CN215212215U - Temporary construction operation platform with drainage system - Google Patents

Temporary construction operation platform with drainage system Download PDF

Info

Publication number
CN215212215U
CN215212215U CN202120730092.4U CN202120730092U CN215212215U CN 215212215 U CN215212215 U CN 215212215U CN 202120730092 U CN202120730092 U CN 202120730092U CN 215212215 U CN215212215 U CN 215212215U
Authority
CN
China
Prior art keywords
sleeve
platform
screw rod
drainage system
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120730092.4U
Other languages
Chinese (zh)
Inventor
高云飞
韩欢
尤卓
贺超
苏宇
杨永康
马维强
崔玮
刘杰
师来庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Group Co Ltd
Original Assignee
Shaanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Group Co Ltd filed Critical Shaanxi Construction Engineering Group Co Ltd
Priority to CN202120730092.4U priority Critical patent/CN215212215U/en
Application granted granted Critical
Publication of CN215212215U publication Critical patent/CN215212215U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a take drainage system's interim construction operation platform, include: the platform main part, platform main part bottom are provided with the drain pipe of vertical direction, are provided with the valve on the drain pipe, lead to the water pipe intercommunication between drain pipe and the water storage bucket. An object of the utility model is to provide a take drainage system's interim construction operation platform that simple structure, construction convenience, support are stable.

Description

Temporary construction operation platform with drainage system
Technical Field
The utility model relates to a house construction technical field, in particular to take drainage system's interim construction operation platform.
Background
The elevartor shaft is the well of installation elevator, the size of well is confirmed according to the elevator lectotype, well wall mounting elevator track and counter weight track, the door opening installation lift-cabin door of reservation, there is elevator machine room at the well top, when carrying out high-rise building construction, all need build the elevartor shaft, when traditional elevartor shaft construction, need the manual work to set up the support body, the one deck is set up down to the one deck of having under construction, personnel construction is dangerous, the sewage that the scavenging pump pipe produced does not have the department and discharges in the elevartor shaft construction, cause the elevartor shaft work efficiency low, the dirty indiscriminate poor of putting of sewage leads to the scene.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model discloses it is low to solve among the prior art elevartor shaft efficiency of construction, and the messy poor problem of dirty in the scene of leading to of indiscriminate putting of sewage.
For this reason, the technical scheme who adopts is, the utility model provides a take drainage system's interim construction operation platform, include: the water storage tank comprises a platform main body, wherein a drain pipe in the vertical direction is arranged at the bottom end of the platform main body, a valve is arranged on the drain pipe, and the drain pipe is communicated with the water storage tank through a water pipe.
Preferably, platform main part bottom is provided with platform elevating gear, platform elevating gear includes: first sleeve, first screw rod, carousel, platform main part bottom is provided with the first sleeve of a plurality of vertical directions, first sleeve one end with platform main part bottom is connected, be provided with the first screw rod of vertical direction in the first sleeve, first sleeve cover is established first screw rod one end, the first screw rod other end extends first sleeve is connected with the underframe upper end of horizontal direction, first screw rod and carousel threaded connection, the carousel is located first sleeve below.
Preferably, be provided with the sleeve pipe on the first sleeve bottom outer wall, the gag lever post of vertical direction passes the sleeve pipe, the gag lever post lower extreme is provided with the couple, and the couple is hung on the underframe, the gag lever post can intraductal reciprocating motion of cover, the gag lever post upper end is provided with the handle.
Preferably, the bottom end of the bottom frame is provided with an adjustable supporting structure, and the adjustable supporting structure comprises: the bottom frame bottom is provided with a plurality of hinged supports, the second sleeve is hinged to the hinged support bottom, a second screw is arranged in the first sleeve, one end of the second screw is in threaded connection with the inner wall of the second sleeve, the other end of the second screw is rotatably connected with the movable support, and a through hole is formed in one side wall of the movable support.
Preferably, a plurality of criss-cross reinforcing rods are arranged on the bottom frame, and two ends of each reinforcing rod are respectively in threaded connection with an adjustable bracket.
Preferably, a support frame is arranged in the platform main body, and a steel plate net is arranged at the top end of the support frame.
Preferably, a plurality of lifting rings are arranged at the top end of the side wall of the platform body.
Preferably, the platform main body is made of a patterned steel plate.
The utility model discloses technical scheme has following advantage: the utility model provides a take drainage system's interim construction operation platform, include: the platform main part, platform main part bottom are provided with the drain pipe of vertical direction, are provided with the valve on the drain pipe, lead to the water pipe intercommunication between drain pipe and the water storage bucket. Because the platform main part is the box that the welding formed, it is convenient to collect and discharge sewage, can keep the job site clean and tidy, and bearing structure is the frame construction that the welding formed, simple structure, and the rigidity is big, can provide stable support, and the installation is dismantled conveniently, can realize having enough to meet the need the use between two elevartors, has improved the efficiency of construction of house elevartor shaft.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a view of the elevator door of the present invention fixed on the side of the hole;
FIG. 3 is a side fixing view of the shear wall of the elevator of the present invention;
FIG. 4 is a view showing an installation state of the present invention;
FIG. 5 is a schematic structural view of the material lifting device of the present invention;
FIG. 6 is a side view of the material lifting device of the present invention;
the device comprises a platform body, a bottom frame, a drain pipe, a valve, a water storage barrel, a first sleeve, a first screw rod, a rotating disc, a limiting rod, a second sleeve, a second screw rod, a movable support, a through hole, a reinforcing rod, a 15 adjustable support, a support frame, a steel plate net, a lifting ring, a sleeve, a 20 expansion bolt, a wall penetrating bolt, a water pipe, a hinge support, a 24 transmission box, a worm wheel, a worm 26, a limiting wheel, a mandrel, a rotating wheel, a steel wire rope, a lifting hook and a supporting frame, wherein the platform body is 1, the bottom frame is 2, the drain pipe is 3, the valve is 4, the water storage barrel is 5, the first sleeve is 6, the first screw rod is 7, the rotating disc is 8, the limiting rod is 9, the second sleeve is 10, the second screw rod is 11, the movable support is 12, the through hole, the reinforcing rod is 15, the adjustable support, the supporting frame is 16, the steel plate net, the lifting ring, the sleeve is 19, the sleeve, the expansion bolt is 20, the wall penetrating bolt, the water pipe, the hinge support is 23, the hinge support, the transmission box is 24, the worm wheel is 25 worm wheel, the limiting wheel is 27 limiting wheel, the mandrel, the rotating wheel is 28 rotating wheel, the rotating wheel, and the rotating wheel is 28 steel wire rope, and the rotating wheel, the rotating wheel is 30 steel wire rope, and the lifting hook.
Detailed Description
In order to make the technical problems, technical solutions and advantages of the present invention to be solved clearer and more obvious, the following description of the preferred embodiments of the present invention is provided with the accompanying drawings, and it should be understood that the preferred embodiments described herein are only used for illustrating and explaining the present invention, and are not used for limiting the present invention.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly or indirectly connected to the other element.
It will be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in an orientation or positional relationship indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The embodiment of the utility model provides a take drainage system's interim construction operation platform, as shown in fig. 1-4, include: platform main part 1, 1 bottom of platform main part is provided with the drain pipe 3 of vertical direction, be provided with valve 4 on the drain pipe 3, lead to pipe 22 intercommunication between drain pipe 3 and the water storage bucket 5.
The working principle and the beneficial effects of the technical scheme are as follows: in the in-process of construction, after the main part progress exceeded 5 layers, pumping equipment was converted into the ground pump by the sky pump, and the sewage that produces the scavenging pump pipe is discharged into in the platform main part 1, keeps the job site clean and tidy, opens valve 4, discharges sewage into water storage bucket 5 through drain pipe 3 and in classify and recycle, then carries out elevator shaft construction processes on next step. Because the platform main part is the box that the welding formed, simple structure, the rigidity is big, and stability is high, and it is convenient to collect the emission sewage, can keep the job site clean and tidy, has improved the efficiency of construction of house elevartor shaft.
In one embodiment, a platform lifting device is disposed at the bottom end of the platform main body 1, and the platform lifting device includes: a first sleeve 6, a first screw 7 and a turntable 8, wherein the bottom end of the platform main body 1 is provided with a plurality of first sleeves 6 in the vertical direction, one end of the first sleeve 6 is connected with the bottom end of the platform main body 1, a first screw 7 in the vertical direction is arranged in the first sleeve 6, the first sleeve 6 is sleeved at one end of the first screw 7, the other end of the first screw 7 extends out of the first sleeve 6 to be connected with the upper end of the bottom frame 2 in the horizontal direction, the first screw 7 is in threaded connection with a rotary table 8, the rotary table 8 is positioned below the first sleeve 6, a sleeve 19 is arranged on the outer wall of the bottom end of the first sleeve 6, the limiting rod 9 in the vertical direction penetrates through the sleeve 19, the utility model discloses a spacing pole 9, including gag lever post 9, underframe 2, gag lever post 9 lower extreme is provided with the couple, and the couple is hung on underframe 2, gag lever post 9 can reciprocating motion in the sleeve pipe 19, gag lever post 9 upper end is provided with the handle.
The working principle and the beneficial effects of the technical scheme are as follows: in the in-process of construction, when the height of platform main part 1 needs to be adjusted, manual rotation carousel 8, through the screw drive of carousel 8 with first screw rod 7, make carousel 8 reciprocate, it reciprocates to drive first sleeve 6, make platform main part 1 reciprocate, platform main part 1 removes to required position back along first screw rod 7, stop rotatory carousel 8, platform main part 1 just can not remove, gag lever post 9 plays the effect of restriction displacement, when preventing the handling operation platform, adjustable bearing structure drops, the workman can adjust as required when the construction, easy operation.
In one embodiment, the bottom end of the bottom frame 2 is provided with an adjustable support structure, which comprises: second sleeve 10, second screw rod 11, hinged-support 23, 2 bottoms of underframe are provided with a plurality of hinged-support 23, second sleeve 10 with hinged-support 23 bottom is articulated, be provided with second screw rod 11 in the first sleeve 6, second screw rod 11 one end with second sleeve 10 inner wall threaded connection, the second screw rod 11 other end rotates with movable support 12 to be connected, be provided with through-hole 13 on the 12 lateral walls of movable support.
The working principle and the beneficial effects of the technical scheme are as follows: when the construction operation platform is installed and hoisted to the elevator shaft by using the tower crane, the bottom frame 2 is prevented from falling by the limiting rod 9, when the length of the supporting leg needs to be adjusted, the second screw rod 11 is rotated, the second screw rod 11 is driven by the threads of the second sleeve 10 and the second screw rod 11 to move up and down, after the length of the supporting leg meets the requirement, the second screw rod 11 stops rotating, the elevator door side movable support 12 is fixed at the top of the door beam by using the expansion bolt 20, and the elevator shear wall side movable support 12 is fixed on the shear wall by using the wall penetrating bolt 21, so that the height of the adjustable supporting structure is convenient to adjust, and the support is stable.
In one embodiment, a plurality of criss-cross reinforcing rods 14 are arranged on the bottom frame 2, and adjustable brackets 15 are respectively screwed at two ends of each reinforcing rod 14.
In one embodiment, a support frame 16 is arranged in the platform body 1, and a steel plate mesh 17 is arranged at the top end of the support frame 16 to prevent personnel from sinking into the wastewater in the platform body 1.
In one embodiment, a plurality of lifting rings 18 are arranged at the top end of the side wall of the platform main body 1, so that the construction operating platform can be conveniently transferred by using a tower crane.
In one embodiment, the platform main body 1 is made of a patterned steel plate, so that the rigidity is high and the support is stable.
In one embodiment, as shown in fig. 5-6, further comprising a material lifting device, the material lifting device comprising: a transmission case 24, a worm wheel 25, a worm 26, a limiting wheel 27,
be provided with transmission case 24 on the 1 inner wall of platform main part, be provided with the worm wheel 25 of vertical direction in the transmission case 24, mandrel 28 one end is passed the centre of a circle of worm wheel 25 with transmission case 24 inner wall rotates and connects, mandrel 28 with worm wheel 25 connects, the mandrel 28 other end passes 24 lateral walls of transmission case, 1 lateral wall of platform in proper order and extends platform main part 1 is connected with spacing wheel 27, be provided with the worm 26 of horizontal direction in the transmission case 24, worm 26 can with worm wheel 25 intermeshing, 26 one end of worm is connected with the rotation of transmission case 24 inner wall, the worm 26 other end passes transmission case 24 lateral wall is connected with runner 29, be provided with the wire rope 30 of vertical direction on the spacing wheel 27, wire rope 30 bottom is provided with lifting hook 31.
The working principle and the beneficial effects of the technical scheme are as follows: in the process of construction, when needs handling material, manual rotation runner 29, it rotates to drive worm 26, worm gear transmission through worm 26 and worm wheel 25, make worm wheel 25 rotate, drive spacing wheel 27 and rotate, it reciprocates to drive lifting hook 31 through wire rope 30, spacing wheel 27 plays the effect of injecing wire rope 30 displacement, after lifting hook 31 moved required position, stop rotatory runner 29, lifting hook 31 just can not remove, worm and gear drive mechanism has self-locking function, the workman can adjust as required when the construction, and is easy to operate.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (7)

1. The utility model provides a take drainage system's interim construction operation platform which characterized in that includes: the water storage platform comprises a platform main body (1), wherein a drain pipe (3) in the vertical direction is arranged at the bottom end of the platform main body (1), a valve (4) is arranged on the drain pipe (3), and the drain pipe (3) is communicated with a water storage barrel (5) through a water pipe (22);
platform main part (1) bottom is provided with platform elevating gear, platform elevating gear includes: first sleeve (6), first screw rod (7), carousel (8), platform main part (1) bottom is provided with first sleeve (6) of a plurality of vertical directions, first sleeve (6) one end with platform main part (1) bottom is connected, be provided with first screw rod (7) of vertical direction in first sleeve (6), first sleeve (6) cover is established first screw rod (7) one end, first screw rod (7) other end extends first sleeve (6) is connected with the underframe (2) upper end of horizontal direction, first screw rod (7) and carousel (8) threaded connection, carousel (8) are located first sleeve (6) below.
2. The temporary construction operation platform with the drainage system according to claim 1, wherein a sleeve (19) is arranged on the outer wall of the bottom end of the first sleeve (6), a vertically-oriented limiting rod (9) penetrates through the sleeve (19), a hook is arranged at the lower end of the limiting rod (9) and hung on the bottom frame (2), the limiting rod (9) can reciprocate in the sleeve (19), and a handle is arranged at the upper end of the limiting rod (9).
3. A temporary construction work platform with drainage system according to claim 1, characterized in that the bottom end of the bottom frame (2) is provided with an adjustable support structure, which comprises: second sleeve (10), second screw rod (11), hinged-support (23), underframe (2) bottom is provided with a plurality of hinged-support (23), second sleeve (10) with hinged-support (23) bottom is articulated, be provided with second screw rod (11) in first sleeve (6), second screw rod (11) one end with second sleeve (10) inner wall threaded connection, second screw rod (11) other end rotates with movable support (12) and is connected, be provided with through-hole (13) on movable support (12) a lateral wall.
4. A temporary construction platform with a drainage system according to claim 1, wherein the bottom frame (2) is provided with a plurality of criss-cross reinforcing rods (14), and the two ends of each reinforcing rod (14) are respectively connected with an adjustable bracket (15) through screw threads.
5. A temporary construction operation platform with a drainage system according to claim 1, wherein a support frame (16) is arranged in the platform main body (1), and a steel plate net (17) is arranged at the top end of the support frame (16).
6. A temporary construction work platform with a drainage system according to claim 1, characterized in that a plurality of hanging rings (18) are arranged at the top end of the side wall of the platform main body (1).
7. A temporary construction operation platform with a drainage system according to claim 1, wherein the platform main body (1) is made of a pattern steel plate.
CN202120730092.4U 2021-04-12 2021-04-12 Temporary construction operation platform with drainage system Active CN215212215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120730092.4U CN215212215U (en) 2021-04-12 2021-04-12 Temporary construction operation platform with drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120730092.4U CN215212215U (en) 2021-04-12 2021-04-12 Temporary construction operation platform with drainage system

Publications (1)

Publication Number Publication Date
CN215212215U true CN215212215U (en) 2021-12-17

Family

ID=79446390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120730092.4U Active CN215212215U (en) 2021-04-12 2021-04-12 Temporary construction operation platform with drainage system

Country Status (1)

Country Link
CN (1) CN215212215U (en)

Similar Documents

Publication Publication Date Title
CN2804045Y (en) Combined pole type lifter
CN211173023U (en) Bottom suspended net attached lifting scaffold
CN215212215U (en) Temporary construction operation platform with drainage system
CN214879778U (en) Auxiliary structure is demolishd to tower machine balance arm end attachment piece
CN108438957B (en) Intelligent full-automatic unmanned cement warehouse cleaning machine
CN219771688U (en) Material equipment is thrown in rust inhibitor production
CN215974712U (en) Device for lifting concrete pouring guide pipe of underground continuous wall
CN214615488U (en) Concrete pouring spreader for building
CN214144760U (en) A support body platform structure for floor pouring construction for housing construction
CN214217918U (en) Vertical shaft suspension device suitable for installation of rotational flow high-lift submersible pump
CN213171212U (en) A hoisting apparatus for building engineering
CN210029833U (en) Lifting equipment for building construction
CN110626960A (en) Mechanical equipment hoisting frame
CN115095128B (en) Method for overhauling pump tube of super high-rise core tube
CN217760843U (en) Multi-section safety ladder cage
CN211649775U (en) Safe hoisting machine for house building construction
CN111021701A (en) Lifting system for building
CN217231503U (en) Bridge construction that stability is high is with hanging basket
CN214780361U (en) Building construction is with novel heavy object hoist device
CN219730359U (en) Quick detach formula oblique hoisting device for foundation ditch engineering support pipe
CN218027773U (en) Building site foundation ditch waterproof construction device
RU205900U1 (en) Device for installation of equipment for cleaning the tubing string from asphalt-resin-paraffin deposits
CN218813690U (en) Support and stirring stake machine are put to stake machine drilling rod
CN216863407U (en) Turnover type portal frame
CN220098314U (en) Herringbone ladder type water pump overhauling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant