CN215212625U - Assembly type water pool post-tensioning annular prestress structure - Google Patents

Assembly type water pool post-tensioning annular prestress structure Download PDF

Info

Publication number
CN215212625U
CN215212625U CN202022940457.4U CN202022940457U CN215212625U CN 215212625 U CN215212625 U CN 215212625U CN 202022940457 U CN202022940457 U CN 202022940457U CN 215212625 U CN215212625 U CN 215212625U
Authority
CN
China
Prior art keywords
annular
tensioning
post
prestressed
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022940457.4U
Other languages
Chinese (zh)
Inventor
张后禅
林君
黄阳玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Research Concrete Building Science And Technology Group Co ltd
Original Assignee
Shanghai Electric Research Concrete Building Science And Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Research Concrete Building Science And Technology Group Co ltd filed Critical Shanghai Electric Research Concrete Building Science And Technology Group Co ltd
Priority to CN202022940457.4U priority Critical patent/CN215212625U/en
Application granted granted Critical
Publication of CN215212625U publication Critical patent/CN215212625U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a pond technical field, concretely relates to assembled pond post-tensioning annular prestressed structure, including wall body prefabricated component and with the post-tensioning annular prestressed structure of wall body prefabricated component collocation, wall body prefabricated component is equipped with the prestressing force pore way, set up the unbonded steel strand wires in the prestressing force pore way, the unbonded steel strand wires pass annular ground tackle of prestressing force. The utility model discloses strengthened pond overall structure's fastness, practiced thrift prestressing force the ground tackle material, reduced the site operation, saved engineering cost.

Description

Assembly type water pool post-tensioning annular prestress structure
Technical Field
The utility model relates to a pond technical field, concretely relates to assembled pond post-tensioning method annular prestressed structure.
Background
Domestic concrete ponds are mostly cast in situ, and the prestress technology effectively controls cracks of concrete generated due to the comprehensive effect of temperature and humidity difference and passes practical tests in the cast-in-situ ponds. The prefabricated components of the assembled circular water pool are spliced together, and the stability of the structure is enhanced by adopting a prestress wire winding method outside the wall body, so that the anti-seepage requirement is met; the prefabricated parts of the assembly type rectangular pool are connected in a wet mode through a post-pouring belt method, and the firmness of the whole structure is guaranteed.
Post-tensioning, with adhesive pre-stressing. The concrete is poured firstly, and the steel bar (reinforcing bar bundle) is stretched after the concrete reaches over 75 percent of the designed strength. The main tensioning procedure is embedding pipe and making hole → pouring concrete → pumping pipe → maintaining and stretching through reinforcing bar → anchoring → grouting (preventing reinforcing bar from rusting). The force transmission path is that the anchorage device is used for preventing the elastic rebound of the steel bar, so that the section concrete obtains the pre-compression stress; post-tensioning, no pre-stressing of the bond. The main tensioning procedure is that prestressed reinforcement is coated with lubricating and anticorrosive materials such as asphalt along the whole length of the outer surface → plastic paper or a sleeve is coated (the prestressed reinforcement and concrete do not build adhesive force) → concrete pouring maintenance → tensioned reinforcement → anchoring.
The prestress of the assembled rectangular water pool is mainly straight stretching, the times are more, time and labor are wasted, materials are wasted, and the construction cost is not saved.
SUMMERY OF THE UTILITY MODEL
The utility model provides an annular prestressed structure of assembled pond post-tensioning method has the ground tackle material that has strengthened the holistic fastness of wall body, has practiced thrift the prestressing force, has reduced the site operation, has saved engineering cost's characteristics.
The utility model provides a technical scheme that its technical problem adopted is:
the utility model provides an assembled pond post-tensioning method annular prestressed structure, includes wall body prefabricated component and the post-tensioning method annular prestressed structure who matches with wall body prefabricated component.
The wall prefabricated component comprises a prefabricated T-shaped component with a notch, a standard section component and an arc-shaped component which are assembled with each other, and a prestressed tendon pore passage is reserved in the prefabricated T-shaped component, the standard section component and the arc-shaped component.
Preferably, a tensioning operation space is reserved in the prefabricated T-shaped component with the notch.
Preferably, the prefabricated T-shaped component with the notch is arranged on two sides of the pool.
Preferably, the arc-shaped component is arranged at a corner of the water pool, and a prestressed steering gear is pre-embedded in the prestressed tendon pore channel.
Preferably, plastic corrugated pipes are arranged at two ends of the prestressed steering gear.
The post-tensioning annular prestress comprises unbonded steel strands and a prestressed annular anchorage, the wall prefabricated part is provided with a prestressed pore channel, and the unbonded steel strands penetrate through the prestressed annular anchorage.
Preferably, the unbonded steel strands are arranged in a balanced manner from bottom to top.
Preferably, the variable-angle tensioning device is arranged in the tensioning operation space and comprises a tool anchor plate, a special annular anchor jack, an extension cylinder, a transition plate, an integral angle transformer, a limiting plate and a prestress annular anchor which are sequentially sleeved on the unbonded steel strand.
The above technical scheme of the utility model has following profitable technological effect:
the utility model discloses strengthen the holistic fastness of outer wall, practiced thrift prestressing force the ground tackle material, reduced the site operation, saved engineering cost.
Drawings
Fig. 1 is a schematic view of the installation of the variable angle stretch-draw equipment of the present invention;
FIG. 2 is a schematic view of the installation of the steering gear of the present invention;
FIG. 3 is a schematic structural view of a middle arc-shaped member of the present invention;
FIG. 4 is a schematic structural view of a middle standard segment component of the present invention;
FIG. 5 is a schematic structural view of a prefabricated T-shaped member with a notch according to the present invention;
fig. 6 is the overall structure diagram of the middle water pool of the present invention.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
The utility model provides a scheme of assembled pond post-tensioning method annular prestressed structure as follows:
reference is made to fig. 1-6.
The assembled type pool post-tensioning annular prestressed structure comprises a wall prefabricated part and a prestressed annular anchorage device 8 matched with the wall prefabricated part for use, wherein the wall prefabricated part is provided with a prestressed pore channel, an unbonded steel strand 1 is arranged in the prestressed pore channel, and the unbonded steel strand 1 penetrates through the prestressed annular anchorage device 8.
In a specific embodiment, the prefabricated wall units include prefabricated T-shaped units (shown in fig. 5), standard section units (shown in fig. 4), arc units (shown in fig. 3), etc. which are assembled with each other and provided at the four corners of the rectangular pool. A tensioning operation space 10 is reserved in the prefabricated T-shaped component with the notch. The arc-shaped component is internally embedded with a prestressed steering gear 11. The two ends of the prestressed steering gear 11 are provided with plastic corrugated pipes 12. The tensioning device is characterized in that variable-angle tensioning equipment is arranged in the tensioning operation space 10 and consists of a tool anchor plate 2, a special annular anchor jack 3, an extension cylinder 4, a transition plate 5, an integral angle changer 6, a limiting plate 7 and a prestress annular anchorage device 8 which are sequentially sleeved on the unbonded steel strand 1. Preferably, the unbonded steel strand 1 is arranged in a balanced manner from bottom to top. The prefabricated T-shaped component with the notch is arranged on the left side and the right side of the water pool.
For a better understanding of the present application, the post-tensioning annular prestressing of the present application is given below, including unbonded steel strands, annular anchors. A plurality of prestress is arranged on the wall body of the water pool from bottom to top, HMZ15-6 annular anchorage devices are adopted, the length of a reserved inner notch of a T-shaped prefabricated part is more than or equal to 1.3m, the center depth is 0.05 m-0.2 m, such as 0.07m, 0.10m and 0.12m, the width is 0.08 m-0.50 m, such as 0.10m, 0.20m and 0.30 m.
The stress mode is as follows: the right angle shape at the corner of the rectangular water tank is changed into an arc shape, the radius of the arc is controlled to be 1.5-2 m through structural stress calculation, and the annular prestress tension of the prefabricated part of the outer wall of the water tank is realized.
The principle of the utility model is as follows: the outer wall of the pool is distributed with a plurality of prestressed tendons, the prestressed tendons transversely penetrate through all prefabricated components (a prefabricated T-shaped component with a notch, a standard section component and an arc-shaped component) of the outer wall, the notches are reserved on the components at the end parts of the anchors (the prefabricated T-shaped component with the notches), and the arc-shaped components are arranged at the corners so as to facilitate annular prestress tensioning.
The whole rectangular water pool is divided into a left part and a right part, and annular prestress tensioning is respectively implemented.
The prestressed unbonded steel strands in all directions of the water pool are mutually staggered, the annular prestress of the outer wall is tensioned, the prestress tensioning is implemented step by step, the tensioning is carried out from the middle to two sides, the tensioning force is expanded in three stages and is respectively 30%, 30% and 40% of control force, and the prestressed notch sealing and anchoring protection is carried out after the tensioning is finished.
As shown in figure 1, after the pre-stressed tensioning of the prefabricated T-shaped component with the notch is finished, concrete is poured into the notch to seal the anchor, and a complete concrete component 9 is formed.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides an assembled pond post-tensioning annular prestressed structure, its characterized in that, includes wall body prefabricated component and the post-tensioning annular prestressed structure who matches with wall body prefabricated component, wall body prefabricated component includes prefabricated T type component, standard section component, the arc component of the area notch of assembling each other, and prestressing tendons pore is reserved to inside.
2. The fabricated pool post-tensioning annular prestressed structure according to claim 1, characterized in that the prefabricated T-shaped members with the notches are reserved with tensioning operation spaces (10).
3. The fabricated pool post-tensioning annular prestressed structure of claim 2, wherein said notched prefabricated T-shaped members are provided at both sides of the pool.
4. The fabricated pool post-tensioned annular prestressed structure according to claim 1, wherein said arc-shaped members are disposed at the corners of the pool, and prestressed deflectors (11) are pre-embedded in the prestressed tendon channels.
5. The fabricated pool post-tensioned annular prestressed structure according to claim 4, wherein both ends of said prestressed deflector (11) are provided with plastic bellows (12).
6. The fabricated pool post-tensioned annular pre-stressed structure according to claim 2, wherein the post-tensioned annular pre-stressed structure comprises unbonded steel strands (1) and a pre-stressed annular anchorage (8), and the unbonded steel strands (1) penetrate through the pre-stressed annular anchorage (8).
7. The fabricated pool post-tensioned annular prestressed structure according to claim 6, characterized in that said unbonded steel strands (1) are uniformly arranged from bottom to top.
8. The assembled pool post-tensioning annular prestressed structure according to claim 6, wherein an angle-variable tensioning device is arranged in the tensioning operation space (10), and comprises a tool anchor plate (2), a ring anchor jack (3), an extension tube (4), a transition plate (5), an integral angle variator (6), a limiting plate (7) and the prestressed annular anchor (8) which are sequentially sleeved on the unbonded steel strand (1).
CN202022940457.4U 2020-12-10 2020-12-10 Assembly type water pool post-tensioning annular prestress structure Active CN215212625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022940457.4U CN215212625U (en) 2020-12-10 2020-12-10 Assembly type water pool post-tensioning annular prestress structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022940457.4U CN215212625U (en) 2020-12-10 2020-12-10 Assembly type water pool post-tensioning annular prestress structure

Publications (1)

Publication Number Publication Date
CN215212625U true CN215212625U (en) 2021-12-17

Family

ID=79417395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022940457.4U Active CN215212625U (en) 2020-12-10 2020-12-10 Assembly type water pool post-tensioning annular prestress structure

Country Status (1)

Country Link
CN (1) CN215212625U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457871A (en) * 2022-03-08 2022-05-10 扬州大学 Prestressing force structure suitable for piece base type pump station business turn over water flow path accuse splits
CN114517596A (en) * 2022-03-10 2022-05-20 山东省建筑科学研究院有限公司 Prestressing force key connection structure of prefabricated wall board and brickwork wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457871A (en) * 2022-03-08 2022-05-10 扬州大学 Prestressing force structure suitable for piece base type pump station business turn over water flow path accuse splits
CN114517596A (en) * 2022-03-10 2022-05-20 山东省建筑科学研究院有限公司 Prestressing force key connection structure of prefabricated wall board and brickwork wall
CN114517596B (en) * 2022-03-10 2024-04-02 山东省建筑科学研究院有限公司 Prestress pin key connection structure of prefabricated wallboard and masonry wall

Similar Documents

Publication Publication Date Title
CN108560423B (en) Construction method of common steel bar and finish-rolled twisted steel bar mixed reinforcement assembly pier
CN215212625U (en) Assembly type water pool post-tensioning annular prestress structure
US6659135B2 (en) Tendon-receiving duct with longitudinal channels
CN104594523B (en) The prestressing force concatenation construction method of fabricated shear wall
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
US6843031B1 (en) Bonded monostrand post-tension system
CN112854595A (en) Prestressed part externally-wrapped steel T-shaped combination beam and construction method thereof
CN103243804A (en) Pre-stressed combined frame of thin wall section steels and concrete, and construction method thereof
CN208533868U (en) A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column
CN103741854B (en) Pre-stressed composite space truss and construction method thereof
CN108086130A (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN108612122B (en) Ultra-large plane-size open caisson foundation structure and construction method thereof
CN204311614U (en) The fabricated shear wall of prestressing force splicing
US6889714B1 (en) Tendon receiving duct for a monostrand bonded post-tension system
CN212715656U (en) Assembled prestressing force structure of curve cloth muscle
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN102493335A (en) Prefabricating prestress steel tube confined concrete pier
CN117188606A (en) Prestressed assembled concrete beam column node and construction method thereof
CN108590037A (en) A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column
CN213682859U (en) Flat cable body
CN201665956U (en) Prestressed parallel steel stranded wire assembly cable structure in annular closed steel tube
CN108411801A (en) One kind reinforcing the old hollow slab bridge construction of single hole and construction method by real abdomen Bars In Poured Concrete Slab
CN210887572U (en) Mixed reinforcement embedded low-prestress dry beam-column joint
CN110284520B (en) Dry-wet hybrid-connection large-span closed frame plate-column assembly system
CN217556671U (en) Pier is assembled to prefabricated festival segmentation step variable cross section

Legal Events

Date Code Title Description
GR01 Patent grant