CN215118224U - Portable construction engineering is schedule for construction management - Google Patents
Portable construction engineering is schedule for construction management Download PDFInfo
- Publication number
- CN215118224U CN215118224U CN202121211062.9U CN202121211062U CN215118224U CN 215118224 U CN215118224 U CN 215118224U CN 202121211062 U CN202121211062 U CN 202121211062U CN 215118224 U CN215118224 U CN 215118224U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- rod
- schedule
- frame
- placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 title claims description 19
- 230000000712 assembly Effects 0.000 claims 1
- 238000000429 assembly Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 6
- 238000005286 illumination Methods 0.000 abstract description 2
- 244000309464 bull Species 0.000 description 5
- 238000009435 building construction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model relates to a portable building engineering is progress schedule for construction management, the on-line screen storage device comprises a base, the top fixedly connected with hydraulic stem of base, both ends are provided with the removal subassembly about the hydraulic stem, the output shaft fixedly connected with connecting rod of hydraulic stem, the top fixedly connected with power supply of connecting rod, the top of the output shaft of power supply is connected with places the frame, it all is provided with the screw rod to place frame and power supply, the left side of placing the frame articulates there is the hinge bar, the top of placing the frame is provided with the light, the inside swing joint of placing the frame has the schedule to draw the board. This portable progress schedule for building engineering construction management reaches and makes the power source drive and places the frame and draw the effect of the rotatory show of board with the schedule, reaches and reminds staff's job schedule to carry out the effect of reminding, and the convenient illumination of light, and the removal subassembly conveniently adjusts the height of highly adjusting according to the use needs of placing frame and schedule and drawing the board simultaneously and use the height.
Description
Technical Field
The utility model relates to a construction technical field.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, and comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called a building construction site or a construction site, and is also called a construction site.
At present, the progress schedule is required to be used in building construction, the current progress schedule is a single drawing, the drawing is inconvenient to show on the site, and the work progress of workers is not convenient to remind.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the technical problem who exists among the prior art, provide a portable progress schedule for building engineering construction management, solved inconvenient with the picture show on the workplace, be not convenient for remind staff's job schedule problem.
The utility model provides an above-mentioned technical problem's technical scheme as follows: the utility model provides a portable construction engineering is progress schedule for construction management, the on-line screen storage device comprises a base, the top fixedly connected with hydraulic stem of base, both ends are provided with the removal subassembly about the hydraulic stem, the output shaft fixedly connected with connecting rod of hydraulic stem, the top fixedly connected with power supply of connecting rod, the top swing joint of the output shaft of power supply has places the frame, it all is provided with the screw rod to place frame and power supply, the left side of placing the frame articulates there is the hinge bar, the top of placing the frame is provided with the light, the inside swing joint of placing the frame has the schedule to draw the board.
On the basis of the technical scheme, the utility model discloses can also do following improvement.
Further, the removal subassembly includes connecting rod, electric push rod and removal wheel, the equal fixedly connected with bracing piece in the left and right sides of hydraulic stem, the bottom fixedly connected with electric push rod of bracing piece, the output shaft fixedly connected with of electric push rod removes the wheel.
Furthermore, the inside of base is seted up quantity and is two telescopic holes, electric push rod output shaft passes through telescopic hole and removes wheel fixed connection.
Further, a placing groove is formed in the top of the connecting rod, and a power source is fixedly connected to the inner top wall of the placing groove.
Further, the power supply includes protection box, bull stick, motor and bearing, the interior roof fixedly connected with protection box of standing groove, the inside fixedly connected with motor of protection box, the output shaft fixedly connected with bull stick of motor, the top fixedly connected with of protection box and bull stick fixed connection's bearing.
Further, place the bottom fixedly connected with montant of frame, the spread groove has been seted up at the top of bull stick, and the montant passes through the spread groove and pegs graft, corresponding screw thread has been seted up to montant and spread groove, be equipped with the screw rod in the screw thread.
Furthermore, the top of the placing frame is fixedly connected with a top box, and the inner top wall of the top box is fixedly connected with an illuminating lamp.
