CN215271207U - Construction engineering management project budget drawing device - Google Patents
Construction engineering management project budget drawing device Download PDFInfo
- Publication number
- CN215271207U CN215271207U CN202120739416.0U CN202120739416U CN215271207U CN 215271207 U CN215271207 U CN 215271207U CN 202120739416 U CN202120739416 U CN 202120739416U CN 215271207 U CN215271207 U CN 215271207U
- Authority
- CN
- China
- Prior art keywords
- bolt
- sleeve
- drawing board
- box
- budget
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 238000007789 sealing Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 description 4
- 230000000630 rising effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to the technical field of project budget drawing, and discloses a budget drawing device for construction project management projects, which comprises a box body and a drawing board; the utility model discloses a box, including box, support, bolt A, sleeve, movable mounting have a sleeve around the box, movable mounting has branch in the sleeve, branch bottom front side fixed mounting has bolt A, the perforation has been seted up at sleeve outside middle part, bolt A runs through in the perforation, rotary mounting has clamping nut A on the bolt A. The utility model discloses a branch is located the sleeve and reciprocates the expansion work that can realize the drawing board, rethread bolt B is located and changes the downthehole rotation and can draw the drawing board upset, and can overturn the drawing board once more after the use, withdraw branch in the sleeve again, can accomplish the work of accomodating of equipment this moment, more small and exquisite flexibility when making it need not to use, and can deposit the drawing tool in the box, improve the practicality greatly, the expansion that this device can be free is with accomodating, the operation mode is simple and convenient, it is laborsaving to save trouble.
Description
Technical Field
The utility model relates to an engineering budget drawing technical field specifically is a building engineering management engineering budget drawing device.
Background
At present, engineering drawing is a professional basic subject, a projection theory of drawing geometry is taken as a basis, a ruler, compasses and a drawing board are taken as tools, a blackboard, a wood pattern and a wall map are taken as media, and during engineering budget, the engineering drawing is often drawn firstly, and then budget quotation is carried out according to the drawn drawing.
The utility model discloses a drawing device is planned in building engineering management engineering budget of bulletin number (CN212590960U), under the effect of removal wheel, the drawing device is conveniently removed and is fixed, increases the convenience of use; the angle of the drawing board main body is adjusted through the telescopic hydraulic rod, the sliding groove and the sliding lug plate, so that drawing operation can be conveniently carried out, display can be carried out in different directions and angles, and the execution of engineering budget operation is increased; the setting of the supporting cabinet body and article rack is favorable to placing the engineering budget drawing apparatus, and getting when convenient the use is taken, has increased the convenience when drawing, but the device still has following shortcoming:
the device can't realize the free exhibition of receiving and releasing of drawing board, still occupies very big space when not using, and flexibility greatly reduced is unfavorable for the use of different positions, uses and has the limitation, and can't play the protection to the drawing board betterly, and dustproof and waterproof effect is poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering management engineering budget drawing device has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction project management project budget drawing device comprises a box body and a drawing board;
sleeves are fixedly arranged on the front side and the rear side of the box body, a supporting rod is movably arranged in each sleeve, a bolt A is fixedly arranged on the front side of the bottom of each supporting rod, a through hole is formed in the middle of the outer side of each sleeve, each bolt A penetrates through each through hole, and a clamping nut A is rotatably arranged on each bolt A;
the hole has been seted up to the branch top, both sides fixed mounting has bolt B around the drawing board, bolt B inserts in changeing downtheholely, the rotatory clamp nut B that installs on bolt B, the hasp is installed to drawing board both sides and box both sides top correspondence.
As a preferred embodiment of the present invention, the middle part of the bottom end of the drawing board is provided with a handle.
As a preferred embodiment of the utility model, lockable universal wheels are installed at the four corners of the bottom of the box body.
As a preferred embodiment of the utility model, a handspike is installed at box left side top.
As a preferred embodiment of the utility model, the rubber sealing strip is installed at the box top.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model relates to a building engineering management engineering budget drawing device, it reciprocates the expansion work that can realize the drawing board to be located the sleeve through branch, rethread bolt B is located and changes the downthehole rotation and can draw the drawing board upset, and can overturn the drawing board once more after the use, withdraw branch in the sleeve again, can accomplish the work of accomodating of equipment this moment, it is more small and exquisite nimble when making it need not to use, and can deposit the drawing instrument in the box, the practicality is greatly improved, this device can freely expand and accomodate, the operation mode is simple and convenient, time saving and labor saving, all the free adjustment of its high angle, improve equipment's flexibility and practicality greatly.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic front view of a budget drawing device for construction engineering management of the present invention;
fig. 2 is a schematic front view of a drawing device for budget of construction engineering management of the present invention;
fig. 3 is a schematic view of a top view structure of a box body of the budget drawing device for the construction engineering management project of the present invention;
fig. 4 is a schematic view of a strut structure of the budget drawing device for construction engineering management.
