CN215291290U - Building external climbing type building construction operation platform - Google Patents

Building external climbing type building construction operation platform Download PDF

Info

Publication number
CN215291290U
CN215291290U CN202120624534.7U CN202120624534U CN215291290U CN 215291290 U CN215291290 U CN 215291290U CN 202120624534 U CN202120624534 U CN 202120624534U CN 215291290 U CN215291290 U CN 215291290U
Authority
CN
China
Prior art keywords
operation platform
cabin
fixedly connected
bottom plate
buffer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120624534.7U
Other languages
Chinese (zh)
Inventor
曲明婕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120624534.7U priority Critical patent/CN215291290U/en
Application granted granted Critical
Publication of CN215291290U publication Critical patent/CN215291290U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vehicle Step Arrangements And Article Storage (AREA)

Abstract

The utility model discloses an outside formula construction operation platform that climbs of building belongs to architectural equipment technical field, and it includes the bottom plate, the four corners department of bottom plate upper surface is connected with four cushion sleeve's lower fixed surface respectively, cushion sleeve's top cup joints mutually with the bottom of extrusion sliding sleeve. This building outside formula construction operation platform that climbs, through setting up guide bar and spacing fixture block, when this operation platform goes up, utilize the guide bar to carry out the restriction of incline direction to the four corners department of operation cabin, spacing fixture block and bracing piece carry out the restriction of moving direction to the operation cabin simultaneously, make this operation platform when going up, can be perpendicular steady through guide bar and spacing fixture block rise, prevented to blow because of strong air current, and lead to the operation cabin to appear rocking and the condition of slope, the stability when this operation platform goes up has been strengthened, constructor's efficiency of construction on this operation platform has been improved.

Description

Building external climbing type building construction operation platform
Technical Field
The utility model belongs to the technical field of the architectural equipment, specifically be a building outside formula construction operation platform that climbs.
Background
Along with modern society's development day by day, the height of building also increases thereupon, traditional scaffold frame can not satisfy high-rise building's user demand, need use construction operation platform to the building outside operation construction of operating, current operation platform is when being under construction to the building outer wall, use the cable wire directly to carry out the operation of going up and down to operation platform mostly, when meetting strong air current and blowing, cause the condition that operation platform is undirectional to rock easily, it is constructor's efficiency on the influence operation platform, and current operation platform is open operation platform mostly, when constructor moves on operation platform, drop construction tool from operation platform easily, cause the injury to the personnel of operation platform below, the safety in utilization is relatively poor.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art's above-mentioned defect, the utility model provides a building outside formula construction operation platform that climbs, current operation platform has been solved when being under construction to the building outer wall, use the cable wire directly to carry out the operation of going up and down to operation platform mostly, when meetting strong air current and blowing, cause the condition that operation platform does not to sway easily, it is constructor's the efficiency of construction on the operation platform to influence, and current operation platform is open operation platform mostly, constructor when moving on operation platform, drop construction tool from operation platform easily, cause the injury to the personnel of operation platform below, the relatively poor problem of safety in utilization.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a formula construction operation platform climbs outside building, includes the bottom plate, the four corners department of bottom plate upper surface respectively with four cushion sleeve's lower fixed surface connection, cushion sleeve's top cup joints with the bottom of extrusion sliding sleeve mutually, be provided with buffer spring in the cushion sleeve, buffer spring's upper and lower both ends respectively with the lower surface of cushion sleeve inner wall and the lower fixed surface connection of extrusion sliding sleeve, the upper surface of extrusion sliding sleeve and the lower fixed surface of buffer board are connected, the lower surface of four cushion sleeve inner walls respectively with the lower fixed surface connection of four guide bars, the equal fixedly connected with universal wheel in four corners department of bottom plate lower surface.
As a further aspect of the present invention: the back of bottom plate and the positive below fixed connection of backup pad, the positive top of backup pad and the back fixed connection of roof, the four corners department fixed connection of the top of four guide bars and roof lower surface, the removal spout has been seted up in the front of backup pad.
As a further aspect of the present invention: the movable sliding groove is internally provided with a limiting clamping block in sliding connection, the front face of the limiting clamping block is fixedly connected with the back face of the operation cabin, four corners of the operation cabin are sleeved with the outer surfaces of the four guide rods, and the front left side of the operation cabin is hinged with the front left side of the cabin door through two hinges.
As a further aspect of the present invention: the positive right side of hatch door is provided with locking device, locking device's right-hand member and the right flank looks joint of operation cabin inner wall, the positive right flank fixedly connected with handle of hatch door, the equal fixedly connected with pull ring in the left and right sides of operation cabin upper surface.
As a further aspect of the present invention: the upper surface of the bottom plate is fixedly connected with the lower surface of the motor, the output end of the motor penetrates through the front surface of the supporting plate to be sleeved with the front surface of the winding wheel, and two steel cables are wound on the outer surface of the winding wheel.
As a further aspect of the present invention: the upper surface of the supporting plate is fixedly connected with the lower surface of the double-groove guide wheel, two through holes are formed in the upper surface of the top plate, and the other ends of the two steel cables penetrate through the double-groove guide wheel and the two through holes to be fixedly connected with the top ends of the two pull rings respectively.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. this building outside formula construction operation platform that climbs, through setting up guide bar and spacing fixture block, when this operation platform goes up, utilize the guide bar to carry out the restriction of incline direction to the four corners department of operation cabin, spacing fixture block and bracing piece carry out the restriction of moving direction to the operation cabin simultaneously, make this operation platform when going up, can be perpendicular steady through guide bar and spacing fixture block rise, prevented to blow because of strong air current, and lead to the operation cabin to appear rocking and the condition of slope, the stability when this operation platform goes up has been strengthened, constructor's efficiency of construction on this operation platform has been improved.
2. This building outside formula construction operation platform that climbs, through setting up operation compartment and hatch door, when this operation platform carries out the use, drive the rolling wheel through the motor and carry out the rolling to the cable wire, utilize the cable wire to rise the operation compartment perpendicularly, the operation compartment after the lift, utilize the hatch door to form the enclosure space in with the operation compartment, make this operation platform when carrying out construction operation, the construction tool in the operation compartment can not drop from the operation compartment because of constructor's removal, personnel to this operation platform below cause the injury when effectively having prevented that the instrument from dropping, this operation platform's safety in utilization has been improved.
3. This formula construction operation platform climbs outside building, through setting up buffer spring, when descending after this operation platform accomplishes, the operation cabin that descends falls to the buffer board on, the buffer board extrudees the buffer spring in the cushion tube through the extrusion sliding sleeve, the impact force that produces when utilizing buffer spring's elasticity to the operation cabin whereabouts weakens and eliminates, make this operation platform can descend through the completion of buffer spring safety and stability, stability when having strengthened this operation platform and descending, the use that has improved this operation platform is experienced.
Drawings
Fig. 1 is a schematic three-dimensional structure of the present invention;
FIG. 2 is a schematic diagram of the right-side cross-sectional structure of the present invention;
FIG. 3 is a schematic view of the right-view enlarged cross-sectional structure of the buffering sleeve of the present invention;
in the figure: the device comprises a base plate 1, a buffer sleeve 2, an extrusion sliding sleeve 3, a buffer spring 4, a buffer plate 5, a guide rod 6, a universal wheel 7, a support plate 8, a top plate 9, a movable sliding groove 10, a limiting clamping block 11, an operation cabin 12, a cabin door 13, a locking device 14, a pull ring 15, a motor 16, a winding wheel 17, a steel cable 18, a double-groove guide wheel 19 and a through hole 20.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
As shown in fig. 1-3, the utility model provides a technical solution: a building external climbing type building construction operation platform comprises a bottom plate 1, four corners of the upper surface of the bottom plate 1 are fixedly connected with the lower surfaces of four buffer sleeves 2 respectively, the top ends of the buffer sleeves 2 are sleeved with the bottom ends of extrusion sliding sleeves 3, buffer springs 4 are arranged in the buffer sleeves 2, when the operation platform descends after being completed, a descending operation cabin 12 falls onto a buffer plate 5, the buffer plate 5 extrudes the buffer springs 4 in the buffer sleeves 2 through the extrusion sliding sleeves 3, impact force generated when the operation cabin 12 falls is weakened and eliminated by the elasticity of the buffer springs 4, the operation platform can descend safely and stably through the buffer springs 4, the stability of the operation platform when descending is enhanced, the use experience of the operation platform is improved, the upper end and the lower end of each buffer spring 4 are fixedly connected with the lower surfaces of the inner walls of the buffer sleeves 2 and the lower surfaces of the extrusion sliding sleeves 3 respectively, the upper surface of extrusion sliding sleeve 3 and the lower fixed surface of buffer board 5 are connected, the lower surface of 2 inner walls of four buffer sleeve respectively with the lower fixed surface of four guide bars 6 is connected, the equal fixedly connected with universal wheel 7 in four corners department of 1 lower surface of bottom plate, through setting up universal wheel 7, when this operation platform carries out the use, remove about driving this operation platform through universal wheel 7, simultaneously can be through the rise height to this operation platform of operation adjustment of motor 16, make this operation platform erect the completion after, can directly adjust operation platform's the position of erectting through the mode that promotes, this operation platform's use convenience has been improved.
