CN215280546U - Energy-conserving heating water pipe welding production cooler bin - Google Patents

Energy-conserving heating water pipe welding production cooler bin Download PDF

Info

Publication number
CN215280546U
CN215280546U CN202121654071.5U CN202121654071U CN215280546U CN 215280546 U CN215280546 U CN 215280546U CN 202121654071 U CN202121654071 U CN 202121654071U CN 215280546 U CN215280546 U CN 215280546U
Authority
CN
China
Prior art keywords
butt joint
joint shell
bolt
water pipe
heating water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121654071.5U
Other languages
Chinese (zh)
Inventor
靳安军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Coal Chemical Xianyang New Thermal Energy Co ltd
Original Assignee
Shaanxi Coal Chemical Xianyang New Thermal Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Coal Chemical Xianyang New Thermal Energy Co ltd filed Critical Shaanxi Coal Chemical Xianyang New Thermal Energy Co ltd
Priority to CN202121654071.5U priority Critical patent/CN215280546U/en
Application granted granted Critical
Publication of CN215280546U publication Critical patent/CN215280546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The utility model discloses an energy-conserving heating water pipe welding production cooler bin, including the base, go up butt joint shell and butt joint shell down, the butt joint shell is installed down through the bolt in the top of base, through bolt erection bracing frame in the butt joint shell down, the upper end block of butt joint shell has last butt joint shell down, it has the manometer to go up one side of butt joint shell through the mounting screw, the stand is installed through the bolt to the one end of butt joint shell down, there is the solenoid valve one side of stand through the mounting screw, the refrigeration case is installed through the bolt to the one end of stand, semiconductor refrigeration piece is installed through the mounting groove in the top of refrigeration case, there is the air-blower one side air intake of refrigeration case through the mounting screw, the top welding roof of stand. This novel energy-conserving heating water pipe welding production cooler bin function is various, easy operation, and the production of being convenient for has satisfied the multiple demand in the use, is fit for extensively using widely.

