CN215221553U - Auxiliary device is used in electric power engineering construction - Google Patents

Auxiliary device is used in electric power engineering construction Download PDF

Info

Publication number
CN215221553U
CN215221553U CN202121561087.1U CN202121561087U CN215221553U CN 215221553 U CN215221553 U CN 215221553U CN 202121561087 U CN202121561087 U CN 202121561087U CN 215221553 U CN215221553 U CN 215221553U
Authority
CN
China
Prior art keywords
sliding
power line
connecting rod
hinged
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121561087.1U
Other languages
Chinese (zh)
Inventor
林莲平
林铖
林铧
林舜添
张丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jurong Power Engineering Co ltd
Original Assignee
Fujian Jurong Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jurong Power Engineering Co ltd filed Critical Fujian Jurong Power Engineering Co ltd
Priority to CN202121561087.1U priority Critical patent/CN215221553U/en
Application granted granted Critical
Publication of CN215221553U publication Critical patent/CN215221553U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Transmission Devices (AREA)

Abstract

The utility model discloses an auxiliary device is used in electric power engineering construction relates to electric power engineering construction equipment technical field, the utility model overcomes when the operation of building, maintaining to the electric wire netting among the prior art, there is the more entanglement of power line together, is difficult to find the power line that is fit for the butt joint, when docking to the power line, needs to adjust its high position, installs comparatively inconvenient problem, now proposes following scheme: the motor comprises a base, wherein a first motor is installed at the right end of the top of the base, a power output end of the first motor is fixedly connected with a first screw, two first sliding blocks are in threaded connection with the outer side of the circumference of the first screw, one end of a first connecting rod is hinged to the first sliding blocks, the other end of the first connecting rod is hinged to a second sliding block, and the second sliding block is in sliding connection with a sliding rod. The utility model discloses a remove the power line to the position that is fit for the installation more, realized preventing that the power line from scattering everywhere simultaneously, shortened the degree of difficulty of looking for the power line, it is also more convenient when docking the power line.

Description

Auxiliary device is used in electric power engineering construction
Technical Field
The utility model relates to an electric power engineering construction equipment technical field especially relates to an auxiliary device is used in electric power engineering construction.
Background
The transmission of electric energy, transformation, distribution and utilization of electricity together form the whole function of the electric power system. By transmitting electricity, power plants and load centers which are far apart (up to thousands of kilometers) are connected, so that the development and utilization of electric energy exceed the regional limit. Compared with the transmission of other energy sources (such as coal transmission, oil transmission and the like), the transmission of electricity has the advantages of small loss, high benefit, flexibility, convenience, easy regulation and control and less environmental pollution; the power transmission can also connect power plants at different places to realize peak-valley regulation. Transmission is an important embodiment of the superiority of electric energy utilization, and is an important energy artery in modern society.
When the operation of construction, maintenance to the electric wire netting, there is the power line more to entangle together, is difficult to find the power line that is fit for the butt joint, when butt joint the power line, need adjust its high position, it is comparatively inconvenient to install.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that when the power grid is constructed and maintained, more power lines are entangled, the power lines suitable for butt joint are difficult to find, the height position of the power lines needs to be adjusted when the power lines are butted, and the installation is inconvenient;
a first motor is installed at the right end of the top of the base, a power output end of the first motor is fixedly connected with a first screw, two first sliding blocks are screwed on the outer side of the circumference of the first screw, one end of a first connecting rod is hinged to the first sliding blocks, the other end of the first connecting rod is hinged to a second sliding block, the second sliding blocks are connected to a sliding rod in a sliding mode, two ends of the sliding rod are fixedly connected to connecting plates, and the tops of the connecting plates are connected with a middle plate;
a second motor is arranged on the connecting plate on the right side, a power output end of the second motor is fixedly connected with a second screw, a third sliding block is screwed on the outer side of the circumference of the second screw, the top of the connecting plate is connected with the middle plate, and the top of the third sliding block is connected to the front wall of the middle plate in a sliding manner;
the two ends of the front wall of the middle plate are respectively hinged with one end of a third connecting rod, the other end of the third connecting rod is hinged with a top plate, the third sliding block is hinged with one end of a second connecting rod, the other end of the second connecting rod is hinged with a third connecting rod on the left side, and a fixing seat for fixing a cable is arranged on the top plate.
Preferably, the first screw is a double-thread screw with two threads in opposite directions, and the two first sliding blocks are respectively screwed on the threads on the two sides.
Preferably, the fixing base center is equipped with the trompil, be equipped with the inner circle ring on the wall of trompil department, the intra-annular bilateral symmetry of inner circle is equipped with fixed clamp splice, the pull rod is connected to fixed clamp splice outside end, the pull rod runs through and the sliding connection fixing base both sides wall, the one end of connecting spring is served to fixed clamp splice outside, the inner circle ring inner wall is connected to the other end of spring.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a remove the power line to the position that is fit for the installation more, realized preventing that the power line from scattering everywhere simultaneously, shortened the degree of difficulty of looking for the power line, it is also more convenient when docking the power line.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the structure of the middle fixing base of the present invention.
Reference numbers in the figures: 1. a base; 2. a first motor; 3. a first screw; 31. a first slider; 4. a first link; 5. a slide bar; 51. a second slider; 6. a connector tile; 7. a middle plate; 8. a second motor; 9. a second screw; 91. a third slider; 10. a second link; 11. a third link; 12. a top plate; 13. a fixed seat; 131. opening a hole; 14. an inner ring; 141. fixing the clamping block; 142. a pull rod; 143. a spring.
Detailed Description
The invention is further described with reference to the accompanying drawings and examples.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "vertical", "horizontal", "up", "down", "front", "back", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description of the present invention, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, an auxiliary device for electric power engineering construction includes a base 1;
a first motor 2 is installed at the right end of the top of the base 1, a power output end of the first motor 2 is fixedly connected with a first screw rod 3, two first sliding blocks 31 are screwed on the outer side of the circumference of the first screw rod 3, one end of a first connecting rod 4 is hinged on the first sliding block 31, the other end of the first connecting rod 4 is hinged with a second sliding block 51, the second sliding block 51 is connected onto a sliding rod 5 in a sliding mode, two ends of the sliding rod 5 are fixedly connected onto a connecting plate 6, and the top of the connecting plate 6 is connected with a middle plate 7;
a second motor 8 is arranged on the connecting plate 6 on the right side, a power output end of the second motor 8 is fixedly connected with a second screw 9, the outer side of the circumference of the second screw 9 is in threaded connection with a third sliding block 91, the top of the connecting plate 6 is connected with the middle plate 7, and the top of the third sliding block 91 is in sliding connection with the front wall of the middle plate 7;
two ends of the front wall of the middle plate 7 are respectively hinged to one end of a third connecting rod 11, the other end of the third connecting rod 11 is hinged to a top plate 12, one end of a second connecting rod 10 is hinged to a third sliding block 91, the other end of the second connecting rod 10 is hinged to the third connecting rod 11 located on the left side, and a fixing seat 13 for fixing a cable is arranged on the top plate 12.
For the construction of better supplementary electric power engineering, the utility model discloses still include first screw rod 3 is two screw threads and revolves to opposite double-end screw, two first slider 31 spiro union in both sides respectively on the screw thread. The center of the fixed seat 13 is provided with an opening 131, the wall of the opening 131 is provided with an inner ring 14, the inner ring 14 is provided with fixed clamping blocks 141 in bilateral symmetry, the outer side end of each fixed clamping block 141 is connected with a pull rod 142, the pull rods 142 penetrate through and are in sliding connection with the two side walls of the fixed seat 13, the outer side end of each fixed clamping block 141 is connected with one end of a spring 143, and the other end of each spring 143 is connected with the inner wall of the inner ring 14.
The working principle is as follows: the utility model discloses a place the power line in fixing base 13 on roof 12, through pulling open pull rod 142 to both sides, drive fixed clamp splice 141 to the both sides motion, compression spring 143 stretches into the power line in trompil 131, opens pull rod 142, and spring 143 contracts, and fixed clamp splice 141 fixes the power line. When two strands of power lines are butted, the first motor 2 can be started according to the actual situation of field installation, the first screw rod 3 is driven to rotate, the two first sliding blocks 31 are driven to move oppositely, the middle plate 7 is driven to move upwards through the first connecting rod 4, and the fixing seat 13 is driven to ascend to the position close to the proper installation and construction position. When needs finely tune the fixing base 13 position, start second motor 8, drive second screw rod 9 and rotate, drive third slider 91 and remove about, through second connecting rod 10 cooperation third connecting rod 11, drive roof 12 and rise slightly or descend and can carry out fine setting left or right, make fixing base 13 drive the power line and reach suitable installation and construction position, the operation of the construction worker of being convenient for. The power line can be prevented from scattering everywhere, the difficulty in finding the power line is reduced, and the butt joint of the power line is more convenient.
The above-mentioned embodiments only express the preferred embodiments of the present invention, and the description thereof is more specific and detailed, but the present invention is not limited to these embodiments, and it should be noted that it is obvious to those skilled in the art. Without departing from the spirit of the present invention, any improvement is within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (3)

1. The utility model provides an auxiliary device is used in electric power engineering construction which characterized in that: comprises a base (1);
a first motor (2) is installed at the right end of the top of the base (1), a power output end of the first motor (2) is fixedly connected with a first screw (3), two first sliding blocks (31) are in threaded connection with the outer side of the circumference of the first screw (3), one end of a first connecting rod (4) is hinged to the first sliding block (31), the other end of the first connecting rod (4) is hinged to a second sliding block (51), the second sliding block (51) is in sliding connection with a sliding rod (5), two ends of the sliding rod (5) are fixedly connected to a connecting plate (6), and the top of the connecting plate (6) is connected with a middle plate (7);
a second motor (8) is mounted on the connecting plate (6) on the right side, a power output end of the second motor (8) is fixedly connected with a second screw rod (9), a third sliding block (91) is screwed on the outer side of the circumference of the second screw rod (9), the top of the connecting plate (6) is connected with the middle plate (7), and the top of the third sliding block (91) is in sliding connection with the front wall of the middle plate (7);
the two ends of the front wall of the middle plate (7) are respectively hinged with one end of a third connecting rod (11), the other end of the third connecting rod (11) is hinged with a top plate (12), the third sliding block (91) is hinged with one end of a second connecting rod (10), the other end of the second connecting rod (10) is hinged with the third connecting rod (11) located on the left side, and a fixing seat (13) for fixing a cable is arranged on the top plate (12).
2. The auxiliary device for electric power engineering construction as claimed in claim 1, wherein: the first screw (3) is a double-thread screw with two threads in opposite directions, and the two first sliding blocks (31) are respectively screwed on the threads on the two sides.
3. The auxiliary device for electric power engineering construction as claimed in claim 1, wherein: the utility model discloses a fixing base, including fixing base (13), fixing base (13) center is equipped with trompil (131), be equipped with inner circle ring (14) on trompil (131) department wall, bilateral symmetry is equipped with fixed clamp splice (141) in inner circle ring (14), pull rod (142) are connected to fixed clamp splice (141) outside end, pull rod (142) run through and sliding connection fixing base (13) both sides wall, the one end of connecting spring (143) is served in fixed clamp splice (141) outside, inner circle ring (14) inner wall is connected to the other end of spring (143).
CN202121561087.1U 2021-07-09 2021-07-09 Auxiliary device is used in electric power engineering construction Active CN215221553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121561087.1U CN215221553U (en) 2021-07-09 2021-07-09 Auxiliary device is used in electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121561087.1U CN215221553U (en) 2021-07-09 2021-07-09 Auxiliary device is used in electric power engineering construction

Publications (1)

Publication Number Publication Date
CN215221553U true CN215221553U (en) 2021-12-17

Family

ID=79430642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121561087.1U Active CN215221553U (en) 2021-07-09 2021-07-09 Auxiliary device is used in electric power engineering construction

Country Status (1)

Country Link
CN (1) CN215221553U (en)

Similar Documents

Publication Publication Date Title
CN108682934A (en) A kind of communication steel tower with antenna terminal safeguard function
CN215221553U (en) Auxiliary device is used in electric power engineering construction
CN113513114B (en) Environment-friendly building curtain top
CN211670555U (en) Electric power engineering cable connects and joins in marriage device
CN113241662A (en) Automatic overhead device for cable
CN210109293U (en) Inside bad point detection device of cable
CN101626150A (en) Grounding wire clamp apparatus crossover tool
CN216391759U (en) Electric power network information real-time monitoring system
CN115621971A (en) Power cable connecting device and using method thereof
CN211574747U (en) Movable safety grating
CN201440574U (en) Grounding line clamp conversion device
CN109650257B (en) Crane manual operator traction device
CN113346406A (en) High-altitude wiring device for power detection
CN215520303U (en) Fence support for electrical equipment
CN214789303U (en) Valve actuator powered by photovoltaic power
CN111162389A (en) Special earth connection of transformer substation's generating line bridge
CN219203849U (en) Wall-mounted distribution box installation connection structure
CN215897214U (en) Wiring arrangement that building intelligent engineering used
CN216215759U (en) High-efficient strenghthened type insulation strain clamp
CN213818537U (en) Power supply shell with wire bunching function
CN214652971U (en) Compensating beam device with automatic unhook mechanism
CN221277436U (en) Protective net provided with photovoltaic panel
CN210490258U (en) Cable erecting device for building electromechanical installation
CN217115456U (en) Cable installation fixing device for electrical engineering
CN220754273U (en) Temporary supporting device for building flat cable