Specifically, as shown in fig. 1 and 2, the back surface of the bottom plate 1 is fixedly connected with the lower part of the front surface of the supporting plate 8, the upper part of the front surface of the supporting plate 8 is fixedly connected with the back surface of the top plate 9, the top ends of the four guide rods 6 are fixedly connected with the four corners of the lower surface of the top plate 9, by arranging the guide rods 6 and the limiting fixture blocks 11, when the operation platform ascends, the four corners of the operation cabin 12 are limited in the inclined direction by the guide rods 6, and simultaneously, the limiting fixture blocks 11 and the supporting rods limit the moving direction of the operation cabin 12, so that when the operation platform ascends, the operation platform can ascend vertically and stably through the guide rods 6 and the limiting fixture blocks 11, thereby preventing the operation cabin 12 from swinging and inclining due to strong air flow blowing, enhancing the stability of the operation platform when ascending, and improving the construction efficiency of constructors on the operation platform, the removal spout 10 has been seted up in the front of backup pad 8, and sliding connection has spacing fixture block 11 in the removal spout 10, and the front of spacing fixture block 11 and the back fixed connection of operation cabin 12, the four corners department of operation cabin 12 cup joints with the surface of four guide bars 6 mutually, and the positive left side of operation cabin 12 is articulated mutually through two hinges and the positive left side of hatch door 13.
Specifically, as shown in fig. 2, a locking device 14 is disposed on the right side of the front surface of the cabin door 13, the right end of the locking device 14 is clamped with the right side surface of the inner wall of the operation cabin 12, a handle is fixedly connected to the right side surface of the front surface of the cabin door 13, by disposing the operation cabin 12 and the cabin door 13, when the operation platform is used, a winding wheel 17 is driven by a motor 16 to wind a steel cable 18, the operation cabin 12 is vertically lifted by the steel cable 18, the operation cabin 12 after being lifted is formed with a closed space in the operation cabin 12 by the cabin door 13, so that when the operation platform is used for construction work, construction tools in the operation cabin 12 cannot fall from the operation cabin 12 due to the movement of construction personnel, thereby effectively preventing the tools from falling down to hurt the personnel below the operation platform, improving the safety of the operation platform, pull rings 15 are fixedly connected to both the left side and the right side of the upper surface of the operation cabin 12, the upper surface of bottom plate 1 and the lower fixed surface of motor 16 are connected, the front that motor 16's output passed backup pad 8 cup joints with the front of rolling wheel 17 mutually, the surface winding of rolling wheel 17 has two cable wires 18, the upper surface of backup pad 8 and the lower fixed surface of double flute leading wheel 19 are connected, two through-holes 20 have been seted up to the upper surface of roof 9, the other end of two cable wires 18 all passes double flute leading wheel 19 and two through-holes 20 respectively with the top fixed connection of two pull rings 15.
The utility model discloses a theory of operation does:
when in use, the hatch 13 is opened by the handle, the construction tools to be used are put into the operation cabin 12, then the constructor enters the operation cabin 12, closes the cabin door 13, and locks the cabin door 13 with the operation cabin 12 through the locking device 14, after the locking is completed, starting the motor 16, the motor 16 winds the steel cable 18 through the winding wheel 17, the steel cable 18 pulls the operation cabin 12 to rise upwards through the double-groove guide wheel 19, the through hole 20 and the pull ring 15, the operation cabin 12 moves upwards vertically under the limitation of the guide rod 6 and the limiting fixture block 11, when the construction is finished and the steel cable needs to descend, the motor 16 is started to rotate reversely, the operation cabin 12 is lowered onto the buffer plate 5 through the steel cable 18, the buffer plate 5 extrudes the buffer spring 4 through the extrusion sliding sleeve 3, and by utilizing the elasticity of the buffer spring 4, the impact force generated when the operation cabin 12 is lowered is buffered and weakened, so that the operation cabin 12 can stably finish the lowering work.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. The utility model provides a formula of climbing building construction operation platform outside building, includes bottom plate (1), its characterized in that: the utility model discloses a buffer structure, including bottom plate (1), bottom plate (2), buffer sleeve (2), buffer spring (4) are provided with in buffer sleeve (2), the upper and lower both ends of buffer spring (4) cup joint with the bottom of extrusion sliding sleeve (3) respectively, the upper surface of extrusion sliding sleeve (3) and the lower fixed surface of buffer board (5) are connected, the lower surface of four buffer sleeve (2) inner walls respectively with the lower fixed surface of four guide bars (6) be connected, the equal fixedly connected with universal wheel (7) of four corners department of bottom plate (1) lower surface.
2. The external climbing building construction operation platform according to claim 1, wherein: the back of bottom plate (1) and the below fixed connection in the front of backup pad (8), the back fixed connection of the top in the front of backup pad (8) and roof (9), the four corners department fixed connection of the top of four guide bars (6) and roof (9) lower surface, removal spout (10) have been seted up in the front of backup pad (8).
3. The external climbing building construction operation platform of claim 2, wherein: the movable sliding groove (10) is connected with a limiting clamping block (11) in a sliding mode, the front face of the limiting clamping block (11) is fixedly connected with the back face of the operation cabin (12), four corners of the operation cabin (12) are sleeved with the outer surfaces of the four guide rods (6), and the front left side of the operation cabin (12) is hinged to the front left side of the cabin door (13) through the two hinges.
4. The external climbing building construction operation platform according to claim 3, wherein: the right side that hatch door (13) are positive is provided with locking device (14), the right-hand member of locking device (14) and the right flank looks joint of operation cabin (12) inner wall, the positive right flank fixedly connected with handle of hatch door (13), the equal fixedly connected with pull ring (15) of the left and right sides of operation cabin (12) upper surface.
5. The external climbing building construction operation platform of claim 2, wherein: the upper surface of the bottom plate (1) is fixedly connected with the lower surface of a motor (16), the output end of the motor (16) penetrates through the front surface of the supporting plate (8) to be sleeved with the front surface of a winding wheel (17), and two steel cables (18) are wound on the outer surface of the winding wheel (17).
6. The building external climbing building construction operation platform according to claim 5, wherein: the upper surface of the supporting plate (8) is fixedly connected with the lower surface of the double-groove guide wheel (19), two through holes (20) are formed in the upper surface of the top plate (9), and the other ends of the two steel cables (18) penetrate through the double-groove guide wheel (19) and the two through holes (20) and are fixedly connected with the top ends of the two pull rings (15) respectively.
CN202120624534.7U 2021-03-29 2021-03-29 Building external climbing type building construction operation platform Expired - Fee Related CN215291290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120624534.7U CN215291290U (en) 2021-03-29 2021-03-29 Building external climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120624534.7U CN215291290U (en) 2021-03-29 2021-03-29 Building external climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN215291290U true CN215291290U (en) 2021-12-24

Family

ID=79534695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120624534.7U Expired - Fee Related CN215291290U (en) 2021-03-29 2021-03-29 Building external climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN215291290U (en)

Similar Documents

Publication Publication Date Title
CN112627565B (en) Suspension mechanism of building curtain wall cleaning device and using method thereof
CN215291290U (en) Building external climbing type building construction operation platform
CN210195191U (en) Scalable building platform
US4378860A (en) Movable staging scaffold system for building construction
CN212356271U (en) Super thick cell board hoist and mount track device
CN219929521U (en) Multifunctional support for coal mine underground roadway high construction
CN216840477U (en) Protective bracket for constructional engineering
CN214531835U (en) External hanging type operation device for large storage tank
CN212687285U (en) Special lift of building installation engineering
CN214570537U (en) Safety protection lift for aerial work platform
CN112609944A (en) Steel construction scaffold structure that building site used
CN211813309U (en) Multi-functional lifting device of architectural equipment
CN206957170U (en) A kind of scaffold for building being easily installed
CN218581143U (en) Liftable scaffold for building outer wall
CN217711641U (en) Lifting stable and non-shaking hanging basket
CN214462354U (en) Guide-insertion type scaffold for building construction
CN215055158U (en) Exterior wall coating construction platform
CN218562974U (en) Basket is hung to bridge construction safety
CN216971805U (en) High-safety standard section safety channel for tower crane
CN219156359U (en) Self-climbing construction crane for elevator steel structure well
CN217420413U (en) Lifting steel pipe frame
CN220485263U (en) Double-layer hanging basket and electric rope arrangement pulling equipment
CN217201534U (en) Limiting device for limiting swing range of traveling cable
CN215886185U (en) Construction elevator for intermediate frequency goods
CN221031352U (en) Lifting structure and scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211224

CF01 Termination of patent right due to non-payment of annual fee