CN215265494U - Progress display device for construction management of building engineering - Google Patents

Progress display device for construction management of building engineering Download PDF

Info

Publication number
CN215265494U
CN215265494U CN202121468279.8U CN202121468279U CN215265494U CN 215265494 U CN215265494 U CN 215265494U CN 202121468279 U CN202121468279 U CN 202121468279U CN 215265494 U CN215265494 U CN 215265494U
Authority
CN
China
Prior art keywords
wall
frame
fixedly connected
sliding
show board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121468279.8U
Other languages
Chinese (zh)
Inventor
田野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121468279.8U priority Critical patent/CN215265494U/en
Application granted granted Critical
Publication of CN215265494U publication Critical patent/CN215265494U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model discloses a progress display device is used in building engineering construction management, including first show board and second show board, first show board and second show board pass through the hinge rotation and connect, and the bar groove has all been seted up to the upper surface of first show board and second show board, and the inner wall sliding connection in bar groove has the bar shape piece, and the front of first show board is seted up flutedly, the inner wall fixedly connected with iron sheet of recess, and the front of iron sheet adsorbs there is the magnetite, and the sliding tray has been seted up to the inner wall of recess, and the inner wall sliding connection of sliding tray has the slide frame, and the inner wall of slide frame inlays and is equipped with glass. This progress display device for building engineering construction management utilizes the magnetic force of magnet to adsorb the paper between magnet and iron sheet, has solved the problem of using tape-stripping paper, has made things convenient for the later stage clearance, through inlaying glass in the sliding frame, can make the paper after posting seal the inner wall at the recess, and the problem that the paper was drenched and blown off when having solved the rain.

Description

Progress display device for construction management of building engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a progress display device for building engineering construction management.
Background
The construction management of the building engineering means that the cost target, the progress target and the quality target of the project are realized through project planning and project control from the beginning of the project to the completion of the project.
Present building engineering management needs use show board show project progress and project arrangement, makes things convenient for constructor to be under construction according to the arrangement on the show board, and current show board simple structure need paste with the sticky tape when puting up the paper, is unfavorable for the later stage clearance, and the paper on rainy day air show board is drenched and is blown off easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a progress display device for building engineering construction management to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a progress display device for construction management of building engineering comprises a first display board and a second display board, wherein the first display board and the second display board are rotatably connected through hinges, strip-shaped grooves are formed in the upper surfaces of the first display board and the second display board, strip-shaped blocks are slidably connected to the inner walls of the strip-shaped grooves, grooves are formed in the front surface of the first display board, iron sheets are fixedly connected to the inner walls of the grooves, magnets are adsorbed on the front surfaces of the iron sheets, sliding grooves are formed in the inner walls of the grooves, sliding frames are slidably connected to the inner walls of the sliding grooves, glass is embedded in the inner walls of the sliding frames, limit blocks are fixedly connected to the front surfaces of the sliding frames, round holes are formed in the front surface of the first display board, plugs are slidably connected to the inner walls of the round holes, compression springs are sleeved on the surfaces of the plugs, insertion holes matched with the plugs are formed in the front surfaces of the limit blocks, and connecting frames are fixedly connected to the back surfaces of the first display board and the second display board, the inner wall sliding connection of carriage has the supporting leg, and the equal fixedly connected with of both sides face of two carriages links up the frame, links up the inner wall of frame and rotates and be connected with the connecting cylinder, and the fixed surface of connecting cylinder is connected with and rotates the frame, and the inner wall sliding connection who rotates the frame has the carriage, and the second show board is the blank.
Preferably, the mounting groove has all been seted up to the both sides face of carriage and supporting leg, the inner wall fixedly connected with expanding spring of mounting groove, expanding spring's other end fixedly connected with buckle, the surface of buckle and the inner wall sliding connection of mounting groove, the draw-in groove with buckle looks adaptation is all seted up to the both sides face of rotating frame and connecting frame.
Preferably, one end of the compression spring is fixedly connected with the front surface of the first display board, and the other end of the compression spring is fixedly connected with the handle of the plug.
Preferably, a through groove for the sliding frame to pass through is formed in the left side surface of the first display board.
Preferably, a step hole is formed in one side of the connecting frame, the inner wall of the step hole is connected with the inserting column in a sliding mode, the inner wall of the step hole is provided with a sliding groove, the surface of the inserting column is fixedly connected with a locking block and a sliding block respectively, the surface of the sliding block is connected with the inner wall of the sliding groove in a sliding mode, and the inner wall of the connecting cylinder is fixedly connected with an inserting ring matched with the locking block.
Preferably, the inner wall of the supporting frame is matched with the surface of the connecting frame, and the inner wall of the groove is provided with a limit groove matched with the limit block.
Advantageous effects
The utility model provides a progress display device for building engineering construction management possesses following beneficial effect:
1. this progress display device for building engineering construction management, through setting up the sliding frame, expand the sliding frame and spill the recess, utilize the magnetic force of magnet to adsorb the paper between magnet and iron sheet, the problem of using tape-stripping paper has been solved, the later stage clearance has been made things convenient for, through inlaying glass in the sliding frame, can make the paper after posting seal the inner wall at the recess, the problem that the paper was drenched and blown down when having solved rain, can write interim project notice on the blank through setting up the second show board into the blank.
2. This progress display device for building engineering construction management through setting up the buckle, utilizes the cooperation of buckle and draw-in groove to accomodate supporting leg and carriage frame to the carriage and rotate the frame inner wall, utilizes the carriage can merge first show board and second show board with the inner wall of carriage overlap joint, utilizes the hinge, has improved the performance of accomodating and the flexibility of show board.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic front view of the present invention;
fig. 3 is a schematic rear view of the present invention;
fig. 4 is a rear view structure diagram of the present invention;
FIG. 5 is a schematic view of a front cross-section structure of the connecting cylinder of the present invention;
FIG. 6 is a schematic view of a front cross-sectional structure of the support leg.
In the figure: 1 first show board, 2 second show boards, 3 shape blocks, 4 iron sheets, 5 magnetite, 6 sliding frames, 7 glass, 8 stopper, 9 spigots, 10 compression spring, 11 link frame, 12 supporting legs, 13 link up the frame, 14 connecting cylinders, 15 rotation frames, 16 braced frames, 17 expanding spring, 18 buckle, 19 inserted columns, 20 locking pieces, 21 slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: a progress display device for construction management of building engineering comprises a first display board 1 and a second display board 2, wherein the first display board 1 and the second display board 2 are rotatably connected through hinges, strip-shaped grooves are formed in the upper surfaces of the first display board 1 and the second display board 2, strip-shaped blocks 3 are slidably connected to the inner walls of the strip-shaped grooves, grooves are formed in the front surface of the first display board 1, iron sheets 4 are fixedly connected to the inner walls of the grooves, magnets 5 are adsorbed on the front surfaces of the iron sheets 4, sliding grooves are formed in the inner walls of the grooves, sliding frames 6 are slidably connected to the inner walls of the sliding grooves, glass 7 is embedded in the inner walls of the sliding frames 6, limit blocks 8 are fixedly connected to the front surfaces of the sliding frames 6, circular holes are formed in the front surface of the first display board 1, plugs 9 are slidably connected to the inner walls of the circular holes, compression springs 10 are sleeved on the surfaces of the plugs 9, one ends of the compression springs 10 are fixedly connected with the front surface of the first display board 1, the other end is fixedly connected with a handle of the plug 9, the front surface of the limiting block 8 is provided with a jack matched with the plug 9, and the sliding frame 6 can be fixed by matching the plug 9 with the slot.
Through setting up sliding frame 6, expand sliding frame 6 and spill the recess, utilize the magnetic force of magnetite 5 to adsorb the paper between magnetite 5 and iron sheet 4, solved the problem of using the tape-stripping paper, made things convenient for the later stage clearance, through inlaying glass 7 in sliding frame 6, can make the paper after posting seal the inner wall at the recess, the problem that the paper was drenched and blown down when having solved rain, can write interim project notice on the blank through setting up second show board 2 into the blank.
The back surfaces of the first display board 1 and the second display board 2 are fixedly connected with connecting frames 11, the inner walls of the connecting frames 11 are connected with supporting legs 12 in a sliding manner, two side surfaces of the two connecting frames 11 are fixedly connected with linking frames 13, the inner walls of the linking frames 13 are connected with connecting cylinders 14 in a rotating manner, one sides of the connecting frames 11 are provided with step holes, the inner walls of the step holes are connected with inserting columns 19 in a sliding manner, the inner walls of the step holes are provided with sliding grooves, the surfaces of the inserting columns 19 are respectively and fixedly connected with locking blocks 20 and sliding blocks 21, the surfaces of the sliding blocks 21 are connected with the inner walls of the sliding grooves in a sliding manner, the inner walls of the connecting cylinders 14 are fixedly connected with inserting rings matched with the locking blocks 20, the inner walls of the inserting rings are provided with tooth grooves, the surfaces of the connecting cylinders 14 are fixedly connected with rotating frames 15, the inner walls of the rotating frames 15 are connected with supporting frames 16 in a sliding manner, the left side surface of the first display board 1 is provided with through grooves for the sliding frames 6 to pass through, the supporting frames 16 and the two side surfaces of the supporting legs 12 are provided with mounting grooves, the inner wall fixedly connected with expanding spring 17 of mounting groove, expanding spring 17's other end fixedly connected with buckle 18, buckle 18's the surface and the inner wall sliding connection of mounting groove, the draw-in groove with 18 looks adaptations of buckle is all seted up to the both sides face of rotating frame 15 and connecting frame 11, the inner wall of carriage 16 and the surperficial looks adaptation of connecting frame 11, the inner wall of recess seted up with the spacing groove of 8 looks adaptations of stopper, second show board 2 is the blank.
Through setting up buckle 18, utilize the cooperation of buckle 18 and draw-in groove to accomodate supporting leg 12 and carriage 16 to connecting frame 11 and rotate frame 15 inner wall, utilize carriage 16 can be with connecting frame 11 overlap joint at the inner wall of carriage 16, utilize the hinge to merge first show board 1 and second show board 2, improved the device accomodate performance and flexibility.
The working principle is as follows: when the device is used, firstly, a first display board 1 and a second display board 2 are unfolded by a hinge, a strip-shaped block 3 is slid into two strip-shaped grooves to fix the first display board 1 and the second display board 2, a supporting leg 12 and a supporting frame 16 respectively slide out of a connecting frame 11 and a rotating frame 15, the supporting leg 12 and the supporting frame 16 are fixed by inserting a buckle 18 and a clamping groove, the rotating frame 15 is rotated to adjust the angle between the rotating frame 15 and the connecting frame 11, a plug 19 is inserted into a step hole, a locking block 20 is inserted into the inner wall of an inserting ring to further fix the angle between the rotating frame 15 and the connecting frame 11, so that the first display board 1 and the second display board 2 are stable and placed in a display area, the plug 9 is pulled to force the plug 9 to be separated from a jack, the sliding frame 6 is pushed to leak out of the groove, paper is placed on an iron sheet 4, the paper is clamped between a magnet 5 and the iron sheet 4 by the magnetic force generated by the magnet 5 and the iron sheet 4, the sliding frame 6 is pushed to seal the groove by using the glass 7 and the sliding frame 6, so that the paper is prevented from being wetted and blown off when raining.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a progress display device for building engineering construction management, includes first show board (1) and second show board (2), its characterized in that: the display board comprises a first display board (1) and a second display board (2) which are rotatably connected through a hinge, wherein strip-shaped grooves are formed in the upper surfaces of the first display board (1) and the second display board (2), strip-shaped blocks (3) are connected to the inner walls of the strip-shaped grooves in a sliding manner, grooves are formed in the front surface of the first display board (1), iron sheets (4) are fixedly connected to the inner walls of the grooves, magnets (5) are adsorbed on the front surfaces of the iron sheets (4), sliding grooves are formed in the inner walls of the grooves, sliding frames (6) are connected to the inner walls of the sliding grooves in a sliding manner, glass (7) is embedded in the inner walls of the sliding frames (6), limit blocks (8) are fixedly connected to the front surfaces of the sliding frames (6), circular holes are formed in the front surface of the first display board (1), plugs (9) are connected to the inner walls of the circular holes in a sliding manner, compression springs (10) are sleeved on the surfaces of the plugs (9), insertion holes matched with the plug blocks (9) are formed in the front surfaces of the limit blocks (8), the back of first show board (1) and second show board (2) is equal fixedly connected with connecting frame (11), the inner wall sliding connection of connecting frame (11) has supporting leg (12), the equal fixedly connected with of both sides face of two connecting frames (11) links up frame (13), the inner wall rotation that links up frame (13) is connected with connecting cylinder (14), the fixed surface of connecting cylinder (14) is connected with rotates frame (15), the inner wall sliding connection that rotates frame (15) has carriage (16), second show board (2) are the blank.
2. The progress display device for construction management of building engineering according to claim 1, characterized in that: the mounting groove has all been seted up to the both sides face of carriage (16) and supporting leg (12), the inner wall fixedly connected with expanding spring (17) of mounting groove, other end fixedly connected with buckle (18) of expanding spring (17), the surface of buckle (18) and the inner wall sliding connection of mounting groove, the draw-in groove with buckle (18) looks adaptation is all seted up to the both sides face of rotating frame (15) and connecting frame (11).
3. The progress display device for construction management of building engineering according to claim 1, characterized in that: one end of the compression spring (10) is fixedly connected with the front surface of the first display board (1), and the other end of the compression spring is fixedly connected with the handle of the plug (9).
4. The progress display device for construction management of building engineering according to claim 1, characterized in that: the left side surface of the first display board (1) is provided with a through groove for the sliding frame (6) to pass through.
5. The progress display device for construction management of building engineering according to claim 1, characterized in that: the step hole has been seted up to one side of connecting frame (11), and the inner wall sliding connection in step hole has inserted post (19), and the spout has been seted up to the inner wall in step hole, inserts the surperficial fixedly connected with locking piece (20) and slider (21) respectively of post (19), the surface of slider (21) and the inner wall sliding connection of spout, the inner wall fixedly connected with of connecting cylinder (14) and the grafting ring of locking piece (20) looks adaptation.
6. The progress display device for construction management of building engineering according to claim 1, characterized in that: the inner wall of the supporting frame (16) is matched with the surface of the connecting frame (11), and the inner wall of the groove is provided with a limit groove matched with the limit block (8).
CN202121468279.8U 2021-06-30 2021-06-30 Progress display device for construction management of building engineering Active CN215265494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121468279.8U CN215265494U (en) 2021-06-30 2021-06-30 Progress display device for construction management of building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121468279.8U CN215265494U (en) 2021-06-30 2021-06-30 Progress display device for construction management of building engineering

