CN215267494U - Wind-water-electricity installation engineering piping lane mount - Google Patents

Wind-water-electricity installation engineering piping lane mount Download PDF

Info

Publication number
CN215267494U
CN215267494U CN202121641712.3U CN202121641712U CN215267494U CN 215267494 U CN215267494 U CN 215267494U CN 202121641712 U CN202121641712 U CN 202121641712U CN 215267494 U CN215267494 U CN 215267494U
Authority
CN
China
Prior art keywords
wall body
mount
seted
still
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121641712.3U
Other languages
Chinese (zh)
Inventor
鄢小文
曹昕鸷
王怡
高雄
钱炳芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Geyu Craft Gift Co ltd
Original Assignee
Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd filed Critical Zhejiang Institute of Mechanical and Electrical Engineering Co Ltd
Priority to CN202121641712.3U priority Critical patent/CN215267494U/en
Application granted granted Critical
Publication of CN215267494U publication Critical patent/CN215267494U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a geomantic omen installation engineering piping lane mount, including the mount, a plurality of fixed orifices has been seted up in mount one side wall body, the installing port has been seted up in the mount opposite side wall body, the mount is equipped with a plurality of bearing mechanism on the wall body that lies in installing port one side, bearing mechanism includes bearing rod, stopper, screw rod, dead lever, depression bar and knob piece, be equipped with the fixed block on bearing rod front end one side wall body, the mount passes through welded mode fixed mounting on bearing rod front end one side wall body, still be equipped with the dog on the fixed block front end wall body. A geomantic omen installation engineering piping lane mount, relate to piping lane fixed equipment technical field, through the setting of adjustable bearing mechanism, the regulation and the installation of the bearing pole of being convenient for, simultaneously, through the setting of dead lever and depression bar, be convenient for carry out spacing fixed with the cable on the bearing pole.

Description

Wind-water-electricity installation engineering piping lane mount
Technical Field
The utility model relates to a piping lane fixed equipment technical field, in particular to geomantic omen installation engineering piping lane mount.
Background
Wind power generation refers to converting kinetic energy of wind into electric energy. Wind energy is a clean nuisanceless renewable energy source, the water and electricity is clean energy, it is renewable, pollution-free, the working costs is low, be convenient for carry out the electric power peak regulation, be favorable to improving resource utilization and economic society's comprehensive benefits, and when the installation was laid to the pipeline at wind-powered electricity water and electricity, the part can adopt all kinds of pipe racks to lay the cable, and can install the cable on the mount in the pipe rack, but, most pipe rack mount all is that single bearing rod is direct to be fixed in the pipe rack through the inflation screw, it is comparatively troublesome when needs carry out the displacement to the bearing rod, in addition, do not carry out the device fixed to the cable specially on most pipe rack, the cable can have the condition of droing when dragging the installation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a geomantic omen installation engineering piping lane mount can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a geomantic omen installation engineering piping lane mount, includes the mount, a plurality of fixed orifices has been seted up in mount one side wall body, the installing port has been seted up in mount opposite side wall body, the mount is equipped with a plurality of bearing mechanism on the wall body that lies in installing port one side, bearing mechanism includes bearing rod, stopper, screw rod, dead lever, depression bar and knob piece.
Preferably, be equipped with the fixed block on the wall body of bearing pole front end one side, the mount passes through welded mode fixed mounting on the wall body of bearing pole front end one side, still be equipped with the dog on the wall body of fixed block front end, the dog passes through welded mode fixed mounting on the wall body of fixed block front end, the rotary trough has still been seted up in the fixed block wall body, the spout has still been seted up in the wall body of bearing pole top.
Preferably, be equipped with the connecting block on the stopper back wall body, the connecting block is integrated into one piece with the stopper, flexible groove has still been seted up in the connecting block wall body, and the stopper alternates through the flexible groove in the back connecting block and installs on the fixed block.
Preferably, be equipped with the commentaries on classics piece on the screw rod back wall body, the commentaries on classics piece is through welded mode fixed mounting on the screw rod, and the screw rod passes through the commentaries on classics piece interlude and installs in the rotary groove of fixed block front end, screw rod front end wall body is still the screw in and is installed in the screw of stopper wall body and extend to the outside, still fixed mounting has the knob pole on the screw rod front end wall body.
Preferably, the slide block is arranged on the wall body at the bottom of the fixing rod, the slide block is fixedly installed on the wall body at the bottom of the fixing rod in a welding mode, balls are further embedded into the wall bodies at the top and the bottom of the slide block respectively, the slide block is installed in a sliding groove in the top of the supporting rod in an inserting mode, an adjusting opening is further formed in the wall body of the fixing rod, and screw grooves are formed in the wall bodies on the two sides in the adjusting opening respectively.
Preferably, the front end of one side of the pressing rod and the rear end wall body are respectively provided with a fixed shaft, the pressing rod is further provided with a clamping groove in the top wall body on one side of the fixed shaft, the knob block is screwed in the screw groove in the fixed rod through the threads of the outer wall on the lower portion, the bottom wall body of the knob block is further provided with a pressing block, and the top wall body of the pressing block is fixedly arranged on the bottom wall body of the knob block in a welding mode.
Compared with the prior art, the utility model discloses following beneficial effect has:
a geomantic omen installation engineering piping lane mount, through the setting of adjustable bearing mechanism, the regulation and the installation of the bearing pole of being convenient for, simultaneously, through the setting of dead lever and depression bar, be convenient for carry on spacing fixedly with the cable on the bearing pole.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a structural exploded view of the support mechanism of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 2;
fig. 4 is a split view of the fixing rod structure of the present invention.
In the figure: 1. a fixed mount; 2. a fixing hole; 3. an installation port; 4. a support mechanism; 5. a support rod; 6. a limiting block; 7. a screw; 8. fixing the rod; 9. a pressure lever; 10. a knob block; 11. a fixed block; 12. a stopper; 13. rotating the groove; 14. rotating the block; 15. a knob stem; 16. a chute; 17. a slider; 18. a ball bearing; 19. an adjustment port; 20. a screw groove; 21. a fixed shaft; 22. a card slot; 23. briquetting; 24. connecting blocks; 25. a telescopic groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, the utility model provides a pair of geomantic omen installation engineering piping lane mount, including mount 1, seted up a plurality of fixed orifices 2 in 1 side wall body of mount, seted up installing port 3 in 1 opposite side wall body of mount, mount 1 is equipped with a plurality of bearing mechanism 4 on the wall body that lies in installing port 3 one side, and bearing mechanism 4 includes bearing rod 5, stopper 6, screw rod 7, dead lever 8, depression bar 9 and knob piece 10.
Be equipped with fixed block 11 on the 5 front end lateral wall bodies of bearing rod, mount 1 is through welded mode fixed mounting on the 5 front end lateral wall bodies of bearing rod, still is equipped with dog 12 on the 11 front end wall bodies of fixed block, and dog 12 is through welded mode fixed mounting on the 11 front end wall bodies of fixed block, has still seted up rotary groove 13 in the 11 wall bodies of fixed block, has still seted up spout 16 in the 5 top wall bodies of bearing rod.
Be equipped with connecting block 24 on the 6 back wall bodies of stopper, connecting block 24 and stopper 6 are integrated into one piece, have still seted up flexible groove 25 in the 24 wall bodies of connecting block to stopper 6 alternates through flexible groove 25 in the back connecting block 24 and installs on fixed block 11.
Be equipped with on the wall body of screw 7 back and change piece 14, change piece 14 through welded mode fixed mounting on screw 7 to screw 7 passes through the piece 14 that changes and alternates and installs in the turn groove 13 of fixed block 11 front end, screw 7 front end wall body still screw in is installed in the screw of stopper 6 wall body and extends to the outside, and still fixed mounting has knob pole 15 on the screw 7 front end wall body, through the setting of screw 7, is convenient for compress tightly stopper 6 on the wall body of mount 1 one side.
Be equipped with slider 17 on the wall body of dead lever 8 bottom, slider 17 is through welded mode fixed mounting on the wall body of dead lever 8 bottom, has still embedded respectively ball 18 in the wall body of slider 17 top and bottom to slider 17 alternates to install in the spout 16 at bearing rod 5 top, regulation mouth 19 has still been seted up in the wall body of dead lever 8, has seted up spiral shell groove 20 in the wall body of regulation mouth 19 interior both sides respectively.
The fixing shaft 21 is respectively arranged at the front end of one side of the pressing rod 9 and the end wall body of the rear end, the clamping groove 22 is further formed in the top wall body of the pressing rod 9 on one side of the fixing shaft 21, the knob block 10 is screwed into the thread groove 20 in the fixing rod 8 through the threads of the outer wall on the lower portion, the pressing block 23 is further arranged on the wall body at the bottom of the knob block 10, the top wall body of the pressing block 23 is fixedly arranged on the wall body at the bottom of the knob block 10 in a welding mode, and the cable is conveniently fixed on the bearing rod 5 through the arrangement of the pressing rod 9 and the knob block 10.
It should be noted that, when the wind, water and electricity installation engineering pipe gallery fixing frame is used, when the bearing rod 5 needs to be installed on the fixing frame 1, the bearing rod 5 is only required to be vertically downward, so that the bearing rod 5 can drive the limit block 6 to pass through the installation opening 3 on one side of the fixing frame 1, then the bearing rod 5 is rotated ninety degrees to one side, so that the bearing rod 5 is clamped in the installation opening 3 through the limit block 6, then the knob rod 15 is rotated, so that the knob rod 15 drives the screw rod 7 to rotate in the screw hole in the wall body of the limit block 6, meanwhile, the screw rod 7 rotates in the rotary groove 13 in the fixed block 11 through the rotary block 14 on the other side, so that the limit block 6 moves to one side on the fixed block 11 through the telescopic groove 25 in the connecting block 24 on one side, so that the bearing rod 5 is fixed on the fixing frame 1 through the extrusion fixation of the limit block 6 and one side of the fixing frame 1, in addition, when the cable on the bearing rod 5 needs to be limited and fixed, the pressing rod 9 is only required to be pulled to one side from the adjusting opening 19 in the fixing rod 8, so that the pressing rod 9 can be adjusted up and down in the adjusting opening 19 through the two fixing shafts 21 on the wall body of one side, and then the knob block 10 is stirred, so that the knob block 10 can rotate in the adjusting opening 19 through the threads on the outer wall of the lower portion, and further move downwards step by step, and further the pressing block 23 is pressed in the clamping groove 22 on the pressing rod 9, and further the cable is pressed on the bearing rod 5 through the pressing rod 9.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a geomantic omen installation engineering piping lane mount, its characterized in that: including mount (1), a plurality of fixed orifices (2) have been seted up in mount (1) a lateral wall body, installing port (3) have been seted up in mount (1) opposite side wall body, mount (1) is equipped with a plurality of bearing mechanism (4) on the wall body that lies in installing port (3) one side, bearing mechanism (4) are including bearing rod (5), stopper (6), screw rod (7), dead lever (8), depression bar (9) and knob piece (10).
2. The wind-water-electricity installation engineering pipe gallery fixing frame of claim 1, characterized in that: be equipped with fixed block (11) on bearing pole (5) front end lateral wall body, mount (1) are through welded mode fixed mounting on bearing pole (5) front end lateral wall body, still be equipped with dog (12) on fixed block (11) front end wall body, dog (12) are through welded mode fixed mounting on fixed block (11) front end wall body, rotary groove (13) have still been seted up in fixed block (11) wall body, spout (16) have still been seted up in bearing pole (5) top wall body.
3. The wind-water-electricity installation engineering pipe gallery fixing frame of claim 2, characterized in that: be equipped with connecting block (24) on stopper (6) back wall body, connecting block (24) and stopper (6) are integrated into one piece, flexible groove (25) have still been seted up in connecting block (24) wall body, and stopper (6) alternate through flexible groove (25) in back connecting block (24) and install on fixed block (11).
4. The wind-water-electricity installation engineering pipe gallery fixing frame of claim 3, characterized in that: be equipped with on screw rod (7) back wall body and change piece (14), change piece (14) through welded mode fixed mounting on screw rod (7), and screw rod (7) are installed in changeing groove (13) of fixed block (11) front end through changeing piece (14) interlude, screw rod (7) front end wall body still screw in is installed in the screw of stopper (6) wall body and is extended to the outside, still fixed mounting has knob pole (15) on screw rod (7) front end wall body.
5. The wind-water-electricity installation engineering pipe gallery fixing frame of claim 4, characterized in that: be equipped with slider (17) on dead lever (8) bottom wall body, slider (17) are through welded mode fixed mounting on dead lever (8) bottom wall body, slider (17) top and the wall body of bottom still imbed respectively in ball (18), and slider (17) alternate and install in spout (16) at bearing rod (5) top, regulation mouth (19) have still been seted up in dead lever (8) wall body, spiral shell groove (20) have been seted up respectively in regulation mouth (19) interior both sides wall body.
6. The wind-water-electricity installation engineering pipe gallery fixing frame of claim 5, characterized in that: fixed axle (21) have been seted up on depression bar (9) one side front end and the rear end wall body respectively, draw-in groove (22) have still been seted up in the top wall body that lies in fixed axle (21) one side in depression bar (9), screw thread screw in through the below outer wall is installed in spiral groove (20) in dead lever (8) in knob piece (10), still be equipped with briquetting (23) on knob piece (10) bottom wall body, briquetting (23) top wall body passes through welded mode fixed mounting on knob piece (10) bottom wall body.
CN202121641712.3U 2021-07-20 2021-07-20 Wind-water-electricity installation engineering piping lane mount Active CN215267494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121641712.3U CN215267494U (en) 2021-07-20 2021-07-20 Wind-water-electricity installation engineering piping lane mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121641712.3U CN215267494U (en) 2021-07-20 2021-07-20 Wind-water-electricity installation engineering piping lane mount

Publications (1)

Publication Number Publication Date
CN215267494U true CN215267494U (en) 2021-12-21

Family

ID=79492930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121641712.3U Active CN215267494U (en) 2021-07-20 2021-07-20 Wind-water-electricity installation engineering piping lane mount

Country Status (1)

Country Link
CN (1) CN215267494U (en)

Similar Documents

Publication Publication Date Title
CN205779483U (en) A kind of domestic movable wind power generation plant
CN215267494U (en) Wind-water-electricity installation engineering piping lane mount
CN205901663U (en) Solar photovoltaic power generation adjustable fixing support device
CN202817598U (en) Jumper wire lead regulator
CN209001478U (en) A kind of power construction device
CN214228173U (en) Optimized telescopic mounting frame for solar panel on outer wall of building engineering
CN209860527U (en) Winding displacement box for electric power construction
CN209710008U (en) A kind of solar panels mounting rack structure convenient for adjusting angle
CN208442420U (en) A kind of heat supply pipeline fixator
CN202348601U (en) Solar water pump device
CN215498831U (en) Photovoltaic support for improving generated energy of photovoltaic panel
CN112377371A (en) Wind driven generator with height adjusting mechanism for wind power generation
CN212481732U (en) Structure of improved roof-mounted and fixed new energy water heater
CN218217208U (en) Quick mounting bracket of solar photovoltaic board
CN208656688U (en) Photovoltaic plant solar panels mounting and fixing support
CN216565035U (en) Three-dimensional magnetic-regulation power-saving device
CN215684277U (en) River course impeller oxygen-increasing machine photovoltaic controller convenient to installation
CN219093386U (en) High-efficient equipment of bending
CN215927658U (en) Domestic aerogenerator fixed mounting frame
CN220823159U (en) Binocular thermal imaging monitor structure
CN215724241U (en) Phase-change energy storage heating system
CN220822978U (en) Solar panel installation connecting assembly
CN211656064U (en) New forms of energy conversion and storage device coupling mechanism
CN204923289U (en) Solar energy power supply ground can air conditioner
CN220849897U (en) Wind power generation device convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230116

Address after: No. 108, Textile 3rd Street, Longgang City, Wenzhou City, Zhejiang Province 325800

Patentee after: Wenzhou geyu Craft Gift Co.,Ltd.

Address before: No. 528, binwen Road, Binjiang District, Hangzhou City, Zhejiang Province 310051

Patentee before: ZHEJIANG INSTITUTE OF MECHANICAL & ELECTRICAL ENGINEERING