CN215143774U - Blanking equipment before circular iron sheet for building preparation - Google Patents

Blanking equipment before circular iron sheet for building preparation Download PDF

Info

Publication number
CN215143774U
CN215143774U CN202022683972.9U CN202022683972U CN215143774U CN 215143774 U CN215143774 U CN 215143774U CN 202022683972 U CN202022683972 U CN 202022683972U CN 215143774 U CN215143774 U CN 215143774U
Authority
CN
China
Prior art keywords
iron sheet
rack
circular iron
frame
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022683972.9U
Other languages
Chinese (zh)
Inventor
邓文文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xincheng Construction Co ltd
Original Assignee
Anhui Xincheng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xincheng Construction Co ltd filed Critical Anhui Xincheng Construction Co ltd
Priority to CN202022683972.9U priority Critical patent/CN215143774U/en
Application granted granted Critical
Publication of CN215143774U publication Critical patent/CN215143774U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Punching Or Piercing (AREA)

Abstract

The utility model relates to a blanking equipment before the preparation for the building especially relates to a blanking equipment before preparation of circular iron sheet for building. The technical problem to be solved is as follows: the blanking equipment for manufacturing the circular iron sheet for the building, which can reduce the labor intensity and improve the blanking efficiency, is provided. The technical scheme is as follows: the utility model provides a blanking equipment before circular iron sheet for building preparation, including: the conveying mechanism is arranged on the rack; and the stamping mechanism is arranged on one side of the rack far away from the conveying mechanism. The utility model discloses a conveying mechanism can carry iron plate, so do not need the user to carry iron plate to can reduce user's intensity of labour, can cut into circular iron sheet with iron plate through punching press mechanism, and punching press mechanism can prevent that circular iron sheet from blocking, and then can improve the blanking efficiency of circular iron sheet.

Description

Blanking equipment before circular iron sheet for building preparation
Technical Field
The utility model relates to a blanking equipment before the preparation for the building especially relates to a blanking equipment before preparation of circular iron sheet for building.
Background
The building refers to an asset formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and constructions; a house refers to an engineering building for people to live, work, study, produce, manage, entertain, store articles and perform other social activities; the difference from buildings is structures, which refer to engineering buildings other than houses, such as fences, roads, dams, wells, tunnels, water towers, bridges, chimneys, and the like.
Circular iron sheet can be used some usually when engineering building, and current circular iron sheet is when producing, and the workman places iron plate on the blanking machine usually, accomplishes the production to circular iron sheet through the blanking machine, when producing circular iron sheet, needs the workman to carry iron plate, so workman's intensity of labour is great, and the easy card of circular iron sheet after the blanking is in the cutter of blanking machine, needs the workman to take out circular iron sheet from the cutter to can reduce the blanking efficiency of circular iron sheet.
Therefore, the development of a pre-manufacturing blanking device for circular iron sheets for buildings, which can reduce labor intensity and improve blanking efficiency, is urgently needed.
SUMMERY OF THE UTILITY MODEL
In order to overcome the workman and carry iron plate to pass through blanking machine production, intensity of labour is great, and the easy card of circular iron sheet needs the workman to take out in the cutter, can reduce the shortcoming of the blanking efficiency of circular iron sheet, the technical problem who solves: the blanking equipment for manufacturing the circular iron sheet for the building, which can reduce the labor intensity and improve the blanking efficiency, is provided.
The technical scheme is as follows: the utility model provides a blanking equipment before circular iron sheet for building preparation, including: the conveying mechanism is arranged on the rack; and the stamping mechanism is arranged on one side of the rack far away from the conveying mechanism.
Further, the conveying mechanism comprises: the mounting frame is fixedly connected to the side wall of the rack, a speed reduction motor is arranged on the mounting frame, two mounting plates are fixedly connected to the left side of the top of the rack, a rotating shaft is rotatably arranged between the two mounting plates, and a conveying roller is fixedly connected to the rotating shaft; the straight gear is fixedly connected to one side, far away from the conveying roller, of the rotating shaft, and an output shaft of the speed reducing motor is provided with a gear lack which is matched with the straight gear.
Further, the punching mechanism includes: the fixing frame is arranged on one side, far away from the conveying roller, of the rack, two contact rods are arranged on the fixing frame, and a reciprocating cylinder is embedded in the fixing frame between the two contact rods; the punching tool is fixed at the bottom end of the telescopic rod of the reciprocating cylinder, and a hollow table is embedded in the rack and is positioned right below the punching tool.
Further, the method also comprises the following steps: the fixed plate is arranged on one side, close to the fixed frame, of the rack, an opening is formed in the middle of the fixed plate, sliding rods are arranged on the fixed plate on the two sides of the opening, a sliding plate is arranged between the two sliding rods in a sliding mode, two first springs are arranged between the sliding plate and the fixed plate, and the two first springs are wound on the corresponding sliding rods respectively; the pressing plate is installed at the bottom of the sliding plate and penetrates through the opening, a lower pressing rod is fixedly connected to the stamping cutter and is located right above the sliding plate.
Further, the method also comprises the following steps: the connecting plates are fixed on the machine frames on the two sides of the hollow table; the rotary type setting of unloading frame, the rotary type is between two connecting plates, and the rigid coupling has two second springs between unloading frame and the frame.
Further, the method also comprises the following steps: the first belt pulley is fixed on one side, close to the straight gear, of the rotating shaft; the rotating rod is connected to the other side, away from the conveying roller, of the rack in a rotating mode, the rotating rod is fixedly provided with a cleaning roller, a second belt wheel is fixedly connected to one side, away from the cleaning roller, of the rotating rod, and a belt is wound between the second belt wheel and the first belt wheel.
The utility model has the advantages of as follows:
1. the utility model can convey the iron plate through the conveying mechanism, thus the user is not required to convey the iron plate, the labor intensity of the user can be reduced, the iron plate can be punched into the circular iron sheet through the punching mechanism, and the punching mechanism can prevent the circular iron sheet from being clamped, thereby the punching efficiency of the circular iron sheet can be improved;
2. the pressing plate can move downwards by the downward movement of the punching cutter through the sliding plate, and the pressing plate can fix the iron plate by the downward movement of the pressing plate, so that the iron plate can be prevented from moving when being punched, and the interference on punching can be prevented;
3. the punched round iron sheets can be conveniently collected through the blanking frame;
4. the dust on the iron plate can be cleaned by clockwise rotation of the cleaning roller.
Drawings
Fig. 1 is a schematic view of a first three-dimensional structure of the present invention.
Fig. 2 is a schematic view of a second three-dimensional structure of the present invention.
Fig. 3 is a schematic view of a partial three-dimensional structure of the present invention.
Fig. 4 is a schematic view of a third three-dimensional structure of the present invention.
Fig. 5 is a schematic diagram of a fourth three-dimensional structure of the present invention.
Reference numerals: 1_ frame, 2_ conveying mechanism, 21_ mounting frame, 22_ speed reduction motor, 23_ mounting plate, 24_ rotating shaft, 25_ conveying roller, 26_ spur gear, 27_ missing gear, 3_ punching mechanism, 31_ mounting frame, 32_ contact rod, 33_ reciprocating cylinder, 34_ punching cutter, 35_ hollow table, 4_ fixing plate, 5_ opening, 6_ sliding rod, 7_ sliding plate, 8_ first spring, 9_ pressing plate, 10_ pressing rod, 11_ connecting plate, 12_ blanking frame, 13_ second spring, 14_ first belt wheel, 15_ rotating rod, 16_ cleaning roller, 17_ second belt wheel and 18_ belt.
Detailed Description
Reference herein to an embodiment means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the invention. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
Example 1
A blanking device used before manufacturing of a circular iron sheet for buildings is shown in figure 1 and comprises a rack 1, a conveying mechanism 2 and a stamping mechanism 3, wherein the conveying mechanism 2 is installed on the left portion of the rack 1, and the stamping mechanism 3 is arranged on the right portion of the rack 1.
When needs use, the user places iron plate in frame 1 of conveying mechanism 2 downside, the user makes iron plate carry right through conveying mechanism 2 afterwards, carry when being located the below of punching press mechanism 3 when iron plate carries right, the user punches into circular iron sheet with iron plate through punching press mechanism 3, after the iron plate blanking is accomplished, the user collect circular iron sheet after the blanking can, so do not need the user to carry iron plate, thereby can reduce user's intensity of labour, and can prevent through punching press mechanism 3 that circular iron sheet from blocking, and then can improve the blanking efficiency of circular iron sheet.
Example 2
On the basis of embodiment 1, as shown in fig. 1 and fig. 2, the conveying mechanism 2 includes an installation frame 21, a speed reduction motor 22, an installation plate 23, a rotation shaft 24, a conveying roller 25, a spur gear 26 and a gear lacking wheel 27, the installation frame 21 is fixedly connected to the front side wall of the rack 1, the speed reduction motor 22 is installed on the installation frame 21 through bolts, the left side of the top of the rack 1 is connected with two installation plates 23, the rotation type between the front and rear installation plates 23 is connected with the rotation shaft 24, the conveying roller 25 is fixedly connected to the rotation shaft 24, the conveying roller 25 is located between the front and rear installation plates 23, the spur gear 26 is installed at the front end of the rotation shaft 24, the gear lacking wheel 27 is fixed to the output shaft of the speed reduction motor 22, and the gear lacking wheel 27 is matched with the spur gear 26.
When needs are carried iron plate rightwards, the user starts gear motor 22 and makes scarce gear 27 anticlockwise rotation, when scarce gear 27 anticlockwise rotation and straight-teeth gear 26 mesh, lack gear 27 and continue anticlockwise rotation, so can make straight-teeth gear 26 clockwise rotation, straight-teeth gear 26 clockwise rotation can drive pivot 24 clockwise rotation, pivot 24 clockwise rotation can make conveying roller 25 clockwise rotation, conveying roller 25 clockwise rotation can carry iron plate rightwards, so can conveniently become circular iron sheet with iron plate blanking, after the whole blanking of iron plate is accomplished, the user closes gear motor 22 can.
As shown in fig. 1 and 2, the punching mechanism 3 includes a fixed frame 31, two contact rods 32, a reciprocating cylinder 33, a punching tool 34 and a hollow table 35, the fixed frame 31 is installed at the right portion of the frame 1, the two contact rods 32 are arranged at the top portion in the fixed frame 31, the reciprocating cylinder 33 is embedded in the fixed frame 31, the reciprocating cylinder 33 is located between the two contact rods 32, the punching tool 34 is installed at the bottom end of the telescopic rod of the reciprocating cylinder 33, the hollow table 35 is embedded in the frame 1 at the lower side of the punching tool 34, and the hollow table 35 is matched with the punching tool 34.
When the iron plate is conveyed rightwards and positioned below the punching tool 34, a user starts the reciprocating cylinder 33 to enable the punching tool 34 to move downwards, the punching tool 34 moves downwards to be matched with the hollow table 35, so that the iron plate can be punched into a circular iron sheet, when the punching tool 34 moves upwards, the punched circular iron sheet can be prevented from being clamped in the punching tool 34 through the contact rod 32, the punched circular iron sheet can fall downwards from the hollow table 35, after all punching of the iron plate is completed, the user closes the reciprocating cylinder 33, and then the user collects the circular iron sheet.
Example 3
On the basis of embodiment 2, as shown in fig. 1 and fig. 3, the device further includes a fixing plate 4, an opening 5, a sliding rod 6, a sliding plate 7, a first spring 8, a pressing plate 9 and a lower pressing rod 10, the fixing plate 4 is installed on the rack 1, the fixing plate 4 is located between the conveying roller 25 and the fixing frame 31, the opening 5 is opened in the middle of the fixing plate 4, the sliding rods 6 are fixedly connected to the tops of the fixing plates 4 on the front side and the rear side of the opening 5, the sliding plate 7 is slidably disposed between the two sliding rods 6, the first spring 8 is wound on the sliding rod 6, the top end of the first spring 8 is connected to the sliding plate 7, the bottom end of the first spring 8 is connected to the fixing plate 4, the pressing plate 9 is fixedly connected to the bottom of the sliding plate 7, the pressing plate 9 penetrates through the opening 5, the top of the punching tool 34 is fixedly connected to the lower pressing rod 10, and the lower pressing rod 10 is located right above the sliding plate 7.
The pressing tool 34 moves downwards to enable the lower pressing rod 10 to move downwards, when the lower pressing rod 10 moves downwards to be in contact with the sliding plate 7, the lower pressing rod 10 continues to move downwards, so that the sliding plate 7 can move downwards, the first spring 8 is compressed along with the downward movement, the sliding plate 7 moves downwards to drive the pressing plate 9 to move downwards, the pressing plate 9 moves downwards to fix the iron plate, so that the iron plate can be prevented from moving when being punched, interference on punching can be avoided, and when the pressing tool 34 moves upwards, the pressing plate 9 can move upwards under the action of the elastic force of the first spring 8.
As shown in fig. 1 and 4, the automatic feeding device further comprises a connecting plate 11, a blanking frame 12 and second springs 13, two connecting plates 11 are mounted on the frame 1 below the hollow table 35, the hollow table 35 is located between the two connecting plates 11, the blanking frame 12 is rotatably disposed between the two connecting plates 11, and the two second springs 13 are fixedly connected between the blanking frame 12 and the frame 1.
When the circular iron sheet of blanking needs to be collected, the user places a collecting box at blanking frame 12 downside, and circular iron sheet after the blanking drops on blanking frame 12 through hollow platform 35 downwards thereupon, because high back formula setting before blanking frame 12, circular iron sheet in blanking frame 12 landing is followed in the collecting box that falls into backward, so can conveniently collect the circular iron sheet after the blanking, can support blanking frame 12 through second spring 13.
As shown in fig. 1 and 5, the cleaning device further comprises a first belt wheel 14, a rotating rod 15, a cleaning roller 16, a second belt wheel 17 and a belt 18, the first belt wheel 14 is mounted on a rotating shaft 24 at the rear side of a spur gear 26, the rotating rod 15 is rotatably connected to the rack 1, the rotating rod 15 is located at the lower left side of the conveying roller 25, the cleaning roller 16 is fixed on the rotating rod 15, the cleaning roller 16 is located in the rack 1, the second belt wheel 17 is fixedly connected to the front end of the rotating rod 15, and the belt 18 is wound between the second belt wheel 17 and the first belt wheel 14.
The clockwise rotation of the rotating shaft 24 can enable the first belt wheel 14 to rotate clockwise, the clockwise rotation of the second belt wheel 17 can enable the second belt wheel 18 to rotate clockwise, the clockwise rotation of the second belt wheel 17 can drive the rotating rod 15 to rotate clockwise, the cleaning roller 16 rotates clockwise along with the clockwise rotation, and the cleaning roller 16 rotates clockwise to clean dust on an iron plate.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (4)

1. The utility model provides a blanking equipment before circular iron sheet for building preparation which characterized in that, including:
the conveying mechanism is arranged on the rack;
the stamping mechanism is arranged on one side of the rack far away from the conveying mechanism;
conveying mechanism includes:
the mounting frame is fixedly connected to the side wall of the rack, a speed reduction motor is arranged on the mounting frame, two mounting plates are fixedly connected to the left side of the top of the rack, a rotating shaft is rotatably arranged between the two mounting plates, and a conveying roller is fixedly connected to the rotating shaft;
the straight gear is fixedly connected to one side, far away from the conveying roller, of the rotating shaft, and an output shaft of the speed reducing motor is provided with a gear lack which is matched with the straight gear;
punching press mechanism is including:
the fixing frame is arranged on one side, far away from the conveying roller, of the rack, two contact rods are arranged on the fixing frame, and a reciprocating cylinder is embedded in the fixing frame between the two contact rods;
the punching tool is fixed at the bottom end of the telescopic rod of the reciprocating cylinder, and a hollow table is embedded in the rack and is positioned right below the punching tool.
2. The pre-manufacturing blanking device for the circular iron sheet for building as claimed in claim 1, further comprising:
the fixed plate is arranged on one side, close to the fixed frame, of the rack, an opening is formed in the middle of the fixed plate, sliding rods are arranged on the fixed plate on the two sides of the opening, a sliding plate is arranged between the two sliding rods in a sliding mode, two first springs are arranged between the sliding plate and the fixed plate, and the two first springs are wound on the corresponding sliding rods respectively;
the pressing plate is installed at the bottom of the sliding plate and penetrates through the opening, a lower pressing rod is fixedly connected to the stamping cutter and is located right above the sliding plate.
3. The pre-manufacturing blanking device for the circular iron sheet for building as claimed in claim 2, further comprising:
the connecting plates are fixed on the machine frames on the two sides of the hollow table;
the rotary type setting of unloading frame, the rotary type is between two connecting plates, and the rigid coupling has two second springs between unloading frame and the frame.
4. The pre-manufacturing blanking device for the circular iron sheet for building as claimed in claim 3, further comprising:
the first belt pulley is fixed on one side, close to the straight gear, of the rotating shaft;
the rotating rod is connected to the other side, away from the conveying roller, of the rack in a rotating mode, the rotating rod is fixedly provided with a cleaning roller, a second belt wheel is fixedly connected to one side, away from the cleaning roller, of the rotating rod, and a belt is wound between the second belt wheel and the first belt wheel.
CN202022683972.9U 2020-11-19 2020-11-19 Blanking equipment before circular iron sheet for building preparation Expired - Fee Related CN215143774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022683972.9U CN215143774U (en) 2020-11-19 2020-11-19 Blanking equipment before circular iron sheet for building preparation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022683972.9U CN215143774U (en) 2020-11-19 2020-11-19 Blanking equipment before circular iron sheet for building preparation

Publications (1)

Publication Number Publication Date
CN215143774U true CN215143774U (en) 2021-12-14

Family

ID=79349465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022683972.9U Expired - Fee Related CN215143774U (en) 2020-11-19 2020-11-19 Blanking equipment before circular iron sheet for building preparation

Country Status (1)

Country Link
CN (1) CN215143774U (en)

Similar Documents

Publication Publication Date Title
CN110877372A (en) Perforating device is used in furniture board processing
CN212018657U (en) Automatic conveying line cleaning equipment for anode plate
CN110861223A (en) Sound-absorbing gypsum board positioning punching processing machinery and processing method
CN215143774U (en) Blanking equipment before circular iron sheet for building preparation
CN111604405A (en) Automatic continuous stamping device of railway signal relay part
CN218361572U (en) Automobile gasket production and processing device
CN216504027U (en) Glass edging device with self-cleaning function
CN205762843U (en) For cleaning the device of solar energy photovoltaic panel
CN214925914U (en) Cutting device is used in gypsum board production
CN210704202U (en) Burnishing device for setting equipment of artificial flower
CN209998169U (en) kinds of house construction is with light steel construction processing punching equipment
CN213523296U (en) A processing equipment that is used for anticorrosive prepolymer class sponge soil of green plant
CN211135167U (en) Device for punching connecting plate
CN213790752U (en) Building environmental protection dust collecting equipment
CN213259792U (en) Board cutting machine is used in production of compound intergral template with waste recovery
CN216328883U (en) Perforating device for construction
CN219583986U (en) Remove fills electric pile with rain-proof mechanism
CN217888790U (en) Equipment for cleaning oil sludge of gantry gearbox
CN216827184U (en) Engineering muck material screening machine
CN216156466U (en) Construction powder collecting vehicle
CN218556412U (en) Hole making equipment for manufacturing steel structure
CN213561162U (en) Automatic feeding pipe cutting machine
CN219054863U (en) Building environmental protection dust fall dust catcher that punches
CN211955122U (en) Air entrainment brick batching fineness detection device
CN216937219U (en) Dust collector of short edger curved arc machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214