CN2151123Y - Self safety unit of lifting basket for construction - Google Patents

Self safety unit of lifting basket for construction Download PDF

Info

Publication number
CN2151123Y
CN2151123Y CN 93230254 CN93230254U CN2151123Y CN 2151123 Y CN2151123 Y CN 2151123Y CN 93230254 CN93230254 CN 93230254 CN 93230254 U CN93230254 U CN 93230254U CN 2151123 Y CN2151123 Y CN 2151123Y
Authority
CN
China
Prior art keywords
swing arm
gear
hanging basket
pulley
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93230254
Other languages
Chinese (zh)
Inventor
纪怀祥
刘永泉
陈卫东
苏景旺
张天印
袁金星
张殿岭
董保国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAOCHENG LIFTING MACHINERY PLANT 9CN)
Original Assignee
LIAOCHENG LIFTING MACHINERY PLANT 9CN)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAOCHENG LIFTING MACHINERY PLANT 9CN) filed Critical LIAOCHENG LIFTING MACHINERY PLANT 9CN)
Priority to CN 93230254 priority Critical patent/CN2151123Y/en
Application granted granted Critical
Publication of CN2151123Y publication Critical patent/CN2151123Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to an automatic safety unit of a lifting basket for construction, which is composed of a supporting part, a safety part and a swing arm part. The supporting part is fixed to the steel tube brackets on the both sides of the lifting basket for construction, and the safety part and the swing arm part are arranged on the supporting part. When a hoisting rope is strained, the swing arm swings 45 DEG angle to be in stress and drives a mating gear to rotate through a supporting shaft. The tension spring is strained, simultaneously an eccentric braking gear rotates to make the middle space enlarge, and a safety rope is loosened. When the hoisting rope is broken or in the relaxation status, the swing arm part is naturally perpendicular, and the tension spring pulls the mating gear to turn and drives the supporting shaft and a gear shaft to rotate, in order to enable the eccentric braking gear to restore to the initial position to jam the safety rope and make the basket stable and balancing to play the action of automatic safety.

Description

Self safety unit of lifting basket for construction
The utility model belongs to the vehicle for construction safety locking motion.
Existing skyscraper basket of work, safety device has various forms, as be with hypervelocity safety lock and manual decline speed-limit device (seeing the Tianjin volume machine ZLD500 of a factory high-rise working finishing hanging basket) and adopt ratchet mechanism realization insurance, add click at the insurance rope sheave back side, by manually stirring the insurance rope sheave, reach insurance purpose (seeing Liaocheng Prefecture, Shandong Province construction engineering corporation construction nacelle device).Though the device of these forms can play certain security insurance effect, under the routine work situation reaction slower, degree of automation is lower, some structure is complicated, with the whole supporting fashionable dress of hanging basket, repair comparatively inconvenient.
The purpose of this utility model just provides a kind of novel building hanging basket safety device, and is simple in structure, easy to install, safe, good reliability, and the degree of automation height is easy to apply.
Task of the present utility model is finished like this: according to the constructional feature of the high-rise operation of building hanging basket, design a kind of building hanging basket automatic safety, comprise support section, the insurance part, the swing arm part, support section is made up of stay bearing plate (1) and pivot shaft (2), the insurance part is by gear wheel shaft (3), engaging gear (4), the off-centre bearing up pulley (5) of stopping, arm-tie (6), extension spring (7), safety rope (9), insurance rope sheave (18) is formed, the swing arm part is by swing arm change gear (10), clamping plate (11), derrick line guide wheel (12), swing arm wheel shaft compositions such as (13), support portion fixes is on building hanging basket both sides steel pipe frames (17), and the swing arm of insurance partial sum partly is installed on the support section.Stay bearing plate (1) is two identical metal sheets, have axis hole in both sides near vertical center line, first metal sheet captiveed joint with hanging basket steel pipe frame (17), be assemblied in the insurance division branch by pivot shaft (2), gear wheel shaft (3) and extension spring set collar (8), second metal sheet covers at insurance division and divides the outside, overlaps fixing again with first metal sheet with screw.Pivot shaft (2) is a long castellated shaft, and an end passes stay bearing plate (1) left side axis hole, and engaging gear (4) and the off-centre bearing up pulley (5) of stopping can be installed, and the other end stretches out outside stay bearing plate (1), can cooperate installation with swing arm change gear (10).Engaging gear (4) and the off-centre bearing up pulley (5) of stopping respectively is two, an engaging gear (4) and off-centre overlapping pivot shaft (2) that is sleeved on of bearing up pulley (5) of stopping is fixed on the part in the stay bearing plate (1), another engaging gear (4) and another off-centre are stopped on the overlapping gear wheel shaft (3) that is sleeved on the interior right side of fixed support plate (1) of bearing up pulley (5), and safety rope (9) is stopped by two off-centre and passed in the space between the bearing up pulley (5).Arm-tie (6) and extension spring (7) respectively are two, and arm-tie (6) is captiveed joint with engaging gear (4) respectively, and the two ends of extension spring (7) are connected with extension spring set collar (8) on the stay bearing plate (1) with arm-tie (6) respectively.Gear wheel shaft (3) is installed in the axis hole on stay bearing plate (1) right side for short castellated shaft, can overlapping suit engaging gear (4) and the off-centre bearing up pulley (5) of stopping.Swing arm change gear (10) is the splined hole wheel, be fixedly set on the pivot shaft (2), clamping plate (11) upper end is fixed together with swing arm change gear (10), the lower end clips swing arm guide wheel (12) and is sleeved on the swing arm wheel shaft (13), and fastening with groove nut (14), pass in the clamping plate (11) of derrick line (16) between swing arm change gear (10) and swing arm wheel shaft (13).Two engaging gears (4) are in engagement all the time, when derrick line (16) tension, make swing arm partly rotate 45 and be strained condition, driving engaging gear (4) by pivot shaft (2) rotates, extension spring (7) tension, simultaneously the off-centre bearing up pulley (5) of stopping rotates intermediate gaps is increased, unclamp safety rope (9), when derrick line (16) fracture of tension or derrick line (16) when being in relaxation state, swing arm partly is in the nature upright position, and extension spring (7) drives pivot shaft (2) with engaging gear (4) pulling revolution, gear wheel shaft (3) rotates, make the off-centre bearing up pulley (5) of stopping recover initial position, the gap dwindles, and jam-packed safety rope (9) is fixed hanging basket, play the voluntary insurance effect, guarantee safety.In order to guarantee balance, support section, insurance part, swing arm part respectively are two covers, are installed in respectively on the building hanging basket both sides steel pipe frames (17).Safety rope (9) is gone up the termination suspension hook and is hung on the cantilever (15) that stretches out on the building, and stop space between the bearing up pulley (5) of two off-centre is passed in the centre, and the lower end twists on the insurance rope sheave (18), the rolling-in or loosen with the lifting of building hanging basket.Under the derrick line normal circumstances, safety rope (9) is in relaxation state, and derrick line when fracture, safety rope (9) is clamped and pins by the off-centre bearing up pulley (5) of stopping, and stable hanging basket plays the voluntary insurance effect.
Through above-mentioned design, trial-production, test, prove that the utility model meets the supporting requirement of building hanging basket, safe and reliable, simple in structure, to be convenient to install, reaction is flexibly, can play safety effect automatically, adapt to all kinds of building hanging basket needs of work, realize giving the meter target preferably.
Below accompanying drawing is illustrated.
Fig. 1-be the utility model fragmentary sectional elevation view;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the utility model installation site scheme drawing.
Among the figure: 1---stay bearing plate, 2---pivot shaft, 3---gear wheel shaft, 4---engaging gear, 5---the off-centre bearing up pulley of stopping, 6---arm-tie, 7---extension spring, 8---the extension spring set collar, 9---safety rope, 10---the swing arm change gear, 11---clamping plate, 12---the swing arm guide wheel, 13---swing arm wheel shaft 14---groove nut, 15---cantilever, 16---derrick line, 17---steel pipe frame, 18---the insurance rope sheave.
The utility model is described in further detail by embodiment at last.
Adopt the A3 steel plate to make wide 160mm, the stay bearing plate of two identical sizes of long 800mm, be welded on the steel pipe support of hanging basket both sides, midway location at each 45mm of the both sides of stay bearing plate vertical center line has axis hole, two axis hole width between centers 90mm, left side axis hole is installed pivot shaft, right axis hole mounting teeth wheel shaft, pivot shaft and gear wheel shaft cause castellated shaft with No. 45 steels, one cover off-centre stop bearing up pulley and engaging gear is installed respectively, engaging gear inside, the off-centre bearing up pulley of stopping overlaps suit outside, is fixed with arm-tie on the engaging gear, arm-tie connects extension spring one end, and the extension spring other end is connected with extension spring set collar on the stay bearing plate.After the insurance division branch installs, cover second stay bearing plate again, with the insurance division enfeoffment inside, with screw that two stay bearing plates are fastening, pivot shaft stretches out outside stay bearing plate, suit swing arm change gear, the swing arm change gear is the splined hole wheel, and both ends of the surface and clamping plate one end weld together, clamping plate are two blocks of identical oblong steel plates, the other end clips the swing arm guide wheel and is sleeved on the swing arm wheel shaft, and swing arm wheel shaft two ends are fastening with nut.Derrick line one end is ined succession and is hung on the cantilever, passes the middle space of clamping plate, and the other end is connected with winch by hanging basket bottom guide wheel.The derrick line tension pulls into 45 with swing arm during lifting, spurs pivot shaft simultaneously and drives 45 ° of engaging gear rotations, by arm-tie tension extension spring, the off-centre bearing up pulley of stopping turns over 45 °, middle gap increase simultaneously, unclamp safety rope, derrick line pulling hanging basket rises or descends.When derrick line disconnected, plumbness was replied in swing arm, and extension spring pulling arm-tie drives 45 ° of engaging gear revolutions, and the off-centre bearing up pulley of stopping rotates to clamped condition simultaneously, and safety rope is tightly clamped, and makes the hanging basket stable equilibrium, plays the voluntary insurance effect.
When connecing according to the aforesaid way installation test, hanging basket prescribed load amount 500kg, actual hanging basket load-carrying 750Kg, 10 meters high three floor outer walls 10 times up and down, then derrick line is destroyed, make it aloft to rupture, safety device plays a role at once, with the stable pinning of hanging basket, keeps balance not fall.Test connects did success ratio 100% three days.The proved response sensitivity, insurance effectively, and is safe and reliable.

Claims (9)

1, a kind of building hanging basket automatic safety, it is characterized in that comprising support section, the insurance part, the swing arm part, support section is made up of stay bearing plate (1) and pivot shaft (2), the insurance part is by gear wheel shaft (3), engaging gear (4), the off-centre bearing up pulley (5) of stopping, arm-tie (6), extension spring (7), safety rope (9), insurance rope sheave (18) is formed, the swing arm part is by swing arm change gear (10), clamping plate (11), derrick line guide wheel (12), swing arm wheel shaft compositions such as (13), support portion fixes is on building hanging basket both sides steel pipe supports (17), and the swing arm of insurance partial sum partly is installed on the support section.
2, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said stay bearing plate (1) is two identical metal sheets, first metal sheet captiveed joint with hanging basket steel pipe frame (17), have axis hole in both sides near vertical center line, be assemblied in the insurance division branch by pivot shaft (2), gear wheel shaft (3) and extension spring set collar (8), second metal sheet covers at insurance division and divides the outside, overlaps fixing again with first metal sheet with screw.
3, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said pivot shaft (2) is long castellated shaft, one end passes stay bearing plate (1) left side axis hole, engaging gear (4) and the off-centre bearing up pulley (5) of stopping can be installed, the other end stretches out outside stay bearing plate (1), can cooperate installation with swing arm change gear (10).
4, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said engaging gear (4) and the off-centre bearing up pulley (5) of stopping respectively is two, an engaging gear (4) and off-centre overlapping pivot shaft (2) that is sleeved on of bearing up pulley (5) of stopping is fixed on the part in the stay bearing plate (1), another engaging gear (4) and another off-centre are stopped on the overlapping gear wheel shaft (3) that is sleeved on the interior right side of fixed pedestal (1) of bearing up pulley (5), and safety rope (9) is stopped by two off-centre and passed in the space between the bearing up pulley (5).
5, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said arm-tie (6) and extension spring (7) respectively are two, arm-tie (6) is captiveed joint with engaging gear (4) respectively, and the two ends of extension spring (7) are connected with extension spring set collar (8) on the stay bearing plate (1) with arm-tie (6) respectively.
6, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said gear wheel shaft (3) for short castellated shaft, is installed in the axis hole on stay bearing plate (1) right side, can overlapping suit engaging gear (4) and the off-centre bearing up pulley (5) of stopping.
7, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said swing arm change gear (10) is the splined hole wheel, be fixedly set on the pivot shaft (2), clamping plate (11) upper end is fixed together with swing arm change gear (10), the lower end clips swing arm guide wheel (12) and is sleeved on the swing arm wheel shaft (13), and fastening with groove nut (14), pass in the clamping plate (11) of derrick line (16) between swing arm change gear (10) and swing arm wheel shaft (13).
8, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said two engaging gears (3) are in engagement all the time, when derrick line (16) tension, make swing arm swing 45 be strained condition, driving engaging gear (4) by pivot shaft (2) rotates, extension spring (7) tension, simultaneously the off-centre bearing up pulley (5) of stopping rotates intermediate gaps is increased, unclamp safety rope (9), when derrick line (16) ruptures or is in relaxation state, swing arm partly is in the nature upright position, extension spring (7) drives pivot shaft (2) with engaging gear (4) pulling revolution, gear wheel shaft (3) rotates, and makes the off-centre bearing up pulley (5) of stopping recover initial position, the gap dwindles, jam-packed safety rope (9).
9, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said support section, insurance part, swing arm part respectively are two covers, be installed in respectively on the building hanging basket both sides steel pipe frames (17).
CN 93230254 1993-02-23 1993-02-23 Self safety unit of lifting basket for construction Expired - Fee Related CN2151123Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93230254 CN2151123Y (en) 1993-02-23 1993-02-23 Self safety unit of lifting basket for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93230254 CN2151123Y (en) 1993-02-23 1993-02-23 Self safety unit of lifting basket for construction

Publications (1)

Publication Number Publication Date
CN2151123Y true CN2151123Y (en) 1993-12-29

Family

ID=33806955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93230254 Expired - Fee Related CN2151123Y (en) 1993-02-23 1993-02-23 Self safety unit of lifting basket for construction

Country Status (1)

Country Link
CN (1) CN2151123Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495561A (en) * 2014-12-29 2015-04-08 龚柱 Anti-falling unit of elevator
CN104627771A (en) * 2014-12-29 2015-05-20 龚柱 Designing method for anti-falling elevator
CN109484943A (en) * 2018-12-12 2019-03-19 宁津汇丰消声器有限公司 A kind of carriage tenesmus deceleration device
CN114476956A (en) * 2022-04-18 2022-05-13 启东市德立神起重运输机械有限公司 Hoist and mount hoist safety arrangement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495561A (en) * 2014-12-29 2015-04-08 龚柱 Anti-falling unit of elevator
CN104627771A (en) * 2014-12-29 2015-05-20 龚柱 Designing method for anti-falling elevator
CN109484943A (en) * 2018-12-12 2019-03-19 宁津汇丰消声器有限公司 A kind of carriage tenesmus deceleration device
CN114476956A (en) * 2022-04-18 2022-05-13 启东市德立神起重运输机械有限公司 Hoist and mount hoist safety arrangement
CN114476956B (en) * 2022-04-18 2022-06-21 启东市德立神起重运输机械有限公司 Hoist and mount hoist safety arrangement

Similar Documents

Publication Publication Date Title
CN201411635Y (en) Construction trolley of safety barrier template
CN111017718B (en) Hoisting device is assisted to super high-rise creeping formwork
CN2151123Y (en) Self safety unit of lifting basket for construction
CN201546439U (en) Adhesive lifting scaffolding
CN101672103B (en) Attached support structure
CN2761564Y (en) Wall supported type lifting device
CN113738089A (en) Hanging basket integral installation construction method of specially-made hanging mechanism device
CN107215784A (en) The crane of Split rotary crane is installed
CN2658128Y (en) Device for controlling and regulating steering of hook of crane
CN117208735A (en) Device for hoisting steel structural member
CN2548982Y (en) Guide rope and weight rope device for elevator
CN212024607U (en) Lifting appliance for steel bar truss floor bearing plate
CN214942221U (en) Hanging basket for outer wall construction
CN212687327U (en) Lifting device for coal mine maintenance equipment
CN208716741U (en) A kind of lifting appliance that construction uses
CN209969974U (en) 360-degree turnover frame
CN111457144A (en) Hoist type hoist
CN207001972U (en) The hand-barring of elevator traction machine
CN206122344U (en) Roll installation of line detection device and use arm
CN2502005Y (en) Chain oil pumping unit
CN205870266U (en) Button bit sharpening machine's two -way rack counter weight elevating gear
CN216844934U (en) Support stable outer quick-witted support frame of air conditioner
CN220845140U (en) Hoisting device
CN2856379Y (en) Detectable rope suspension means
CN219045406U (en) Tower type lower power pumping unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee