CN215267528U - Secondary piping terminal box device - Google Patents
Secondary piping terminal box device Download PDFInfo
- Publication number
- CN215267528U CN215267528U CN202121673037.2U CN202121673037U CN215267528U CN 215267528 U CN215267528 U CN 215267528U CN 202121673037 U CN202121673037 U CN 202121673037U CN 215267528 U CN215267528 U CN 215267528U
- Authority
- CN
- China
- Prior art keywords
- terminal box
- box body
- annular plate
- junction box
- connecting block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model provides a secondary piping terminal box device, relates to electromechanical installation technical field, including the terminal box body, with the coaxial and cover of terminal box body establish the annular plate in the terminal box body outside, connect respectively in the connecting block between 4 lateral wall surfaces and the annular plate internal surface of terminal box, constitute the slip casting hole between the adjacent connecting block, the front end opening of terminal box body flush with the front end of annular plate or outstanding preceding terminal surface in annular plate, the connecting block respectively with the lateral wall surface of the terminal box body of being connected perpendicular. This novel levelness that can quick accurate positioning terminal box body, it is troublesome to have avoided the crooked follow-up construction that leads to of terminal box, can improve the efficiency of terminal box installation, guarantee installation effect.
Description
Technical Field
The utility model relates to an electromechanical installation technical field, concretely relates to secondary piping terminal box device.
Background
When the junction box is installed on the conventional electromechanical secondary piping, the phenomenon that the levelness of the junction box does not reach the standard exists, and the junction box after installation and shaping is pitching and laterally skewed, so that the appearance quality is poor, and the difficulty of later-stage construction is increased. The phenomenon is difficult to completely avoid by means of the existing construction process, so that an installation tool which can simply and quickly position the levelness and the verticality of the junction box is needed to be invented.
SUMMERY OF THE UTILITY MODEL
The utility model provides a secondary piping terminal box device, the problem that exists among the purpose is solved prior art.
In order to achieve the purpose, the technical scheme adopted by the novel device is as follows:
the utility model provides a secondary piping terminal box device, includes the terminal box body, coaxial and the cover of terminal box body establish the annular plate in the terminal box body outside, connect respectively in the connecting block between 4 lateral wall surface and the annular plate internal surface of terminal box, constitute the slip casting hole between the adjacent connecting block, the front end opening of terminal box body flush with the front end of annular plate or outstanding preceding terminal surface in annular plate, the connecting block respectively with the lateral wall surface of the terminal box body of being connected perpendicular.
Preferably, 2 opposite connecting blocks in the 4 connecting blocks have the same axis, and the shape and the size of each connecting block are the same.
Preferably, the section of the connecting block is circular or square.
Preferably, the connecting block and the annular plate are both made of PVC materials.
Preferably, the middle upper part of the front end face of one of the connecting blocks is also provided with a jack, an inserting rod is inserted into the jack, the end part of the inserting rod is connected with a plumb bob through a rope, a marking line is arranged on the front end face of the connecting block below the jack along the direction vertical to the outer surface of the corresponding side wall of the junction box, and the extension line of the marking line passes through the central point of the jack.
This novel secondary piping terminal box device's beneficial effect does: this novel levelness that can quick accurate positioning terminal box body, it is troublesome to have avoided the crooked follow-up construction that leads to of terminal box, can improve the efficiency of terminal box installation, guarantee installation effect.
Description of the drawings:
FIG. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of an embodiment of the present invention with plumb bob;
1. an annular plate; 2. a junction box body; 3. grouting holes; 4. connecting blocks; 5. a jack; 6. inserting a rod; 7. a rope; 8. a plumb bob; 9. and marking lines.
The specific implementation mode is as follows:
the present invention is described in detail below with reference to the drawings, which are intended to illustrate preferred embodiments of the present invention and not to limit the scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations and positional relationships based on the orientations and positional relationships shown in the drawings, and are only used for describing the present invention and simplifying the description, but do not indicate or imply that the device or the element to be referred to must have a specific orientation and a specific orientation configuration and operation, and thus, should not be construed as limiting the present invention.
Examples 1,
As shown in fig. 1:
a secondary piping junction box device comprises a junction box body 2, an annular plate 1 which is coaxial with the junction box body and is sleeved outside the junction box body, and connecting blocks 4 which are respectively connected between the outer surfaces of 4 side walls of the junction box and the inner surface of the annular plate, wherein grouting holes 3 are formed between the adjacent connecting blocks, and the front end opening of the junction box body 2 is flush with the front end of the annular plate or protrudes out of the front end surface of the annular plate; the connecting blocks are respectively vertical to the outer surface of the side wall of the connecting box body;
of the 4 connecting blocks 4, the 2 opposite connecting blocks 4 have the same axis, and the shape and the size of each connecting block 4 are the same;
the section of the connecting block 4 is circular or square;
the connecting block 4 and the annular plate 1 are made of PVC materials.
Examples 2,
This example differs from example 1 only in that: as shown in fig. 2, a jack 5 is further arranged at the middle upper part of the front end face of one of the connecting blocks, a plunger 6 is inserted into the jack 5, the end part of the plunger 6 is connected with a plumb bob 8 through a rope 7, a marking line 9 is arranged on the front end face of the connecting block below the jack 5 along the direction perpendicular to the outer surface of the corresponding side wall of the junction box, and the extending line of the marking line 9 passes through the center point of the jack.
The novel use principle is as follows:
this neotype annular plate size should match with the size that the entrance to a cave was reserved to the terminal box, during the use, as shown in fig. 1, will this neotype insert and reserve the entrance to a cave, rotatory annular plate makes one of them a set of relative connecting block be located vertical state, and another group is located the horizontality promptly, has adjusted promptly this moment the levelness and the straightness that hangs down of terminal box body, adjust the after-fixing can, fixed back slip casting.
As a further accurate positioning method, the plumb bob connected to the front end face of one of the connecting blocks is referred, when the plumb bob is in a vertical state and the rope 7 is aligned with the marking line, the junction box is in a horizontal state, and can be fixed at the moment, and then grouting is performed through the grouting hole, so that the inserted rod, the rope and the plumb bob used in the embodiment can be pulled out in time so as to be used for positioning other junction boxes.
Claims (5)
1. A secondary piping terminal block device is characterized in that: the junction box comprises a junction box body, an annular plate which is coaxial with the junction box body and is sleeved on the outer side of the junction box body, and connecting blocks which are respectively connected between the outer surfaces of 4 side walls of the junction box and the inner surface of the annular plate, wherein grouting holes are formed between the adjacent connecting blocks, the front end opening of the junction box body is flush with the front end of the annular plate or protrudes out of the front end surface of the annular plate, and the connecting blocks are respectively vertical to the outer surfaces of the side walls of the junction box body.
2. A secondary piping terminal block device as claimed in claim 1, wherein: of the 4 connecting blocks, 2 opposite connecting blocks have the same axis, and the shape and the size of each connecting block are the same.
3. A secondary piping terminal block device as claimed in claim 2, wherein: the section of the connecting block is circular or square.
4. A secondary piping terminal block device as claimed in claim 3, wherein: the connecting block and the annular plate are both made of PVC materials.
5. A secondary piping terminal block device as claimed in claim 4, wherein: the middle-upper part of the front end face of one of the connecting blocks is also provided with a jack, an inserting rod is inserted in the jack, the end part of the inserting rod is connected with a plumb bob through a rope, a marking line is arranged on the front end face of the connecting block below the jack along the direction vertical to the outer surface of the corresponding side wall of the junction box, and the extension line of the marking line passes through the central point of the jack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121673037.2U CN215267528U (en) | 2021-07-22 | 2021-07-22 | Secondary piping terminal box device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121673037.2U CN215267528U (en) | 2021-07-22 | 2021-07-22 | Secondary piping terminal box device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215267528U true CN215267528U (en) | 2021-12-21 |
Family
ID=79493728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121673037.2U Active CN215267528U (en) | 2021-07-22 | 2021-07-22 | Secondary piping terminal box device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215267528U (en) |
-
2021
- 2021-07-22 CN CN202121673037.2U patent/CN215267528U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109571724B (en) | Adjustable concrete precast block mould | |
CN105762728A (en) | Method for pre-burying of strong and weak electricity box and electrical tubing | |
CN216664115U (en) | A mould for constructing anti-floating anchor rod end stagnant water structure | |
CN215267528U (en) | Secondary piping terminal box device | |
CN208456113U (en) | Die worker's tool is hung at a kind of adjustable floor drop plate | |
CN212427700U (en) | Assembled curtain wall decorative column structure | |
CN211691448U (en) | Inner formwork component of elevator shaft | |
CN220705149U (en) | Steel construction hangs mould | |
CN209308232U (en) | A kind of type unitized curtain wall fin position limiting structure | |
CN210195239U (en) | Combined building splicing template for building | |
CN218493154U (en) | Prefabricated wall body bearing structure convenient to dismouting | |
CN215594901U (en) | Height difference plate slope hanging die | |
CN216196660U (en) | Interval adjustable outer wall reinforcing bar location leads wall and consolidates template | |
CN209924764U (en) | Spliced door with positioning mechanism | |
CN218032371U (en) | Pipeline sleeve combined aluminum alloy support | |
CN211817328U (en) | Displacement-adjustable main and auxiliary keel connecting piece | |
CN214462559U (en) | Outer beam formwork perpendicularity adjusting component | |
CN213653782U (en) | Embedded part for fixing elevator shaft horizontal net during building | |
CN213440247U (en) | Perpendicularity monitoring assembly type prefabricated wallboard production mold | |
CN214498399U (en) | Special wire-releasing iron box for building aluminum mold | |
CN212836796U (en) | Vertical pipe positioning device | |
CN214531196U (en) | Assembled building connection structure convenient to firm installation | |
CN213806905U (en) | High-strength concrete pole | |
CN214798716U (en) | Full-plastic junction box capable of being fixed in 3D (three-dimensional) positioning mode | |
CN110445072B (en) | Construction method of cable support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |