CN215165455U - Assembled geogrid - Google Patents

Assembled geogrid Download PDF

Info

Publication number
CN215165455U
CN215165455U CN202121008824.5U CN202121008824U CN215165455U CN 215165455 U CN215165455 U CN 215165455U CN 202121008824 U CN202121008824 U CN 202121008824U CN 215165455 U CN215165455 U CN 215165455U
Authority
CN
China
Prior art keywords
montant
geogrid
baffle
utility
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121008824.5U
Other languages
Chinese (zh)
Inventor
辛海利
王玉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yingxin Engineering Materials Co ltd
Original Assignee
Shandong Yingxin Engineering Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yingxin Engineering Materials Co ltd filed Critical Shandong Yingxin Engineering Materials Co ltd
Priority to CN202121008824.5U priority Critical patent/CN215165455U/en
Application granted granted Critical
Publication of CN215165455U publication Critical patent/CN215165455U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model provides an assemble geogrid mainly relates to geogrid technical field. The utility model provides an assemble geogrid, includes two montants, two distribute about the montant, every several evenly distributed's through-hole is all seted up to montant one side, two be equipped with several horizontal poles between the montant, every in the horizontal pole both ends all insert corresponding through-hole, every both sides all are seted up through the groove about the horizontal pole both ends, every pass through the inslot and all rotate installation baffle, corresponding two through spring coupling between the baffle. The beneficial effects of the utility model reside in that: the utility model discloses simple structure, convenient to use uses through the cooperation of spring with the baffle, and completion that can be quick is assembled, has saved the time of assembling, has improved and has assembled efficiency, has reduced operating personnel manual labor, and dismantles the convenience, brings the convenience for the use.

Description

Assembled geogrid
Technical Field
The utility model mainly relates to a geogrid technical field specifically is an assemble geogrid.
Background
The grid is a two-dimensional grid or three-dimensional grid screen grid with a certain height formed by thermoplastic or die pressing of high polymer such as polypropylene and polyvinyl chloride, when the grid is used for civil engineering, the grid is called as a geogrid, the steel-plastic composite geogrid is formed by weaving or clamping and arranging single belts at certain intervals longitudinally or transversely by a fusion welding technology of special reinforced adhesion and welding the cross joints of the single belts by using a high-strength steel wire, special treatment is carried out on the steel-plastic composite geogrid, polyethylene or polypropylene and other auxiliary agents are added, and the composite high-strength tensile strips are formed by extrusion and have rough embossing on the surfaces.
The traditional geogrid assembling mode is that plastic belts are used for binding at the lap joint of the geogrid, the connected geogrid is fixed on the ground by using U-shaped nails, or the screw holes of the two geogrids are aligned and the two geogrids are inserted by using screws, but the geogrids are large and difficult to align, so that the two assembling modes are time-consuming, the splicing efficiency of people is reduced, and the lap joint is easily damaged, so that the existing efficacy of the geogrid is influenced.
SUMMERY OF THE UTILITY MODEL
For solving the not enough of prior art, the utility model provides an assemble geogrid, the utility model discloses simple structure, convenient to use uses through the cooperation of spring with the baffle, and completion that can be quick is assembled, has saved the time of assembling, has improved and has assembled efficiency, has reduced operating personnel manual labor, and dismantles the convenience, brings the convenience for the use.
The utility model discloses a realize above-mentioned purpose, realize through following technical scheme:
the utility model provides an assemble geogrid, includes two montants, two distribute about the montant, every several evenly distributed's through-hole is all seted up to montant one side, two be equipped with several horizontal poles between the montant, every in the horizontal pole both ends all insert corresponding through-hole, every both sides all are seted up through the groove about the horizontal pole both ends, every pass through the inslot and all rotate installation baffle, corresponding two through spring coupling between the baffle.
Furthermore, one side of each baffle is provided with a stop block.
Furthermore, every the montant top all installs the inserted bar, the inserted bar can block into the montant bottom.
Furthermore, the surfaces of the vertical rods and the cross rods are coated with anti-rust layers.
Contrast prior art, the beneficial effects of the utility model are that:
the utility model discloses simple structure, convenient to use uses through the cooperation of spring with the baffle, and completion that can be quick is assembled, has saved the time of assembling, has improved and has assembled efficiency, has reduced operating personnel manual labor, and dismantles the convenience, brings the convenience for the use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a cross bar configuration;
FIG. 3 is a schematic view of a vertical bar structure;
reference numerals shown in the drawings: 1. a vertical rod; 2. a through hole; 3. a cross bar; 4. penetrating through the groove; 5. a rotating shaft; 6. a baffle plate; 7. a spring; 8. a stopper; 9. and (4) inserting the rod.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Furthermore, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teachings of the present invention, and these equivalents also fall within the scope defined in the present application.
As shown in fig. 1-3, an assemble geogrid, including two montants 1, two distribute about montant 1, every montant 1 one side all sets up several evenly distributed's through-hole 2, two be equipped with several horizontal poles 3 between the montant 1, every in 3 both ends of horizontal pole all insert corresponding through-hole 2, every the groove 4, every are all seted up to both sides about 3 both ends of horizontal pole pass through in the groove 4, every pass through all rotate erection baffle 6, corresponding two through spring 7 connection between the baffle 6.
Specifically, one side of each baffle 6 is provided with a stop block 8. The baffle 6 can be limited by the stop block 8, and the assembling firmness of the cross rods 3 and 1 is further improved.
Specifically, every 1 top of montant all installs inserted bar 9, inserted bar 9 can block into 1 bottom of montant. The inserted bar 9 can connect the two vertical bars 1 which are distributed up and down, so that the assembly efficiency is improved.
Specifically, the surfaces of the vertical rods 1 and the cross rods 3 are coated with anti-rust layers. The surfaces of the vertical rod 1 and the cross rod 3 are coated with anti-rust layers, so that the corrosion resistance of the vertical rod 1 and the cross rod 3 is improved, and the service life of the vertical rod 1 and the cross rod 3 is prolonged.
Example (b):
when using this device, at first place two montants 1 about, then take a horizontal pole 3, press the baffle 6 at horizontal pole 3 both ends, make baffle 6 rotate around corresponding pivot 5, in the transparent groove 4 that corresponds baffle 6 income, spring 7 is compressed, then go into corresponding through-hole 2 with horizontal pole 3 both ends card respectively in, under spring 7's elastic force effect, pop out the baffle 6 at horizontal pole 3 both ends from the transparent groove 4 that corresponds, and then make baffle 4 and through-hole 2 form the joint, and then accomplish and assemble, then install remaining horizontal pole 3 in proper order, accomplish assembling of grid.
The utility model discloses simple structure, convenient to use uses through the cooperation of spring with the baffle, and completion that can be quick is assembled, has saved the time of assembling, has improved and has assembled efficiency, has reduced operating personnel manual labor, and dismantles the convenience, brings the convenience for the use.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (4)

