CN215291392U - Building steel mould - Google Patents

Building steel mould Download PDF

Info

Publication number
CN215291392U
CN215291392U CN202023273247.0U CN202023273247U CN215291392U CN 215291392 U CN215291392 U CN 215291392U CN 202023273247 U CN202023273247 U CN 202023273247U CN 215291392 U CN215291392 U CN 215291392U
Authority
CN
China
Prior art keywords
steel mould
fixedly connected
side wall
mould body
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023273247.0U
Other languages
Chinese (zh)
Inventor
袁桂芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Chenqihan Road And Bridge Equipment Co ltd
Original Assignee
Wuhan Xingsheng Hongyun Road And Bridge Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xingsheng Hongyun Road And Bridge Equipment Manufacturing Co ltd filed Critical Wuhan Xingsheng Hongyun Road And Bridge Equipment Manufacturing Co ltd
Priority to CN202023273247.0U priority Critical patent/CN215291392U/en
Application granted granted Critical
Publication of CN215291392U publication Critical patent/CN215291392U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building steel mould, including the steel mould body, steel mould body lateral wall fixedly connected with reinforcing plate, a plurality of dead levers of lateral wall fixedly connected with that the steel mould body is close to the reinforcing plate, every barrel has been seted up in the dead lever, and is a plurality of rotate through the screw thread in the barrel and be connected with the threaded rod, every the quad slit has been seted up, every the threaded rod is kept away from the lateral wall fixedly connected with and the square block that the quad slit matches of quad slit. The utility model has the advantages of, whole steel mould body is very convenient when installation and dismantlement, only need rotate the threaded rod on the steel mould body can dismantle a plurality of steel mould bodies with shaft-like, and steel mould body stability after the installation is high, when dismantling the steel mould body, supports through supporting the piece and pours the wall and can avoid the steel mould body to paste on pouring the wall, makes things convenient for the staff to dismantle the steel mould body.

Description

Building steel mould
Technical Field
The utility model relates to a construction technical field especially relates to a building steel mould.
Background
In the construction industry, steel forms are construction forms used to cast concrete structures in situ, such as concrete walls, stairs, floors, beams, columns, etc. In practice, most of the steel templates are assembled into a single or a plurality of mould cavities for casting, and the blocks are fixedly connected into a whole by pins.
Present building steel mould need carry out fixed connection to the steel mould one by one through a plurality of bolts or connection structure when fixed with a plurality of steel moulds, and connection process work load is big, consumes time long, leads to work efficiency low, and the steel mould among the prior art is easy to glue when dismantling on the wall of pouring, and the staff is difficult for taking off the steel mould, and the staff grasps not good dynamics and takes place the incident easily when dismantling the steel mould that glues.
To this end, we propose a construction steel mold to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the steel mould is difficult to detach and the like when steel mould installation work load is big among the prior art, long consuming time and the steel mould is dismantled easily to be glued to the wall, and the building steel mould that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building steel mould, includes the steel mould body, steel mould body lateral wall fixedly connected with reinforcing plate, the steel mould body is close to a plurality of dead levers of lateral wall fixedly connected with of reinforcing plate, every barrel has been seted up in the dead lever, and is a plurality of rotate through the screw thread in the barrel and be connected with the threaded rod, every the quad slit has been seted up to the lateral wall of threaded rod, every the square piece that the lateral wall fixedly connected with and the quad slit of quad slit mate is kept away from to the threaded rod, a plurality of thread bush that match with the threaded rod of steel mould body lateral wall fixedly connected with, sliding connection has the swivel nut between two dead levers that the steel mould body is close to same threaded rod, and is a plurality of the swivel nut passes through the bearing rotation with a plurality of threaded rods and is connected.
Preferably, a plurality of internal grooves are formed in the steel die body, the thread sleeves extend into the internal grooves, and the part of each thread sleeve extending into the internal grooves is fixedly connected with a sliding plate matched with the internal grooves.
Preferably, the side wall of each sliding plate, which is far away from the screw sleeve, is fixedly connected with an inclined rack, and the length of each inclined rack is matched with the distance between two fixed rods on the same threaded rod.
Preferably, each internal groove is rotatably connected with a threaded cylinder, and the side wall of each threaded cylinder is fixedly connected with a helical gear matched with the helical rack.
Preferably, the side wall of the steel die body, which is far away from the fixing rod, is provided with a plurality of grooves, and each groove is internally connected with a butting block in a clamping manner.
Preferably, every the screw thread section of thick bamboo internal rotation is connected with the screw thread strip, and is a plurality of the screw thread strip stretches into a plurality of recesses, every the part fixedly connected with slider that the screw thread strip stretches into the recess, and is a plurality of the slider is connected with a plurality of piece joint of supporting through a plurality of expanding spring.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the steel mould bodies can be spliced and fixed together through the structures such as the threaded rods, the square blocks and the like, the threaded rods can be inserted into the square grooves to rotate the threaded rods through tools after splicing, and therefore the threaded rod hopper in each fixed rod can rotate, the threaded rods on different steel mould bodies can be fixed mutually through threaded movement of the threaded rods, the steel mould bodies can be fixed more firmly, the steel mould bodies can be fixed only by rotating the started threaded rods, the steel mould bodies are simple to install and disassemble, the use is convenient, the workload of workers is reduced, and the working efficiency is improved;
2. can make the slider support to support the piece and outwards remove when dismantling the steel mould body through screw thread section of thick bamboo and screw thread strip isotructure, thereby support the piece and support the steel mould body with the wall contact of pouring, avoid the steel mould body to glue together with the wall of pouring, consequently can be very easy dismantle the steel mould body, reduce the emergence of incident.
Drawings
Fig. 1 is a schematic structural view of a construction steel mold provided by the present invention;
fig. 2 is a schematic side structure view of a construction steel mold according to the present invention;
fig. 3 is the utility model provides a dead lever and threaded rod isotructure sketch map of building steel mould.
In the figure: 1 steel mould body, 2 reinforcing plates, 3 fixed rods, 4 threaded rods, 5 square blocks, 6 threaded sleeves, 7 threaded sleeves, 8 sliding plates, 9 helical racks, 10 threaded cylinders, 11 helical gears, 12 threaded strips, 13 sliding blocks, 14 telescopic springs and 15 abutting blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a building steel mold comprises a steel mold body 1, a reinforcing plate 2 is fixedly connected to the side wall of the steel mold body 1, a plurality of fixing rods 3 are fixedly connected to the side wall of the steel mold body 1 close to the reinforcing plate 2, a screw barrel is arranged in each fixing rod 3, a threaded rod 4 is rotatably connected to the plurality of screw barrels through screw threads, a square hole is formed in the side wall of each threaded rod 4, a square block 5 matched with the square hole is fixedly connected to the side wall of each threaded rod 4 far away from the square hole, a plurality of thread sleeves 6 matched with the threaded rods 4 are fixedly connected to the side wall of the steel mold body 1, a thread sleeve 7 is slidably connected between the two fixing rods 3 close to the same threaded rod 4 of the steel mold body 1, the plurality of thread sleeves 7 are rotatably connected with the plurality of threaded rods 4 through bearings, the plurality of steel mold bodies 1 can be spliced and fixed together through the structures of the threaded rods 4, the square blocks 5 and the like, after splicing is finished, the threaded rod 4 extends into the square groove through a tool to rotate the threaded rod 4, so that the threaded rod 4 hopper in each fixed rod 3 can rotate, the threaded rods 4 on different steel mould bodies 1 are moved to be fixed with each other through threads, the steel mould bodies 1 are fixed more firmly, the steel mould bodies 1 can be fixed only by rotating the threaded rod 4 at the beginning, the steel mould bodies 1 are simple to install and disassemble, the use is convenient, the workload of workers is reduced, and the working efficiency is improved;