Publications (1)

Publication Number Publication Date
CN215265494U true CN215265494U (en) 2021-12-21

Family

ID=79485321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121468279.8U Active CN215265494U (en) 2021-06-30 2021-06-30 Progress display device for construction management of building engineering

Country Status (1)

Country Link
CN (1) CN215265494U (en)

Similar Documents

Publication Publication Date Title
CN204790754U (en) Hard disk quick replacement device
CN210244897U (en) Foldable LED display screen
CN215265494U (en) Progress display device for construction management of building engineering
CN206293857U (en) A kind of electric power optical cable fixture
CN211580374U (en) Wall-mounted cabinet capable of moving
CN210691999U (en) Portable accounting account show board
CN204141178U (en) Bamboo desktop computer display screen fixture
CN210567345U (en) Combined frame structure surrounding photographic track
CN212276632U (en) Teaching information show board is used in teaching of art class internet
CN210841764U (en) Curved surface linkage adjusting shoe tree
CN210466992U (en) Simulation sand table for enterprise project planning
CN216166256U (en) Movable assembled storage cabinet
CN213309212U (en) Portable outdoor barbecue is with accomodating table cabinet
CN220459075U (en) Detachable photo frame
CN218869713U (en) Office table convenient to disassemble, assemble and transport
CN211422272U (en) Hand-operated chain type window opener
CN213872010U (en) Computer information processing device
CN218072115U (en) Network rack convenient to equipment
CN211984679U (en) Bed board and bedstead
CN217969097U (en) Drawing board frame for animation production
CN204292563U (en) Portable finance and accounting archives frame
CN210467206U (en) Engineering progress display device for construction management
CN217161345U (en) Table leg screen splicing structure and office table
CN215526958U (en) Multimedia teaching projecting apparatus based on computer technology