CN215210869U CN202120267864.5U CN202120267864U CN215210869U CN 215210869 U CN215210869 U CN 215210869U CN 202120267864 U CN202120267864 U CN 202120267864U CN 215210869 U CN215210869 U CN 215210869U
Authority
CN
China
Prior art keywords
geomembrane
concrete panel
asphalt concrete
anchoring
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120267864.5U
Other languages
Chinese (zh)
Inventor
雷显阳
王樱畯
姜忠见
侯靖
徐跃明
孙檀坚
谭建平
陈乔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202120267864.5U priority Critical patent/CN215210869U/en
Application granted granted Critical
Publication of CN215210869U publication Critical patent/CN215210869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a geomembrane and bituminous concrete panel double-track anchored seepage prevention structure adopts the reinforced concrete connecting plate to link up between geomembrane and bituminous concrete panel, the geomembrane through first anchor assembly anchor in reinforced concrete connecting plate top surface, bituminous concrete panel overlap joint in reinforced concrete connecting plate top surface, the fluting of bituminous concrete panel top surface in this overlap joint district and backfill elastic concrete arrange second anchor assembly on the elastic concrete, the cover plate has been laid to the anchor between first anchor assembly and the second anchor assembly. The connection structure of the geomembrane and the asphalt concrete panel has stronger adaptive deformability under the action of reservoir water load, runs reliably and is an important technology in water conservancy and hydropower engineering.

Description

Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel
Technical Field
The utility model relates to a hydraulic and hydroelectric engineering field, concretely relates to impervious structure of geomembrane and bituminous concrete panel double anchor.
Background
With the rapid development of water conservancy and hydropower engineering, sites with excellent topographic and geological conditions are less and less. Under the condition of complex terrain and geology, in order to meet the requirement of damming and reservoir formation, certain reservoir basin seepage prevention measures are often adopted. When the hydrogeological conditions of the reservoir basin have obvious zoning characteristics or the requirements of deformation and bearing capacity of the foundation surface of different parts are met, a combined seepage-proofing mode is generally adopted.
The asphalt concrete panel has the characteristics of good anti-seepage performance, convenient construction and the like, and is adopted by more and more projects; in recent years, with the continuous progress of geosynthetics, geomembranes are increasingly applied to some high-filling warehouse basin seepage-proofing projects due to strong adaptive deformability.
In order to ensure that the connection of the anti-seepage structure is reliable, the peripheral lap joint in the geomembrane anti-seepage engineering needs to be mechanically anchored by bolts, and because the strength of asphalt concrete is low, the geomembrane is difficult to be directly anchored on an asphalt concrete panel, so that although the asphalt concrete and the geomembrane have better basic deformation adapting capability, the adoption of the asphalt concrete panel on the bank and the geomembrane on the bottom of the reservoir is a better anti-seepage type, but is limited by the factor that the anti-seepage bodies of the asphalt concrete panel and the geomembrane are difficult to be anchored and connected, and at present, an engineering example of the combined anti-seepage of the asphalt concrete panel and the geomembrane does not exist.
For asphalt concrete panels and geomembranes on dams and high-fill bodies, large deformation is generated after water storage of reservoirs, and if the adaptive deformation capability of a lap joint structure is poor, concentrated leakage channels are likely to be generated to influence the safety of the dams.
Therefore, how to adopt certain engineering measures enables the connection structure of the geomembrane and the asphalt concrete panel to have stronger adaptive deformability under the action of reservoir water load and to operate reliably, and the connection structure is an important technology in water conservancy and hydropower engineering.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: aiming at asphalt concrete panels and geomembrane anti-seepage bodies, the double-channel anchoring anti-seepage connecting structure is safe, reliable, simple and easy in structure and convenient to construct.
In order to solve the technical problem, the utility model discloses a following technical scheme realizes:
the utility model provides a geomembrane and bituminous concrete panel double-track anchored seepage prevention structure adopts the reinforced concrete connecting plate to link up between geomembrane and bituminous concrete panel, the geomembrane through first anchor assembly anchor in reinforced concrete connecting plate top surface, bituminous concrete panel overlap joint in reinforced concrete connecting plate top surface, the fluting of bituminous concrete panel top surface in this overlap joint district and backfill elastic concrete arrange second anchor assembly on the elastic concrete, the cover plate has been laid to the anchor between first anchor assembly and the second anchor assembly.
As a preferred technical scheme of the utility model, the top surface of one side of the reinforced concrete connecting plate is upwards bulged to form a boss, and correspondingly, the geomembrane is anchored on the top surface of the boss through a first anchoring part; the bottom end of the asphalt concrete panel extends downwards to the step surface of the reinforced concrete connecting plate and is abutted against the side wall of the boss.
As a preferred technical scheme of the utility model, the cover plate bonds on the asphalt concrete panel after the anchor end of this one side of second anchor assembly extends one section length to the asphalt concrete panel, and the cover plate edge adopts the banding agent to seal.
As an optimal technical scheme of the utility model, in the overlap joint district set up plasticity stagnant water material between asphalt concrete panel and the reinforced concrete connecting plate.
As an optimized technical scheme of the utility model, the cover plate is in reserve one section length between first anchor assembly and the second anchor assembly to fill plastics stagnant water material and form the swell below this section cover plate.
As an optimized technical scheme of the utility model, first anchor assembly and second anchor assembly constitute by expansion bolts and stainless steel angle steel.
As an optimized technical proposal of the utility model, the cover plate is a chloroprene rubber cover plate.
As an optimized technical scheme of the utility model, the elastic concrete is elastic epoxy concrete.
Compared with the prior art, the utility model, following advantage and beneficial effect have:
(1) set up the concrete connecting plate between asphalt concrete and the geomembrane, the connecting plate is located high filling body, adopts geomembrane, chloroprene rubber cover plate etc. to cover the connecting plate completely to adopt twice anchor fixed, avoided the concrete connecting plate probably to appear because of deformation fracture, asphalt concrete and local reasons such as throw off and then cause reservoir seepage scheduling problem with the connecting plate.
(2) The elastic modulus of the elastic epoxy concrete is only about one tenth of that of concrete, the elastic epoxy concrete has the characteristics of low elastic modulus, high tensile strength and good flexibility, and the elastic epoxy concrete is embedded into the asphalt concrete, can better adapt to the deformation of an asphalt concrete panel, is used as an anchoring body of a second anchoring structure, and has a more ideal anchoring effect.
(3) The chloroprene rubber cover sheet has better flexibility than a geomembrane, the chloroprene rubber cover sheet is arranged between the first anchoring structure and the second anchoring structure, and extends for a certain distance to the downstream asphalt concrete panel, so that the chloroprene rubber cover sheet is better in fitting property with the asphalt concrete panel, is easier to be bonded and connected, and has a better anti-seepage effect. The plastic water stop material is arranged under the chloroprene rubber cover plate, and gaps and defects generated by the connecting structure can be filled under the action of water pressure, so that water leakage is avoided.
(4) The mode of slotting on the asphalt concrete panel and filling the elastic epoxy concrete is adopted for anchoring, the structure is simple, and the construction is convenient.
In conclusion, two anchors are arranged on the reinforced concrete connecting plate, so that the connecting plate seepage-proofing structure on the high filling body can better adapt to deformation generated after water storage, and the seepage risk caused by the separation of the seepage-proofing joint after the connecting plate deforms is avoided.
Drawings
Fig. 1 is a schematic plan view of the present invention;
fig. 2 is a schematic sectional view taken along the line a-a in fig. 1.
Reference numerals: 1-a geomembrane; 2-asphalt concrete panels; 3-reinforced concrete connecting plates; 4-high fill; 5-elastic concrete; 6-a first anchor; 7-a second anchor; 8-plastic water stop material; 9-cover plate; 10-edge sealing agent; 11-expansion bolts; 12-stainless steel angle iron; 13-a boss; 14-step surface.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the following description of the preferred embodiments of the present invention is given with reference to the accompanying examples, but it should be understood that the drawings are for illustrative purposes only and are not to be construed as limiting the patent; for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted. The positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the present patent.
The present invention will be further described with reference to the accompanying drawings 1 and 2 and the following examples, which are not intended as a limitation of the present invention.
As shown in fig. 1 and 2, the present embodiment provides an anti-seepage structure with two anchors for geomembrane and asphalt concrete panel, which comprises a geomembrane 1, an asphalt concrete panel 2, a reinforced concrete connecting plate 3 and a cover sheet 9, wherein the geomembrane 1 is connected with the asphalt concrete panel 2 by the reinforced concrete connecting plate 3, and two anchors are respectively arranged on the reinforced concrete connecting plate 3 and the elastic concrete 5 filled in the asphalt concrete panel 2 to form the anti-seepage structure.
In the embodiment, the reinforced concrete connecting plate 3 is positioned on the high filling body 4 at the bottom of the reservoir, and the top surface of one side of the reinforced concrete connecting plate is upwards raised to form a boss 13 in a step shape; the geomembrane 1 is paved on the top surfaces of the bosses 13 of the reinforced concrete connecting plates 3 and is fixedly connected with the bosses 13 through first anchoring parts 6.
In the embodiment, the bottom end of the asphalt concrete panel 2 extends downwards to the step surface 14 of the reinforced concrete connecting plate 3 and is abutted against the side wall of the boss 13; the top surface of the asphalt concrete panel 2 close to one side of the boss is excavated to form a groove, and elastic concrete 5 is backfilled in the groove and is tightly fused with the asphalt concrete panel 2; the elastic concrete 5 is preferably elastic epoxy concrete in this embodiment. The specific grooving size is determined according to the running water head of the reservoir, an indoor model test and the principle of no water seepage under the designed water head. After the asphalt concrete panel 2 is grooved, the thickness of the lower part still needs to meet the requirements of an anti-seepage panel.
In the embodiment, one end of the cover plate 9 is anchored on the top surface of the boss through a first anchoring part 6, and the other end is anchored on the elastic concrete 5 through a second anchoring part 7; the first anchoring piece 6 and the second anchoring piece 7 are both composed of expansion bolts 11 and stainless steel angle steels 12, and the expansion bolts 6 are anchored on the stainless steel angle steels 12 at equal intervals. The cover plate 9 is reserved with a length between the first anchoring piece 6 and the second anchoring piece 7, and a plastic water stopping material 8 is filled below the cover plate 9 to form a bulge. The preferred cover 9 of this embodiment is a neoprene cover.
Further, the anchoring end of the cover plate 9 on the side of the second anchoring member 7 extends to the asphalt concrete panel 2 for a certain length, and then is adhered to the asphalt concrete panel 2, and the edge of the cover plate 9 is sealed by the edge sealing agent 10. The geomembrane 1, the asphalt concrete panel 2, the reinforced concrete connecting plate 3 and the cover plate 9 form a double-anchoring anti-seepage structure under the cooperation of the first anchoring piece 6 and the second anchoring piece 7.
Further, a plastic water stop material 8 is arranged between the asphalt concrete panel 2 and the step surface 14 of the reinforced concrete connecting plate 3.
According to the utility model discloses a description and attached drawing, the technical personnel in the field make or use very easily the utility model discloses a seepage prevention structure of geomembrane and bituminous concrete panel double-deck anchor to can produce the positive effect recorded in the utility model.
Unless otherwise specified, in the present invention, if the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, it is only for convenience of describing the present invention and simplifying the description, rather than to indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, therefore, the terms describing orientation or positional relationship in the present invention are used for illustrative purposes only, and should not be construed as limiting the present patent, specific meanings of the above terms can be understood by those of ordinary skill in the art in light of the specific circumstances in conjunction with the accompanying drawings.
Unless expressly stated or limited otherwise, the terms "disposed," "connected," and "connected" are used broadly and encompass both fixed and removable connections, or integral connections; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The above is only the preferred embodiment of the present invention, not to the limitation of the present invention in any form, all the technical matters of the present invention all fall into the protection scope of the present invention to any simple modification and equivalent change of the above embodiments.

Claims (8)

1. The utility model provides an impervious structure of geomembrane and bituminous concrete panel double-track anchor which characterized in that: the geomembrane (1) is connected with the asphalt concrete panel (2) through a reinforced concrete connecting plate (3), the geomembrane (1) is anchored on the top surface of the reinforced concrete connecting plate (3) through a first anchoring part (6), and the asphalt concrete panel (2) is lapped on the top surface of the reinforced concrete connecting plate (3); slotting the top surface of the asphalt concrete panel (2) in the lap joint area, backfilling elastic concrete (5), arranging a second anchoring piece (7) on the elastic concrete (5), and anchoring and paving a cover plate (9) between the first anchoring piece (6) and the second anchoring piece (7).
2. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: the top surface of one side of the reinforced concrete connecting plate (3) is upwards bulged to form a boss (13), and correspondingly, the geomembrane (1) is anchored on the top surface of the boss (13) through a first anchoring piece (6); the bottom end of the asphalt concrete panel (2) extends downwards to the step surface (14) of the reinforced concrete connecting plate (3) and is abutted against the side wall of the boss (13).
3. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: and the anchoring end of the cover plate (9) on the side of the second anchoring piece (7) extends to the asphalt concrete panel (2) for a certain length and then is adhered to the asphalt concrete panel (2), and the edge of the cover plate (9) is sealed by adopting an edge sealing agent (10).
4. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: and a plastic water stopping material (8) is arranged between the asphalt concrete panel (2) and the reinforced concrete connecting plate (3) in the lap joint area.
5. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: the cover plate (9) is reserved with a length between the first anchoring piece (6) and the second anchoring piece (7), and a plastic water stop material (8) is filled below the cover plate (9) to form a bulge.
6. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: the first anchoring piece (6) and the second anchoring piece (7) are both composed of expansion bolts (11) and stainless steel angle steel (12).
7. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: the cover plate (9) is a chloroprene rubber cover plate.
8. The geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure according to claim 1, wherein: the elastic concrete (5) is elastic epoxy concrete.
CN202120267864.5U 2021-01-29 2021-01-29 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel Active CN215210869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120267864.5U CN215210869U (en) 2021-01-29 2021-01-29 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120267864.5U CN215210869U (en) 2021-01-29 2021-01-29 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel

Publications (1)

Publication Number Publication Date
CN215210869U true CN215210869U (en) 2021-12-17

Family

ID=79439214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120267864.5U Active CN215210869U (en) 2021-01-29 2021-01-29 Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel

Country Status (1)

Country Link
CN (1) CN215210869U (en)

Similar Documents

Publication Publication Date Title
CN205917610U (en) Prefabricated assembled concrete box culvert
CN205502264U (en) Waterproof structure of movement joint
CN214939858U (en) Waterproof structure of concrete dam seam
CN103526724A (en) Anchoring impervious structure in which reservoir bottom geomembrane is connected with reservoir periphery drainage gallery peripheral joints
CN113152698A (en) Waterstop structure for deformation joint of structure and construction method thereof
CN112921900B (en) Geomembrane and asphalt concrete panel double-channel anchoring anti-seepage structure
CN110453650A (en) A kind of aqueduct water sealing structure and its construction method
CN215210869U (en) Seepage-proofing structure for double-channel anchoring of geomembrane and asphalt concrete panel
CN204266170U (en) A kind of dam foundation gallery syndeton
CN215715042U (en) Geomembrane and asphalt concrete panel horizontal sliding anti-seepage connecting structure
CN112900365B (en) Geomembrane and asphalt concrete panel horizontal sliding anti-seepage connecting structure
CN216006829U (en) Seepage-proof sealing structure for reservoir danger removal and reinforcement
CN211621471U (en) Water stop type suitable for inclined wall geomembrane cofferdam bank slope toe board construction joint
CN113463573A (en) Asphalt concrete panel-geomembrane anti-seepage system and construction method thereof
CN111005305A (en) Integral abutment-steel pipe concrete pile joint with lead core laminated rubber device
CN214089708U (en) Geomembrane seepage-proofing panel and concrete seepage-proofing wall seepage-proofing joint structure
CN216475120U (en) Diversion seepage-proofing structure for culvert pipe of temporary cofferdam
CN112575744A (en) Full-warehouse basin PE geomembrane anti-seepage panel arrangement type and construction method
CN206941658U (en) The double water sealing structures of concrete extension joint
CN219671244U (en) Geomembrane seepage-proofing structure of side water inlet and outlet front pool of pumped storage power station
CN217352331U (en) Double-layer geomembrane and seam surface water stop connecting structure
CN218880740U (en) Storehouse basin geomembrane and storehouse bank concrete panel connection seal structure
CN217517544U (en) Connection structure of underground continuous wall
CN218757307U (en) Seepage-proofing structure of concrete faced rockfill dam
CN220058368U (en) Deformation joint blocking and dredging combination device connected with existing structure