CN215281625U - Pipeline installation device for building heating and ventilation - Google Patents

Pipeline installation device for building heating and ventilation Download PDF

Info

Publication number
CN215281625U
CN215281625U CN202121005726.6U CN202121005726U CN215281625U CN 215281625 U CN215281625 U CN 215281625U CN 202121005726 U CN202121005726 U CN 202121005726U CN 215281625 U CN215281625 U CN 215281625U
Authority
CN
China
Prior art keywords
base
pole setting
building
slot
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121005726.6U
Other languages
Chinese (zh)
Inventor
许瑞华
李丽旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121005726.6U priority Critical patent/CN215281625U/en
Application granted granted Critical
Publication of CN215281625U publication Critical patent/CN215281625U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a warm logical pipe installation device that uses of building, comprising a base plate, fixed surface installs the base on the bottom plate top, the spout has been seted up on base side surface, the fluting has been seted up to base top upper surface, the base passes through spout sliding connection has a plurality of sliders, the utility model discloses the beneficial effect who reaches is: by arranging the base, a sliding groove is formed in the side end of the base, a sliding block is arranged in the sliding groove, a vertical rod is arranged at the top of the sliding block, a pipe bracket is arranged at the top end of the vertical rod, the position of the pipe bracket can be adjusted by manually adjusting the position of the sliding block, a pipeline is conveniently supported, the installation is convenient, the hand holding is not needed in the installation process, and the installation convenience is improved; through set up the slot at the pole setting side, installation inserted bar in the slot sets up spacing hole on the inserted bar, sets up the jack in the pole setting for the pole setting height can be adjusted to the device when using, thereby adjusts the pipe-supporting rack height, and the not pipeline of co-altitude of easy to assemble, rational in infrastructure, simple has improved the piping erection convenience nature.

Description

Pipeline installation device for building heating and ventilation
Technical Field
The utility model relates to a warm logical pipe erection device of using of building belongs to warm logical technical field.
Background
Heating and ventilation are one component of a building. The method comprises the following steps: heating, ventilation and air conditioning. Meanwhile, the system also cultivates the high-level engineering technical talents and the major of the management talents which are used for working in the technical fields of building environment control, building energy conservation and building facility intelligence and have the capabilities of designing, constructing, debugging and running management of public facility systems such as air conditioning, heat supply, ventilation, building water supply and drainage, fuel gas supply and the like, building heat energy supply systems and building energy conservation and the capability of formulating the scheme of a building automation system.
Pipeline installation needs to be carried out during the warm construction of leading to of building, because the mounting height is different among the pipeline installation process, needs artifical hand, and the installation is troublesome, consequently provides a warm pipeline installation device that leads to of building.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art's defect, provide a warm general purpose pipe installation device of building.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a warm logical pipe installation device of building, comprising a base plate, fixed surface installs the base on the bottom plate top, the spout has been seted up on base side surface, the fluting has been seted up to base top upper surface, the base passes through spout sliding connection has a plurality of sliders, the slider top is provided with the pole setting, the slot has been seted up on pole setting side surface, the pole setting passes through the slot is pegged graft there is the inserted bar, the inserted bar top can be dismantled and be connected with the stinger frame.
As an optimized technical scheme of the utility model, a plurality of spacing holes have been seted up to the inserted bar side, two jacks have been seted up on pole setting side upper portion.
As an optimal technical scheme of the utility model, correspond on the inserted bar spacing hole with connect through the gag lever post between the jack in the pole setting.
As an optimal technical scheme of the utility model, the fluting has been seted up to base top upper surface, the fluting with the spout intercommunication.
As a preferred technical scheme of the utility model, the fixed orifices has been seted up on slider top surface, the pole setting bottom through screwed joint with the connection can be dismantled to the fixed orifices.
The utility model discloses the beneficial effect who reaches is: by arranging the base, a sliding groove is formed in the side end of the base, a sliding block is arranged in the sliding groove, a vertical rod is arranged at the top of the sliding block, a pipe bracket is arranged at the top end of the vertical rod, the position of the pipe bracket can be adjusted by manually adjusting the position of the sliding block, a pipeline is conveniently supported, the installation is convenient, the hand holding is not needed in the installation process, and the installation convenience is improved; through set up the slot at the pole setting side, installation inserted bar in the slot sets up spacing hole on the inserted bar, sets up the jack in the pole setting for the pole setting height can be adjusted to the device when using, thereby adjusts the pipe-supporting rack height, and the not pipeline of co-altitude of easy to assemble, rational in infrastructure, simple has improved the piping erection convenience nature.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic view of the base structure of the present invention.
In the figure: 1. a base plate; 2. a base; 3. a chute; 4. a slider; 5. erecting a rod; 6. a slot; 7. inserting a rod; 8. a limiting hole; 9. a jack; 10. a limiting rod; 11. a stinger; 12. grooving; 13. and (7) fixing holes.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example 1
As shown in fig. 1-2, the utility model provides a warm general pipeline installation device of building, including bottom plate 1, fixed surface installs base 2 on 1 top of bottom plate, spout 3 has been seted up on 2 side surfaces of base, fluting 12 has been seted up to 2 top upper surfaces of base, base 2 passes through 3 sliding connection of spout have a plurality of sliders 4, 4 tops of slider are provided with pole setting 5, slot 6 has been seted up on 5 side surfaces of pole setting, pole setting 5 passes through slot 6 is pegged graft and is had inserted bar 7, inserted bar 7 top can be dismantled and be connected with stinger frame 11.
A plurality of limiting holes 8 are formed in the side end of the inserting rod 7, and two inserting holes 9 are formed in the upper portion of the side end of the vertical rod 5.
The corresponding limiting hole 8 on the inserted rod 7 is connected with the jack 9 on the upright rod 5 through a limiting rod 10, so that the fixing is convenient, and the disassembly is convenient.
The upper surface of the top of the base 2 is provided with a slot 12, the slot 12 is communicated with the chute 3, and the upright rod 5 can conveniently penetrate through and is connected with the sliding block 4.
Fixed orifices 13 have been seted up on 4 top surfaces of slider, pole setting 5 bottom through screwed joint with fixed orifices 13 can dismantle the connection, pole setting 5 simple to operate, and convenient to detach.
Specifically, when the utility model is used, the base 2 is arranged, the side end of the base 2 is provided with the chute 3, the sliding block 4 is arranged in the chute 3, the top of the sliding block 4 is provided with the vertical rod 5, the top end of the vertical rod 5 is provided with the stinger 11, the position of the stinger 11 can be adjusted by manually adjusting the position of the sliding block 4, a pipeline is conveniently supported, the installation is convenient, the hand holding is not needed in the installation process, and the installation convenience is improved; through seting up slot 6 at 5 sides in pole setting, installation inserted bar 7 in the slot 6 sets up spacing hole 8 on the inserted bar 7, sets up jack 9 on the pole setting 5 for 5 heights in pole setting can be adjusted to the device when using, thereby adjust stinger 11 height, the not pipeline of co-altitude of easy to assemble, rational in infrastructure, simple has improved the piping erection convenience nature.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a warm pipe erection device that leads to of building, includes bottom plate (1), its characterized in that: fixed surface installs base (2) on bottom plate (1) top, spout (3) have been seted up on base (2) side surface, fluting (12) have been seted up to base (2) top upper surface, base (2) pass through spout (3) sliding connection has a plurality of slider (4), slider (4) top is provided with pole setting (5), slot (6) have been seted up on pole setting (5) side surface, pole setting (5) pass through slot (6) are pegged graft and are had inserted bar (7), inserted bar (7) top can be dismantled and be connected with stinger frame (11).
2. The mounting device for the heating and ventilating pipeline of the building as claimed in claim 1, wherein the side end of the inserted rod (7) is provided with a plurality of limiting holes (8), and the upper part of the side end of the upright rod (5) is provided with two insertion holes (9).
3. A heating and ventilating pipe installing device for building as claimed in claim 2, wherein the corresponding limiting hole (8) on the inserted rod (7) and the inserting hole (9) on the vertical rod (5) are connected through a limiting rod (10).
4. A heating and ventilating duct installing device for building as claimed in claim 1, wherein the base (2) is provided with a slot (12) on the top upper surface, and the slot (12) is communicated with the chute (3).
5. The mounting device for the heating and ventilating pipeline of the building as claimed in claim 1, wherein the top surface of the sliding block (4) is provided with a fixing hole (13), and the bottom of the upright rod (5) is detachably connected with the fixing hole (13) through a threaded joint.
CN202121005726.6U 2021-05-12 2021-05-12 Pipeline installation device for building heating and ventilation Expired - Fee Related CN215281625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121005726.6U CN215281625U (en) 2021-05-12 2021-05-12 Pipeline installation device for building heating and ventilation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121005726.6U CN215281625U (en) 2021-05-12 2021-05-12 Pipeline installation device for building heating and ventilation

