CN215267662U - Load optimization distribution and AGC quick response system of thermal power plant - Google Patents

Load optimization distribution and AGC quick response system of thermal power plant Download PDF

Info

Publication number
CN215267662U
CN215267662U CN202120347975.7U CN202120347975U CN215267662U CN 215267662 U CN215267662 U CN 215267662U CN 202120347975 U CN202120347975 U CN 202120347975U CN 215267662 U CN215267662 U CN 215267662U
Authority
CN
China
Prior art keywords
load
energy storage
agc
storage module
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120347975.7U
Other languages
Chinese (zh)
Inventor
党小建
王东培
王晓乾
陈志刚
骆贵兵
张海龙
乔越
杨明强
杨辉
张靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202120347975.7U priority Critical patent/CN215267662U/en
Application granted granted Critical
Publication of CN215267662U publication Critical patent/CN215267662U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A load optimization distribution and AGC quick response system of a thermal power plant comprises an RTU remote measurement and control terminal, wherein the RTU remote measurement and control terminal sends an AGC load instruction of the whole plant to a load distribution operation server and controls a unit to output corresponding power according to the AGC load instruction; each unit is also connected with an energy storage module, the energy storage module is connected with a load distribution operation server through an energy storage control system, the load distribution operation server is connected with an operation state evaluation system, the operation state evaluation system obtains real-time data of the energy storage module and the units and evaluates the state of the units, the load distribution operation server carries out load distribution adjustment on each unit and the energy storage module according to an evaluation result, and the energy storage control system controls the energy storage module to charge and discharge according to the difference value of the actual load and an AGC load instruction in the adjustment process so as to respond to the AGC load instruction. The utility model discloses can realize quick, the accurate response of AGC instruction, extension unit life-span.

Description

Load optimization distribution and AGC quick response system of thermal power plant
Technical Field
The utility model belongs to thermal power factory Control field, concretely relates to load optimization distribution and AGC (Automatic power Generation Control) quick response system of thermal power factory.
Background
In the face of a severe market examination, not only needs to start from own interests and consider how to actually reduce the operating cost of a power plant in a deep level from multiple angles, but also needs to prolong the service life and the overhaul period of a unit.
At present, most AGC of the thermal power plant adopts a single-machine AGC mode that a load instruction is directly sent to a unit which is put into the AGC by scheduling. In this way, because the load of the power grid changes very frequently, the power grid balances the power load in time, so that the unit which is put into the AGC is always in a corresponding variable load state, the coal, the wind and the water of the unit change along with the change of the load, the steam pressure and the temperature fluctuate to and fro greatly, and the service life of the unit is greatly influenced. In addition, the auxiliary machines, valves, dampers and other devices frequently operate, reducing the service life of these devices. Meanwhile, the load adjustment of a single unit is restricted by an AGC instruction, so that the unit is not favorable for flexibly carrying out operations such as high-load soot blowing, variable-load decoking and the like. When the single machine is used for AGC, the load regulation of each machine set is discontinuous due to the reasons that the load locking is increased or decreased and the like caused by the out-of-limit of the parameters of the machine set due to the starting and stopping of a coal mill or a combustor. Therefore, the AGC frequency modulation performance of the thermal power generating unit often has a gap from the adjustment expectation of the power grid, and problems such as delay and deviation of adjustment may occur.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to thermal power factory unit load adjusts discontinuous problem among the above-mentioned prior art, provides a thermal power factory load optimization distribution and AGC quick response system, realizes accomplishing the in-plant load optimization distribution that accords with unit self load demand under the prerequisite that satisfies electric wire netting AGC and adjust expectation, reaches quick, the accurate response to the AGC instruction.
In order to achieve the above object, the present invention provides the following technical solutions:
a load optimization distribution and AGC quick response system of a thermal power plant comprises an RTU remote measurement and control terminal, wherein the RTU remote measurement and control terminal sends an AGC load instruction of the whole plant to a load distribution operation server, and the load distribution operation server controls a corresponding unit to output corresponding power according to the AGC load instruction; each unit is also connected with an energy storage module, the energy storage module is connected with a load distribution operation server through an energy storage control system, the load distribution operation server is also connected with an operation state evaluation system, the operation state evaluation system acquires real-time data of the energy storage module and the units and evaluates the state of the units, an evaluation result is fed back to the load distribution operation server, the load distribution operation server carries out load distribution adjustment on each unit and the energy storage module according to the evaluation result, the difference value between the actual load of the units and an AGC load instruction in the adjustment process is transmitted to the energy storage control system through the load distribution operation server, and the energy storage control system controls the energy storage module to charge and discharge according to the difference value so as to respond to the AGC load instruction.
Preferably, the operation state evaluation system is provided with a storage module for storing real-time data.
Preferably, the RTU remote measurement and control terminal can be wirelessly and remotely connected with a power grid master control platform.
Preferably, the operation state evaluation system adopts a sub-function module of the SIS safety instrument system.
Preferably, the RTU remote measurement and control terminal is connected with and collects the total power of the energy storage module and each unit.
Preferably, each unit in the plant is networked through a DCS system.
Preferably, the operation state evaluation system obtains real-time data of each unit through the DCS system.
Preferably, the energy storage control system acquires real-time data of the energy storage module.
Based on the utility model discloses a load optimization distribution and AGC quick response method of thermal power factory, including following step:
-sending plant-wide AGC load instructions to a load distribution calculation server;
the load distribution operation server controls the corresponding unit to output corresponding power according to the AGC load instruction;
connecting each unit of the whole plant with an energy storage module, acquiring real-time data of the energy storage module and each unit, evaluating the state of the unit, and feeding an evaluation result back to a load distribution operation server;
and the load distribution operation server performs load distribution adjustment on each unit and the energy storage module according to the evaluation result, and the energy storage module charges and discharges according to the difference value between the actual load of the unit and the AGC load instruction so as to respond to the AGC load instruction.
Preferably, the load distribution of each unit of the power plant is adjusted according to the following principle:
a. the unit is optimally operated under the condition of constant load;
b. the change amplitude of the superheated steam temperature and the reheated steam temperature is kept minimum when the load is changed;
c. if the load change exceeds the output of all the units and the energy storage modules, feeding back information to a power grid master control platform;
d. and setting the maximum load change rate of the unit for safe operation, wherein the load change rate of a single unit does not exceed the maximum load change rate in the load adjustment process.
Compared with the prior art, the utility model discloses use the whole AGC adjustment object that is of power plant, the electric wire netting dispatch sends whole factory load instruction to the power plant, constitute whole factory load distribution and monitoring system by load distribution operation server and running state evaluation system, increase energy storage module and participate in the load adjustment, utilize energy storage module quick adjustment output's ability, reach AGC quick response's purpose, can avoid steam pressure and temperature to come and go undulant by a wide margin simultaneously, and auxiliary equipment's frequent action.