Description

Energy-conserving heating water pipe welding production cooler bin
Technical Field
The utility model relates to a cooler bin technical field, in particular to energy-conserving heating water pipe welding production cooler bin.
Background
The electric heating principle is that a heating cable is buried in a floor to heat the floor to 18-28 ℃, heat is uniformly radiated indoors to achieve the heating effect, the water heating principle is that water buried in a water pipe under the floor is heated to a proper temperature through equipment to enable the water to be uniformly radiated indoors, when the underground water pipe is arranged, the water pipe joint needs to be welded in advance, cooling equipment needs to be used for cooling after welding, and the anti-corrosion treatment is carried out on a welding seam.
The existing welding production cooling equipment has the following defects: 1. the welding seam can not be cooled quickly, so that the production efficiency is improved; 2. the air inlet flow is not convenient to adjust, different use requirements are met, and therefore the energy-saving heating water pipe welding production cooling box is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an energy-conserving heating water pipe welding production cooler bin can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an energy-conserving heating water pipe welding production cooler bin, includes the base, goes up butt joint shell and butt joint shell down, the butt joint shell is installed down through the bolt in the top of base, through bolt erection bracing frame in the butt joint shell down, the upper end block of butt joint shell has last butt joint shell down, it has the manometer to go up one side of butt joint shell through the screw installation, the stand is installed through the bolt to the one end of butt joint shell down, there is the solenoid valve one side of stand through the screw installation, the refrigeration case is installed through the bolt to the one end of stand, semiconductor refrigeration piece is installed through the mounting groove in the top of refrigeration case, there is the air-blower one side air intake of refrigeration case through the screw installation, the top welding roof of stand, and the electric hydraulic cylinder is installed through the mount pad at the top of roof, there is the PLC controller bottom of roof through the screw installation.
Further, the welding has the thing board of putting on the support frame, and puts the thing board and be provided with the multiunit, the output and the input of solenoid valve pass through the pipeline respectively with butt joint shell and refrigeration case intercommunication down.
Furthermore, a pressure release valve is arranged on one side of the lower butt joint shell, and the refrigerating end of the semiconductor refrigerating piece is located in the refrigerating box.
Furthermore, the detection end of the pressure gauge is positioned in the upper butt joint shell, and the output end of the PLC is connected with the input end of the electric hydraulic cylinder through a lead.
Further, the output shaft of the electric hydraulic cylinder penetrates through the top plate and is mounted at the top of the upper butting shell through a bolt.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. utilize PLC controller automatic control electric hydraulic cylinder output stroke, be convenient for promote go up butt joint shell and inseparable block under on the butt joint shell, put the heating water pipe that the welding is good at the multiunit and put thing board top, make and go up the butt joint shell block inseparable, open air-blower and semiconductor refrigeration piece, utilize the semiconductor refrigeration piece to the cooling of refrigeration incasement, reduce inside temperature.
2. The air-blower is blown into the refrigeration incasement with external air, and the cold gas enters into down to butt joint the shell and refrigerates the water pipe after butt joint in the last butt joint shell under the effect of atmospheric pressure, and the back of refrigerating is convenient for carry out anticorrosive treatment to the weld, utilizes the manometer to be convenient for detect inside pressure numerical value, and the personnel of being convenient for know, when atmospheric pressure is great, opens the relief valve and carries out the pressure release fast, utilizes the solenoid valve to be convenient for adjust air intake flow, satisfies different user demands.
Drawings
Fig. 1 is the overall structure schematic diagram of the cooling box produced by welding the energy-saving heating water pipe.
Fig. 2 is the utility model relates to a support frame structure schematic diagram of energy-conserving heating water pipe welding production cooler bin.
In the figure: 1. a blower; 2. an electromagnetic valve; 3. a refrigeration case; 4. a column; 5. a semiconductor refrigeration sheet; 6. a PLC controller; 7. a top plate; 8. an electric hydraulic cylinder; 9. a pressure gauge; 10. an upper docking shell; 11. a lower splice shell; 12. a pressure relief valve; 13. a base; 14. a storage plate; 15. a support frame.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, an energy-saving heating water pipe welding production cooling box comprises a base 13, an upper butt joint shell 10 and a lower butt joint shell 11, wherein the top of the base 13 is provided with the lower butt joint shell 11 through a bolt, a support frame 15 is installed in the lower butt joint shell 11 through a bolt, the upper end of the lower butt joint shell 11 is clamped with the upper butt joint shell 10, one side of the upper butt joint shell 10 is provided with a pressure gauge 9 through a bolt, one end of the lower butt joint shell 11 is provided with a stand column 4 through a bolt, one side of the stand column 4 is provided with an electromagnetic valve 2 through a bolt, one end of the stand column 4 is provided with a refrigeration box 3 through a bolt, the top of the refrigeration box 3 is provided with a semiconductor refrigeration sheet 5 through a mounting groove, an air inlet at one side of the refrigeration box 3 is provided with an air blower 1 through a bolt, the top of the stand column 4 is welded with a top plate 7, and the top of the top plate 7 is provided with an electric hydraulic cylinder 8 through a mounting seat, and a PLC (programmable logic controller) 6 is installed at the bottom of the top plate 7 through a screw.
Wherein, the welding has the thing board 14 on the support frame 15, and puts the thing board 14 and be provided with the multiunit, the output and the input of solenoid valve 2 pass through the pipeline respectively with butt joint shell 11 and refrigeration case 3 intercommunication down.
In this embodiment, as shown in fig. 2, the welded heating water pipes are placed on the tops of the plurality of groups of storage plates 14, so as to be convenient for storage.
Wherein, one side of lower butt joint shell 11 is provided with relief valve 12, the refrigeration end of semiconductor refrigeration piece 5 is located refrigeration case 3.
In this embodiment, as shown in fig. 1, when the air pressure is large, the pressure relief valve 12 is opened to quickly relieve the pressure, and the electromagnetic valve 2 is used to conveniently adjust the air inflow, so as to meet different use requirements.
The detection end of the pressure gauge 9 is positioned in the upper butt joint shell 10, and the output end of the PLC 6 is connected with the input end of the electric hydraulic cylinder 8 through a lead.
In this embodiment, as shown in fig. 1, the PLC controller 6 is used to automatically control the output stroke of the electric hydraulic cylinder 8, so as to facilitate lifting the upper docking shell 10 and tightly engaging with the lower docking shell 11.
Wherein, the output shaft of the electric hydraulic cylinder 8 is installed on the top of the upper butt joint shell 10 through a top plate 7 by bolts.
It should be noted that the utility model relates to an energy-saving heating water pipe welding production cooling box, during operation, utilize PLC controller 6 automatic control electric hydraulic cylinder 8 output stroke, be convenient for promote butt joint shell 10 and closely block on butt joint shell 11 down, put the good heating water pipe of welding on multiunit thing board 14 top, make butt joint shell 10 block closely, open air-blower 1 and semiconductor refrigeration piece 5, utilize semiconductor refrigeration piece 5 to refrigerate and cool down in the refrigeration box 3, reduce the internal temperature, air-blower 1 is with the air drum of external world in refrigeration box 3, under the effect of atmospheric pressure cold gas enters butt joint shell 11 down and butt joint shell 10 in to refrigerate the water pipe after the butt joint, be convenient for carry out anticorrosive treatment to the butt joint after refrigerating, utilize manometer 9 to be convenient for detect the internal pressure numerical value, be convenient for personnel know, when atmospheric pressure is great, open relief valve 12 and carry out the pressure release fast, the electromagnetic valve 2 is convenient for adjusting the air inflow, and different use requirements are met.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides an energy-conserving heating water pipe welding production cooler bin, includes base (13), goes up butt joint shell (10) and lower butt joint shell (11), its characterized in that: the top of the base (13) is provided with a lower butt joint shell (11) through a bolt, a bolt mounting support frame (15) is arranged in the lower butt joint shell (11), the upper end of the lower butt joint shell (11) is clamped with an upper butt joint shell (10), one side of the upper butt joint shell (10) is provided with a pressure gauge (9) through a bolt, one end of the lower butt joint shell (11) is provided with a stand column (4) through a bolt, one side of the stand column (4) is provided with a solenoid valve (2) through a bolt, one end of the stand column (4) is provided with a refrigeration box (3) through a bolt, the top of the refrigeration box (3) is provided with a semiconductor refrigeration sheet (5) through a mounting groove, one side air inlet of the refrigeration box (3) is provided with an air blower (1) through a bolt, the top of the stand column (4) is welded with a top plate (7), and the top of the top plate (7) is provided with an electric hydraulic cylinder (8) through a mounting seat, and a PLC (programmable logic controller) (6) is installed at the bottom of the top plate (7) through a screw.
2. The energy-saving heating water pipe welding production cooling tank of claim 1, characterized in that: the welding has puts thing board (14) on support frame (15), and puts thing board (14) and be provided with the multiunit, the output and the input of solenoid valve (2) pass through the pipeline respectively with lower butt joint shell (11) and refrigeration case (3) intercommunication.
3. The energy-saving heating water pipe welding production cooling tank of claim 1, characterized in that: one side of the lower butt joint shell (11) is provided with a pressure release valve (12), and the refrigerating end of the semiconductor refrigerating piece (5) is positioned in the refrigerating box (3).
4. The energy-saving heating water pipe welding production cooling tank of claim 1, characterized in that: the detection end of the pressure gauge (9) is positioned in the upper butt joint shell (10), and the output end of the PLC (6) is connected with the input end of the electric hydraulic cylinder (8) through a lead.
5. The energy-saving heating water pipe welding production cooling tank of claim 1, characterized in that: an output shaft of the electric hydraulic cylinder (8) penetrates through the top plate (7) and is mounted at the top of the upper butt joint shell (10) through a bolt.
CN202121654071.5U 2021-07-21 2021-07-21 Energy-conserving heating water pipe welding production cooler bin Active CN215280546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121654071.5U CN215280546U (en) 2021-07-21 2021-07-21 Energy-conserving heating water pipe welding production cooler bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121654071.5U CN215280546U (en) 2021-07-21 2021-07-21 Energy-conserving heating water pipe welding production cooler bin

Publications (1)

Publication Number Publication Date
CN215280546U true CN215280546U (en) 2021-12-24

Family

ID=79522140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121654071.5U Active CN215280546U (en) 2021-07-21 2021-07-21 Energy-conserving heating water pipe welding production cooler bin

Country Status (1)

Country Link
CN (1) CN215280546U (en)

Similar Documents

Publication Publication Date Title
CN215280546U (en) Energy-conserving heating water pipe welding production cooler bin
CN105650959B (en) A kind of liquid nitrogen cooling device and its assembly method
CN201486817U (en) Residual heat water heating device of air compressor
CN106765456A (en) A kind of hold over system and timesharing accumulation of heat co-feeding system
CN205373475U (en) Circulation heating type waste heat recovery device
CN207421511U (en) A kind of new heat-exchanger support of pipelines
CN210584290U (en) Oil refining chemical industry safety environmental protection gas collection system
CN207330973U (en) Modified blast furnace soft water closed circulation system
CN203642304U (en) Automatic super conductor temperature control heat supplying and energy saving system
CN206944791U (en) One kind oxygen liquid argon cold recovery system
CN207688427U (en) A kind of Teat pump boiler
CN204738935U (en) Energy-saving two-stage cooler
CN201433899Y (en) Air compressor waste heat regenerating device
CN210374108U (en) Four-season solar medium heat source and power generation system
CN206966937U (en) Wearing plate built-up welding platform clamping apparatus
CN202766584U (en) Cooling system for annealing furnace disk roller device
CN114046675B (en) Heat exchange equipment for high-pressure drainage cooling of power plant
CN205117668U (en) Water cooling and heat recovery unit of air compressor machine
CN206220177U (en) A kind of non-negative pressure stabilized tank of heat exchange
CN205578080U (en) Large -scale engine waste heat utilizes device
CN216540720U (en) Intermediate frequency electric furnace cooling device for bearing forging processing
CN104390207A (en) Heat recovering and utilizing system for low-temperature flue gas
CN214330760U (en) Leading natural gas heating device of gas turbine
CN212381801U (en) Energy-conserving sunlight energy storage formula greenhouse
CN213984246U (en) Energy-efficient carbon dioxide liquefying plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant