CN215212535U - Building site is with interim board house convenient to install fast and dismantle - Google Patents
Building site is with interim board house convenient to install fast and dismantle Download PDFInfo
- Publication number
- CN215212535U CN215212535U CN202120443159.6U CN202120443159U CN215212535U CN 215212535 U CN215212535 U CN 215212535U CN 202120443159 U CN202120443159 U CN 202120443159U CN 215212535 U CN215212535 U CN 215212535U
- Authority
- CN
- China
- Prior art keywords
- wallboard main
- main body
- main part
- wallboard
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001105 regulatory effect Effects 0.000 claims abstract description 22
- 238000009434 installation Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 30
- 238000006073 displacement reaction Methods 0.000 claims description 24
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000007306 turnover Effects 0.000 description 11
- 238000000034 method Methods 0.000 description 3
- 235000012054 meals Nutrition 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a building site is with interim board house convenient to install fast and dismantle, including wallboard main part, fixed spring and locating hole, the surface mounting of wallboard main part has the regulating block, and one side that the regulating block is close to the wallboard main part is fixed with the reference column, the inside of wallboard main part is provided with the gag lever post, and the surface of wallboard main part is run through to the one end of gag lever post to be connected with supporting spring between gag lever post and the wallboard main part, the side surface of wallboard main part is provided with the fixture block, and is connected with fixed spring between fixture block and the wallboard main part. This building site is with interim board house convenient to quick installation and dismantlement is provided with the wallboard main part, accomplishes the buildding to the board house wall body through the mode that 4 wallboard main parts blocks together, need not use the bolt to after the wall body concatenation is accomplished, only need can accomplish the dismantlement of wall body, convenience very fast through the mode that rotates the regulating block.
Description
Technical Field
The utility model relates to a building site building technical field specifically is a building site is with interim board house convenient to install fast and dismantle.
Background
Along with the development of society, high building mansion rises up with pulling out, and this is not left the hard work of construction worker, and some construction workers who do work outside need to build some board houses on construction site because far away from the family in order to make things convenient for the lodging, but current building site has some problems with interim board house in the in-service use:
firstly, the existing temporary board house for the construction site needs to be fixed through a large number of bolts, so that the board house is very troublesome to mount and dismount, does not meet the actual use requirement of the construction site, and greatly reduces the use convenience of the temporary board house;
secondly, the existing temporary board house for the construction site is only a wall body with bald four sides, and no place is provided for a construction worker to place articles or have a meal, so that the construction worker is inconvenient to have a meal and rest after working.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building site is with interim board house convenient to install fast and dismantle to the dismantlement that proposes in solving above-mentioned background art installs inconveniently and does not have storing space's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a temporary board house for construction sites convenient to rapidly install and disassemble comprises a wall board main body, a fixing spring and a positioning hole, wherein an adjusting block is installed on the outer surface of the wall board main body, a limiting column is fixed on one side, close to the wall board main body, of the adjusting block, an adjusting gear is arranged inside the wall board main body, one end of the adjusting gear penetrates through the outer surface of the wall board main body, a limiting spring is connected between one end, penetrating through the outer surface of the wall board main body, of the adjusting gear and the adjusting block, a positioning groove is formed in the outer surface of the wall board main body, a displacement rod is connected inside the wall board main body, a clamping rod is fixed on the outer surface of one side of the displacement rod, an unlocking rod is connected to the outer surface of the adjusting gear and located inside the wall board main body, a turnover plate is installed on the outer surface of the wall board main body in an embedded mode, and a limiting rod is arranged inside the wall board main body, and the one end of gag lever post runs through the surface of wallboard main part to be connected with supporting spring between gag lever post and the wallboard main part, the side surface of wallboard main part is provided with the fixture block, and is connected with fixed spring between fixture block and the wallboard main part, and the locating hole has been seted up to the one end of fixture block.
Preferably, the regulating block constitutes the block structure through spacing post and wallboard main part, and the regulating block constitutes sliding construction with adjusting gear to the regulating block passes through spacing spring and constitutes elastic construction with adjusting gear.
Preferably, the adjusting gear and the wall plate main body form a rotating structure, and the adjusting gear is respectively in meshed connection with the displacement rod and the unlocking rod.
Preferably, the displacement rod and the wall board main body form a sliding structure, and the displacement rod and the positioning hole form a clamping structure through a clamping rod.
Preferably, the limiting rod and the wallboard main body form a sliding structure, the limiting rod and the turnover plate form a clamping structure, and the limiting rod and the wallboard main body form an elastic structure through a supporting spring.