Further, the utility model discloses use the unchangeable load operation of unit to be the best when distributing load, the change range of overheated steam temperature and reheat steam temperature is minimum when becoming the load, and this is the core of control, and the production of reducible heating surface cinder, drop and deposit, reduce the influence that steam temperature changes by a wide margin to steam turbine steady operation reduce metal fatigue degree, extension main equipment life. And if the load change is large and exceeds the output of all the units and the energy storage modules, feeding back information to the power grid master control platform. The power plant also feeds back information to the power grid master control platform while responding to the load change, so that the characteristic of the single instruction of the current AGC is changed, and the subsystem and the control system can fully exchange information. And the maximum load change rate protection of the safe operation of the unit is set. In the adjusting process, the difference value between the actual load of the unit and the AGC instruction is transmitted to the energy storage control system by the load distribution operation server, and the energy storage control system controls the energy storage module to rapidly charge and discharge according to the difference value, so that the AGC instruction can be rapidly and accurately responded.
Drawings
FIG. 1 is a schematic structural view of a load optimization distribution and AGC quick response system of a thermal power plant;
in the drawings: 1-RTU remote measurement and control terminal; 2-load distribution calculation server; 3-an energy storage module; 4-an energy storage control system; 5-running state evaluation system; 6-power grid master control platform.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the utility model discloses thermal power factory load optimization distribution and AGC quick response system, including RTU remote measurement and control terminal 1, RTU remote measurement and control terminal 1 wireless remote connection electric wire netting is total to control platform 6. The RTU remote measurement and control terminal 1 sends AGC load instructions of a whole plant to the load distribution operation server 2, and the load distribution operation server 2 controls corresponding units to output corresponding power according to the AGC load instructions; and all the units in the plant are networked through a DCS system. Each unit is further connected with an energy storage module 3, the energy storage module 3 is connected with a load distribution operation server 2 through an energy storage control system 4, the load distribution operation server 2 is further connected with an operation state evaluation system 5, the operation state evaluation system 5 obtains real-time data of each unit through a DCS (distributed control system), the energy storage control system 4 obtains the real-time data of the energy storage module 3, an evaluation result is fed back to the load distribution operation server 2, the operation state evaluation system 5 adopts a sub-function module of an SIS (SIS safety instrumentation system), and the operation state evaluation system 5 is provided with a storage module for storing the real-time data. The load distribution operation server 2 carries out load distribution adjustment on each unit and the energy storage module 3 according to the evaluation result, the difference value between the actual load of the unit and the AGC load instruction in the adjustment process is transmitted to the energy storage control system 4 by the load distribution operation server 2, and the energy storage control system 4 controls the energy storage module 3 to charge and discharge according to the difference value so as to respond to the AGC load instruction. The RTU remote measurement and control terminal 1 is connected with and collects the total power of the energy storage module 3 and each unit.
Based on the utility model discloses a load optimization distribution and AGC quick response method of thermal power factory, including following step:
sending AGC load instructions of the whole plant to the load distribution calculation server 2;
the load distribution operation server 2 controls the corresponding set to output the corresponding power according to the AGC load instruction;
connecting each unit of the whole plant with the energy storage module 3, acquiring the energy storage module 3 and real-time data of each unit, performing unit state evaluation, and feeding an evaluation result back to the load distribution operation server 2;
the load distribution operation server 2 performs load distribution adjustment on each unit and the energy storage module 3 according to the evaluation result, and the energy storage module 3 charges and discharges according to the difference value between the actual load of the unit and the AGC load instruction so as to respond to the AGC load instruction.
Load distribution and adjustment are carried out on each unit of the power plant according to the following principle:
a. the unit is optimally operated under the condition of constant load;
b. the change amplitude of the superheated steam temperature and the reheated steam temperature is kept minimum when the load is changed;
c. if the load change exceeds the output of all the units and the energy storage modules, feeding back information to the power grid master control platform 6;
d. and setting the maximum load change rate of the unit for safe operation, wherein the load change rate of a single unit does not exceed the maximum load change rate in the load adjustment process.
And the power grid dispatching transmits the load instruction of the whole plant to a load distribution operation server 2 in the plant through an RTU remote measurement and control terminal 1. The operation state evaluation system 5 acquires real-time data of the unit and the energy storage module 3 from the DCS and the energy storage control system 4, stores the real-time data into a database, completes calculation in a workstation of the operation state evaluation system, evaluates the state of an important auxiliary machine and the unit in real time, and transmits the result to the load distribution operation server 2 and the power grid master control platform 6. And a feedback signal of the total output of the unit and the energy storage module 3 is uploaded to a power grid general control platform 6. And according to the state evaluation result of the unit, when a certain unit needs to perform operations such as high-load soot blowing, variable-load decoking and the like. And on the premise of meeting the total load requirement of the AGC command, load adjustment among the machine groups is carried out according to the principle.
The above-mentioned embodiments are only preferred embodiments of the present invention, and it should be understood by those skilled in the art that the present invention can be modified and replaced by other simple modifications and replacements without departing from the spirit and principle of the present invention, and these modifications and replacements also fall within the protection scope of the appended claims.

