CN215252104U - Prevention of seepage water plastic course of convenient construction - Google Patents

Prevention of seepage water plastic course of convenient construction Download PDF

Info

Publication number
CN215252104U
CN215252104U CN202121513938.5U CN202121513938U CN215252104U CN 215252104 U CN215252104 U CN 215252104U CN 202121513938 U CN202121513938 U CN 202121513938U CN 215252104 U CN215252104 U CN 215252104U
Authority
CN
China
Prior art keywords
layer
plastic
seepage
supporting layer
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121513938.5U
Other languages
Chinese (zh)
Inventor
丁红伟
李一凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fengbang Building Materials Technology Co ltd
Original Assignee
Anhui Fengbang Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fengbang Building Materials Technology Co ltd filed Critical Anhui Fengbang Building Materials Technology Co ltd
Priority to CN202121513938.5U priority Critical patent/CN215252104U/en
Application granted granted Critical
Publication of CN215252104U publication Critical patent/CN215252104U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The application relates to the field of plastic runways, and discloses a water seepage prevention plastic runway convenient to construct, which comprises a plastic layer, wherein a supporting layer is poured and connected on the lower surface of the plastic layer, a plurality of diversion holes are formed in the supporting layer, a reinforcing layer is poured and connected on the outer surface of the plastic layer, a plurality of diversion grooves are integrally formed below the inner part of the reinforcing layer, a first seepage layer is poured and connected on the lower surface of the supporting layer, a second seepage layer is poured and connected on the upper surface of the first seepage layer, underground reverse seepage water flow can be temporarily stored in the reinforcing layer through the supporting layer, so that partial water flow can directly seep into the ground through the diversion grooves, partial seepage water of the first seepage layer and the second seepage layer is well shared, the phenomenon that the water flow seeps into the plastic layer from the ground reversely due to overlarge water flow is avoided to the maximum extent, and the plastic layer is soaked, affecting the service life of the plastic layer.

Description

Prevention of seepage water plastic course of convenient construction
Technical Field
The application relates to the field of plastic runways, in particular to a water seepage prevention plastic runway convenient to construct.
Background
The plastic track is also named as all-weather track for track and field sports and consists of polyurethane prepolymer, mixed polyether, waste tyre rubber, EPDM rubber grain or PU grain, pigment, assistant and stuffing. The plastic track has the characteristics of good flatness, high compressive strength, proper hardness and elasticity and stable physical performance, is beneficial to the exertion of the speed and the technology of athletes, effectively improves the sports performance and reduces the tumble injury rate. The plastic track is made of materials such as polyurethane rubber, has certain elasticity and color, has certain ultraviolet resistance and aging resistance, and is the best all-weather outdoor sports ground floor material internationally recognized.
At present, the plastic course is laying the in-process, can utilize a lot of relevant laying device for whole work progress is comparatively convenient, but the plastic course of laying at present lacks certain prevention of seepage water function, and when the rainwater was too big, the speed of the rainwater of underground absorption is not fast enough, leads to the water of underground absorption to reverse ooze the plastic course top, produces to soak the plastic course, leads to drying time slow, probably influences the life of plastic course.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the application provides the water seepage prevention plastic track convenient to construct.
The application provides a convenient seepage prevention plastic course of being under construction adopts following technical scheme:
the utility model provides a convenient to be under construction's prevention of seepage water plastic course, includes the plastic layer, the plastic layer lower surface is pour and is connected with the supporting layer, a plurality of water conservancy diversion hole has been seted up to the supporting layer inside, the plastic layer surface is pour and is connected with the back up coat, just a plurality of the inside below integrated into one piece of back up coat has the guiding gutter, the supporting layer lower surface is pour and is connected with the infiltration layer No. one, No. two infiltration layers are pour and are connected with to infiltration layer upper surface.
Through adopting the above technical scheme, it is connected with the supporting layer to pour at the plastic layer lower surface, make to produce certain clearance between plastic layer and the infiltration layer No. two, and then can keep in certain water yield inside the supporting layer, a plurality of link up the notch has been seted up inside the supporting layer, and a plurality of link up notch and a plurality of guiding gutter position one-to-one, be convenient for with the inside rivers of supporting layer leading-in underground to through link up notch and guiding gutter, this device No. two infiltration layer integrated into one piece are the arc form, conveniently follow the reverse rivers that ooze in the underground, can be better produce the reposition of redundant personnel in infiltration layer both sides No. two, make things convenient for the guiding gutter to derive rivers.
Preferably, the outer surface of the reinforcing layer is connected with a compaction block in a clamping mode on one side, the outer surface of the compaction block is connected with the corresponding part of the upper surface of the plastic layer in a laminating mode, a fixing frame is poured inside the compaction block, a limiting rod is connected to the lower portion inside the fixing frame in a clamping mode, and one side of the outer surface of the limiting rod is connected with the inner portion of the reinforcing layer in a clamping mode.
Through adopting above-mentioned technical scheme, the compaction piece surface is laminated with the plastic layer upper surface department of correspondence mutually and is connected, can effectually carry out the compaction to plastic layer edge both sides, has seted up the notch that link up in inside one side of compaction piece, and the gag lever post one side of being convenient for is connected with the inside department of correspondence mutually of compaction piece to can carry on spacingly to the compaction piece, guaranteed the stability of compaction piece laminating at the plastic layer upper surface.
Preferably, a plurality of reinforcing ribs are connected in the supporting layer in a pouring manner.
Through adopting above-mentioned technical scheme, pour in supporting layer inside and be connected with a plurality of strengthening rib, be convenient for strengthen the holistic support nature of supporting layer, this device strengthening rib integrated into one piece becomes the unrestrained form simultaneously, forms the triangular supports of a plurality of with the inside both sides of supporting layer for the strengthening rib can further strengthen the support nature to the supporting layer.
Preferably, the welding of fixed frame internal surface top has spacing spring piece, just spacing spring piece surface one side and the corresponding side welding of gag lever post surface mutually.
Through adopting above-mentioned technical scheme, fixed frame is inside to carry out elastic connection through spacing spring piece and gag lever post for the block that both can not influence the gag lever post removes, makes things convenient for the compaction piece to break away from with the guiding gutter, can apply the reverse effort in gag lever post one side through spacing spring piece again simultaneously, carries out certain spacing to the gag lever post, has effectively guaranteed the stability of gag lever post at the inside block of back up coat.
Preferably, a fixing rod is welded below the outer surface of the limiting spring block.
Through adopting above-mentioned technical scheme, it has the dead lever to weld below spacing spring block surface, and dead lever surface one side is connected with the inside looks block of fixed frame for the user can be through the pulling to the dead lever, and more convenient compresses spacing spring block.
To sum up, the application comprises the following beneficial technical effects: can keep in the rivers that reverse ooze underground inside through the supporting layer for partial rivers can directly permeate into the underground through a plurality of guiding gutter, fine share the partial infiltration capacity of a infiltration layer and No. two infiltration layer rivers, avoided in the at utmost because rivers are too big, lead to rivers to reverse to permeate into the plastic layer inside from the underground, produce to soak the plastic layer, influence the service life on plastic layer. The compaction piece surface is laminated with the plastic layer upper surface department of correspondence mutually and is connected, can effectually carry out the compaction to plastic layer edge both sides, avoids plastic layer both sides edge to take place to stick up the limit as far as possible, has reduced the practicality on plastic layer.
Drawings
FIG. 1 is a schematic cross-sectional view of a plastic track body according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of detail connection enlargement at a position of application embodiment.
Description of reference numerals: 1. a plastic layer; 2. a support layer; 3. a fixing frame; 4. a flow guide hole; 5. a reinforcement layer; 6. reinforcing ribs; 7. a first water seepage layer; 8. compacting the block; 9. a diversion trench; 10. a second water seepage layer; 11. a limiting rod; 12. a limiting spring block; 13. and (5) fixing the rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses prevention of seepage water plastic course of construction convenience. Referring to fig. 1, a convenient-to-construct water seepage-proof plastic runway, wherein a supporting layer 2 is poured and connected on the lower surface of a plastic layer 1, so that a certain gap is formed between the plastic layer 1 and a second water seepage layer 10, and a certain amount of water can be temporarily stored in the supporting layer 2, a reinforcing layer 5 is poured and connected on the outer surfaces of the plastic layer 1 and the supporting layer 2, so as to ensure the connection firmness between the plastic layer 1 and the supporting layer 2, and a plurality of diversion holes 4 are integrally formed in the supporting layer 2, so that the water in the plastic layer 1 can be guided into the supporting layer 2 through the diversion holes 4, a plurality of through notches are formed in the supporting layer 2, and the plurality of through notches correspond to a plurality of diversion grooves 9 one by one, so that the water in the supporting layer 2 can be guided into the ground through the through notches and the diversion grooves 9, and the second water seepage layer 10 of the runway is integrally formed into an arc shape, the convenience is from the reverse rivers that ooze of underground, and what can be better produces the reposition of redundant personnel in No. two water seepage layers 10 both sides, makes things convenient for guiding gutter 9 to derive rivers.
Referring to fig. 1 and 2, be connected with compaction piece 8 at 5 outer surface one side blocks of back up coat, make things convenient for compaction piece 8 and guiding gutter 9 to install, 8 outer surfaces of compaction piece are laminated with 1 upper surface on plastic layer and are connected mutually in the department that corresponds simultaneously, can effectually carry out the compaction to 1 marginal both sides on plastic layer, seted up the notch of lining up in 8 inside one sides of compaction piece, be convenient for gag lever post 11 one side and 8 inside department that correspond mutually of compaction piece run through and be connected, thereby can carry on spacingly to compaction piece 8, guaranteed the stability of compaction piece 8 laminating at plastic layer 1 upper surface.
Referring to fig. 1, pour in supporting layer 2 inside and be connected with a plurality of strengthening rib 6, be convenient for strengthen the holistic support nature of supporting layer 2, this device strengthening rib 6 integrated into one piece becomes the unrestrained form simultaneously, forms the triangular supports of a plurality of with the inside both sides of supporting layer 2 for strengthening rib 6 can further strengthen the support nature to supporting layer 2.
Referring to fig. 1 and 2, the fixed frame 3 of this device is inside to carry out elastic connection through spacing spring block 12 and gag lever post 11 for the block that neither can influence gag lever post 11 removes, makes things convenient for compaction piece 8 and guiding gutter 9 to break away from, can exert the reverse acting force in gag lever post 11 one side through spacing spring block 12 again simultaneously, carries out certain spacing to gag lever post 11, has effectively guaranteed the stability of gag lever post 11 at the inside block of back up coat 5.
Referring to fig. 2, the fixing rod 13 is welded below the outer surface of the limiting spring block 12, and one side of the outer surface of the fixing rod 13 is connected with the fixing frame 3 in a clamping manner, so that a user can compress the limiting spring block 12 more conveniently by pulling the fixing rod 13.
The implementation principle of the seepage-proof plastic track convenient to construct in the embodiment of the application is as follows: this device all pours at plastic layer 1 and 2 surfaces of supporting layer and is connected with back up coat 5, be convenient for guarantee the fastness of connection between plastic layer 1 and the supporting layer 2, simultaneously there is a plurality of water conservancy diversion hole 4 at the inside integrated into one piece of supporting layer 2, the water of the plastic layer 1 inside of being convenient for can lead to the supporting layer 2 inside through a plurality of water conservancy diversion hole 4 water conservancy diversion, thereby can permeate the underground with rivers through No. two infiltration layers 10 and infiltration layer 7, 5 surface one side blocks of back up coat are connected with compaction piece 8 simultaneously, and 8 surfaces of compaction piece are laminated with the corresponding department mutually with the plastic layer 1 upper surface, can effectually carry out the compaction to 1 marginal both sides in plastic layer, avoid 1 both sides edge in plastic layer to take place to stick up the limit as far as possible, the practicality of plastic layer 1 has been reduced.
When rivers are too big, can keep in the inside of supporting layer 2 with the rivers that the underground refluxes out for partial rivers can directly permeate into the underground through a plurality of guiding gutter 9, fine share the infiltration capacity of a part of a infiltration layer 7 and No. two infiltration layers 10 rivers, avoided in the at utmost because rivers are too big, lead to rivers to reverse to permeate into plastic layer 1 inside from the underground.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (5)