Publications (1)

Publication Number Publication Date
CN215281625U true CN215281625U (en) 2021-12-24

Family

ID=79540014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121005726.6U Expired - Fee Related CN215281625U (en) 2021-05-12 2021-05-12 Pipeline installation device for building heating and ventilation

Country Status (1)

Country Link
CN (1) CN215281625U (en)

Similar Documents

Publication Publication Date Title
CN215281625U (en) Pipeline installation device for building heating and ventilation
CN205860185U (en) Multistage interim heating system
CN202328715U (en) Wall-mounted structure of wall-mounted air conditioner indoor machine
CN209145127U (en) A kind of furred ceiling board fixing structure
CN204850203U (en) Anti - bearing structure of furred ceiling
CN203654534U (en) Photovoltaic module fixing device for curtain wall
CN209780132U (en) Laying structure of assembled ceramic tile
CN201021825Y (en) Combined mutual compensation heat collection system device for solar and gas wall-hung furnace
CN209893601U (en) Pipeline hanger for installing central air conditioner
CN208588071U (en) A kind of hanging air conditioner component being easily installed
CN202109682U (en) Adjustable triaxial tile hook structure
CN216073886U (en) Blast furnace tuyere blowpipe support
CN206514444U (en) A kind of temperature and humidity regulation system combines constructing structure with active beam-cooling
CN218237607U (en) Independently distributed air heat source pump unit
CN220870232U (en) Pipeline supporting device for installation of central air conditioning engineering
CN203561108U (en) Wind source heat pump device for outdoor directional air supply and air return
CN218672359U (en) Multi-connected indoor unit assembly
CN204992373U (en) Prefabricated cabin formula transformer substation of compact
CN215322684U (en) Building is warm to be led to and is used material conveyer
CN217079778U (en) Assembly type floor positioning and mounting structure based on BIM technology
CN211977152U (en) Building ventilation system
CN220082306U (en) Auxiliary splicing tool for warm ventilation pipes
CN215675784U (en) Novel intelligent electric boiler
CN220771330U (en) Heating and ventilation engineering mounting structure
CN212692122U (en) Module furnace branch control device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211224