1. An assemble geogrid, includes two montants (1), its characterized in that: two distribute about montant (1), every through-hole (2) that several evenly distributed were all seted up to montant (1) one side, two be equipped with several horizontal pole (3) between montant (1), every horizontal pole (3) both ends are all inserted in corresponding through-hole (2), every both sides all set up through groove (4), every about horizontal pole (3) both ends all rotate installation baffle (6), corresponding two through pivot (5) in through groove (4) connect through spring (7) between baffle (6).
2. The assembled geogrid according to claim 1, wherein: one side of each baffle (6) is provided with a stop block (8).
3. The assembled geogrid according to claim 1, wherein: every montant (1) top all installs inserted bar (9), inserted bar (9) can block into montant (1) bottom.
4. The assembled geogrid according to claim 1, wherein: and anti-rust layers are coated on the surfaces of the vertical rods (1) and the cross rods (3).
CN202121008824.5U 2021-05-12 2021-05-12 Assembled geogrid Active CN215165455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121008824.5U CN215165455U (en) 2021-05-12 2021-05-12 Assembled geogrid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121008824.5U CN215165455U (en) 2021-05-12 2021-05-12 Assembled geogrid

Publications (1)

Publication Number Publication Date
CN215165455U true CN215165455U (en) 2021-12-14

Family

ID=79368941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121008824.5U Active CN215165455U (en) 2021-05-12 2021-05-12 Assembled geogrid

Country Status (1)

Country Link
CN (1) CN215165455U (en)

Similar Documents

Publication Publication Date Title
CN2495685Y (en) Quick-action joint for prestressed concrete piles
CN211257397U (en) Steel construction assembled wall body
CN215165455U (en) Assembled geogrid
CN212772868U (en) Pre-buried bearing structure
CN210887578U (en) Plug-in truss structure and early warning system thereof
CN209046173U (en) A kind of gantry connection structure of stable connection
CN211773527U (en) Pin-connected panel geogrid
CN212772284U (en) Geogrid
CN208202564U (en) Ironware back cord corner connector
CN205776291U (en) A kind of novel strip footing
CN207405791U (en) A kind of plug-in type I-steel node structure
CN212406213U (en) Make things convenient for combination formula heel post reinforcing apparatus of dismouting
CN217601394U (en) Unidirectional stretching grating convenient to disassemble
CN206467774U (en) A kind of splicing magnetic connecting structure of post and post
CN204826845U (en) Line tower is crossed to stable in structure's assembled
CN204948920U (en) Individual layer agricultural greenhouse steelframe
CN211565842U (en) Combined type steel bar stacking rack
CN213204191U (en) Mechanical connection structure, end plate and prefabricated concrete member connecting device
CN204510930U (en) Be convenient to the preassembled transformer station assembled
CN213709866U (en) Steel structure column and connecting structure thereof
CN213906162U (en) Novel double-upright-column cable support
CN103790238A (en) Connector for connecting assembly type steel plate shearing wall and steel beam
CN210069140U (en) Pipeline fixing device is used in municipal works pipe network construction
CN213087225U (en) Prefabricated general reinforcement explorator
CN219327069U (en) Polyester warp knitting sand-fixing geocell

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A type of assembled geogrid

Effective date of registration: 20231207

Granted publication date: 20211214

Pledgee: Feicheng Sub branch of Postal Savings Bank of China Co.,Ltd.

Pledgor: Shandong Yingxin Engineering Materials Co.,Ltd.

Registration number: Y2023980069816

PE01 Entry into force of the registration of the contract for pledge of patent right