1. The utility model provides a convenient seepage prevention plastic course of being under construction which characterized in that: including plastic layer (1), plastic layer (1) lower surface is pour and is connected with supporting layer (2), a plurality of water conservancy diversion hole (4) have been seted up to supporting layer (2) inside, plastic layer (1) surface is pour and is connected with back up coat (5), just a plurality of back up coat (5) inside below integrated into one piece have guiding gutter (9), supporting layer (2) lower surface is pour and is connected with infiltration layer (7), infiltration layer (7) upper surface is pour and is connected with infiltration layer (10) No. two.
2. The water seepage prevention plastic track convenient for construction according to claim 1, characterized in that: the plastic layer is characterized in that a compaction block (8) is connected to one side of the outer surface of the reinforcing layer (5) in a clamped mode, the outer surface of the compaction block (8) is connected with the corresponding position of the upper surface of the plastic layer (1) in a fitted mode, a fixing frame (3) is connected to the inside of the compaction block (8) in a pouring mode, a limiting rod (11) is connected to the inside lower portion of the fixing frame (3) in a clamped mode, and one side of the outer surface of the limiting rod (11) is connected with the inside of the reinforcing layer (5) in a clamped mode.
3. The water seepage prevention plastic track convenient for construction according to claim 1, characterized in that: and a plurality of reinforcing ribs (6) are poured and connected inside the supporting layer (2).
4. The water seepage prevention plastic track convenient for construction according to claim 2, characterized in that: the welding of fixed frame (3) internal surface top has spacing spring piece (12), just spacing spring piece (12) surface one side and gag lever post (11) surface correspond the side and weld mutually.
5. The water seepage prevention plastic track convenient for construction according to claim 4, characterized in that: and a fixing rod (13) is welded below the outer surface of the limiting spring block (12).
CN202121513938.5U 2021-07-05 2021-07-05 Prevention of seepage water plastic course of convenient construction Active CN215252104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121513938.5U CN215252104U (en) 2021-07-05 2021-07-05 Prevention of seepage water plastic course of convenient construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121513938.5U CN215252104U (en) 2021-07-05 2021-07-05 Prevention of seepage water plastic course of convenient construction

Publications (1)

Publication Number Publication Date
CN215252104U true CN215252104U (en) 2021-12-21

Family

ID=79486925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121513938.5U Active CN215252104U (en) 2021-07-05 2021-07-05 Prevention of seepage water plastic course of convenient construction

Country Status (1)

Country Link
CN (1) CN215252104U (en)

Similar Documents

Publication Publication Date Title
CN209039905U (en) A kind of asphalt paving convenient for construction
CN113215905A (en) High-strength road structure
CN215252104U (en) Prevention of seepage water plastic course of convenient construction
CN206721602U (en) A kind of permeable road structure in environmentally friendly gardens
CN204456232U (en) The impermeable ground in a kind of power station
CN214245202U (en) Environment-friendly plastic course for sports
CN220643691U (en) Waterproof type plastic course
CN215668819U (en) Pervious concrete with buffering function
CN218711932U (en) Anti-seepage plastic track
CN211665464U (en) Novel environment-friendly runway surface layer with efficient mixing function
CN217556608U (en) Waterproof plastic course
CN214783058U (en) Environment-friendly polyurethane track
CN220301105U (en) Rubber runway capable of preventing cracking
CN211665476U (en) Water-based mixed type plastic track surface layer
CN213709035U (en) Prevent rubber runway that ponding discharged fast
CN201099814Y (en) High intensity road bed water-proof cloth
CN213233022U (en) Ventilative type plastic course with drainage function
CN111074725A (en) Composite plastic track and construction method thereof
CN215210290U (en) Concrete antidetonation is from waterproof construction
CN217026537U (en) Water absorption brick for urban road
CN218061215U (en) Anti-cracking wear-resistant terrace
CN215252098U (en) High elasticity is from tying line runway
CN219430432U (en) Porous breathable plastic track
CN215947773U (en) Road surface structure containing rubber asphalt stress absorbing layer
CN216551425U (en) Concrete road surface structure that permeates water of accelerating rainwater infiltration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant