CN215215627U CN202120042648.0U CN202120042648U CN215215627U CN 215215627 U CN215215627 U CN 215215627U CN 202120042648 U CN202120042648 U CN 202120042648U CN 215215627 U CN215215627 U CN 215215627U
Authority
CN
China
Prior art keywords
steel wire
wire rope
equipment
connecting plates
adjusting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120042648.0U
Other languages
Chinese (zh)
Inventor
陈曦
李海阳
刘明岳
周德志
刘然
陈友慧
贾及汉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE
Shenyang Electric Power Survey & Design Institute Co ltd
State Grid Corp of China SGCC
Original Assignee
STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE
Shenyang Electric Power Survey & Design Institute Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE, Shenyang Electric Power Survey & Design Institute Co ltd, State Grid Corp of China SGCC filed Critical STATE GRID LIAONING ECONOMIC TECHNIQUE INSTITUTE
Priority to CN202120042648.0U priority Critical patent/CN215215627U/en
Application granted granted Critical
Publication of CN215215627U publication Critical patent/CN215215627U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention belongs to the technical field of electric power tower matching equipment, and particularly relates to a 5G equipment pole mounting bracket which comprises a group of connecting plates, a fixing plate, a steel wire rope and an adjusting structure, wherein the connecting plates and the fixing plate are respectively provided with a group of protruding through holes; the connecting plates are respectively and oppositely arranged at the head end and the tail end of the steel wire rope; the adjusting structure is used for connecting a group of connecting plates. The steel wire rope connecting piece has the advantages that the steel wire rope is adopted as the connecting piece, flexibility is tight, and contact is good. Adopt vertical link plate, can perfect connection member of connecting 5G equipment, the wholeness is good. And a self-fastening mode is adopted to strengthen the connection tightness. The adaptability is strong, can install on the pole of various diameters.

Description

5G equipment pole installing support
Technical Field
The invention belongs to the technical field of electric power tower complete equipment, and particularly relates to an electric pole mounting bracket for 5G equipment.
Background
With the popularization and development of new 5G technologies, a large number of 5G devices need to be arranged in an urban area due to the characteristics of the 5G devices themselves. If the 5G equipment is arranged on an iron tower and a steel pipe pole of a power line in an urban area, the existing resources are fully utilized, the repeated construction of a tower frame is avoided, the construction period can be shortened, the infrastructure process of the 5G equipment is accelerated, and the popularization of a 5G network is promoted better. Has good development prospect and great economic and social benefits. The key point of the work is how to better connect the 5G equipment with the existing power tower, adjust the proper angle and height on the premise of not influencing the normal operation, maintenance and repair of the power line, and exert the performance of sharing the 5G equipment to the greatest extent. The shaft tower that current power line used divide into steel-pipe pole and iron tower, does not consider current 5G equipment to install additional when considering electric power tower design installation, consequently need develop the installing support of a 5G pole equipment, possesses engineering such as adjustment device mounting height and installation angle, furthest performance 5G equipment.
SUMMERY OF THE UTILITY MODEL
In view of the above problems, the utility model provides a 5G equipment pole mounting bracket, which comprises a set of connecting plate, a fixed plate, a steel wire rope and an adjusting structure, wherein the connecting plate and the fixed plate are respectively provided with a set of protruding through holes, and the steel wire rope forms an annular structure by penetrating the upper through holes of the connecting plate and the fixed plate and is fixed around the periphery of the pole; the connecting plates are respectively and oppositely arranged at the head end and the tail end of the steel wire rope; the adjusting structure is used for connecting a group of connecting plates, and is used for adjusting and fixing the distance between the connecting plates.
Furthermore, the head end and the tail end of the steel wire rope are respectively provided with a limiting part for blocking the head-tail through holes.
Furthermore, the adjusting structure is a movable bolt, a fastening nut is arranged on the movable bolt, one end of the bolt is rotatably fixed in a connecting plate body, a threaded hole is correspondingly formed in the other connecting plate body, and the other end of the bolt is screwed into the connecting plate body through the rotating nut to realize fixation.
Furthermore, an adjusting structure is respectively arranged at the upper part and the lower part of the group of connecting plates.
Furthermore, the fixed plate evenly be provided with a plurality ofly, be equipped with the installation component on the fixed plate, this installation component includes a set of connecting rod that sets up relatively, is equipped with a set of mounting hole on this connecting rod for install 5G equipment.
The steel wire rope connecting piece has the advantages that the steel wire rope is adopted as the connecting piece, flexibility is tight, and contact is good. Adopt vertical link plate, can perfect connection member of connecting 5G equipment, the wholeness is good. And a self-fastening mode is adopted to strengthen the connection tightness. The mounting bracket is high in adaptability, can be mounted on electric poles with various diameters, and is particularly suitable for mounting multi-edge and round steel pipe pole electric poles.
Drawings
Fig. 1 is a schematic structural view of the utility model;
FIG. 2 is a schematic view of the mounting assembly of FIG. 1;
fig. 3 is a schematic view of the mounting structure of the utility model and the electric pole;
FIG. 4 is a top view of the upper rod of the mounting bracket;
wherein, the connecting plate-1 and the fixing plate-2; a fastening nut-3; a movable bolt-4; a limiting piece-5; perforation-6; a steel wire rope-7; mounting the component-8; an electric pole-9.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-3, the utility model provides a 5G equipment pole 9 mounting bracket, which comprises a set of connecting plate 1, a fixing plate 2, a steel wire rope 7 and an adjusting structure, wherein a set of protruding through holes 6 are respectively arranged on the connecting plate 1 and the fixing plate 2, and the steel wire rope 7 forms an annular structure by penetrating the upper through holes 6 of the connecting plate 1 and the fixing plate 2 and is fixed around the periphery of the pole 9; the connecting plates 1 are respectively and oppositely arranged at the head end and the tail end of the steel wire rope 7; the adjusting structure is used for connecting a group of connecting plates 1, and is used for adjusting and fixing the distance between the connecting plates 1.
As an improvement of the scheme, the head end and the tail end of the steel wire rope 7 are respectively provided with a limiting piece 5 for clamping the head-tail through holes 6.
As the improvement of the scheme, the adjusting structure is a movable bolt 4, a fastening nut 3 is arranged on the movable bolt 4, one end of the bolt is rotatably fixed in a connecting plate 1 body, a threaded hole is correspondingly formed in the other connecting plate 1 body, and the other end of the bolt is screwed into the connecting plate 1 body through rotating the fastening nut 3 to realize fixation.
As the improvement of the scheme, an adjusting structure is respectively arranged at the upper part and the lower part of a group of connecting plates 1.
Referring to fig. 2, as a modification of the scheme, a plurality of fixing plates 2 are uniformly arranged, a mounting assembly 8 is arranged on the fixing plate 2, the mounting assembly 8 comprises a set of oppositely arranged connecting rods, and a set of mounting holes are arranged on the connecting rods and used for mounting 5G equipment. The mounting assembly 8 can adjust the mounting distance between the two as required.
The mounting support connecting plate and the mounting direct fixing plate are connected through the steel wire rope and then fixed on the rod body of the power line tower, after the end socket of the end part of the steel wire rope is fixed, the support is fastened on the rod body of the tower through adjusting the fastening support nut, and the effect of tightly fitting the rod body is achieved. Then the 5G equipment is fixed on the rod body through the 5G equipment fixing piece. When 5G equipment is required to be installed on an electric power tower, firstly, according to the requirement, an installing support connecting plate 1 and an installing support fixing plate 2 are arranged at the proper height and direction of a rod body 9 of the electric power tower, a steel wire rope 7 is used for penetrating through a steel wire rope of the connecting plate to be preliminarily fastened after perforation, the end position of the steel wire rope is processed, a steel wire rope fixing end limiting part is additionally installed, then a fastening nut is adjusted, and the purpose of firmly fixing the whole flexible electric pole installing support of the 5G equipment on the rod body 9 of the electric power tower is achieved by rotating a movable bolt 4. And finally, fixing the 5G equipment in the figure 1 on the 5G equipment fixing and mounting assembly to finish mounting.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (5)

1. The utility model provides a 5G equipment pole installing support which characterized in that: the steel wire rope is formed into an annular structure by oppositely penetrating the connecting plate and the upper through holes of the fixed plate and is fixed around the periphery of the electric pole; the connecting plates are respectively and oppositely arranged at the head end and the tail end of the steel wire rope; the adjusting structure is used for connecting a group of connecting plates.
2. A 5G equipment pole mounting bracket as recited in claim 1, wherein: the head end and the tail end of the steel wire rope are respectively provided with a limiting piece.
3. A 5G equipment pole mounting bracket as recited in claim 1, wherein: the adjusting structure is a movable bolt, a fastening nut is arranged on the movable bolt, one end of the bolt is rotatably fixed in a connecting plate body, a threaded hole is correspondingly formed in the other connecting plate body, and the other end of the bolt is screwed into the connecting plate body through the rotating nut.
4. A 5G equipment pole mounting bracket as recited in claim 1, wherein: the upper part and the lower part of the group of connecting plates are respectively provided with an adjusting structure.
5. A 5G equipment pole mounting bracket as recited in claim 1, wherein: the fixed plate evenly be provided with a plurality ofly, be equipped with the installation component on the fixed plate, this installation component includes a set of connecting rod that sets up relatively, is equipped with a set of mounting hole on this connecting rod.
CN202120042648.0U 2021-01-08 2021-01-08 5G equipment pole installing support Active CN215215627U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120042648.0U CN215215627U (en) 2021-01-08 2021-01-08 5G equipment pole installing support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120042648.0U CN215215627U (en) 2021-01-08 2021-01-08 5G equipment pole installing support

Publications (1)

Publication Number Publication Date
CN215215627U true CN215215627U (en) 2021-12-17

Family

ID=79437077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120042648.0U Active CN215215627U (en) 2021-01-08 2021-01-08 5G equipment pole installing support

Country Status (1)

Country Link
CN (1) CN215215627U (en)

Similar Documents

Publication Publication Date Title
CN215215627U (en) 5G equipment pole installing support
CN201774188U (en) Water-cooled cable mounting clamp
CN210156891U (en) Lightning arrester support
CN214013157U (en) 5G equipment mounting support suitable for iron tower
CN2914433Y (en) Duplex hanging string of extra high voltage transmission line
CN201963015U (en) High-voltage terminal steel pipe rod with platform
CN213753785U (en) Clamping and locking combined ladder for overhead transmission line maintenance
CN214091259U (en) Steel pipe power transmission tower capable of preventing lightning stroke
CN211579537U (en) Windproof reinforcing device for overhead power line
CN104343276A (en) Adjustable cross arm electric power steel pipe rod
CN211950745U (en) Bridge deck suspension type wind power generation device
CN209815490U (en) Hoisting device for rotor magnetic pole in hydraulic generator pit
CN204143774U (en) Electric power steel pipe tower signboard fixing device
CN203374042U (en) Adjustable cross arm type electric power steel pipe pole
CN215601001U (en) Transmission line terminal tower cable fixing device
CN218124622U (en) Angle-adjustable solar panel mounting bracket of line arrester monitoring device
CN219711733U (en) Wind power generation tower barrel internal cable installation device
CN219576603U (en) Novel annular link plate of variable angle of overhead ground wire
CN216110003U (en) Shared iron tower type base station antenna platform based on steel pipe tower
CN218788741U (en) Transmission line prevents outer broken device of dangerous vehicle
CN213243494U (en) Arc split type cable support
CN219980408U (en) Lightning protection device for overhead line
CN216751152U (en) Extra-high voltage arrester mounting structure
CN215364378U (en) Lifting equipment direction wire rope is with taking self-locking fixed guider
CN215369009U (en) Electric power tower of mountable 5G basic station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant