CN215253568U - Composite heat-insulation outer wall connecting clamp device for building engineering construction - Google Patents

Composite heat-insulation outer wall connecting clamp device for building engineering construction Download PDF

Info

Publication number
CN215253568U
CN215253568U CN202121738226.3U CN202121738226U CN215253568U CN 215253568 U CN215253568 U CN 215253568U CN 202121738226 U CN202121738226 U CN 202121738226U CN 215253568 U CN215253568 U CN 215253568U
Authority
CN
China
Prior art keywords
structures
transverse telescopic
wall
wall connecting
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121738226.3U
Other languages
Chinese (zh)
Inventor
董嘉诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Weikaida New Thermal Insulation Material Co ltd
Original Assignee
Xinjiang Weikaida New Thermal Insulation Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Weikaida New Thermal Insulation Material Co ltd filed Critical Xinjiang Weikaida New Thermal Insulation Material Co ltd
Priority to CN202121738226.3U priority Critical patent/CN215253568U/en
Application granted granted Critical
Publication of CN215253568U publication Critical patent/CN215253568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a composite heat-insulation external wall connecting clamp device for building engineering construction, which comprises three transverse telescopic structures and wall connecting structures, wherein two adjacent transverse telescopic structures are provided with uniformly distributed vertical telescopic structures, the top ends of the transverse telescopic structures and the wall connecting structures are provided with adjusting structures, the top ends of the transverse telescopic structures and the wall connecting structures are provided with limiting structures, and one sides of the transverse telescopic structures and the vertical telescopic structures are provided with uniformly distributed locking structures; the transverse telescopic structure comprises a cross rod, T-shaped grooves are formed in two ends of the cross rod, and transverse telescopic rods are arranged on the inner walls of the T-shaped grooves. The utility model discloses a can adjust according to the concrete size of template for anchor clamps are better to the centre gripping effect of template, and at the in-process of on-the-spot pouring concrete, the heat preservation can not take place deformation at the in-process that forms, improves the location effect of heated board.

Description

Composite heat-insulation outer wall connecting clamp device for building engineering construction
Technical Field
The utility model belongs to the technical field of building engineering, more specifically say, it relates to a building engineering construction is with compound incubation outer wall connection fixture device.
Background
The external wall thermal insulation is formed by compounding polymer mortar, glass fiber gridding cloth, flame-retardant molded polystyrene foam board (EPS) or extruded sheet (XPS) and other materials, and is used for the external wall of a building to play a thermal insulation role.
In the method of the vertical molding of cast-in-place concrete, need utilize the template to carry out the location and pour, need utilize fixture to carry out the joint, but current fixture is when using, and the location effect is not good, can not adjust according to the concrete size of required heated board, leads to the concrete when forming the heated board, and the tension in the formation process can drive the template and take place the deformation, influences the roughness of heat preservation, consequently, technical personnel in the field provide a composite insulation outer wall connection fixture device for the construction engineering to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a building engineering construction is with compound incubation outer wall connection fixture device can adjust according to the concrete size of template for anchor clamps are better to the centre gripping effect of template, at the in-process of on-the-spot pouring concrete, and the heat preservation can not take place deformation at the in-process that forms, improves the location effect of heated board.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a composite heat-insulation outer wall connecting clamp device for building engineering construction comprises three transverse telescopic structures and wall connecting structures, wherein vertical telescopic structures which are uniformly distributed are arranged between every two adjacent transverse telescopic structures;
the transverse telescopic structure comprises a cross rod, two ends of the cross rod are provided with T-shaped grooves, and the inner wall of each T-shaped groove is provided with a transverse telescopic rod;
through above-mentioned technical scheme, horizontal pulling horizontal telescopic link, horizontal telescopic link slides in T type groove, can be according to the length of the concrete transverse dimension regulation horizontal pole of mould for the laminating is accomplished to the length of horizontal extending structure and mould, thereby increases the centre gripping effect to the mould.
Furthermore, the vertical telescopic structure comprises a vertical rod, and a vertical telescopic rod is inserted into the bottom end of the vertical rod;
through above-mentioned technical scheme, according to the height of mould, spur vertical telescopic link to reach the purpose of adjusting the anchor clamps height, it is better to the vertical centre gripping effect of mould, avoids when concreting, because of the condition that stress reason appears deformation.
Furthermore, the wall surface connecting structure comprises two connecting plates, and two reinforcing rods are fixedly connected between the two connecting plates;
through above-mentioned technical scheme, utilize two connecting plates and reinforcing bar to fix the wall for the location effect to the wall is better, improves the stability of anchor clamps.
Furthermore, the adjusting structure comprises two mounting plates and two threaded sleeves, the two mounting plates are respectively mounted at the top end of the transverse rod above and the top end of the connecting plate, both ends of each threaded sleeve are in threaded connection with a screw rod, and the other end of each screw rod is fixedly connected with one side of each mounting plate;
through above-mentioned technical scheme, rotatory thread bush, thread bush drive two lead screws synchronous motion, drive horizontal extending structure, vertical extending structure and wall connection structure while inwards move, accomplish the centre gripping operation, are convenient for carry out centre gripping and location, improve equipment's application scope to different walls.
Furthermore, the limiting structure comprises a limiting rod, the top end of the transverse rod above the limiting structure and the connecting plate are fixedly connected with vertical plates, and the limiting rods respectively penetrate through the vertical plates;
through above-mentioned technical scheme, when horizontal pole and connecting plate removed, the gag lever post played effective spacing purpose, avoided taking place the condition of skew, the normal operating of guarantee equipment at centre gripping process horizontal pole and connecting plate.
Further, the locking structure comprises a fixing bolt, a protection pad is arranged at the end part of the fixing bolt, and the protection pad is a rubber material component;
through above-mentioned technical scheme, rotatory fixing bolt, fixing bolt can drive the protection and fill up and remove, and the protection of rubber material fills up can play the guard action to horizontal telescopic link and vertical telescopic link, avoids horizontal telescopic link and vertical telescopic link the in-process of locking the condition of damage to appear.
To sum up, the utility model discloses following beneficial effect has:
1. through setting up horizontal extending structure and vertical extending structure, adjust horizontal extending structure according to the size of mould, stimulate horizontal telescopic link, horizontal telescopic link slides in T type groove, can adjust the length of horizontal pole according to the concrete horizontal size of mould, make the length of horizontal extending structure and mould accomplish the laminating, after horizontal regulation, rotatory fixing bolt fixes horizontal telescopic link, according to the height of mould, stimulate vertical telescopic link, thereby reach the purpose of adjusting the anchor clamps height, accomplish the complete laminating of horizontal extending structure and vertical extending structure and mould, make anchor clamps better to the centre gripping effect of template, at the in-process of on-the-spot pouring concrete, the heat preservation can not take place deformation at the in-process that forms, improve the location effect of heated board.
2. Through setting up the regulation structure, rotatory thread bush, thread bush drive two lead screw synchronous motion, drive horizontal extending structure, vertical extending structure and wall connection structure while inwards move, accomplish the centre gripping operation, are convenient for carry out centre gripping and location, improve equipment's application scope to different walls.
Drawings
FIG. 1 is a perspective view of the present embodiment;
FIG. 2 is a schematic structural view of the lateral expansion structure of the present embodiment;
FIG. 3 is a schematic structural view of the vertical telescopic structure of the present embodiment;
fig. 4 is a schematic structural view of the wall surface connecting structure of the present embodiment.
Description of reference numerals: 1. a transverse telescopic structure; 101. a cross bar; 102. a transverse telescopic rod; 2. a vertical telescopic structure; 201. a vertical rod; 202. a vertical telescopic rod; 3. a wall surface connecting structure; 301. a connecting plate; 302. a reinforcing rod; 4. an adjustment structure; 401. mounting a plate; 402. a threaded sleeve; 403. a screw rod; 5. a limiting structure; 501. a vertical plate; 502. a limiting rod; 6. a locking structure; 601. fixing the bolt; 602. a protective pad.
Detailed Description
Example (b):
the present invention will be described in further detail with reference to the accompanying fig. 1-4.
A composite heat-insulation outer wall connecting clamp device for building engineering construction comprises three transverse telescopic structures 1 and wall connecting structures 3, wherein vertical telescopic structures 2 which are uniformly distributed are arranged between every two adjacent transverse telescopic structures 1, adjusting structures 4 are arranged at the top ends of the upper transverse telescopic structure 1 and the wall connecting structure 3, limiting structures 5 are arranged at the top ends of the upper transverse telescopic structure 1 and the wall connecting structure 3, and locking structures 6 which are uniformly distributed are arranged on one sides of the transverse telescopic structure 1 and one side of each vertical telescopic structure 2; horizontal extending structure 1 includes horizontal pole 101, and T type groove has all been seted up at the both ends of horizontal pole 101, and the inner wall in T type groove is provided with horizontal telescopic link 102, horizontal pulling horizontal telescopic link 102, and horizontal telescopic link 102 slides in T type groove, accomplishes the horizontal regulation operation.
Vertical extending structure 2 includes montant 201, and it has vertical telescopic link 202 to peg graft in the bottom of montant 201, according to the height of mould, stimulates vertical telescopic link 202, accomplishes high regulation. Wall connection structure 3 includes that quantity is two connecting plate 301, and fixedly connected with quantity is two anchor strut 302 between two connecting plate 301, and is better to the location effect of wall. Adjusting structure 4 includes that quantity is two mounting panel 401 and thread bush 402, two mounting panels 401 are installed respectively on the top of top horizontal pole 101 and the top of connecting plate 301, the equal threaded connection in both ends of thread bush 402 has lead screw 403, the other end of lead screw 403 and one side fixed connection of mounting panel 401, rotatory thread bush 402, thread bush 402 drives two lead screw 403 synchronous motion, drive horizontal extending structure 1, vertical extending structure 2 and wall connection structure 3 inwards move simultaneously, accomplish the centre gripping operation.
Further, limit structure 5 includes gag lever post 502, and the top of top horizontal pole 101 and the equal fixedly connected with riser 501 of connecting plate 301, gag lever post 502 run through respectively and correspond riser 501, and gag lever post 502 plays effective spacing purpose, the normal operating of guarantee equipment. The locking structure 6 comprises a fixing bolt 601, a protective pad 602 is arranged at the end of the fixing bolt 601, and the protective pad 602 is a rubber material member, so that a locked object is protected while the locking operation is completed.
The working principle is as follows: the equipment is placed from the top of a wall surface, the transverse telescopic structure 1 is adjusted according to the size of a mold, the transverse telescopic rod 102 is pulled, the transverse telescopic rod 102 slides in a T-shaped groove, the length of the transverse rod 101 can be adjusted according to the specific transverse size of the mold, so that the transverse telescopic structure 1 is attached to the length of the mold, after the transverse adjustment is finished, the transverse fixing bolt 601 is rotated to fix the transverse telescopic rod 102, the vertical telescopic rod 202 is pulled according to the height of the mold, the purpose of adjusting the height of a clamp is achieved, the transverse telescopic structure 1, the vertical telescopic structure 2 and the mold are completely attached to each other, after the adjustment is finished, the threaded sleeve 402 is rotated, the threaded sleeve 402 drives the two screw rods 403 to synchronously move, the transverse telescopic structure 1, the vertical telescopic structure 2 and the wall surface connecting structure 3 are driven to simultaneously move inwards, so that the transverse telescopic structure is completely attached to the wall surface and the mold, and then reinforcement operation is carried out, and finally, carrying out concrete cast-in-place operation.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a composite insulation outer wall connection fixture device for building engineering construction, is three horizontal extending structure (1) and wall connection structure (3) including quantity, its characterized in that: vertical telescopic structures (2) which are uniformly distributed are arranged between every two adjacent transverse telescopic structures (1), adjusting structures (4) are arranged at the top ends of the upper transverse telescopic structures (1) and the wall surface connecting structures (3), limiting structures (5) are arranged at the top ends of the upper transverse telescopic structures (1) and the wall surface connecting structures (3), and locking structures (6) which are uniformly distributed are arranged on one sides of the transverse telescopic structures (1) and one sides of the vertical telescopic structures (2);
the transverse telescopic structure (1) comprises a cross rod (101), T-shaped grooves are formed in two ends of the cross rod (101), and transverse telescopic rods (102) are arranged on the inner walls of the T-shaped grooves.
2. The composite heat-insulation outer wall connecting clamp device for the construction of the constructional engineering as claimed in claim 1, which is characterized in that: the vertical telescopic structure (2) comprises a vertical rod (201), and a vertical telescopic rod (202) is inserted into the bottom end of the vertical rod (201).
3. The composite heat-insulation outer wall connecting clamp device for the construction of the constructional engineering as claimed in claim 1, which is characterized in that: wall connection structure (3) are including quantity connecting plate (301) two, two fixedly connected with quantity reinforcing rod (302) two between connecting plate (301).
4. The composite heat-insulation outer wall connecting clamp device for the construction of the constructional engineering as claimed in claim 3, which is characterized in that: adjust structure (4) including quantity mounting panel (401) and thread bush (402) two, two mounting panel (401) are installed respectively in the top of horizontal pole (101) with the top of connecting plate (301), the equal threaded connection in both ends of thread bush (402) has lead screw (403), the other end of lead screw (403) and one side fixed connection of mounting panel (401).
5. The composite heat-insulation outer wall connecting clamp device for the construction of the constructional engineering as claimed in claim 3, which is characterized in that: limiting structure (5) include gag lever post (502), the top of horizontal pole (101) with the equal fixedly connected with riser (501) of connecting plate (301), gag lever post (502) link through respectively and correspond riser (501).
6. The composite heat-insulation outer wall connecting clamp device for the construction of the constructional engineering as claimed in claim 1, which is characterized in that: the locking structure (6) comprises a fixing bolt (601), a protective pad (602) is arranged at the end part of the fixing bolt (601), and the protective pad (602) is a rubber material member.
CN202121738226.3U 2021-07-29 2021-07-29 Composite heat-insulation outer wall connecting clamp device for building engineering construction Expired - Fee Related CN215253568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121738226.3U CN215253568U (en) 2021-07-29 2021-07-29 Composite heat-insulation outer wall connecting clamp device for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121738226.3U CN215253568U (en) 2021-07-29 2021-07-29 Composite heat-insulation outer wall connecting clamp device for building engineering construction

Publications (1)

Publication Number Publication Date
CN215253568U true CN215253568U (en) 2021-12-21

Family

ID=79495417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121738226.3U Expired - Fee Related CN215253568U (en) 2021-07-29 2021-07-29 Composite heat-insulation outer wall connecting clamp device for building engineering construction

Country Status (1)

Country Link
CN (1) CN215253568U (en)

Similar Documents

Publication Publication Date Title
CN105714961B (en) It is cast-in-place to build assembled heat insulation external mold board member and external wall structure body free of demolition and construction method
DK170688B1 (en) Insulated layered wall with connecting elements
CN105064548A (en) Wall structure of dismounting-free constructional column formwork and construction method of wall structure
CN112497439A (en) Die and method for manufacturing bridge deck auxiliary member
CN215253568U (en) Composite heat-insulation outer wall connecting clamp device for building engineering construction
CN105544815B (en) One kind is cast-in-place to build prefabricated whole assembly heat preservation exterior sheathing assembling structure free of demolition
CN204983661U (en) Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm
CN104763149A (en) Light steel concrete construction method
CN215803213U (en) Building concrete construction template anchor clamps
CN215150159U (en) Prefabricated superimposed sheet mould
CN213143853U (en) Template device for light-transmitting material modified rammed earth wall
WO2003064781A1 (en) An erection unit for a building floor slab and the erection method thereof
CN111706006A (en) Integrated reinforced bar mould-free cast-in-situ concrete column
CN112343222A (en) Assembly type superposed shear wall structure, construction system and construction method thereof
CN111305092A (en) Combined template applicable to long-distance cast-in-situ culvert
CN215106314U (en) Self-locking positioning piece type broken bridge opposite-pulling piece assembly, construction supporting system and wall
CN219075446U (en) Prefabricated post reinforcing bar fixture
CN217318482U (en) Mould is used in production of prefabricated balcony that stability is strong
CN213766348U (en) Prefabricated column formwork structure
CN217175691U (en) Floor expansion joint department template device for shear force wall
CN117403806B (en) Prefabricating method of laminated wall capable of nondestructively integrating ceramic tiles and heat preservation layers
CN114508183A (en) Disassembly-free external wall formwork for cold regions and construction method thereof
CN210421534U (en) Concrete placement of structure integration exempts from to tear open heated board connecting piece
CN220247626U (en) Basement wall large-scale combined wood formwork support system
CN219100412U (en) Corner wall body constructional column template bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221