped on the outer surface of the heat insulation layer (8) in a straight line shape, and connecting columns are connected among the annular frames.
5. A pipe for building heating according to claim 1, characterized in that: locking mechanical system is including installing locking frame (10) on one of them link (4), fixed orifices one (15) have been seted up on locking frame (10), sliding connection has locking post (16) in fixed orifices one (15), the global position department that just is located between link (4) and locking frame (10) of locking post (16) is equipped with solid fixed ring (19), the global position department that just is located between solid fixed ring (19) and locking frame (10) of locking post (16) is equipped with spring two (17), another set up on link (4) with locking post (16) complex fixed orifices two (18).
CN202120569368.5U 2021-03-20 2021-03-20 Pipeline for building heating Expired - Fee Related CN215293893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120569368.5U CN215293893U (en) 2021-03-20 2021-03-20 Pipeline for building heating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120569368.5U CN215293893U (en) 2021-03-20 2021-03-20 Pipeline for building heating

Publications (1)

Publication Number Publication Date
CN215293893U true CN215293893U (en) 2021-12-24

Family

ID=79534016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120569368.5U Expired - Fee Related CN215293893U (en) 2021-03-20 2021-03-20 Pipeline for building heating

Country Status (1)

Country Link
CN (1) CN215293893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114952658A (en) * 2022-06-11 2022-08-30 孙建永 Quality detection equipment for engineering supervision

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114952658A (en) * 2022-06-11 2022-08-30 孙建永 Quality detection equipment for engineering supervision

Similar Documents

Publication Publication Date Title
CN215293893U (en) Pipeline for building heating
CN213871681U (en) Pipeline positioning and mounting equipment
CN210830890U (en) Connecting piece for pipeline
CN205347468U (en) Blast furnace stave prosthetic devices
CN210141424U (en) Dismantle convenient heat preservation protective pipe way
CN214368534U (en) Pipeline fixing device is used in hydraulic engineering construction
CN201787270U (en) Floating pipeline quick-repair joint
CN214368351U (en) Connect stable pipeline for hydraulic and hydroelectric engineering construction
CN212044399U (en) Quick mounting structure for sewer line connection
CN209100707U (en) A kind of blow-off line with anti-backflow device
CN214331693U (en) Pipeline for hydraulic and hydroelectric engineering convenient to installation
CN213361525U (en) Comprehensive efficient water supply and drainage pipeline
CN215831418U (en) Running water supply pipe with function of preventing frostbite
CN219571091U (en) Pipeline pre-burying device for fire engineering
CN214618189U (en) Support device for movable pipeline
CN210564870U (en) Intercepting pipeline for water supply of labyrinth ring of water turbine
CN211059477U (en) Pipeline mounting bracket
CN204986235U (en) Adiabatic high temperature pipeline of nanometer hole silicon
CN212080384U (en) Novel composite pipeline
CN220102403U (en) High-pressure-resistant pipeline
CN212616769U (en) Anti-loosening pipeline rigid clamp with pretightening force
CN217951659U (en) Corrosion-resistant directly buried pipeline
CN220669183U (en) Steam conveying pipeline for garbage power generation
CN213576242U (en) Corrosion-resistant glass fiber reinforced plastic sand inclusion pipeline
CN220186039U (en) Supporting pier structure for house pipeline laying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211224