the steel die body 1 is internally provided with a plurality of inner grooves, a plurality of screw sleeves 7 extend into the plurality of inner grooves, the part of each screw sleeve 7 extending into the inner groove is fixedly connected with a sliding plate 8 matched with the inner groove, the side wall of each sliding plate 8 far away from the screw sleeve 7 is fixedly connected with a helical rack 9, the length of each helical rack 9 is matched with the distance between two fixing rods 3 on the same threaded rod 4, each inner groove is rotatably connected with a threaded barrel 10, the side wall of each threaded barrel 10 is fixedly connected with a helical gear 11 matched with the helical rack 9, the side wall of the steel die body 1 far away from the fixing rods 3 is provided with a plurality of grooves, each groove is internally connected with a resisting block 15 in a clamping way, each threaded barrel 10 is rotatably connected with a threaded strip 12, a plurality of threaded strips 12 extend into the plurality of grooves, the part of each threaded strip 12 extending into the groove is fixedly connected with a sliding block 13, the plurality of sliding blocks 13 are connected with the plurality of resisting blocks 15 in a clamping way through a plurality of telescopic springs 14, can make slider 13 support and support piece 15 outwards to remove when dismantling steel mould body 1 through screw thread section of thick bamboo 10 and screw thread strip 12 isotructures, thereby support piece 15 and the wall contact of pouring and support steel mould body 1, avoid steel mould body 1 and the wall of pouring to glue together, consequently can be very easy dismantle steel mould body 1, reduce the emergence of incident.
When the utility model is used, a plurality of steel die bodies 1 are spliced together through a square block 5 and a square groove, the threaded rods 4 are rotated by a tool after splicing, the threaded rods 4 on the plurality of steel die bodies 1 can be simultaneously rotated under the action of the square block 5, thereby moving through threads, the threaded rods 4 on the plurality of steel die bodies 1 are mutually staggered to realize the integral fixing effect, and the plurality of steel die bodies 1 can complete the fixing only by rotating the threaded rods 4 twice, thereby greatly reducing the workload of workers, improving the working efficiency of the workers, when the threaded rods 4 move rightwards, the threaded rods 4 drive the threaded sleeves 7 to move rightwards, the threaded sleeves 7 drive the slide plate 8 to move rightwards to drive the helical rack 9 to move rightwards, when the helical rack 9 moves rightwards to drive the helical gear 11 to rotate, when the helical gear 11 drives the threaded sleeve 10 to rotate the threaded sleeve 10, the threaded strips 12 can move, when the helical rack 9 moved rightwards, the thread strip 12 moved in the thread cylinder 10, the thread strip 12 drove the slider 13 and moved to the direction of thread cylinder 10, when dismantling steel mould body 1, reverse rotation threaded rod 4, threaded rod 4 resets, swivel nut 7 moved leftwards this moment, consequently, slider 13 moved to the direction of keeping away from thread cylinder 10, slider 13 supported support block 15 through expanding spring 14, consequently, support block 15 and the wall of pouring and offset, people can avoid steel mould body 1 and pour the wall and paste together when dismantling steel mould body 1, thereby make things convenient for the staff to dismantle.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A building steel mould comprises a steel mould body (1) and is characterized in that a reinforcing plate (2) is fixedly connected with the side wall of the steel mould body (1), the side wall of the steel die body (1) close to the reinforcing plate (2) is fixedly connected with a plurality of fixing rods (3), each fixing rod (3) is internally provided with a screw barrel, a plurality of screw barrels are connected with threaded rods (4) in a rotating way through threads, the side wall of each threaded rod (4) is provided with a square hole, the side wall of each threaded rod (4) far away from the square hole is fixedly connected with a square block (5) matched with the square hole, the side wall of the steel die body (1) is fixedly connected with a plurality of thread sleeves (6) matched with the threaded rods (4), the steel mould body (1) is close to and is connected with swivel nut (7) between two dead levers (3) of same threaded rod (4) sliding connection, and is a plurality of swivel nut (7) are connected through the bearing rotation with a plurality of threaded rods (4).
2. The construction steel die as claimed in claim 1, wherein a plurality of internal grooves are formed in the steel die body (1), a plurality of screw sleeves (7) extend into the internal grooves, and a sliding plate (8) matched with the internal grooves is fixedly connected to a part of each screw sleeve (7) extending into the internal grooves.
3. The construction steel die as claimed in claim 2, wherein a helical rack (9) is fixedly connected to the side wall of each sliding plate (8) far away from the screw sleeve (7), and the length of each helical rack (9) is matched with the distance between two fixing rods (3) on the same threaded rod (4).
4. A construction steel die according to claim 3, wherein each internal groove is rotatably connected with a threaded cylinder (10), and a helical gear (11) matched with the helical rack (9) is fixedly connected with the side wall of each threaded cylinder (10).
5. The construction steel die as claimed in claim 4, wherein the side wall of the steel die body (1) far away from the fixing rod (3) is provided with a plurality of grooves, and each groove is internally connected with a butting block (15) in a clamping manner.
6. The construction steel die as claimed in claim 5, wherein each thread cylinder (10) is rotatably connected with a thread strip (12), the thread strips (12) extend into a plurality of grooves, a sliding block (13) is fixedly connected to a part of each thread strip (12) extending into a groove, and the sliding blocks (13) are connected with the abutting blocks (15) in a clamping manner through a plurality of telescopic springs (14).
CN202023273247.0U 2020-12-29 2020-12-29 Building steel mould Active CN215291392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023273247.0U CN215291392U (en) 2020-12-29 2020-12-29 Building steel mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023273247.0U CN215291392U (en) 2020-12-29 2020-12-29 Building steel mould

Publications (1)

Publication Number Publication Date
CN215291392U true CN215291392U (en) 2021-12-24

Family

ID=79528334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023273247.0U Active CN215291392U (en) 2020-12-29 2020-12-29 Building steel mould

Country Status (1)

Country Link
CN (1) CN215291392U (en)

Similar Documents

Publication Publication Date Title
CN111391082B (en) Box girder template for road and bridge construction
CN215291392U (en) Building steel mould
CN111236627A (en) High wall body concrete once only pours shaping template
CN212764002U (en) Assembled bearing beam mould
CN215519927U (en) Concrete building template for civil engineering
CN215906996U (en) Steel construction building connecting piece
CN214195535U (en) Template device for engineering service construction
CN212554387U (en) Concrete tubular pile cast molding auxiliary device
CN112677294B (en) Mold for manufacturing prefabricated stand column and construction method thereof
CN218969911U (en) External mold trolley in square water return channel
CN220451409U (en) Reinforcing structure at expansion joint of shear wall template
CN217257063U (en) Precast concrete box girder mould
CN217054309U (en) Cast-in-place template of building of easy drawing of patterns
CN216505813U (en) Concrete mould proof template convenient to adjust
CN215702636U (en) Hollow mould for prefabricated floor slab
CN216712751U (en) Novel formwork shell plate connecting and fixing device for bridge construction
CN216865962U (en) Template frame of template quick detach positioning connection spare and applied this connecting piece
CN220864297U (en) Adjustable die
CN201047289Y (en) Tunnel liner trolley
CN214293635U (en) Prefabricated box girder mould
CN220146240U (en) Supporting mechanism for internal mold of box girder
CN211772882U (en) A operation platform for construction of bridge high mound
CN112720834B (en) Auxiliary mechanism for bridge and using method thereof
CN219992754U (en) Channel steel connection structure convenient to dismantle
CN214885470U (en) Hydraulic self-climbing sliding form convenient to disassemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221020

Address after: No. 115, Dongsheng Road, Luohan Village, Luohansi Street, Huangpi District, Wuhan, Hubei 430000

Patentee after: Wuhan Chenqihan Road and Bridge Equipment Co.,Ltd.

Address before: 430000 Zhudian Village, Huangpi District, Huangpi District, Wuhan City, Hubei Province

Patentee before: Wuhan Xingsheng Hongyun road and Bridge Equipment Manufacturing Co.,Ltd.

TR01 Transfer of patent right