Claims (7)

1. A load optimization distribution and AGC quick response system of a thermal power plant is characterized by comprising an RTU remote measurement and control terminal (1), wherein the RTU remote measurement and control terminal (1) sends an AGC load instruction of a whole plant to a load distribution operation server (2), and the load distribution operation server (2) controls a corresponding unit to output corresponding power according to the AGC load instruction; each unit is also connected with an energy storage module (3), the energy storage module (3) is connected with a load distribution operation server (2) through an energy storage control system (4), the load distribution operation server (2) is also connected with an operation state evaluation system (5), the operation state evaluation system (5) acquires real-time data of the energy storage module (3) and the units and evaluates the state of the units, an evaluation result is fed back to the load distribution operation server (2), the load distribution operation server (2) carries out load distribution adjustment on each unit and the energy storage module (3) according to the evaluation result, a difference value between an actual load of the unit and an AGC load instruction in an adjustment process is transmitted to the energy storage control system (4) through the load distribution operation server (2), and the energy storage control system (4) controls the energy storage module (3) to charge and discharge according to the AGC load instruction; the running state evaluation system (5) adopts a sub-function module of the SIS safety instrument system.
2. The thermal power plant load optimized distribution and AGC fast response system of claim 1, wherein: the running state evaluation system (5) is provided with a storage module for storing real-time data.
3. The thermal power plant load optimized distribution and AGC fast response system of claim 1, wherein: the RTU remote measurement and control terminal (1) can be wirelessly and remotely connected with a power grid general control platform (6).
4. The thermal power plant load optimized distribution and AGC fast response system of claim 1, wherein: the RTU remote measurement and control terminal (1) is connected with and collects the total power of the energy storage module (3) and each unit.
5. The thermal power plant load optimized distribution and AGC fast response system of claim 1, wherein: and all the units in the plant are networked through a DCS system.
6. The thermal power plant load optimized distribution and AGC fast response system of claim 5, wherein: and the running state evaluation system (5) acquires real-time data of each unit through the DCS.
7. The thermal power plant load optimized distribution and AGC fast response system of claim 1, wherein: and the energy storage control system (4) acquires real-time data of the energy storage module (3).
CN202120347975.7U 2021-02-07 2021-02-07 Load optimization distribution and AGC quick response system of thermal power plant Active CN215267662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120347975.7U CN215267662U (en) 2021-02-07 2021-02-07 Load optimization distribution and AGC quick response system of thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120347975.7U CN215267662U (en) 2021-02-07 2021-02-07 Load optimization distribution and AGC quick response system of thermal power plant

Publications (1)

Publication Number Publication Date
CN215267662U true CN215267662U (en) 2021-12-21

Family

ID=79501416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120347975.7U Active CN215267662U (en) 2021-02-07 2021-02-07 Load optimization distribution and AGC quick response system of thermal power plant

Country Status (1)

Country Link
CN (1) CN215267662U (en)

Similar Documents

Publication Publication Date Title
CN112821426A (en) System and method for optimizing load distribution and AGC quick response of thermal power plant
CN103855721B (en) Wind farm monitoring system accesses system and the information switching method of power network dispatching system
CN203224772U (en) Primary frequency modulation control system for 660MW supercritical units
US8744635B2 (en) Power production control method based on power production rate requirement
CN111478376A (en) Thermal power generating unit coordinated control peak shaving frequency modulation system and method
EP2863513B1 (en) Compensation of frequency deviations in grids with high turbine penetration
CN104810851B (en) Load regulation speed dynamic regulating method and device under AGC mode of thermal power generating unit
CN112260324B (en) Frequency modulation method for eliminating grid-connected risk of new energy by utilizing energy storage
CN107370177A (en) Variable Speed Wind Power Generator primary frequency modulation control device and application method
CN109412210B (en) Fine adjustment method for active power of wind turbine generator
CN104020739A (en) Intelligent power generation control system for thermal power plant and control method thereof
CN113032377A (en) Independent micro-grid operation control method formed by energy storage and micro gas turbine
CN107465198B (en) A kind of wind power field automatic voltage control and system
CN104300587A (en) Power grid frequency modulation control system and method based on wind power generation and thermal power generation
CN109378833A (en) A method of unit fast frequency hopping is realized by control extraction flow of steam
US9985437B2 (en) Combined electrical power plant
CN110581551A (en) Method and device for wind turbine generator to participate in emergency control of power grid
CN215267662U (en) Load optimization distribution and AGC quick response system of thermal power plant
CN116613782A (en) Light-fire cooperation flexible peak shaving power generation control system and control method
CN114069701B (en) Multi-time-scale power control system suitable for new energy station
CN109445277A (en) The power contorl parameters automatic adjustment system and method taken based on data automatic seeking
CN106100141B (en) Power station active power and reactive power automatic control system
CN211744058U (en) Energy management platform
CN112467805A (en) Double-asynchronous feedback thermal power generation primary and secondary frequency modulation comprehensive optimization system
CN111461502A (en) Calculation and control method for equivalent vibration area of power station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant