CN215177918U - Tower crane monitoring and early warning system - Google Patents

Tower crane monitoring and early warning system Download PDF

Info

Publication number
CN215177918U
CN215177918U CN202121770417.8U CN202121770417U CN215177918U CN 215177918 U CN215177918 U CN 215177918U CN 202121770417 U CN202121770417 U CN 202121770417U CN 215177918 U CN215177918 U CN 215177918U
Authority
CN
China
Prior art keywords
tower crane
alarm
detection device
wall
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121770417.8U
Other languages
Chinese (zh)
Inventor
朱亮
陈耀
徐日云
徐星
麻金龙
侯遵德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Fourth Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202121770417.8U priority Critical patent/CN215177918U/en
Application granted granted Critical
Publication of CN215177918U publication Critical patent/CN215177918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a tower crane control early warning system, include: stress detection device, alarm, attach the wall connecting piece, the tower crane is connected with attaching the wall through attaching the wall connecting piece, and the alarm is connected with stress detection device. The stress detection device can detect the wall-attached stress in real time, and when the wall-attached stress is larger than a preset threshold value, the alarm sends out an alarm signal to remind workers to take emergency treatment measures, so that safety accidents are avoided. In addition, a displacement detection device and an inclination angle detection device can be additionally arranged to monitor the tower crane in multiple directions, so that the safety of the tower crane operation is improved.

Description

Tower crane monitoring and early warning system
Technical Field
The utility model relates to a tower crane technical field, in particular to tower crane control early warning system.
Background
The tower crane is a common transport tool in the field of buildings, can realize horizontal transport and vertical transport functions, and further improves the working efficiency. However, after the installation height of the tower crane exceeds the independent height, in order to ensure that the tower crane does not lose stability when lifting heavy objects, a constraint is added to the tower body in the horizontal direction through the wall attachment. The collapse accident caused by the instability of the wall attached by the tower crane is usually caused by the fact that the actual stress of the wall attached is far larger than the design value. At present, the collapse of the tower crane is mainly prevented by improving the overall stability of the tower crane, but when the heavy object is lifted, the working condition is complex, and the lifting safety is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a tower crane control early warning system can the state of real time monitoring tower crane, and then improves the security of construction.
In order to achieve the above object, the utility model provides a following technical scheme:
a tower crane monitoring and early warning system comprises: stress detection device, alarm, attach the wall connecting piece, the tower crane passes through attach the wall connecting piece with attach the wall and be connected, the alarm with stress detection device connects, stress detection device is used for detecting attaches wall stress, the alarm is used for working when attaching wall stress and being greater than when predetermineeing the threshold value, sends alarm signal.
Preferably, the stress detection device comprises a vibrating wire type strain gauge and a vibrating wire data acquisition instrument, the vibrating wire type strain gauge and the vibrating wire data acquisition instrument are fixed on the wall-attached connecting piece, the vibrating wire type strain gauge is used for detecting the wall-attached stress and sending the wall-attached stress to the vibrating wire data acquisition instrument, and the vibrating wire data acquisition instrument is used for sending the processed data to the alarm.
Preferably, still include with the displacement detection device that the alarm is connected, displacement detection device is used for detecting the tower crane with attach the relative displacement between the wall, the alarm is used for working as when relative displacement is greater than and predetermines the displacement threshold value, send alarm signal.
Preferably, the displacement detection device comprises a resistance type displacement meter and a displacement data acquisition instrument which are fixed on the wall-attached connecting piece, the resistance type displacement meter is used for sending the relative displacement data acquired by the resistance type displacement meter to the displacement data acquisition instrument, and the displacement data acquisition instrument is used for sending the processed data to the alarm.
Preferably, still include with the inclination detection device that the alarm is connected, inclination detection device installs on the tower crane, be used for detecting the inclination of tower crane, the alarm still is used for when the inclination of tower crane exceeds when predetermineeing the slope threshold value, sends alarm signal.
Preferably, the tilt angle detection device is a biaxial inclinometer.
Preferably, the alarm is a wireless audible and visual alarm.
Preferably, the wall-attached connecting piece is connected with the tower crane through a square frame hoop.
Preferably, the alarm device further comprises a wireless transmission device and a mobile terminal, and the alarm device is connected with the mobile terminal through the wireless transmission device so as to send an alarm signal to the mobile terminal.
Compared with the prior art, the technical scheme has the following advantages:
1. can real-time detection attach wall stress through stress detection device, when attaching wall stress and surpassing the predetermined stress threshold value, can in time send alarm signal through the alarm, and then guarantee the security of tower crane construction.
2. Through addding displacement detection device and inclination detection device to the tower crane to carry out diversified control, can effectively improve the work security of tower crane, can reduce the input of artifical periodic inspection cost moreover, and then reduce intensity of labour.
3. The alarm is connected with the mobile terminal, and the alarm signal can be transmitted to the staff in time, so that emergency measures can be taken in time, and the construction safety of the staff is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is the utility model relates to a concrete embodiment provides a tower crane monitoring and early warning system's schematic structure diagram.
The reference numbers are as follows:
the device comprises a vibrating wire type strain gauge 1, a vibrating wire data acquisition instrument 2, a resistance type displacement meter 3, a displacement data acquisition instrument 4, a biaxial inclinometer 5, an alarm 6, a wireless transmission device 7, a wall attachment connecting piece 8, a frame hoop 9 and a tower crane 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a tower crane monitoring and early warning system according to an embodiment of the present invention.
The embodiment of the utility model provides a tower crane control early warning system, include: stress detection device, alarm 6, attach wall connecting piece 8, tower crane 10 through attaching wall connecting piece 8 with attach the wall and be connected, alarm 6 is connected with stress detection device, alarm 6 is wireless audible-visual annunciator 6. Stress detection device can real-time detection attach wall stress, and when attaching wall stress and being greater than preset threshold value, alarm 6 sends alarm signal to remind the staff to take emergency treatment measures, for example urgent danger avoiding, shut down etc. and then avoid taking place the incident, improved the security of tower crane 10 work.
The stress detection device comprises a vibrating wire type strain gauge 1 and a vibrating wire data acquisition instrument 2, the vibrating wire type strain gauge 1 and the vibrating wire data acquisition instrument 2 are fixed on an attached wall connecting piece 8, the vibrating wire type strain gauge 1 sends detected attached wall stress to the vibrating wire data acquisition instrument 2, and the vibrating wire data acquisition instrument 2 sends processed data to an alarm 6. In addition, other types of stress detection devices can be selected as long as the change of the wall-attached stress can be detected.
Besides the stress detection device, a displacement detection device and an inclination angle detection device which are respectively connected with the alarm 6 can be additionally arranged, wherein the displacement detection device can detect the relative displacement between the tower crane 10 and the attached wall in real time, and when the relative displacement is greater than a preset displacement threshold value, the alarm 6 sends out an alarm signal; inclination detection device installs on tower crane 10, can real-time detection tower crane 10's inclination, and inclination detection device is preferably biax inclinometer 5, and when tower crane 10's inclination exceeded and predetermine the slope threshold value, alarm 6 sent alarm signal. When one of the stress detection device, the displacement detection device and the inclination angle detection device detects that the data exceeds a corresponding preset threshold value, an alarm signal can be sent out, so that the safety of the tower crane 10 monitoring and early warning system is ensured from multiple aspects.
The displacement detection device specifically comprises a resistance type displacement meter 3 and a displacement data simulation acquisition instrument which are fixed on an attached wall connecting piece 8, wherein the resistance type displacement meter 3 can send relative displacement data acquired by the resistance type displacement meter to the displacement data acquisition instrument 4, and the displacement data acquisition instrument 4 sends processed data to an alarm 6.
It should be noted that, the concrete working principle of the vibrating wire strain gauge 1, the vibrating wire data acquisition instrument 2, the resistance type displacement meter 3, the displacement data acquisition instrument 4 and the biaxial inclinometer 5 refers to the prior art, and the core of the application lies in applying the detection instrument on the tower crane 10 to monitor the collapse of the tower crane 10, thereby improving the construction safety.
In order to improve the connection stability of the wall-attached connecting piece 8 and the tower crane 10, the wall-attached connecting piece 8 is horizontally arranged, one end of the wall-attached connecting piece 8 is connected with an attached wall, the other end of the wall-attached connecting piece is connected with the square hoop 9, the square hoop 9 is connected with the tower crane 10, the square hoop 9 is made of double-groove I-shaped steel, and a pin hole is formed in the end part of the square hoop 9 so that a bolt can be inserted into the pin hole to lock the square hoop 9. Wherein can set up a plurality of screw holes on attaching wall connecting piece 8 to installation stress detection device, displacement detection device, through dismantling the connected mode promptly, the use of having enough to meet the need many times of being convenient for, thereby reach resources are saved's purpose, also can become an organic whole through fixed connection's mode and attaching wall connecting piece 8 certainly, in order to improve the installation effectiveness. In addition, all the detecting instruments are connected by copper core polyvinyl chloride insulated wires.
Further, the alarm 6 is connected with the mobile terminal through the wireless transmission device 7 to send the alarm signal to the mobile terminal, for example, the data can be transmitted to the mobile terminal through the 4G transmission base station, and the mobile terminal can be a mobile phone or a computer. Through being connected alarm 6 with mobile terminal, reducible artifical periodic inspection cost reduces intensity of labour, improves the efficiency of construction.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
It is right above the utility model provides a tower crane control early warning system introduces in detail. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (9)

1. The utility model provides a tower crane control early warning system which characterized in that includes: stress detection device, alarm, attach the wall connecting piece, the tower crane passes through attach the wall connecting piece with attach the wall and be connected, the alarm with stress detection device connects, stress detection device is used for detecting attaches wall stress, the alarm is used for working when attaching wall stress and being greater than when predetermineeing the threshold value, sends alarm signal.
2. The tower crane monitoring and early warning system according to claim 1, wherein the stress detection device comprises a vibrating wire type strain gauge and a vibrating wire data acquisition instrument, the vibrating wire type strain gauge and the vibrating wire data acquisition instrument are fixed on the wall-attached connecting piece, the vibrating wire type strain gauge is used for detecting the wall-attached stress and sending the wall-attached stress to the vibrating wire data acquisition instrument, and the vibrating wire data acquisition instrument is used for sending processed data to the alarm.
3. The tower crane monitoring and early warning system according to claim 2, further comprising a displacement detection device connected with the alarm, wherein the displacement detection device is used for detecting the relative displacement between the tower crane and the attached wall, and the alarm is used for sending out an alarm signal when the relative displacement is greater than a preset displacement threshold value.
4. The tower crane monitoring and early warning system according to claim 3, wherein the displacement detection device comprises a resistance type displacement meter and a displacement data acquisition instrument which are fixed on the wall-attached connecting piece, the resistance type displacement meter is used for sending relative displacement data acquired by the resistance type displacement meter to the displacement data acquisition instrument, and the displacement data acquisition instrument is used for sending processed data to the alarm.
5. The tower crane monitoring and early warning system according to claim 4, further comprising an inclination angle detection device connected with the alarm, wherein the inclination angle detection device is installed on the tower crane and used for detecting the inclination angle of the tower crane, and the alarm is further used for sending an alarm signal when the inclination angle of the tower crane exceeds a preset inclination threshold value.
6. The tower crane monitoring and early warning system according to claim 5, wherein the inclination angle detection device is a dual-axis inclinometer.
7. The tower crane monitoring and early warning system according to claim 1, wherein the alarm is a wireless audible and visual alarm.
8. The tower crane monitoring and early warning system of claim 1, wherein the wall-attached connecting piece is connected with the tower crane through a square hoop.
9. The tower crane monitoring and early warning system according to any one of claims 1 to 8, further comprising a wireless transmission device and a mobile terminal, wherein the alarm is connected with the mobile terminal through the wireless transmission device to send an alarm signal to the mobile terminal.
CN202121770417.8U 2021-07-29 2021-07-29 Tower crane monitoring and early warning system Active CN215177918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121770417.8U CN215177918U (en) 2021-07-29 2021-07-29 Tower crane monitoring and early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121770417.8U CN215177918U (en) 2021-07-29 2021-07-29 Tower crane monitoring and early warning system

Publications (1)

Publication Number Publication Date
CN215177918U true CN215177918U (en) 2021-12-14

Family

ID=79405821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121770417.8U Active CN215177918U (en) 2021-07-29 2021-07-29 Tower crane monitoring and early warning system

Country Status (1)

Country Link
CN (1) CN215177918U (en)

Similar Documents

Publication Publication Date Title
CN106241631A (en) Tower crane Hoisting Security control system
CN209246957U (en) A kind of template deformation monitoring device
CN104197993A (en) Health monitoring and safety warning method for shipbuilding gantry crane structure
CN110984255A (en) Foundation pit support structure horizontal displacement monitoring and early warning system
CN104264589B (en) A kind of Hanging Basket status real time monitor method
CN215177918U (en) Tower crane monitoring and early warning system
CN102344093A (en) Tower crane anti-leaning intelligent monitoring system
CN204778521U (en) Visual tower crane collision early warning device based on ultrasonic wave
CN112562293A (en) Bridge electronic safety early warning system based on 5G technology
CN204754248U (en) Super high -rise building construction elevator regularization connects material platform
CN209455992U (en) A kind of safety monitoring device for preventing cantilever crane loop wheel machine from toppling
CN217478903U (en) Deformation monitoring device for tower crane
CN212642090U (en) Monitoring system of cantilever type externally hung protection frame
CN202296926U (en) Intelligent inclination-preventing monitoring system for tower crane
CN210795560U (en) Safety monitoring device for tower crane
CN204162333U (en) Based on the tower machine monitoring device of STM32
CN211928728U (en) Existing building safety monitoring alarm control system
CN202575790U (en) Safety supervision management system for tower crane
CN203624863U (en) Novel bridge crane with double alarms
CN205666907U (en) Transmission line prevents outer broken monitoring devices based on wire is got
CN217878846U (en) Scaffold connection strength monitoring system
CN110775826A (en) Automatic identification system and method for dangerous source
CN211665811U (en) Foundation pit support structure horizontal displacement monitoring and early warning system
CN214755429U (en) Prevent injuring by a crashing object power cable protection network
CN217106395U (en) Multifunctional monitoring device for spatial attitude of holding pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant