CN215212761U - Construction area building management is fallen and is fallen to make an uproar and prevent grey median - Google Patents
Construction area building management is fallen and is fallen to make an uproar and prevent grey median Download PDFInfo
- Publication number
- CN215212761U CN215212761U CN202121563854.2U CN202121563854U CN215212761U CN 215212761 U CN215212761 U CN 215212761U CN 202121563854 U CN202121563854 U CN 202121563854U CN 215212761 U CN215212761 U CN 215212761U
- Authority
- CN
- China
- Prior art keywords
- noise reduction
- plate
- buckling frame
- noise
- building management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 40
- 230000009467 reduction Effects 0.000 claims abstract description 57
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 14
- 238000003466 welding Methods 0.000 claims abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 25
- 238000002955 isolation Methods 0.000 claims description 13
- 239000007921 spray Substances 0.000 claims description 6
- 239000000428 dust Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 5
- 230000002265 prevention Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 14
- 238000005406 washing Methods 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000005457 optimization Methods 0.000 description 8
- 238000009826 distribution Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000007599 discharging Methods 0.000 description 3
- 238000005728 strengthening Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model provides a construction area building management falls makes an uproar and prevents grey median, include: the noise reduction plate, the noise reduction hole and the drain hole; the noise reduction plate is of a rectangular plate-shaped structure, and noise reduction holes are formed in the noise reduction plate; the drain hole is formed in the bottom of the noise reduction plate; the bracket is inserted and installed at the top end of the noise reduction plate through the buckling frame and is positioned at the end part of the buckling frame, and the bracket and the buckling frame are of an integrated structure; the reinforcing rib is positioned between the buckling frame and the bracket and is connected with the buckling frame and the bracket in a welding mode; the limiting column is arranged at the top end of the buckling frame and is connected with the buckling frame in a welding mode; the utility model discloses an improve of falling the noise and preventing grey median to construction area building management, it is reasonable to have a structural design, and noise reduction effect is good, washing effect is good, is convenient for clear up, clean, easy to assemble and dismantlement, advantage that the practicality is strong to effectual problem and the not enough that appear in having solved current device.
Description
Technical Field
The utility model relates to a construction technical field, more specifically the theory that says so especially relates to a construction region building management is fallen and is fallen to make an uproar and prevent grey median.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
The median can be erect usually in the edge of job site, plays to fall and makes an uproar, the purpose of protection, but the effect of the median of nevertheless falling the noise is comparatively single, and the job site dust is great, falls the surface of median of making an uproar and is covered by the dust very easily, and the clearance of not being convenient for, cleanness influence normal use.
In view of the above, the present invention provides a noise-reducing and dust-preventing isolation strip for building management in a construction area, which aims to solve the problems and improve the practical value by using the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction area building management is fallen and is fallen grey median is prevented to solve the problem and not enough that provide in the above-mentioned background art.
In order to achieve the above object, the utility model provides a construction area building management falls to make an uproar and prevents grey median is reached by following specific technological means:
a construction area building management noise reduction and dust prevention isolation belt comprises: the device comprises a noise reduction plate, noise reduction holes, water drainage holes, buckling frames, a support, reinforcing ribs, limiting columns, limiting plates, a tee joint, a water supply pipe, a joint, a bent pipe, a spray head, a connecting pipe and a hanging frame; the noise reduction plate is of a rectangular plate-shaped structure, and noise reduction holes are formed in the noise reduction plate; the drain hole is formed in the bottom of the noise reduction plate; the bracket is inserted and installed at the top end of the noise reduction plate through the buckling frame and is positioned at the end part of the buckling frame, and the bracket and the buckling frame are of an integrated structure; the reinforcing rib is positioned between the buckling frame and the bracket and is connected with the buckling frame and the bracket in a welding mode; the limiting column is arranged at the top end of the buckling frame and is connected with the buckling frame in a welding mode; the limiting plate is arranged at the top end of the bracket and is connected with the bracket in a welding mode; the tee joint is screwed and installed at two ends of the connecting pipe, is placed above the buckling frame and is embedded and installed on the inner side of the limiting column; the bent pipe is placed above the bracket and embedded and installed on the inner side of the limiting plate; the water supply pipe is arranged above the bracket and is connected with the tee joint in a screwing mode; the water supply pipe is connected with the elbow pipe through a joint; the spray head is screwed and installed at the end part of the bent pipe; the hanging rack is installed on two sides of the noise reduction plate in a welding mode.
As this technical scheme's further optimization, the utility model relates to a construction area building management is fallen and make an uproar and prevent grey median fall the board of making an uproar and be rectangle cavity platelike, and fall the hole of making an uproar and run through and set up in the both sides of falling the board of making an uproar.
As this technical scheme's further optimization, the utility model relates to a construction area building management is fallen and is fallen grey median is fallen the hole of making an uproar and be the long circular hole, and fall the crisscross distribution in both sides of falling the board of making an uproar in the hole of making an uproar.
As the further optimization of this technical scheme, the utility model relates to a construction area building management is fallen and is fallen grey median is prevented to make an uproar the wash port is the circular port, and the wash port is linear array form distribution and is provided with many places in the bottom of falling the board of making an uproar.
As this technical scheme's further optimization, the utility model relates to a construction area building management is fallen and is fallen dustproof median of making an uproar detains the frame and for the plate column structure of falling the U-shaped, and detains the frame and symmetrically install two departments on falling the board of making an uproar.
As this technical scheme's further optimization, the utility model relates to a construction area building management is fallen and is fallen grey median of making an uproar the support is rectangle platelike structure, and the support slope sets up at the front end of detaining the frame, and the inclination of support is 30 degrees.
As the further optimization of this technical scheme, the utility model relates to a construction area building management is fallen and is fallen grey median is prevented that makes an uproar the strengthening rib is triangle-shaped platelike structure.
As this technical scheme's further optimization, the utility model relates to a construction area building management is fallen and is fallen grey median is prevented to the whole outward appearance of spacing post is cylindricly, and just spacing post is the symmetry form distribution on the top of detaining the frame and installs everywhere.
As a further optimization of this technical scheme, the utility model relates to a construction area building management is fallen and is fallen ash-proof median of making an uproar the limiting plate is rectangle platelike structure, and two places are installed at the top symmetry of support to the limiting plate.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. the utility model discloses it is rectangular cavity platelike to fall the board of making an uproar, and fall the hole of making an uproar and run through and set up in the both sides of falling the board of making an uproar, it is the long circular hole to fall the hole of making an uproar, and fall the hole of making an uproar and be the crisscross distribution in the both sides of falling the board of making an uproar, the wash port is the circular port, and the wash port is the setting that linear array form distributes and is provided with the multiple department in the bottom of falling the board of making an uproar, sound can produce the loss when falling the board both sides of making an uproar and fall the hole of making an uproar, reach the purpose of making an uproar, and the wash port of falling the board bottom of making an uproar and offering conveniently will fall the inside log discharge of board of making an uproar, avoid falling the board inside ponding of making an uproar, prevent to rust.
2. The utility model discloses the support is rectangle platelike structure, and the support slope sets up at the front end of detaining the frame, and the inclination of support is 30 degrees, and the strengthening rib is triangle-shaped platelike structure's setting, and the support plays the supporting role to the shower nozzle, lifts the shower nozzle to the eminence, increases the coverage of shower nozzle, improves washing effect, is convenient for clear up, clean, and the strengthening rib plays the reinforcement effect to the support with detaining the frame, prevents that the support is crooked, warp.
3. The utility model discloses the whole outward appearance of spacing post is cylindricly, and spacing post is the symmetry form distribution on the top of detaining the frame and installs four places, and the limiting plate is rectangle platelike structure, and the setting of two places is installed to the limiting plate in the top symmetry of support, and spacing post plays the effect spacing, location to the tee bend, and the limiting plate plays spacing, the effect of location to the return bend, and easy to assemble and dismantlement improve installation fastness stability simultaneously.
4. The utility model discloses an improve of falling the noise and preventing grey median to construction area building management, it is reasonable to have a structural design, and noise reduction effect is good, washing effect is good, is convenient for clear up, clean, easy to assemble and dismantlement, advantage that the practicality is strong to effectual problem and the not enough that appear in having solved current device.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic bottom structure of the present invention;
fig. 3 is a schematic view of the structure of the present invention;
fig. 4 is a schematic side view of the present invention;
fig. 5 is a schematic view of the bracket structure of the present invention;
fig. 6 is a schematic diagram of the structure of the limit post of the present invention.
In the figure: the device comprises a noise reduction plate 1, a noise reduction hole 2, a water discharge hole 3, a buckling frame 4, a support 5, a reinforcing rib 6, a limiting column 7, a limiting plate 8, a tee joint 9, a water supply pipe 10, a joint 11, an elbow pipe 12, a spray head 13, a connecting pipe 14 and a hanging frame 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Please refer to fig. 1 to 3, the utility model provides a construction area building management falls makes an uproar and prevents grey median's concrete technical implementation scheme:
a construction area building management noise reduction and dust prevention isolation belt comprises: the device comprises a noise reduction plate 1, a noise reduction hole 2, a water discharge hole 3, a buckling frame 4, a support 5, a reinforcing rib 6, a limiting column 7, a limiting plate 8, a tee joint 9, a water supply pipe 10, a joint 11, an elbow pipe 12, a spray head 13, a connecting pipe 14 and a hanging frame 15; the noise reduction plate 1 is of a rectangular plate-shaped structure, and the noise reduction holes 2 are formed in the noise reduction plate 1; the drain hole 3 is arranged at the bottom of the noise reduction plate 1; the bracket 5 is inserted and installed at the top end of the noise reduction plate 1 through the buckling frame 4, the bracket 5 is positioned at the end part of the buckling frame 4, and the bracket 5 and the buckling frame 4 are of an integrated structure; the reinforcing rib 6 is positioned between the buckling frame 4 and the bracket 5, and the reinforcing rib 6 is connected with the buckling frame 4 and the bracket 5 in a welding mode; the limiting column 7 is arranged at the top end of the buckling frame 4, and the limiting column 7 is connected with the buckling frame 4 in a welding mode; the limiting plate 8 is arranged at the top end of the bracket 5, and the limiting plate 8 is connected with the bracket 5 in a welding mode; the tee joint 9 is screwed and installed at two ends of the connecting pipe 14, the tee joint 9 is placed above the buckling frame 4, and the tee joint 9 is embedded and installed on the inner side of the limiting column 7; the elbow 12 is placed above the bracket 5, and the elbow 12 is embedded and installed on the inner side of the limit plate 8; the water supply pipe 10 is arranged above the bracket 5, and the water supply pipe 10 is connected with the tee joint 9 in a screwing mode; the water supply pipe 10 is connected with the elbow pipe 12 through a joint 11; the nozzle 13 is screwed and installed at the end part of the elbow 12; the hanging rack 15 is installed on two sides of the noise reduction plate 1 in a welding mode.
Specifically, the noise reduction plate 1 is in a rectangular hollow plate shape, and the noise reduction holes 2 are formed through both sides of the noise reduction plate 1.
Specifically, the noise reduction holes 2 are oblong holes, and the noise reduction holes 2 are distributed on two sides of the noise reduction plate 1 in a staggered mode.
Specifically, the drain holes 3 are circular holes, and the drain holes 3 are distributed at a plurality of positions in a linear array at the bottom of the noise reduction plate 1.
Specifically, the buckling frame 4 is an inverted U-shaped plate structure, and two positions of the buckling frame 4 are symmetrically arranged on the noise reduction plate 1.
Specifically, the bracket 5 is a rectangular plate-shaped structure, the bracket 5 is obliquely arranged at the front end of the buckling frame 4, and the inclination angle of the bracket 5 is 30 degrees.
Specifically, the reinforcing ribs 6 are of a triangular plate-shaped structure.
Specifically, the overall appearance of the limiting column 7 is cylindrical, and the limiting column 7 is symmetrically arranged at four positions on the top end of the buckling frame 4.
Specifically, the limiting plate 8 is of a rectangular plate-shaped structure, and two positions of the limiting plate 8 are symmetrically arranged at the top end of the bracket 5.
The method comprises the following specific implementation steps:
will fall board 1 of making an uproar and pass through stores pylon 15 fixed mounting on stand (not involving in the picture), the hole 2 of making an uproar reaches the purpose of making an uproar of falling in the utilization on the board 1 of making an uproar of falling, then will detain 4 grafting installations and fall the top of board 1 of making an uproar, then the tee bend 9 that will assemble, water pipe 10, connect 11, return bend 12, shower nozzle 13 is installed on support 5, spacing post 7 plays limiting displacement to tee bend 9, limiting plate 8 plays limiting displacement to return bend 12, and couple together all tee bends 9 through water pipe 10, for shower nozzle 13 water supply, shower nozzle 13 spouts water, play the washing effect to board 1 of making an uproar of falling, be convenient for clear up, it is clean, the ash prevention has been realized.
In summary, the following steps: according to the noise-reducing and dust-preventing isolation belt for building management in the construction area, the noise-reducing plate is in a rectangular hollow plate shape, the noise-reducing holes penetrate through two sides of the noise-reducing plate, the noise-reducing holes are long circular holes and are distributed on two sides of the noise-reducing plate in a staggered mode, the water discharging holes are circular holes, the water discharging holes are distributed at multiple positions in a linear array mode at the bottom of the noise-reducing plate, sound can be lost when the noise-reducing holes are formed in two sides of the noise-reducing plate, the purpose of noise reduction is achieved, the water inside the noise-reducing plate can be conveniently discharged through the water discharging holes formed in the bottom of the noise-reducing plate, water accumulation inside the noise-reducing plate is avoided, and rusting is prevented; the support is of a rectangular plate-shaped structure, the support is obliquely arranged at the front end of the buckling frame, the inclination angle of the support is 30 degrees, the reinforcing ribs are arranged in a triangular plate-shaped structure, the support supports the sprayer, the sprayer is lifted to a high position, the coverage area of the sprayer is enlarged, the washing effect is improved, and the sprayer is convenient to clean and clean, and the reinforcing ribs reinforce the support and the buckling frame to prevent the support from being bent and deformed; the integral appearance of the limiting column is cylindrical, four positions of the limiting column are symmetrically distributed and installed at the top end of the buckling frame, the limiting plate is of a rectangular plate-shaped structure, two positions of the limiting plate are symmetrically installed at the top end of the support, the limiting column plays a limiting and positioning role on the tee joint, the limiting plate plays a limiting and positioning role on the bent pipe, the installation and the disassembly are convenient, and meanwhile, the installation firmness and the stability are improved; through the improvement to the construction area building management noise reduction dustproof median of making an uproar, it is reasonable to have a structural design, and noise reduction effect is good, washing effect is good, is convenient for clear up, clean, easy to assemble and dismantlement, advantage that the practicality is strong to effectual problem and the not enough that appear in having solved current device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (9)
1. A construction area building management noise reduction and dust prevention isolation belt comprises: the device comprises a noise reduction plate (1), noise reduction holes (2), a water discharge hole (3), a buckling frame (4), a bracket (5), a reinforcing rib (6), a limiting column (7), a limiting plate (8), a tee joint (9), a water supply pipe (10), a joint (11), a bent pipe (12), a spray head (13), a connecting pipe (14) and a hanging frame (15); the method is characterized in that: the noise reduction plate (1) is of a rectangular plate-shaped structure, and the noise reduction holes (2) are formed in the noise reduction plate (1); the drain hole (3) is formed in the bottom of the noise reduction plate (1); the support (5) is inserted and installed at the top end of the noise reduction plate (1) through the buckling frame (4), the support (5) is located at the end part of the buckling frame (4), and the support (5) and the buckling frame (4) are of an integrated structure; the reinforcing rib (6) is positioned between the buckling frame (4) and the support (5), and the reinforcing rib (6) is connected with the buckling frame (4) and the support (5) in a welding mode; the limiting column (7) is installed at the top end of the buckling frame (4), and the limiting column (7) is connected with the buckling frame (4) in a welding mode; the limiting plate (8) is arranged at the top end of the bracket (5), and the limiting plate (8) is connected with the bracket (5) in a welding mode; the tee joint (9) is screwed and installed at two ends of the connecting pipe (14), the tee joint (9) is placed above the buckling frame (4), and the tee joint (9) is embedded and installed on the inner side of the limiting column (7); the bent pipe (12) is placed above the bracket (5), and the bent pipe (12) is embedded and installed on the inner side of the limiting plate (8); the water supply pipe (10) is arranged above the bracket (5), and the water supply pipe (10) is connected with the tee joint (9) in a screwing mode; the water supply pipe (10) is connected with the elbow (12) through a joint (11); the spray head (13) is screwed and installed at the end part of the elbow pipe (12); the hanging rack (15) is installed on two sides of the noise reduction plate (1) in a welding mode.
2. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the noise reduction plate (1) is in a rectangular hollow plate shape, and noise reduction holes (2) penetrate through the two sides of the noise reduction plate (1).
3. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the noise reduction holes (2) are oblong holes, and the noise reduction holes (2) are distributed on two sides of the noise reduction plate (1) in a staggered mode.
4. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the drain holes (3) are circular holes, and the drain holes (3) are distributed at a plurality of positions in a linear array at the bottom of the noise reduction plate (1).
5. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the buckling frame (4) is of an inverted U-shaped plate structure, and the buckling frame (4) is symmetrically provided with two positions on the noise reduction plate (1).
6. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the support (5) is of a rectangular plate-shaped structure, the support (5) is obliquely arranged at the front end of the buckling frame (4), and the inclination angle of the support (5) is 30 degrees.
7. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the reinforcing ribs (6) are of triangular plate-shaped structures.
8. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the whole appearance of the limiting column (7) is cylindrical, and the limiting column (7) is symmetrically distributed and installed at four positions on the top end of the buckling frame (4).
9. The noise-reducing and dust-preventing isolation strip for construction area building management according to claim 1, wherein: the limiting plates (8) are of rectangular plate structures, and the two positions of the limiting plates (8) are symmetrically arranged at the top end of the support (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121563854.2U CN215212761U (en) | 2021-07-11 | 2021-07-11 | Construction area building management is fallen and is fallen to make an uproar and prevent grey median |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121563854.2U CN215212761U (en) | 2021-07-11 | 2021-07-11 | Construction area building management is fallen and is fallen to make an uproar and prevent grey median |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215212761U true CN215212761U (en) | 2021-12-17 |
Family
ID=79430122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121563854.2U Expired - Fee Related CN215212761U (en) | 2021-07-11 | 2021-07-11 | Construction area building management is fallen and is fallen to make an uproar and prevent grey median |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215212761U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324424A (en) * | 2022-09-09 | 2022-11-11 | 济南四建(集团)有限责任公司 | Civil engineering construction noise reduction and dust fall environmental protection system |
-
2021
- 2021-07-11 CN CN202121563854.2U patent/CN215212761U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324424A (en) * | 2022-09-09 | 2022-11-11 | 济南四建(集团)有限责任公司 | Civil engineering construction noise reduction and dust fall environmental protection system |
CN115324424B (en) * | 2022-09-09 | 2023-09-01 | 济南四建(集团)有限责任公司 | Noise-reducing dust-reducing environment-friendly system for civil construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215212761U (en) | Construction area building management is fallen and is fallen to make an uproar and prevent grey median | |
CN208981750U (en) | Expanded metal lath installs connection component | |
CN213329955U (en) | Flower basket diagonal rod type overhanging scaffold | |
JP2001115635A (en) | Floor of building | |
CN108396913B (en) | Rear-mounted GRC cornice structure and construction method thereof | |
CN217399823U (en) | Indoor appliance drainage connecting disc | |
CN201714005U (en) | Precast concrete stair | |
CN210917979U (en) | Combined box house top structure | |
KR200417292Y1 (en) | Horizontal rayer type roof drain system | |
CN210898358U (en) | Dustproof cable bridge device | |
CN210369232U (en) | Waterproof structure of toilet | |
CN210381997U (en) | Green wall structure | |
CN220058587U (en) | Brick-concrete building drainage system | |
CN114592591B (en) | Support-free prefabricated air conditioner bracket and construction method | |
CN217352849U (en) | Assembled concrete member and prefabricated building | |
CN215484309U (en) | Steel construction assembly structure of modularization stone material finish wall | |
CN216130632U (en) | Assembled bathroom | |
CN217079407U (en) | Archaize building roof mounting structure | |
CN214696434U (en) | Crossbeam with stealthy drainage function | |
KR102609267B1 (en) | A supporter for the rain gutter | |
CN211899286U (en) | Prestressed roof panel with drainage structure | |
CN218091534U (en) | Many specifications dysmorphism cross-section floor connection structure | |
CN215631284U (en) | Quick-assembly design wood-plastic composite floor | |
CN216239024U (en) | Wall connecting piece | |
CN212835811U (en) | Drainage waterproof construction and module case room in module case room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211217 |
|
CF01 | Termination of patent right due to non-payment of annual fee |