CN215173836U - Movable connecting frame for water prevention and control of ground survey - Google Patents

Movable connecting frame for water prevention and control of ground survey Download PDF

Info

Publication number
CN215173836U
CN215173836U CN202121390076.1U CN202121390076U CN215173836U CN 215173836 U CN215173836 U CN 215173836U CN 202121390076 U CN202121390076 U CN 202121390076U CN 215173836 U CN215173836 U CN 215173836U
Authority
CN
China
Prior art keywords
rotating rod
slider
ground
support body
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121390076.1U
Other languages
Chinese (zh)
Inventor
樊建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Danqin Geological And Mineral Engineering Survey And Design Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121390076.1U priority Critical patent/CN215173836U/en
Application granted granted Critical
Publication of CN215173836U publication Critical patent/CN215173836U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a prevention and cure water link technical field specifically is a swing joint frame for surveying prevention and cure water with ground, including first support body and second support body, the second support body passes through elevating system and first support body swing joint, still includes: the lifting mechanism comprises a motor, a driving wheel, a rotating shaft, a rotating rod assembly, a driven wheel and a movable rack; the installation mechanism comprises a telescopic component, a sliding rail, a first sliding block, a second sliding block, a fixed block and an elastic piece. The movable connecting frame for measuring and controlling water on the ground can control the height of the ground measuring device through the lifting mechanism according to actual application, thereby improving the practicability of the connecting frame and improving the working efficiency of measuring and controlling water on the ground; the mounting stability of the mounting mechanism to the ground measuring device can be improved through the triangular fixing mode of the second sliding block and the fixing block in the mounting mechanism and the elastic force of the elastic piece.

Description

Movable connecting frame for water prevention and control of ground survey
Technical Field
The utility model relates to a prevention and cure water link technical field specifically is a swing joint frame that is used for surveying prevention and cure water with ground.
Background
The water damage of the coal mine is a common disaster in the process of mine infrastructure construction and production, the water damage of the coal mine affects the production efficiency of the mine slightly, and a vicious accident of drowning people is caused seriously.
The existing movable connecting frame for ground measurement and water control can fix the ground measurement device on the connecting frame, but has low stability, does not have a mechanism for the vertical movement of the ground measurement device, and has great limitation. Therefore, in view of the above situation, there is an urgent need to develop a movable connection frame for ground survey of control water to overcome the disadvantages in the current practical application.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a swing joint frame for preventing and treating water is surveyed to ground to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a swing joint frame for surveying prevention and cure water with ground, includes first support body and second support body, the second support body passes through elevating system and first support body swing joint, still includes: the lifting mechanism comprises a motor, a driving wheel, a rotating shaft, a rotating rod assembly, a driven wheel and movable racks, the motor is fixed on the first frame body, the rotating shaft is connected with the output end of the motor, the driving wheel and the driven wheel are respectively sleeved on the rotating shaft, the driving wheel and the driven wheel are meshed and connected with the movable racks, the driving wheel drives the driven wheel and the movable racks to rotate by rotation, one end of the rotating rod assembly is fixedly installed on the rotating shaft, one end, far away from the rotating shaft, of the rotating rod assembly is rotatably connected with the side wall of the second frame body, and the rotating rod assembly rotates to drive the second frame body to lift; and
installation mechanism, installation mechanism includes flexible subassembly, slide rail, first slider, second slider, fixed block and elastic component, flexible subassembly is installed on the second support body, flexible subassembly includes cylinder and telescopic link, flexible subassembly is used for controlling the flexible slip of first slider, slide rail and fixed block are installed respectively on the second support body, first slider and second slider movable mounting are on the slide rail, just first slider drives the second slider and slides, the elastic component is installed respectively on a side end face of second slider and fixed block, the elastic component is used for surveying the device with installing.
As a further aspect of the present invention: the bull stick subassembly includes the main dwang and follows the dwang, the one end of main dwang is installed in the pivot, the other end of main dwang is rotated with the follow dwang and is connected, the one end of following the dwang is rotated with the lateral wall of second support body and is connected.
As a further aspect of the present invention: the second sliding block is provided with a sliding groove, and the first sliding block slides on the sliding rail through the sliding groove.
As a further aspect of the present invention: the mounting groove and the through hole have been seted up on the first support body, the mounting groove is used for the installation of movable rack, the through hole is used for the removal of bull stick subassembly, install a plurality of handle on the first support body, just install a plurality of fixed establishment on the terminal surface of a side that the handle was kept away from to the first support body, fixed establishment is used for swing joint frame's fixing.
As a further aspect of the present invention: the fixing mechanism comprises a hinged seat, a rotating rod, a fixing piece and an inserting rod, the hinged seat is installed on the end face of the first frame body, and the two ends of the rotating rod are rotatably connected with the hinged seat and the inserting rod through the fixing piece.
As a further aspect of the present invention: the second frame body is provided with a mounting hole, and the mounting hole is used for fixedly mounting the ground measuring device through the mounting mechanism.
Compared with the prior art, the beneficial effects of the utility model are that:
1) through the structural arrangement of the lifting mechanism, the motor rotates to drive the rotating shaft to rotate, and simultaneously drives the driving wheel to rotate, the driving wheel and the driven wheel are meshed and connected with the movable rack, the movable rack moves through the rotation of the driving wheel, and indirectly drives the driven wheel to rotate, so that the rotating shaft arranged on the driven wheel rotates, and the rotating rod assembly is driven to rotate, the lifting of the lifting mechanism on the second frame body is realized, the height of the device can be conveniently measured according to actual application control, the practicability of the connecting frame is improved, and the working efficiency of measuring and controlling water is improved;
2) through the structure setting of installation mechanism, flexible subassembly drives first slider and slides on the slide rail, through the relation of being connected of first slider and second slider, has driven the second slider of installing in the first slider left and right sides and has slided for install the elastic component on second slider and fixed block and survey the device and carry out fixed mounting to ground, can survey the device through flexible subassembly and stabilize fixedly with ground, can increase the installation stability of installation mechanism survey the device to ground through the elastic force of elastic component.
To sum up, the utility model relates to a movable connecting frame for ground measurement of water for prevention and treatment, which overcomes the defects in the current practical application, and the height of the ground measurement device can be controlled according to the practical application through the lifting mechanism, thereby improving the practicability of the connecting frame and the working efficiency of the ground measurement of water for prevention and treatment; the mounting stability of the mounting mechanism to the ground measuring device can be improved through the triangular fixing mode of the second sliding block and the fixing block in the mounting mechanism and the elastic force of the elastic piece.
Drawings
Fig. 1 is a schematic structural view of the movable connection frame for water control of ground survey of the present invention.
Fig. 2 is a structural plan view of the movable connection frame for water control of ground survey of the present invention.
FIG. 3 is a schematic structural view of the mounting mechanism of FIG. 1.
Fig. 4 is an enlarged schematic view of a structure in fig. 1.
Fig. 5 is a structural sectional view of B-B in fig. 3.
In the figure: 1-a first frame body, 11-a mounting groove, 12-a through hole, 2-a lifting mechanism, 21-a motor, 22-a driving wheel, 23-a rotating shaft, 24-a supporting member, 25-a rotating rod component, 251-a main rotating rod, 252-a driven rotating rod, 26-a driven wheel, 27-a movable rack, 3-a mounting mechanism, 31-an air cylinder, 32-a telescopic rod, 33-a sliding rail, 34-a first sliding block, 35-a second sliding block, 351-a sliding groove, 36-a fixing block, 37-an elastic member, 4-a second frame body, 41-a mounting hole, 5-a handle, 6-a fixing mechanism, 61-a hinged seat, 62-a rotating rod, 63-a fixing member and 64-an inserting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The technical solution of the present invention will be described in further detail with reference to the following embodiments.
As shown in fig. 1 to 5, as an embodiment of the utility model provides a swing joint frame for ground survey control water, including first support body 1 and second support body 4, second support body 4 passes through elevating system 2 and first support body 1 swing joint, still includes: the lifting mechanism 2 comprises a motor 21, a driving wheel 22, a rotating shaft 23, a rotating rod assembly 25, a driven wheel 26 and movable racks 27, the motor 21 is fixed on the first frame body 1, the rotating shaft 23 is connected with the output end of the motor 21, the driving wheel 22 and the driven wheel 26 are respectively sleeved on the rotating shaft 23, the driving wheel 22 and the driven wheel 26 are meshed with the movable racks 27, the driving wheel 22 rotates to drive the driven wheel 26 and the movable racks 27 to rotate, one end of the rotating rod assembly 25 is fixedly installed on the rotating shaft 23, one end, far away from the rotating shaft 23, of the rotating rod assembly 25 is rotatably connected with the side wall of the second frame body 4, and the rotating rod assembly 25 rotates to drive the second frame body 4 to lift; and
installation mechanism 3, installation mechanism 3 includes flexible subassembly, slide rail 33, first slider 34, second slider 35, fixed block 36 and elastic component 37, flexible unit mount is on second support body 4, flexible subassembly includes cylinder 31 and telescopic link 32, flexible subassembly is used for controlling the flexible slip of first slider 34, slide rail 33 and fixed block 36 are installed respectively on second support body 4, first slider 34 and second slider 35 movable mounting are on slide rail 33, just first slider 34 drives second slider 35 and slides, elastic component 37 is installed respectively on a side end face of second slider 35 and fixed block 36, elastic component 37 is used for surveying the device with installing.
In this embodiment, the rotation of the motor 21 drives the driving wheel 22 and the rotating shaft 23 to rotate, and simultaneously, through the meshed connection between the driving wheel 22 and the driven wheel 26 and the movable rack 27, the movable rack 27 moves in the installation slot 11 under the rotation of the driving wheel 22, so as to drive the driven wheel 26 and the rotating shaft 23 installed on the driven wheel 26 to rotate, and drive the rotating rod assembly 25 to rotate through the rotation of the rotating shaft 23, so that the lifting mechanism 2 can lift and lower the second frame body 4 and the ground measuring device installed on the second frame body 4;
the work of cylinder 31 drives telescopic link 32 and stretches out and draws back among the flexible subassembly, it interacts on slide rail 33 to have driven first slider 34, install respectively at the both ends of first slider 34 in the spout 351 on the second slider 35 of the left and right sides, first slider 34 slides under telescopic link 32's the flexible, the second slider 35 that has driven the left and right sides slides on slide rail 33, make the elastic component 37 of installing on second slider 35 contract to the elastic component 37 of installing on fixed block 36, thereby it is fixed to realize surveying the triangle of device to ground, the elastic force through elastic component 37 can improve installation mechanism 3 and survey the installation stability of device to ground.
As shown in fig. 1, as a preferred embodiment of the present invention, the rotating rod assembly 25 includes a main rotating rod 251 and a sub rotating rod 252, one end of the main rotating rod 251 is installed on the rotating shaft 23, the other end of the main rotating rod 251 is rotatably connected to the sub rotating rod 252, and one end of the sub rotating rod 252 is rotatably connected to the side wall of the second frame body 4.
In the present embodiment, the rotating rod assembly 25 employs the main rotating rod 251 and the slave rotating rod 252, and the main rotating rod 51 rotates under the rotation of the rotating shaft 23, so as to drive the slave rotating rod 252 to rotate; the rotating rod assembly 25 can also adopt the connection mode of a threaded shaft and a sliding sleeve to realize the lifting of the second frame body 4, and the sliding sleeve is installed on the second frame body 4 and is connected with the sliding sleeve through the threaded shaft. The threaded shaft drives the sliding sleeve to move up and down when rotating, and the second frame body 4 and the ground measuring device can move up and down.
As shown in fig. 3, as a preferred embodiment of the present invention, a sliding groove 351 is disposed on the second slider 35, and the first slider 34 slides in the sliding groove 351 and drives the second slider 35 to slide on the sliding rail 33.
As shown in fig. 2 and 4, as a preferred embodiment of the present invention, a mounting groove 11 and a through hole 12 are provided on the first frame body 1, the mounting groove 11 is used for mounting the movable rack 27, the through hole 12 is used for moving the rotating rod assembly 25, a plurality of handles 5 are mounted on the first frame body 1, a plurality of fixing mechanisms 6 are mounted on a side end surface of the first frame body 1 away from the handles 5, and the fixing mechanisms 61 are used for fixing the movable connecting frame.
In this embodiment, the handle 5 is installed on the four end side walls of the first frame body 1, and the handle 5 can realize the convenient movement of the movable connecting frame, thereby improving the transportation convenience and practicability of the movable connecting frame.
As shown in fig. 1, as a preferred embodiment of the present invention, the fixing mechanism 61 includes a hinge base 61, a rotating rod 62, a fixing member 63 and an inserting rod 64, the hinge base 61 is installed on the end surface of the first frame body 1, and both ends of the rotating rod 62 are rotatably connected with the hinge base 61 and the inserting rod 64 through the fixing member 63.
In this embodiment, the rotating rod 62 and the inserting rod 64 can be folded and rotated through the hinge seat 61 and the fixing member 63; when the ground measurement is needed, the rotating rod 62 and the inserting rod 64 are rotated, the inserting rod 64 is inserted into the corresponding ground measurement position, the rotating rod 62 and the inserting rod 64 can be fixed through screwing the fixing piece 63, and the stability of the movable connecting frame in the ground measurement process is improved. The fixing mechanism 61 can adopt a hydraulic cylinder and a hydraulic disc to improve the stability of the movable connecting frame, and before the fixing mechanism is used, the movable connecting frame is subjected to overhead processing through the hydraulic cylinder and the hydraulic disc, so that the stability of the movable connecting frame in the process of stress is ensured, and the stability of the movable connecting frame in the process of ground measurement is ensured.
As shown in fig. 3, as a preferred embodiment of the present invention, a mounting hole 41 is opened on the second frame body 4, and the mounting hole 41 is used for fixing and mounting the ground measuring device by the mounting mechanism 3.
The utility model discloses a theory of operation is:
the rotating rod 62 and the inserting rod 64 can be folded and rotated through the hinged seat 61 and the fixing piece 63, when the ground measurement needs to be carried out, the rotating rod 62 and the inserting rod 64 are rotated, the inserting rod 64 is inserted into a corresponding ground measurement position, the rotating rod 62 and the inserting rod 64 can be fixed through screwing the fixing piece 63, and the movable connecting frame is prevented from shaking and the like in the ground measurement process;
the rotation of the motor 21 drives the driving wheel 22 and the rotating shaft 23 to rotate, and simultaneously, the driving wheel 22 and the driven wheel 26 are meshed with the movable rack 27, so that the movable rack 27 moves in the mounting groove 11 under the rotation of the driving wheel 22, the driven wheel 26 and the rotating shaft 23 mounted on the driven wheel 26 are driven to rotate, the rotating rod assembly 25 is driven to rotate through the rotation of the rotating shaft 23, and the lifting mechanism 2 is used for lifting and moving the second frame body 4 and the ground detection device mounted on the second frame body 4;
the working of the cylinder 31 in the telescopic assembly drives the telescopic rod 32 to extend and retract, so as to drive the first sliding block 34 to interact on the sliding rail 33, two ends of the first sliding block 34 are respectively installed in the sliding grooves 351 of the second sliding blocks 35 on the left side and the right side, the first sliding block 34 slides under the extension and retraction of the telescopic rod 32, so as to drive the second sliding blocks 35 on the left side and the right side to slide on the sliding rail 33, so that the elastic part 37 installed on the second sliding block 35 contracts towards the elastic part 37 installed on the fixed block 36, thereby realizing the triangular fixation of the ground measuring device, and the installation stability of the installation mechanism 3 on the ground measuring device can be improved through the elastic force of the elastic part 37;
the working principle of the movable connecting frame for the ground measurement of the water control is described above.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a swing joint frame for surveying prevention and cure water with ground, includes first support body and second support body, the second support body passes through elevating system and first support body swing joint, its characterized in that still includes:
the lifting mechanism comprises a motor, a driving wheel, a rotating shaft, a rotating rod assembly, a driven wheel and movable racks, the motor is fixed on the first frame body, the rotating shaft is connected with the output end of the motor, the driving wheel and the driven wheel are respectively sleeved on the rotating shaft, the driving wheel and the driven wheel are meshed and connected with the movable racks, the driving wheel drives the driven wheel and the movable racks to rotate by rotation, one end of the rotating rod assembly is fixedly installed on the rotating shaft, one end, far away from the rotating shaft, of the rotating rod assembly is rotatably connected with the side wall of the second frame body, and the rotating rod assembly rotates to drive the second frame body to lift; and
installation mechanism, installation mechanism includes flexible subassembly, slide rail, first slider, second slider, fixed block and elastic component, flexible subassembly is installed on the second support body, flexible subassembly includes cylinder and telescopic link, flexible subassembly is used for controlling the flexible slip of first slider, slide rail and fixed block are installed respectively on the second support body, first slider and second slider movable mounting are on the slide rail, just first slider drives the second slider and slides, the elastic component is installed respectively on a side end face of second slider and fixed block, the elastic component is used for surveying the device with installing.
2. The movable connecting frame for preventing and treating water according to claim 1, wherein the rotating rod assembly comprises a main rotating rod and a slave rotating rod, one end of the main rotating rod is installed on the rotating shaft, the other end of the main rotating rod is rotatably connected with the slave rotating rod, and one end of the slave rotating rod is rotatably connected with the side wall of the second frame body.
3. The movable connecting frame for the ground detection, the prevention and the treatment of water according to claim 1, wherein the second sliding block is provided with a sliding groove, and the first sliding block slides on the sliding rail through the sliding groove.
4. The movable connecting frame for ground detection, prevention and treatment of water according to claim 1, wherein the first frame body is provided with an installation groove and a through hole, the installation groove is used for installing a movable rack, the through hole is used for moving the rotating rod assembly, the first frame body is provided with a plurality of handles, a side end face of the first frame body, away from the handles, is provided with a plurality of fixing mechanisms, and the fixing mechanisms are used for fixing the movable connecting frame.
5. The movable connecting frame for ground detection, control and water according to claim 4, wherein the fixing mechanism comprises a hinged seat, a rotating rod, a fixing part and an inserting rod, the hinged seat is installed on the end face of the first frame body, and two ends of the rotating rod are rotatably connected with the hinged seat and the inserting rod through the fixing part.
6. The movable connecting frame for the ground detection, the prevention and the treatment of water according to claim 1, wherein the second frame body is provided with a mounting hole, and the mounting hole is used for fixedly mounting a ground detection device through a mounting mechanism.
CN202121390076.1U 2021-06-22 2021-06-22 Movable connecting frame for water prevention and control of ground survey Active CN215173836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121390076.1U CN215173836U (en) 2021-06-22 2021-06-22 Movable connecting frame for water prevention and control of ground survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121390076.1U CN215173836U (en) 2021-06-22 2021-06-22 Movable connecting frame for water prevention and control of ground survey

Publications (1)

Publication Number Publication Date
CN215173836U true CN215173836U (en) 2021-12-14

Family

ID=79385825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121390076.1U Active CN215173836U (en) 2021-06-22 2021-06-22 Movable connecting frame for water prevention and control of ground survey

Country Status (1)

Country Link
CN (1) CN215173836U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114294537A (en) * 2022-01-20 2022-04-08 山东华岳勘察测绘有限公司 Portable intelligent survey and drawing location balance instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114294537A (en) * 2022-01-20 2022-04-08 山东华岳勘察测绘有限公司 Portable intelligent survey and drawing location balance instrument

Similar Documents

Publication Publication Date Title
CN111641370B (en) Solar photovoltaic board convenient to remove
CN215173836U (en) Movable connecting frame for water prevention and control of ground survey
CN211549578U (en) Rock drill that construction used
CN213898042U (en) Building construction operation supporting mechanism
CN116995565B (en) Auxiliary installation device of power supply pipeline
CN204676954U (en) Move integrally the rotary parking apparatus of pitching
CN214944038U (en) Drilling machine fixing base with clamping function
CN210685317U (en) Construction platform for building
CN210033271U (en) Movable drilling machine for tunnel construction
CN213654154U (en) Lifting type construction platform for house building engineering
CN212631522U (en) Fire water monitor subassembly convenient to equipment
CN109736609B (en) Shared bicycle underground parking device and using method thereof
CN217556967U (en) Geotechnical engineering slope reinforcement equipment
CN217396588U (en) Auxiliary supporting device for installation of civil air defense door
CN218951972U (en) Hanging basket for wider bridge construction
CN217712564U (en) Chassis for receiving and originating equipment of shield machine
CN219081620U (en) Drill boom with double drill frames
CN219672568U (en) Drilling machine for geotechnical engineering
CN213897248U (en) Miniature excavator with fixable chassis
CN214273182U (en) A personnel protection companion for highway construction
CN219753221U (en) In-hole oblique jet grouting pile machine
CN217630203U (en) Pedal lifting device
CN220226080U (en) Door and window auxiliary installation device
CN220741040U (en) Petroleum logging instrument butt joint device
CN216480742U (en) Energy-concerving and environment-protective formula lighting device for bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230906

Address after: Room 1102, Unit 1, Building 8, Jiangbin 1, Sihao Community, Chengguan Street Office, Shangzhou District, Shangluo City, Shaanxi Province, 726000

Patentee after: Shaanxi Danqin Geological and Mineral Engineering Survey and Design Co.,Ltd.

Address before: 034100 No. 179 Ping'an Street, Yuanping City, Xinzhou City, Shanxi Province

Patentee before: Fan Jianwei

TR01 Transfer of patent right