CN215254403U - Scaffold frame is used in construction of building wall with adjustable height - Google Patents

Scaffold frame is used in construction of building wall with adjustable height Download PDF

Info

Publication number
CN215254403U
CN215254403U CN202121661989.2U CN202121661989U CN215254403U CN 215254403 U CN215254403 U CN 215254403U CN 202121661989 U CN202121661989 U CN 202121661989U CN 215254403 U CN215254403 U CN 215254403U
Authority
CN
China
Prior art keywords
bracing piece
scaffold
adjustable height
building wall
symmetry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121661989.2U
Other languages
Chinese (zh)
Inventor
陈达人
杜红
侍波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Jianqing Construction Engineering Co ltd
Original Assignee
Nantong Jianqing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Jianqing Construction Engineering Co ltd filed Critical Nantong Jianqing Construction Engineering Co ltd
Priority to CN202121661989.2U priority Critical patent/CN215254403U/en
Application granted granted Critical
Publication of CN215254403U publication Critical patent/CN215254403U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold frame is used in building wall construction with adjustable height, including the bracing piece structure, the bracing piece structure has four, four bracing piece structure's top is provided with the cross bracing board structure, four structural a lift bracing piece, four of all installing of bracing piece on the lift bracing piece a plurality of fixing clip hole has all been seted up, four structural symmetry of bracing piece installs four bracing piece fixed knot and constructs, bracing piece fixed knot constructs and contains fixed horizontal pole, the inner of fixed horizontal pole is provided with the horizontal pole and pulls the piece, four the symmetry is provided with two spacing springs between the bracing piece fixed knot structure. A scaffold frame for building wall construction with adjustable height belongs to building construction equipment field, through setting up the lift support pole and with the setting of stull plate structure on the lift support pole, can be so that the scaffold frame can carry out altitude mixture control to finally promote the practicality of scaffold frame.

Description

Scaffold frame is used in construction of building wall with adjustable height
Technical Field
The utility model relates to a construction equipment field, in particular to scaffold frame is used in construction of building wall with adjustable height.
Background
The wall decoration treatment is generally painting or wall paper sticking, and the exterior surface of a wall body is decorated and divided into an indoor wall surface and an outdoor wall surface. Wall finishing is an integral part of building design. The modern indoor wall surface beautifies the indoor environment and adjusts the illumination by using the change of color and texture, and various materials with easy cleaning and good physical properties are selected to meet the using functions in various aspects. The outdoor wall surface directly influences the appearance of a building and the appearance of a city, and materials with certain waterproof and weatherproof performance are selected according to the use requirements and technical and economic conditions of the building, so that the wall structure is protected, and the appearance is kept clean. The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form. Different types of engineering construction select scaffolds with different purposes. The bridge support frame uses the bowl to detain the residence of scaffold, also has to use portal scaffold. Compared with the common structure, the working condition of the scaffold has the following characteristics: the load variation is large; the fastener connecting node belongs to semi-rigidity, the rigidity of the node is related to the quality of the fastener and the mounting quality, and the performance of the node has larger variation; the scaffold structure and the members have initial defects, such as initial bending and corrosion of rod pieces, large setting size error, large load eccentricity and the like; the connection point with the wall has larger constraint variation to the scaffold. The existing scaffold for building wall construction can not be adjusted in height according to the use requirement when in use, thereby reducing the practicability of the scaffold.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a scaffold frame is used in building wall construction with adjustable height can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold frame is used in construction of building wall with adjustable height, includes bracing piece structure, bracing piece structure has four, four bracing piece structure's top is provided with the cross bracing piece structure, four structural a lift bracing piece, four of all installing of bracing piece all a plurality of fixing clip hole has been seted up on the lift bracing piece, four bracing piece fixed knot constructs are installed to the structural symmetry of bracing piece, bracing piece fixed knot constructs and contains fixed horizontal pole, the inner of fixed horizontal pole is provided with the horizontal pole and pulls the piece, four the symmetry is provided with two spacing springs between the bracing piece fixed knot structure.
Preferably, four the symmetry is provided with two and connects the horizontal pole between the bracing piece structure, four the symmetry is provided with two and connects the diaphragm between the bracing piece structure, four one has all been seted up in bracing piece structure's upper end and has been accomodate the cavity, two connect and have all been seted up a spring on the diaphragm and accomodate the groove, two the spring is accomodate the groove and is run through two inside and outside both ends of connecting the diaphragm respectively, two equal symmetry has been seted up on the inner wall in groove is accomodate to the spring and has been worn the groove, the intercommunication is worn the groove and is run through the cavity of accomodating that groove and bracing piece structure upper end were seted up with the spring.
Preferably, four lifting support rods are respectively installed in four accommodating cavities formed in the upper ends of the four support rod structures, and a connecting block structure is arranged above the four support rod structures at the upper ends of the four lifting support rods.
Preferably, the cross bracing plate structure is installed on four connecting block structures arranged at the upper ends of the four lifting support rods.
Preferably, four fixed cross rods on the four support rod fixing structures are respectively installed in the four communicating through grooves, and four cross rod pulling blocks arranged at the inner ends of the four fixed cross rods are respectively arranged in the two spring accommodating grooves.
Preferably, the two limiting springs are respectively arranged in two spring accommodating grooves formed in the two connecting transverse plates, and the two limiting springs are respectively connected with the four transverse rod pulling blocks.
Compared with the prior art, the utility model discloses following beneficial effect has:
the height of the scaffold can be adjusted by arranging the lifting support rods and arranging the cross brace plate structure on the lifting support rods, so that the practicability of the scaffold is finally improved; through setting up bracing piece fixed knot structure and spacing spring, the fixed of the bracing piece that can be convenient for go up and down.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the supporting rod structure and the connecting transverse plate of the present invention;
fig. 3 is a schematic view of the position relationship between the support rod fixing structure and the limiting spring of the present invention.
In the figure: 1. a support rod structure; 2. a cross brace plate structure; 3. lifting the supporting rod; 4. a support rod fixing structure; 5. a limiting spring; 6. connecting the cross bars; 7. connecting the transverse plates; 8. a receiving cavity; 9. a spring receiving groove; 10. the through groove is communicated; 11. fixing the clamp hole; 12. a connecting block structure; 13. fixing the cross bar; 14. the horizontal pole pulls the piece.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, a scaffold frame for building wall construction with adjustable height, including bracing piece structure 1, bracing piece structure 1 has four, four bracing piece structure 1's top is provided with spreader structure 2, all install a lifting support pole 3 on four bracing piece structure 1, a plurality of fixing clip hole 11 has all been seted up on four lifting support pole 3, four bracing piece fixed knot construct 4 are installed to the symmetry on four bracing piece structure 1, bracing piece fixed knot construct 4 contains fixed horizontal pole 13, the inner of fixed horizontal pole 13 is provided with horizontal pole pulling block 14, the symmetry is provided with two spacing springs 5 between four bracing piece fixed knot construct 4.
In this embodiment, the symmetry is provided with two and connects horizontal pole 6 between four bracing piece structure 1, the symmetry is provided with two between four bracing piece structure 1 and connects diaphragm 7, one storage cavity 8 has all been seted up to four bracing piece structure 1's upper end, two connect and all seted up a spring on the diaphragm 7 and accomodate groove 9, two springs are accomodate groove 9 and are run through two inside and outside both ends of connecting diaphragm 7 respectively, two intercommunication wear groove 10 have all been seted up to the symmetry on the inner wall of groove 9 is accomodate to two springs, intercommunication wear groove 10 is accomodate the spring and is held groove 9 and the storage cavity 8 that bracing piece structure 1 upper end was seted up and run through.
In this embodiment, in order to make the scaffold frame can carry out altitude mixture control to finally promote the practicality of scaffold frame, set up lifting support pole 3, four lifting support pole 3 are installed respectively in four storage cavity 8 that four bracing piece structure 1 upper ends were seted up, and four lifting support pole 3's upper end all is provided with a connecting block structure 12 in the top that is located four bracing piece structure 1.
In this embodiment, the spreader structure 2 is mounted on four connection block structures 12 provided at the upper ends of the four lifting support rods 3.
In this embodiment, in order to fix the lifting support rod 3, the support rod fixing structures 4 are provided, four fixing cross rods 13 on the four support rod fixing structures 4 are respectively installed in the four communicating through grooves 10, and four cross rod pulling blocks 14 arranged at the inner ends of the four fixing cross rods 13 are respectively arranged in the two spring accommodating grooves 9.
In this embodiment, in order to facilitate the fixing of the lifting support rod 3, the limiting springs 5 are provided, the two limiting springs 5 are respectively arranged in the two spring accommodating grooves 9 formed in the two connecting transverse plates 7, and the two limiting springs 5 are respectively connected with the four transverse rod pulling blocks 14.
It should be noted that, the utility model relates to a height-adjustable scaffold for building wall construction, in the using process, when the height of the cross bracing plate structure 2 needs to be adjusted, the cross rod pulling block 14 on the bracing rod fixing structure 4 can be pulled inwards, at the same time, the limiting spring 5 can be compressed by the cross rod pulling block 14, when the fixing cross rod 13 on the bracing rod fixing structure 4 is separated from the fixing clip hole 11 arranged on the lifting bracing rod 3, the height adjustment of the cross bracing plate structure 2 can be started, at the same time, the lifting bracing rod 3 can move upwards or downwards in the containing cavity 8 arranged at the upper end of the bracing rod structure 1, when the height of the cross bracing plate structure 2 is proper, the bracing rod fixing structure 4 is loosened, at the same time, the limiting spring 5 can push the bracing rod fixing structure 4 outwards, thereby finally, the fixing cross rod 13 on the bracing rod fixing structure 4 can be clipped into the fixing clip hole 11 arranged on the lifting bracing rod 3, thereby finally completing the height adjustment of the spreader structure 2.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a scaffold frame is used in construction of building wall with adjustable height, includes bearing bar structure (1), bearing bar structure (1) has four, four the top of bearing bar structure (1) is provided with stull plate structure (2), its characterized in that: four all install one lifting support pole (3), four on bracing piece structure (1) a plurality of fixing clip hole (11), four have all been seted up on lifting support pole (3) bracing piece structure (1) is gone up the symmetry and is installed four bracing piece fixed knot and construct (4), bracing piece fixed knot constructs (4) and contains fixed horizontal pole (13), the inner of fixed horizontal pole (13) is provided with horizontal pole pulling block (14), four the symmetry is provided with two spacing springs (5) between bracing piece fixed knot constructs (4).
2. The scaffold for building wall construction with adjustable height of claim 1, wherein: four the symmetry is provided with two and connects horizontal pole (6), four between bracing piece structure (1) the symmetry is provided with two and connects diaphragm (7), four between bracing piece structure (1) one has all been seted up in the upper end of bracing piece structure (1) and has been accomodate cavity (8), two connect and all seted up one spring on diaphragm (7) and accomodate groove (9), two the spring is accomodate groove (9) and is run through two inside and outside both ends of connecting diaphragm (7) respectively, two equal symmetry has seted up two intercommunication on the inner wall of spring accomodate groove (9) and has worn groove (10), intercommunication is worn groove (10) and is accomodate groove (9) and bracing piece structure (1) upper end and seted up accomodate cavity (8) and run through.
3. The scaffold for building wall construction with adjustable height of claim 2, wherein: four lifting support rods (3) are respectively arranged in four containing cavities (8) formed in the upper ends of the four support rod structures (1), and a connecting block structure (12) is arranged above the four support rod structures (1) at the upper ends of the four lifting support rods (3).
4. The scaffold for building wall construction with adjustable height of claim 3, wherein: the cross brace plate structure (2) is arranged on four connecting block structures (12) arranged at the upper ends of the four lifting support rods (3).
5. The scaffold for building wall construction with adjustable height of claim 4, wherein: four fixed cross rods (13) on the four supporting rod fixing structures (4) are respectively installed in the four communicating penetrating grooves (10), and four cross rod pulling blocks (14) arranged at the inner ends of the four fixed cross rods (13) are respectively arranged in the two spring accommodating grooves (9).
6. The scaffold for building wall construction with adjustable height of claim 5, wherein: the two limiting springs (5) are respectively arranged in two spring accommodating grooves (9) formed in the two connecting transverse plates (7), and the two limiting springs (5) are respectively connected with the four transverse rod pulling blocks (14).
CN202121661989.2U 2021-07-21 2021-07-21 Scaffold frame is used in construction of building wall with adjustable height Expired - Fee Related CN215254403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121661989.2U CN215254403U (en) 2021-07-21 2021-07-21 Scaffold frame is used in construction of building wall with adjustable height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121661989.2U CN215254403U (en) 2021-07-21 2021-07-21 Scaffold frame is used in construction of building wall with adjustable height

Publications (1)

Publication Number Publication Date
CN215254403U true CN215254403U (en) 2021-12-21

Family

ID=79493368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121661989.2U Expired - Fee Related CN215254403U (en) 2021-07-21 2021-07-21 Scaffold frame is used in construction of building wall with adjustable height

Country Status (1)

Country Link
CN (1) CN215254403U (en)

Similar Documents

Publication Publication Date Title
CN204126102U (en) A kind of sheet material fast-assembling ceiling structure
CN102168462A (en) Curtain wall plate back-hanging system
CN215254403U (en) Scaffold frame is used in construction of building wall with adjustable height
CN104674997A (en) Supporting structure of archaized wood structure building roof and construction method thereof
CN218581076U (en) Mounting structure of adjustable ground frame of assembled
CN202831513U (en) Wall decorative frame
CN205935898U (en) Tower is decorated to roof convenient to overhaul
CN214462094U (en) Portable dry pendant combined installation system
CN212026736U (en) Concatenation formula building curtain
CN213060106U (en) Folding hanging basket for exterior wall decoration
CN110805183B (en) Hoisting type aluminum curtain wall plate and splicing method
CN206477537U (en) One kind exempts from base treatment vitrified tile thin plate stone material dry suspending structure
CN205558168U (en) Floor support frame
CN216616497U (en) Decoration design furred ceiling beam assembly
CN218586818U (en) Cable bridge
CN214402640U (en) Installation mechanism of steel frame for building
CN219773319U (en) Auxiliary stand for curtain wall assembly installation
CN213204897U (en) Scaffold for building construction
CN216109797U (en) Light wall body installation mechanism
CN216196420U (en) Interior decoration auxiliary equipment
CN214462389U (en) Scaffold for building engineering
CN220978763U (en) Electric hanging basket erecting device
CN211524018U (en) Heightening hanging basket hanging mechanism
CN217840887U (en) Civil engineering construction support
CN204491955U (en) A kind of braced structures of Archaizing wood structural construction roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221