Preferably, the clamping blocks are distributed on the side surface of the wall plate main body at equal intervals, the clamping blocks and the wall plate main body form a sliding structure, and the clamping blocks and the wall plate main body form an elastic structure through fixing springs.
Compared with the prior art, the beneficial effects of the utility model are that: this building site is with interim board house convenient to quick installation and dismantlement:
1. the wallboard main bodies are arranged, the building of the wall body of the board house is completed in a mode that the 4 wallboard main bodies are clamped together through the clamping blocks, bolts are not needed, and the disassembly of the wall body can be completed quickly only by rotating the adjusting blocks after the wall body is spliced, so that the wallboard is very convenient;
2. the turnover plate is arranged, and a part of the wall body can be changed into a platform capable of placing articles and a dining table for a construction worker by turning down the turnover plate, so that the temporary board house is not only a bald four-side wall, and the practicability of the temporary board house is enhanced;
3. be provided with the gag lever post, make to turn over the board through the gag lever post and can not overturn and cause to turn over the board and damage or turn over board occupation space in the transportation, only can make the gag lever post relieve the spacing to turning over the board when rotating the adjusting gear and fixing the wallboard main part to the feasible board that turns over can overturn the use downwards.
Drawings
FIG. 1 is a schematic overall front sectional view of the present invention;
FIG. 2 is a schematic view of the overall sectional view of the present invention;
FIG. 3 is a schematic side sectional view of the present invention;
FIG. 4 is a schematic view of the cross-sectional structure of the fixture block and the main body of the wall plate;
fig. 5 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a wallboard body; 2. an adjusting block; 3. a limiting column; 4. an adjusting gear; 5. a limiting spring; 6. positioning a groove; 7. a displacement rod; 8. a clamping rod; 9. an unlocking lever; 10. turning over a plate; 11. a limiting rod; 12. a support spring; 13. a clamping block; 14. fixing the spring; 15. and (7) positioning the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a temporary board house for construction sites convenient for quick installation and disassembly comprises a wall board main body 1, an adjusting block 2, a limiting column 3, an adjusting gear 4, a limiting spring 5, a positioning groove 6, a displacement rod 7, a clamping rod 8, an unlocking rod 9, a turning plate 10, a limiting rod 11, a supporting spring 12, a clamping block 13, a fixing spring 14 and a positioning hole 15, wherein the adjusting block 2 is installed on the outer surface of the wall board main body 1, the limiting column 3 is fixed on one side, close to the wall board main body 1, of the adjusting block 2, the adjusting gear 4 is arranged inside the wall board main body 1, one end of the adjusting gear 4 penetrates through the outer surface of the wall board main body 1, the limiting spring 5 is connected between one end, penetrating through the outer surface of the wall board main body 1, of the positioning groove 6 is arranged on the outer surface of the wall board main body 1, the displacement rod 7 is connected inside the wall board main body 1, and the clamping rod 8 is fixed on the outer surface of one side of the displacement rod 7, the surface of adjusting gear 4 is connected with unblock pole 9, and unblock pole 9 is located wallboard main part 1's inside, and the embedded board 10 that turns over of installing of wallboard main part 1's surface, wallboard main part 1's inside is provided with gag lever post 11, and the surface of wallboard main part 1 is run through to the one end of gag lever post 11, and be connected with supporting spring 12 between gag lever post 11 and the wallboard main part 1, wallboard main part 1's side surface is provided with fixture block 13, and be connected with fixing spring 14 between fixture block 13 and the wallboard main part 1, and locating hole 15 has been seted up to the one end of fixture block 13.
Regulating block 2 constitutes the block structure through spacing post 3 and wallboard main part 1, and regulating block 2 constitutes sliding construction with adjusting gear 4 to regulating block 2 constitutes elastic construction through spacing spring 5 and adjusting gear 4, and regulating block 2 makes regulating block 2 can't rotate and drive adjusting gear 4 and rotate through spacing post 3 and wallboard main part 1 block, prevents that regulating block 2 from rotating at will in the transportation.
Adjusting gear 4 constitutes revolution mechanic with wallboard main part 1, and adjusting gear 4 is connected for the meshing with displacement pole 7 and unblock pole 9 respectively, and adjusting gear 4 rotates and drives displacement pole 7 and unblock pole 9 through the meshing with displacement pole 7 and unblock pole 9 and slide.
The gag lever post 11 constitutes sliding construction with wallboard main part 1, and gag lever post 11 constitutes the block structure with turning over board 10, and gag lever post 11 passes through supporting spring 12 and constitutes elastic construction with wallboard main part 1, and gag lever post 11 slides and break away from and turn over the block of board 10, makes to turn over board 10 and can not rotate at will, and gag lever post 11 keeps under supporting spring 12's support and turns over the block of board 10 in the transportation, prevents to turn over board 10 and rotates at will.
The working principle is as follows: when the temporary board house convenient for quick installation and disassembly for construction site is used, firstly, as shown in fig. 1-5, the wall board main body 1 is placed at a proper position, then the other wall board main body 1 is inserted into the positioning groove 6 through the clamping block 13 supported by the fixing spring 14, then the adjusting block 2 is slid towards the direction far away from the wall board main body 1, so that the limiting column 3 is separated from the clamping with the wall board main body 1, the adjusting block 2 is rotated at the moment, the adjusting block 2 drives the adjusting gear 4 to rotate, the adjusting gear 4 drives the displacement rod 7 and the unlocking rod 9 to slide through the engagement with the displacement rod 7 and the unlocking rod 9, the displacement rod 7 slides to drive the clamping rod 8 to be clamped with the positioning hole 15, so that the position between the clamping block 13 and the wall board main body 1 is fixed, the installation between the 2 wall board main bodies 1 is completed, the process is repeated, when the fourth wall board main body 1 is installed, the wall board main body 1 is kept in a vertical state with the other two wall board main bodies 1, and the positioning groove 6 of the wall board main body 1 The fixture block 13 aligned with the previous wallboard main body 1 is pushed in, at the moment, the fixture block 13 on the fourth wallboard main body 1 is squeezed by the other first wallboard main body 1 to slide towards the inside of the fourth wallboard main body 1 and compress the fixing spring 14, and when the fixture block 13 slides to the positioning groove 6 on the first wallboard main body 1, the fixture block is clamped into the positioning groove 6 under the support of the compressed fixing spring 14, so that the assembly of the four-side wallboard main body 1 is completed, then the roof of the board room is hung on the assembled four-side wallboard main body 1, and the quick installation of the board room is completed;
in the using process, the adjusting gear 4 rotates to drive the unlocking rod 9 to slide, the unlocking rod 9 pushes the limiting rod 11 to slide and compress the supporting spring 12, the limiting rod 11 is separated from the clamping with the turning plate 10, so that the turning plate 10 can rotate downwards to be used as a placed object or be used as a dining table, after construction in a construction site is completed, the turning plate 10 is turned upwards, then the adjusting block 2 is rotated, the displacement rod 7 drives the clamping rod 8 to slide and be separated from the clamping with the positioning hole 15, the clamping block 13 can slide and be separated from the clamping with the positioning groove 6, when the wallboard main body 1 is disassembled, the clamping block 13 is extruded by the positioning groove 6 to slide towards the inside of the wallboard main body 1 until 2 wallboard main bodies 1 are completely separated, meanwhile, the adjusting gear 4 drives the unlocking rod 9 to slide and be separated from the contact with the limiting rod 11, the limiting rod 11 is clamped with the turning plate 10 under the support of the supporting spring 12, so that the turning plate 10 cannot rotate randomly, at this moment, the adjusting block 2 is released, the adjusting block 2 slides towards the direction close to the wallboard main body 1 under the driving of the limiting spring 5 and is clamped with the wallboard main body 1 through the limiting column 3, the adjusting block 2 is prevented from rotating at the process of transporting and carrying the wallboard main body 1 to cause the turnover plate 10 to rotate randomly and damage, and the overall practicability is increased.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building site is with interim board house convenient to quick installation and dismantlement, includes wallboard main part (1), fixed spring (14) and locating hole (15), its characterized in that: the outer surface of the wallboard main body (1) is provided with a regulating block (2), one side of the regulating block (2) close to the wallboard main body (1) is fixed with a limiting column (3), a regulating gear (4) is arranged in the wallboard main body (1), one end of the regulating gear (4) penetrates through the outer surface of the wallboard main body (1), a limiting spring (5) is connected between one end of the regulating gear (4) penetrating through the outer surface of the wallboard main body (1) and the regulating block (2), the outer surface of the wallboard main body (1) is provided with a positioning groove (6), the inner part of the wallboard main body (1) is connected with a displacement rod (7), a clamping rod (8) is fixed on the outer surface of one side of the displacement rod (7), the outer surface of the regulating gear (4) is connected with an unlocking rod (9), the unlocking rod (9) is positioned in the wallboard main body (1), and a turning plate (10) is installed on the outer surface of the wallboard main body (1) in an embedded mode, the utility model discloses a wallboard, including wallboard main part (1), the inside of wallboard main part (1) is provided with gag lever post (11), and the surface of wallboard main part (1) is run through to the one end of gag lever post (11) to be connected with supporting spring (12) between gag lever post (11) and wallboard main part (1), the side surface of wallboard main part (1) is provided with fixture block (13), and is connected with between fixture block (13) and wallboard main part (1) fixed spring (14) to locating hole (15) have been seted up to the one end of fixture block (13).
2. A temporary board house for construction site facilitating quick installation and removal according to claim 1, wherein: regulating block (2) constitute the block structure through spacing post (3) and wallboard main part (1), and regulating block (2) and adjusting gear (4) constitute sliding construction to regulating block (2) pass through spacing spring (5) and adjusting gear (4) constitute elastic construction.
3. A temporary board house for construction site facilitating quick installation and removal according to claim 1, wherein: adjusting gear (4) and wallboard main part (1) constitute revolution mechanic, and adjusting gear (4) are connected for the meshing with displacement pole (7) and unblock pole (9) respectively.
4. A temporary board house for construction site facilitating quick installation and removal according to claim 1, wherein: the displacement rod (7) and the wallboard main body (1) form a sliding structure, and the displacement rod (7) and the positioning hole (15) form a clamping structure through the clamping rod (8).
5. A temporary board house for construction site facilitating quick installation and removal according to claim 1, wherein: the limiting rod (11) and the wallboard main body (1) form a sliding structure, the limiting rod (11) and the turning plate (10) form a clamping structure, and the limiting rod (11) and the wallboard main body (1) form an elastic structure through the supporting spring (12).
6. A temporary board house for construction site facilitating quick installation and removal according to claim 1, wherein: the clamping blocks (13) are distributed on the side surface of the wall plate main body (1) at equal intervals, the clamping blocks (13) and the wall plate main body (1) form a sliding structure, and the clamping blocks (13) and the wall plate main body (1) form an elastic structure through fixing springs (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120443159.6U CN215212535U (en) | 2021-03-02 | 2021-03-02 | Building site is with interim board house convenient to install fast and dismantle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120443159.6U CN215212535U (en) | 2021-03-02 | 2021-03-02 | Building site is with interim board house convenient to install fast and dismantle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215212535U true CN215212535U (en) | 2021-12-17 |
Family
ID=79441337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120443159.6U Expired - Fee Related CN215212535U (en) | 2021-03-02 | 2021-03-02 | Building site is with interim board house convenient to install fast and dismantle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215212535U (en) |
-
2021
- 2021-03-02 CN CN202120443159.6U patent/CN215212535U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847455B (en) | Curtain wall structure and mounting method thereof | |
CN110821034B (en) | House building builds quick concatenation formula assembly wall board | |
CN215212535U (en) | Building site is with interim board house convenient to install fast and dismantle | |
CN220184268U (en) | Assembled building supporting seat | |
CN211078205U (en) | Telescopic lifting frame for narrow space | |
CN210052260U (en) | Fire acousto-optic alarm | |
CN214322879U (en) | Flexible grinding driving mechanism for steel pipe | |
CN212336480U (en) | Hoisting structure for ceiling installation | |
CN109404812B (en) | LED lamp convenient to installation | |
CN109235591B (en) | Integrated squatting pan for movable house of box house | |
CN212478749U (en) | Isolation net for building construction | |
CN216974003U (en) | But decoration wallboard of fast-assembling that installation quality is good | |
CN217537424U (en) | Composite sound insulation wallboard | |
CN220847201U (en) | Indicating device convenient to installation | |
CN220903233U (en) | Pipeline installation device for construction | |
CN220184248U (en) | Steel construction rack convenient to installation | |
CN216740333U (en) | Detachable modularization indoor decoration combination formula furred ceiling structure | |
CN221143198U (en) | Super high-rise back bolt stone curtain wall | |
CN220998942U (en) | Hanging fixture for mounting glass curtain wall | |
CN219685398U (en) | Efficient fixing and assembling device for compressor piston | |
CN208039591U (en) | A kind of suspended ceiling mounting structure | |
CN221001530U (en) | Prefabricated building inner wall partition board convenient to installation | |
CN216517321U (en) | Fixing structure of outdoor steel structure elevator | |
CN117071790B (en) | Curtain wall building and construction method thereof | |
CN221298575U (en) | Aluminum die and wood die combined type template structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211217 |