Compared with the prior art, the technical scheme of the application has the following beneficial technical effects:
this portable progress schedule for building engineering construction management, be provided with the hydraulic stem through the base setting, the removal subassembly, the connecting rod, the power supply, place the frame, the screw rod, the hinge bar, light and schedule drawing board, thereby it places the frame and draws the board with the schedule to fix to have reached the utilization, utilize the screw rod to be connected with the power supply, reach and make the power supply drive and place the frame and draw the effect of the rotatory show of board with the schedule, reach the effect of reminding staff's progress of work and reminding, and the light makes things convenient for the illumination, the convenient regulation of removal subassembly is simultaneously placed the frame and is drawn the height of board with the schedule and adjust the use height according to the use needs.
Drawings
Fig. 1 is a sectional view of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1 according to the present invention;
fig. 3 is a front view of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the base, 2, hydraulic stem, 3, removal subassembly, 4, connecting rod, 5, power supply, 6, place the frame, 7, screw rod, 8, hinge bar, 9, light, board is painted to 10, schedule, 11, bull stick, 12, montant, 13, spread groove.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Referring to fig. 1-3, the schedule for construction management of mobile building engineering in this embodiment includes a base 1, two telescopic holes are formed in the base 1, an output shaft of an electric push rod is fixedly connected to a movable wheel through the telescopic holes, and the width of the telescopic holes is the same as that of the movable wheel, so that the movable wheel can be conveniently stored by the telescopic holes when not in use, a hydraulic rod 2 is fixedly connected to the top of the base 1, movable components 3 are disposed at the left and right ends of the hydraulic rod 2, each movable component 3 includes a support rod, an electric push rod and a movable wheel, the support rods are fixedly connected to the left and right sides of the hydraulic rod 2, the electric push rod is fixedly connected to the bottom of the support rod, the movable wheel is fixedly connected to the output shaft of the electric push rod, so that the movable wheel can be driven to move up and down by the electric push rod, the connecting rod 4 is fixedly connected to the output shaft of the hydraulic rod 2, and the power source 5 is fixedly connected to the top of the connecting rod 4, the top of the connecting rod 4 is provided with a placing groove, the inner top wall of the placing groove is fixedly connected with a power source 5, the power source 5 is convenient to hide and avoid the situation that a plurality of workers in a working place cause the power source 5 to break, the power source 5 comprises a protection box, a rotating rod 11, a motor and a bearing, the inner top wall of the placing groove is fixedly connected with the protection box, the motor is fixedly connected inside the protection box, an output shaft of the motor is fixedly connected with the rotating rod 11, the bearing fixedly connected with the rotating rod 11 is fixedly connected at the top of the protection box, the rotating rod 11 is convenient to rotate more stably, the output shaft of the power source 5 is movably connected with a placing frame 6, the placing frame 6 and the power source 5 are both provided with a screw rod 7, the bottom of the placing frame 6 is fixedly connected with a vertical rod 12, the top of the rotating rod 11 is provided with a connecting groove 13, the vertical rod 12 is spliced with the rotating rod 11 through the connecting groove 13, and threaded holes are formed in the vertical rod 12 and the rotating rod 11, the screw 7 is in threaded connection with the vertical rod 12 and the rotating rod 11 through threaded holes, the vertical rod 12 and the rotating rod 11 are fixed together conveniently by the screw 7, the left side of the placing frame 6 is hinged with a hinged rod 8, the top of the placing frame 6 is provided with an illuminating lamp 9, the top of the placing frame 6 is fixedly connected with a top box, the inner top wall of the top box is fixedly connected with the illuminating lamp 9, a schedule can be seen clearly when the light is poor, the schedule drawing board 10 is movably connected inside the placing frame 6,
the working principle of the above embodiment is as follows: rotate articulated rod 8 when using and make the schedule draw board 10 place in the inside of placing frame 6, start the high back that board 10 was drawn to the hydraulic stem 2 adjustment show schedule, draw board 10 and rotate the show starting power supply 5 drive schedule, light 9 is convenient for increase visual effect simultaneously, and plays when not needing to remove that removal subassembly 3 conveniently accomodates the inside of base 1, and base 1 also can be placed more stably.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (6)
1. The progress schedule for the mobile construction engineering construction management is characterized by comprising a base (1), wherein a hydraulic rod (2) is fixedly connected to the top of the base (1), moving assemblies (3) are arranged at the left end and the right end of the hydraulic rod (2), each moving assembly (3) comprises a supporting rod, an electric push rod and a moving wheel, the supporting rods are fixedly connected to the left side and the right side of the hydraulic rod (2), the electric push rods are fixedly connected to the bottoms of the supporting rods, the output shafts of the electric push rods penetrate through the base (1) and are fixedly connected with the moving wheels, the output shafts of the hydraulic rod (2) are fixedly connected with connecting rods (4), power sources (5) are fixedly connected to the tops of the connecting rods (4), a placing frame (6) is connected to the top ends of the output shafts of the power sources (5), and a hinge rod (8) is hinged to the left side of the placing frame (6), the top of placing the frame (6) is provided with a lighting lamp (9), and the inside of placing the frame (6) is movably connected with a schedule drawing board (10).
2. The mobile construction engineering construction management progress schedule table according to claim 1, wherein two telescopic holes are formed in the base (1), and the electric push rod output shaft is fixedly connected with the movable wheel through the telescopic holes.
3. The mobile construction engineering construction management schedule according to claim 2, characterized in that a placing groove is opened on the top of the connecting rod (4), and a power source (5) is fixedly connected to the inner top wall of the placing groove.
4. The mobile construction engineering construction management progress schedule of claim 3, wherein the power source (5) comprises a protection box, a rotating rod (11), a motor and a bearing, the protection box is fixedly connected to the inner top wall of the placing groove, the motor is fixedly connected to the inner portion of the protection box, the rotating rod is fixedly connected to the output shaft of the motor, and the bearing fixedly connected with the rotating rod (11) is fixedly connected to the top of the protection box.
5. The mobile construction engineering construction management progress schedule as claimed in claim 4, wherein a vertical rod (12) is fixedly connected to the bottom of the placing frame (6), a connecting groove (13) is formed in the top of the rotating rod (11), the vertical rod (12) is inserted through the connecting groove (13), corresponding threads are formed in the vertical rod (12) and the connecting groove (13), and a screw (7) is arranged in each thread.
6. The mobile construction project construction management progress schedule according to claim 5, wherein a top box is fixedly connected to the top of the placing frame (6), and an illuminating lamp (9) is fixedly connected to the inner top wall of the top box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121211062.9U CN215118224U (en) | 2021-06-01 | 2021-06-01 | Portable construction engineering is schedule for construction management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121211062.9U CN215118224U (en) | 2021-06-01 | 2021-06-01 | Portable construction engineering is schedule for construction management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215118224U true CN215118224U (en) | 2021-12-10 |
Family
ID=79302122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121211062.9U Expired - Fee Related CN215118224U (en) | 2021-06-01 | 2021-06-01 | Portable construction engineering is schedule for construction management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215118224U (en) |
-
2021
- 2021-06-01 CN CN202121211062.9U patent/CN215118224U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207567684U (en) | A kind of construction warning sign | |
CN215118224U (en) | Portable construction engineering is schedule for construction management | |
CN208041764U (en) | A kind of underground lamp easy for removal and installation | |
CN220504466U (en) | Building construction safety device | |
CN204577999U (en) | A kind of cable intermediate terminals head special operation platform | |
CN207279328U (en) | A kind of portable multi-function moves lighting device | |
CN209056104U (en) | A kind of Clothing Design and Engineering teaching special operation device | |
CN210485527U (en) | Landscape lamp powered by solar energy | |
CN214803831U (en) | Architectural design removes show stand | |
CN211952595U (en) | Garden street lamp | |
CN210076961U (en) | Art design is with workstation of angle regulation of being convenient for | |
CN211040735U (en) | Dust collector of landscape lighting lamp | |
CN208011520U (en) | Garden lamp in a kind of convenient repairing | |
CN211821849U (en) | Light for construction | |
CN208899929U (en) | Stage is used in a kind of performance | |
CN219469559U (en) | Lifting mechanism | |
CN212377819U (en) | Special lighting device of building block construction | |
CN221054942U (en) | Night construction temporary lighting device for building construction | |
CN212343120U (en) | Power distribution box capable of being overturned and convenient to maintain | |
CN216591149U (en) | Novel hydraulic engineering construction is with illumination of being convenient for to remove device | |
CN219912769U (en) | Plant light filling lamp of adjustable light intensity | |
CN220343989U (en) | Homeland space planning equipment | |
CN211294564U (en) | Hydraulic engineering progress management device | |
CN214222597U (en) | Remote interactive equipment for art teaching | |
CN108730832A (en) | Track lamp that is a kind of easy to repair and replacing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211210 |
|
CF01 | Termination of patent right due to non-payment of annual fee |