CN215258232U - Rural sewage is placer for pipe network construction - Google Patents
Rural sewage is placer for pipe network construction Download PDFInfo
- Publication number
- CN215258232U CN215258232U CN202121544171.2U CN202121544171U CN215258232U CN 215258232 U CN215258232 U CN 215258232U CN 202121544171 U CN202121544171 U CN 202121544171U CN 215258232 U CN215258232 U CN 215258232U
- Authority
- CN
- China
- Prior art keywords
- frame
- bearing
- pipe network
- group
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000010865 sewage Substances 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000008093 supporting effect Effects 0.000 claims description 27
- 230000000087 stabilizing effect Effects 0.000 claims description 14
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a placer is used in rural sewage pipe network construction, including the bearing frame, support foot rest and hoop piece, bearing frame bottom surface fixedly connected with multiunit support foot rest, the interior slide frame one end fixed connection of support foot rest is on the bearing frame bottom surface, be provided with first mounting hole on the interior slide frame, interior slide frame sliding connection is in the sliding cavity of outer slide frame, and vertically be provided with multiunit second mounting hole on the outer slide frame, run through first mounting hole, the second mounting hole is provided with first double-screw bolt, the equal threaded connection in both ends of first double-screw bolt has fixation nut, outer slide frame bottom threaded connection has the awl foot, the corresponding two sets of firm holes that are provided with on the bearing frame, correspond the equal fixedly connected with a set of second double-screw bolt in every group firm hole on the hoop piece, the second double-screw bolt passes corresponding firm hole, second double-screw bolt low side threaded connection has firm nut. The utility model relates to a sewage pipe network installation technical field, it can guarantee that the pipeline is placed firmly.
Description
Technical Field
The utility model relates to a sewage pipe network installation technical field, specific placer is used in rural sewage pipe network construction that says so.
Background
Rural sewage pipe network is when construction installation, generally need support the pipeline through the support frame, and prior art's support frame is when fixing subaerial, because of the general height unevenness on rural ground, consequently makes the support frame place also not steady, just so makes the pipeline place also not steady enough.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned weak point that exists among the prior art, the utility model aims at providing a guarantee that the pipeline places firm placer for rural sewage pipe network construction.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: a containing device for rural sewage pipe network construction comprises a bearing frame, supporting foot frames and hoop sheets, wherein multiple groups of supporting foot frames are fixedly connected to the bottom surface of the bearing frame, each supporting foot frame comprises an inner sliding frame, an outer sliding frame and a conical foot, one end of each inner sliding frame is fixedly connected to the bottom surface of the bearing frame, a first mounting hole is formed in the inner sliding frame and close to the bottom end of the inner sliding frame in a through mode, a sliding cavity is formed in the outer sliding frame, each inner sliding frame is slidably connected into the corresponding sliding cavity, multiple groups of second mounting holes are longitudinally formed in the outer sliding frame in a through mode, one group of second mounting holes correspond to the first mounting holes, a first stud is arranged in the first mounting hole and the second mounting hole in a penetrating mode, fixing nuts are connected to two ends of the first stud in a threaded mode, and the conical foot is connected to the bottom end of the outer sliding frame in a threaded mode;
the bearing frame is correspondingly provided with two groups of stabilizing holes, a group of second studs corresponding to each group of stabilizing holes are fixedly connected to the hoop, the second studs penetrate through the corresponding stabilizing holes, and the lower ends of the second studs are in threaded connection with stabilizing nuts.
The bearing frame comprises two groups of bearing tables and a connecting frame fixedly connected between the two groups of bearing tables, and each group of bearing tables is provided with an arc groove.
The supporting foot frames are four groups, and each group of supporting foot frames is fixedly connected to one end of the bearing platform.
The group of the stabilizing holes are arranged on the group of the connecting frames, and the stabilizing holes are positioned at the middle points of the connecting frames.
The bearing platform with be integrative structure setting between the link.
The two ends of the hoop sheet are fixedly connected with a group of end lugs, and the second stud is fixedly connected to the bottom surfaces of the end lugs.
The utility model has the advantages that:
1. the utility model discloses an interior balladeur train can slide in outer balladeur train to through the cooperation between first double-screw bolt, the fixation nut, can realize the preliminary adjustment of supporting foot rest height, later can carry out the meticulous regulation of height to the supporting foot rest through screw thread rotation awl foot, just so make the device when fixing on ground, can adjust the height of every group supporting foot rest according to ground height, thereby guarantee the placing steadily of bearing frame, guarantee that the pipeline is placed steadily;
2. the utility model discloses place the pipeline back on the bearing frame, can be with hoop piece and pipeline outer wall in close contact with to threaded connection through firm screw thread and second double-screw bolt makes and fixes hoop piece, thereby guarantees hoop piece and stabilizes the pipeline, guarantees that the pipeline is placed firmly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an exploded schematic view of the present invention.
In the figure: the structure comprises a bearing table 1, a connecting frame 2, an arc groove 3, an inner sliding frame 4, an outer sliding frame 5, a taper pin 6, a first mounting hole 7, a sliding cavity 8, a second mounting hole 9, a first stud 10, a fixing nut 11, a stabilizing hole 12, a hoop sheet 13, a second stud 14, an end lug 15 and a stabilizing nut 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 and 2, a placing device for rural sewage pipe network construction includes a bearing frame, a supporting foot frame and a hoop sheet 13;
the bearing frame comprises two groups of bearing tables 1 and a connecting frame 2 fixedly connected between the two groups of bearing tables 1, in order to ensure the bearing frame to be integrally firm, the bearing tables 1 and the connecting frame 2 are arranged in an integrated structure, and each group of bearing tables 1 is provided with an arc groove 3 for placing a pipeline;
the bottom surface of the bearing frame is fixedly connected with a plurality of groups of supporting foot frames, specifically, four groups of supporting foot frames are adopted, and each group of supporting foot frame is fixedly connected with one end of the bearing platform 1, so that the supporting foot frames are ensured to have good supporting effect on the bearing frame;
the supporting foot frame comprises an inner sliding frame 4, an outer sliding frame 5 and a taper foot 6, one end of the inner sliding frame 4 is fixedly connected to the bottom surface of the bearing frame, a first mounting hole 7 is arranged on the inner sliding frame 4 and close to the bottom end of the inner sliding frame, a sliding cavity 8 is arranged inside the outer sliding frame 5, the inner sliding frame 4 is connected into the sliding cavity 8 in a sliding mode, a plurality of groups of second mounting holes 9 are longitudinally arranged on the outer sliding frame 5 in a penetrating mode, one group of second mounting holes 9 correspond to the first mounting hole 7, a first stud 10 penetrates through the first mounting hole 7 and the second mounting hole 9, fixing nuts 11 are connected to two ends of the first stud 10 in a threaded mode, the taper foot 6 is connected to the bottom end of the outer sliding frame 5 in a threaded mode, the inner sliding frame 4 can slide in the outer sliding frame 5, the first mounting hole 7 corresponds to the group of second mounting holes 9 according to the height requirement of the supporting foot frame, and the inner sliding frame 4, the outer sliding frame and the taper foot 6 are achieved through the cooperation of the first stud 10 and the fixing nuts 11, The outer sliding frame 5 is fixed, and then the height of the supporting foot frame can be finely adjusted by rotating the taper foot 6, so that the height of the supporting foot frame can be adjusted according to the height of the ground, and the bearing frame is stably placed;
the bearing frame is gone up the corresponding two sets of firm holes 12 that are provided with, and a set of firm hole 12 sets up on a set of link 2, firm hole 12 is located the mid point position of link 2, hoop piece 13 is last to correspond the equal fixedly connected with a set of second double-screw bolt 14 of every group firm hole 12, it is concrete, the equal fixedly connected with in both ends of hoop piece 13 is a set of end ear 15, second double-screw bolt 14 fixed connection is on end ear 15 bottom surface, and second double-screw bolt 14 passes corresponding firm hole 12, 14 low end threaded connection of second double-screw bolt have firm nut 16, after the pipeline was placed on the bearing frame, can be with hoop piece 13 and pipeline outer wall in close contact with, and threaded connection through firm nut 16 and second double-screw bolt 14, make hoop piece 13 fixed, thereby make to fix the pipeline through hoop piece 13, guarantee that placing of pipeline is firm.
The utility model discloses a theory of operation is: during the use, adjust the height of every group supporting leg according to the height position on ground, concrete regulation mode is:
firstly, detaching a first stud 10 and a fixing nut 11, then sliding an outer sliding frame 5, so that a first mounting hole 7 corresponds to a group of second mounting holes 9 according to the height position of the ground, then enabling the first stud 10 to penetrate through the first mounting hole 7 and the second mounting holes 9, connecting the two ends of the first stud 10 with the fixing nut 11 in a threaded manner, then rotating a conical foot 6 according to the height position of the ground, so that the height of each supporting foot frame is finely adjusted again, then adjusting each group of supporting foot frames in the same manner, so that the height of each group of supporting foot frames meets the requirement of the height of the ground, and then driving the conical foot 6 into the ground;
place the pipeline between two sets of bearing platforms 1, later make hoop piece 13 and pipeline outer wall in close contact with, through the threaded connection of firm nut 16 and second double-screw bolt 14 for fix hoop piece 13, thereby make hoop piece 13 fixed the pipeline, guarantee that the pipeline is placed firmly.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. The utility model provides a rural sewage pipe network placer for construction which characterized in that: the bearing frame comprises a bearing frame, a plurality of groups of supporting foot frames and hoop sheets (13), wherein the bottom surface of the bearing frame is fixedly connected with the plurality of groups of supporting foot frames, each supporting foot frame comprises an inner sliding frame (4), an outer sliding frame (5) and a conical foot (6), one end of each inner sliding frame (4) is fixedly connected onto the bottom surface of the bearing frame, a first mounting hole (7) is arranged on each inner sliding frame (4) close to the bottom end of each inner sliding frame in a through mode, a sliding cavity (8) is arranged inside each outer sliding frame (5), each inner sliding frame (4) is connected into the corresponding sliding cavity (8) in a sliding mode, a plurality of groups of second mounting holes (9) are longitudinally arranged on each outer sliding frame (5) in a through mode, one group of the second mounting holes (9) correspond to the first mounting holes (7), a first stud (10) is arranged in a penetrating mode through the first mounting holes (7) and the second mounting holes (9), and fixing nuts (11) are in threaded connection with the two ends of the first stud (10), the bottom end of the outer sliding frame (5) is in threaded connection with the taper foot (6);
the bearing frame is correspondingly provided with two groups of stabilizing holes (12), the hoop sheet (13) corresponding to each group of stabilizing holes (12) is fixedly connected with a group of second studs (14), the second studs (14) penetrate through the corresponding stabilizing holes (12), and the lower ends of the second studs (14) are in threaded connection with stabilizing nuts (16).
2. The rural sewage pipe network construction placing device of claim 1, wherein: the bearing frame comprises two groups of bearing tables (1) and a connecting frame (2) fixedly connected between the two groups of bearing tables (1), and each group of bearing tables (1) is provided with an arc groove (3).
3. The rural sewage pipe network construction placing device of claim 2, wherein: the supporting foot frames are four groups, and each group of supporting foot frames is fixedly connected to one end of the bearing table (1).
4. The rural sewage pipe network construction placing device of claim 2, wherein: the group of the stabilizing holes (12) are arranged on the group of the connecting frames (2), and the stabilizing holes (12) are positioned at the middle points of the connecting frames (2).
5. The rural sewage pipe network construction placing device of claim 2, wherein: the bearing table (1) and the connecting frame (2) are arranged in an integrated structure.
6. The rural sewage pipe network construction placing device of claim 1, wherein: both ends of hoop piece (13) all fixedly connected with a set of end ear (15), second double-screw bolt (14) fixed connection be in on end ear (15) bottom surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121544171.2U CN215258232U (en) | 2021-07-08 | 2021-07-08 | Rural sewage is placer for pipe network construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121544171.2U CN215258232U (en) | 2021-07-08 | 2021-07-08 | Rural sewage is placer for pipe network construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215258232U true CN215258232U (en) | 2021-12-21 |
Family
ID=79489952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121544171.2U Expired - Fee Related CN215258232U (en) | 2021-07-08 | 2021-07-08 | Rural sewage is placer for pipe network construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215258232U (en) |
-
2021
- 2021-07-08 CN CN202121544171.2U patent/CN215258232U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215258232U (en) | Rural sewage is placer for pipe network construction | |
CN210902187U (en) | Bathroom cabinet body stable balance structure | |
CN211239230U (en) | Bus duct installing support | |
CN217769121U (en) | Adjustable multifunctional dual-power cabinet | |
CN204289397U (en) | The assembly tooling of a kind of high voltage direct current transmission converter valve assembly silicon stack unit | |
CN207708472U (en) | The desktop adjuster of billiard table | |
CN202525472U (en) | Teaching drawing board support frame | |
CN220254082U (en) | Bus bridge convenient to install and detach | |
CN215604612U (en) | Support frame of flexible thin film material | |
CN221080825U (en) | Cable fixing device for electric automation equipment | |
CN205785259U (en) | Rigidity continuously adjusts and simultaneously advances mechanism | |
CN219256176U (en) | Fixing device for sheet heating | |
CN215569216U (en) | Conference reservation machine based on face recognition | |
CN212815253U (en) | Pin-connected panel cupboard foot | |
CN210115810U (en) | Machining clamp for insulating support of current collector | |
CN221177881U (en) | Multimedia loudspeaker box convenient to install and fix | |
CN217089919U (en) | Office table convenient to install | |
CN221348464U (en) | Fixing base for small screen bracket | |
CN219147005U (en) | Corner table top mounting structure | |
CN213550482U (en) | Desk convenient to height-adjusting | |
CN215249220U (en) | Tower crane with strong adhesion and fixation | |
CN211958905U (en) | Municipal administration overhauls uses motor fixing device | |
CN220800397U (en) | Combined file table | |
CN215720278U (en) | Bearing seat with conveniently-adjustable supporting thickness | |
CN212044375U (en) | Positioner is used in desk chair lifting support equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211221 |
|
CF01 | Termination of patent right due to non-payment of annual fee |