In the figure: 1. a box body; 2. a sleeve; 3. a strut; 4. perforating; 5. a bolt A; 6. clamping the nut A; 7. a bolt B; 8. clamping the nut B; 9. drawing boards; 10. a hasp; 11. a handle; 12. a lockable universal wheel; 13. a handspike; 14. hole turning; 15. a rubber sealing strip.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inner", "outer" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are merely for convenience of description of the present invention and for simplicity of description, but do not indicate or imply that the device or element referred to must have a specific shape or simplified description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly, e.g., as meaning fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution: a construction project management project budget drawing device comprises a box body 1 and a drawing board 9;
the front side and the rear side of the box body 1 are fixedly provided with sleeves 2, a support rod 3 is movably arranged in each sleeve 2, a bolt A5 is fixedly arranged on the front side of the bottom of each support rod 3, a through hole 4 is formed in the middle of the outer side of each sleeve 2, a bolt A5 penetrates through each through hole 4, and a clamping nut A6 is rotatably arranged on each bolt A5;
rotating hole 14 has been seted up to branch 3 top, both sides fixed mounting has bolt B7 around drawing board 9, bolt B7 inserts in rotating hole 14, rotary mounting has clamping nut B8 on bolt B7, hasp 10 is installed to drawing board 9 both sides and box 1 both sides top correspondence.
In this embodiment (please refer to fig. 1, fig. 2, fig. 3 and fig. 4), it reciprocates to be located sleeve 2 through branch 3 and can realize the expansion work of drawing board 9, rethread bolt B7 is located 14 rotations in the commentaries on classics hole and can overturn drawing board 9 and draw, can overturn drawing board 9 once more after the use, withdraw sleeve 2 with branch 3 again, can accomplish the work of accomodating of equipment this moment, it is more small and exquisite nimble when making it need not to use, and can deposit the drawing instrument in the box 1, the practicality is greatly improved, this device can expand freely and accomodate, the operating mode is simple and convenient, time and labor saving, its high angle all can freely be adjusted, the flexibility and the practicality of equipment are greatly improved.
In this embodiment (see fig. 1), a handle 11 is installed in the middle of the bottom end of the drawing board 9, and the carrying work after the box body 1 is folded can be facilitated through the handle 11.
In this embodiment (see fig. 1), lockable universal wheels 12 are installed at four corners of the bottom of the box body 1, and the box body 1 can be moved by the lockable universal wheels 12.
In this embodiment (please refer to fig. 1), a push rod 13 is installed at the top of the left side of the box body 1, and the movement of the box body 1 can be more labor-saving and convenient through the push rod 13.
In this embodiment (see fig. 1), the top of the box body 1 is provided with a rubber sealing strip 15, and when the drawing board 9 is located above the box body 1 and is closed, the rubber sealing strip 15 can play a role in sealing, so as to play a role in water and dust prevention.
It should be noted that the utility model relates to a construction engineering management project budget drawing device, which comprises a box body 1; 2. a sleeve; 3. a strut; 4. perforating; 5. a bolt A; 6. clamping the nut A; 7. a bolt B; 8. clamping the nut B; 9. drawing boards; 10. a hasp; 11. a handle; 12. a lockable universal wheel; 13. a handspike; 14. hole turning; 15. the rubber sealing strip, the part is the general standard part or the part known by the skilled person, its structure and principle are known by the technical manual or by the routine experiment method, when using, at first, locate in the bush 2 through the fulcrum bar 3 and pull out upwards, at this moment bolt A5 can locate in the perforation 4 and move upwards, thus realize the rising of the drawing board 9, but rotatable clamp nut A6 after rising to suitable height, clamp nut A6 can finish the clamping and fixing work of the position of the fulcrum bar 3 at this moment, then locate in the rotating hole 14 and rotate and can turn over the drawing board 9 through the bolt B7, adjust the suitable angle after turning over and rotate clamp nut B8 and finish the fixing work, then the staff can locate on the drawing board 9 and carry out the drawing work, and loosen clamp nut B8 after using and make the drawing board 9 rotate and make the handle 11 face upwards, loosening clamping nut A6 again makes branch 3 withdraw in sleeve 2, can accomplish the work of accomodating of equipment this moment, it is more small and exquisite nimble when making it need not to use, and can deposit the drawing instrument in the box 1, improve the practicality greatly, this device can expand freely and accomodate, the operation is simple convenient, time saving and labor saving, its high angle all can freely be adjusted, the flexibility and the practicality of improve equipment greatly, can play sealed effect through rubber seal strip 15 when drawing board 9 is located box 1 top closure, thereby play waterproof dirt-proof effect, and can realize box 1's removal through lockable universal wheel 12, can make box 1's removal more laborsaving convenient through handspike 13, can be convenient for the transport work after box 1 packs up through handle 11.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. A construction engineering management project budget drawing device is characterized by comprising a box body (1) and a drawing board (9);
sleeves (2) are fixedly arranged on the front side and the rear side of the box body (1), a supporting rod (3) is movably arranged in each sleeve (2), a bolt A (5) is fixedly arranged on the front side of the bottom of each supporting rod (3), a through hole (4) is formed in the middle of the outer side of each sleeve (2), each bolt A (5) penetrates through each through hole (4), and a clamping nut A (6) is rotatably arranged on each bolt A (5);
rotating hole (14) have been seted up to branch (3) top, both sides fixed mounting has bolt B (7) around drawing board (9), bolt B (7) insert in rotating hole (14), clamping nut B (8) are installed in the rotation on bolt B (7), hasp (10) are installed to drawing board (9) both sides and box (1) both sides top correspondence.
2. The budget drawing device for the construction engineering management project according to claim 1, wherein: and a handle (11) is arranged in the middle of the bottom end of the drawing board (9).
3. The budget drawing device for the construction engineering management project according to claim 1, wherein: lockable universal wheels (12) are installed at four corners of the bottom of the box body (1).
4. The budget drawing device for the construction engineering management project according to claim 1, wherein: and a hand push rod (13) is arranged at the top of the left side of the box body (1).
5. The budget drawing device for the construction engineering management project according to claim 1, wherein: the top of the box body (1) is provided with a rubber sealing strip (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120739416.0U CN215271207U (en) | 2021-04-13 | 2021-04-13 | Construction engineering management project budget drawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120739416.0U CN215271207U (en) | 2021-04-13 | 2021-04-13 | Construction engineering management project budget drawing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215271207U true CN215271207U (en) | 2021-12-24 |
Family
ID=79536256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120739416.0U Expired - Fee Related CN215271207U (en) | 2021-04-13 | 2021-04-13 | Construction engineering management project budget drawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215271207U (en) |
-
2021
- 2021-04-13 CN CN202120739416.0U patent/CN215271207U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108859584B (en) | Fine arts are with portable case of painting from life | |
CN215271207U (en) | Construction engineering management project budget drawing device | |
CN212650583U (en) | Architectural design workstation | |
CN210930214U (en) | Adjustable drawing board is used in outdoor study | |
CN211048853U (en) | Energy and power specialty teaching are with show board | |
CN215125294U (en) | Portable engineering cost workstation | |
CN206030928U (en) | Painting tool box for fine arts | |
CN211787727U (en) | Teaching show board is trailed to portable project management progress | |
CN211252641U (en) | Conveyer for construction | |
CN207669285U (en) | Tool storage equipment | |
CN113551973A (en) | Metal material hardness detection equipment | |
CN213962166U (en) | Portable multi-functional engineering cost budgets case | |
CN216331113U (en) | Drawing equipment for mathematical education | |
CN211323627U (en) | Workstation that building engineering cost was used | |
CN212920992U (en) | Portable drawing board of fine arts student | |
CN213215732U (en) | Civil engineering cost is budget toolbox for management | |
CN213352372U (en) | Open-air portable topography mapping instrument platform | |
CN213646287U (en) | Plasma arc welding equipment with stable operation | |
CN218489395U (en) | Outdoor portable multi-functional drawing board | |
CN213562427U (en) | Workbench with electric movable sliding table | |
CN214727858U (en) | Novel portable drawing board for animation design | |
CN218110747U (en) | Portable tool for surveying and mapping field | |
CN220742567U (en) | Drawing board for construction drawing | |
CN220403441U (en) | Drawing auxiliary tool | |
CN213947962U (en) | Multifunctional drawing tool for urban and rural planning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211224 |