CN2151123Y - Self safety unit of lifting basket for construction - Google Patents
Self safety unit of lifting basket for construction Download PDFInfo
- Publication number
- CN2151123Y CN2151123Y CN 93230254 CN93230254U CN2151123Y CN 2151123 Y CN2151123 Y CN 2151123Y CN 93230254 CN93230254 CN 93230254 CN 93230254 U CN93230254 U CN 93230254U CN 2151123 Y CN2151123 Y CN 2151123Y
- Authority
- CN
- China
- Prior art keywords
- swing arm
- gear
- hanging basket
- pulley
- safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to an automatic safety unit of a lifting basket for construction, which is composed of a supporting part, a safety part and a swing arm part. The supporting part is fixed to the steel tube brackets on the both sides of the lifting basket for construction, and the safety part and the swing arm part are arranged on the supporting part. When a hoisting rope is strained, the swing arm swings 45 DEG angle to be in stress and drives a mating gear to rotate through a supporting shaft. The tension spring is strained, simultaneously an eccentric braking gear rotates to make the middle space enlarge, and a safety rope is loosened. When the hoisting rope is broken or in the relaxation status, the swing arm part is naturally perpendicular, and the tension spring pulls the mating gear to turn and drives the supporting shaft and a gear shaft to rotate, in order to enable the eccentric braking gear to restore to the initial position to jam the safety rope and make the basket stable and balancing to play the action of automatic safety.
Description
The utility model belongs to the vehicle for construction safety locking motion.
Existing skyscraper basket of work, safety device has various forms, as be with hypervelocity safety lock and manual decline speed-limit device (seeing the Tianjin volume machine ZLD500 of a factory high-rise working finishing hanging basket) and adopt ratchet mechanism realization insurance, add click at the insurance rope sheave back side, by manually stirring the insurance rope sheave, reach insurance purpose (seeing Liaocheng Prefecture, Shandong Province construction engineering corporation construction nacelle device).Though the device of these forms can play certain security insurance effect, under the routine work situation reaction slower, degree of automation is lower, some structure is complicated, with the whole supporting fashionable dress of hanging basket, repair comparatively inconvenient.
The purpose of this utility model just provides a kind of novel building hanging basket safety device, and is simple in structure, easy to install, safe, good reliability, and the degree of automation height is easy to apply.
Task of the present utility model is finished like this: according to the constructional feature of the high-rise operation of building hanging basket, design a kind of building hanging basket automatic safety, comprise support section, the insurance part, the swing arm part, support section is made up of stay bearing plate (1) and pivot shaft (2), the insurance part is by gear wheel shaft (3), engaging gear (4), the off-centre bearing up pulley (5) of stopping, arm-tie (6), extension spring (7), safety rope (9), insurance rope sheave (18) is formed, the swing arm part is by swing arm change gear (10), clamping plate (11), derrick line guide wheel (12), swing arm wheel shaft compositions such as (13), support portion fixes is on building hanging basket both sides steel pipe frames (17), and the swing arm of insurance partial sum partly is installed on the support section.Stay bearing plate (1) is two identical metal sheets, have axis hole in both sides near vertical center line, first metal sheet captiveed joint with hanging basket steel pipe frame (17), be assemblied in the insurance division branch by pivot shaft (2), gear wheel shaft (3) and extension spring set collar (8), second metal sheet covers at insurance division and divides the outside, overlaps fixing again with first metal sheet with screw.Pivot shaft (2) is a long castellated shaft, and an end passes stay bearing plate (1) left side axis hole, and engaging gear (4) and the off-centre bearing up pulley (5) of stopping can be installed, and the other end stretches out outside stay bearing plate (1), can cooperate installation with swing arm change gear (10).Engaging gear (4) and the off-centre bearing up pulley (5) of stopping respectively is two, an engaging gear (4) and off-centre overlapping pivot shaft (2) that is sleeved on of bearing up pulley (5) of stopping is fixed on the part in the stay bearing plate (1), another engaging gear (4) and another off-centre are stopped on the overlapping gear wheel shaft (3) that is sleeved on the interior right side of fixed support plate (1) of bearing up pulley (5), and safety rope (9) is stopped by two off-centre and passed in the space between the bearing up pulley (5).Arm-tie (6) and extension spring (7) respectively are two, and arm-tie (6) is captiveed joint with engaging gear (4) respectively, and the two ends of extension spring (7) are connected with extension spring set collar (8) on the stay bearing plate (1) with arm-tie (6) respectively.Gear wheel shaft (3) is installed in the axis hole on stay bearing plate (1) right side for short castellated shaft, can overlapping suit engaging gear (4) and the off-centre bearing up pulley (5) of stopping.Swing arm change gear (10) is the splined hole wheel, be fixedly set on the pivot shaft (2), clamping plate (11) upper end is fixed together with swing arm change gear (10), the lower end clips swing arm guide wheel (12) and is sleeved on the swing arm wheel shaft (13), and fastening with groove nut (14), pass in the clamping plate (11) of derrick line (16) between swing arm change gear (10) and swing arm wheel shaft (13).Two engaging gears (4) are in engagement all the time, when derrick line (16) tension, make swing arm partly rotate 45 and be strained condition, driving engaging gear (4) by pivot shaft (2) rotates, extension spring (7) tension, simultaneously the off-centre bearing up pulley (5) of stopping rotates intermediate gaps is increased, unclamp safety rope (9), when derrick line (16) fracture of tension or derrick line (16) when being in relaxation state, swing arm partly is in the nature upright position, and extension spring (7) drives pivot shaft (2) with engaging gear (4) pulling revolution, gear wheel shaft (3) rotates, make the off-centre bearing up pulley (5) of stopping recover initial position, the gap dwindles, and jam-packed safety rope (9) is fixed hanging basket, play the voluntary insurance effect, guarantee safety.In order to guarantee balance, support section, insurance part, swing arm part respectively are two covers, are installed in respectively on the building hanging basket both sides steel pipe frames (17).Safety rope (9) is gone up the termination suspension hook and is hung on the cantilever (15) that stretches out on the building, and stop space between the bearing up pulley (5) of two off-centre is passed in the centre, and the lower end twists on the insurance rope sheave (18), the rolling-in or loosen with the lifting of building hanging basket.Under the derrick line normal circumstances, safety rope (9) is in relaxation state, and derrick line when fracture, safety rope (9) is clamped and pins by the off-centre bearing up pulley (5) of stopping, and stable hanging basket plays the voluntary insurance effect.
Through above-mentioned design, trial-production, test, prove that the utility model meets the supporting requirement of building hanging basket, safe and reliable, simple in structure, to be convenient to install, reaction is flexibly, can play safety effect automatically, adapt to all kinds of building hanging basket needs of work, realize giving the meter target preferably.
Below accompanying drawing is illustrated.
Fig. 1-be the utility model fragmentary sectional elevation view;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the utility model installation site scheme drawing.
Among the figure: 1---stay bearing plate, 2---pivot shaft, 3---gear wheel shaft, 4---engaging gear, 5---the off-centre bearing up pulley of stopping, 6---arm-tie, 7---extension spring, 8---the extension spring set collar, 9---safety rope, 10---the swing arm change gear, 11---clamping plate, 12---the swing arm guide wheel, 13---swing arm wheel shaft 14---groove nut, 15---cantilever, 16---derrick line, 17---steel pipe frame, 18---the insurance rope sheave.
The utility model is described in further detail by embodiment at last.
Adopt the A3 steel plate to make wide 160mm, the stay bearing plate of two identical sizes of long 800mm, be welded on the steel pipe support of hanging basket both sides, midway location at each 45mm of the both sides of stay bearing plate vertical center line has axis hole, two axis hole width between centers 90mm, left side axis hole is installed pivot shaft, right axis hole mounting teeth wheel shaft, pivot shaft and gear wheel shaft cause castellated shaft with No. 45 steels, one cover off-centre stop bearing up pulley and engaging gear is installed respectively, engaging gear inside, the off-centre bearing up pulley of stopping overlaps suit outside, is fixed with arm-tie on the engaging gear, arm-tie connects extension spring one end, and the extension spring other end is connected with extension spring set collar on the stay bearing plate.After the insurance division branch installs, cover second stay bearing plate again, with the insurance division enfeoffment inside, with screw that two stay bearing plates are fastening, pivot shaft stretches out outside stay bearing plate, suit swing arm change gear, the swing arm change gear is the splined hole wheel, and both ends of the surface and clamping plate one end weld together, clamping plate are two blocks of identical oblong steel plates, the other end clips the swing arm guide wheel and is sleeved on the swing arm wheel shaft, and swing arm wheel shaft two ends are fastening with nut.Derrick line one end is ined succession and is hung on the cantilever, passes the middle space of clamping plate, and the other end is connected with winch by hanging basket bottom guide wheel.The derrick line tension pulls into 45 with swing arm during lifting, spurs pivot shaft simultaneously and drives 45 ° of engaging gear rotations, by arm-tie tension extension spring, the off-centre bearing up pulley of stopping turns over 45 °, middle gap increase simultaneously, unclamp safety rope, derrick line pulling hanging basket rises or descends.When derrick line disconnected, plumbness was replied in swing arm, and extension spring pulling arm-tie drives 45 ° of engaging gear revolutions, and the off-centre bearing up pulley of stopping rotates to clamped condition simultaneously, and safety rope is tightly clamped, and makes the hanging basket stable equilibrium, plays the voluntary insurance effect.
When connecing according to the aforesaid way installation test, hanging basket prescribed load amount 500kg, actual hanging basket load-carrying 750Kg, 10 meters high three floor outer walls 10 times up and down, then derrick line is destroyed, make it aloft to rupture, safety device plays a role at once, with the stable pinning of hanging basket, keeps balance not fall.Test connects did success ratio 100% three days.The proved response sensitivity, insurance effectively, and is safe and reliable.
Claims (9)
1, a kind of building hanging basket automatic safety, it is characterized in that comprising support section, the insurance part, the swing arm part, support section is made up of stay bearing plate (1) and pivot shaft (2), the insurance part is by gear wheel shaft (3), engaging gear (4), the off-centre bearing up pulley (5) of stopping, arm-tie (6), extension spring (7), safety rope (9), insurance rope sheave (18) is formed, the swing arm part is by swing arm change gear (10), clamping plate (11), derrick line guide wheel (12), swing arm wheel shaft compositions such as (13), support portion fixes is on building hanging basket both sides steel pipe supports (17), and the swing arm of insurance partial sum partly is installed on the support section.
2, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said stay bearing plate (1) is two identical metal sheets, first metal sheet captiveed joint with hanging basket steel pipe frame (17), have axis hole in both sides near vertical center line, be assemblied in the insurance division branch by pivot shaft (2), gear wheel shaft (3) and extension spring set collar (8), second metal sheet covers at insurance division and divides the outside, overlaps fixing again with first metal sheet with screw.
3, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said pivot shaft (2) is long castellated shaft, one end passes stay bearing plate (1) left side axis hole, engaging gear (4) and the off-centre bearing up pulley (5) of stopping can be installed, the other end stretches out outside stay bearing plate (1), can cooperate installation with swing arm change gear (10).
4, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said engaging gear (4) and the off-centre bearing up pulley (5) of stopping respectively is two, an engaging gear (4) and off-centre overlapping pivot shaft (2) that is sleeved on of bearing up pulley (5) of stopping is fixed on the part in the stay bearing plate (1), another engaging gear (4) and another off-centre are stopped on the overlapping gear wheel shaft (3) that is sleeved on the interior right side of fixed pedestal (1) of bearing up pulley (5), and safety rope (9) is stopped by two off-centre and passed in the space between the bearing up pulley (5).
5, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said arm-tie (6) and extension spring (7) respectively are two, arm-tie (6) is captiveed joint with engaging gear (4) respectively, and the two ends of extension spring (7) are connected with extension spring set collar (8) on the stay bearing plate (1) with arm-tie (6) respectively.
6, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said gear wheel shaft (3) for short castellated shaft, is installed in the axis hole on stay bearing plate (1) right side, can overlapping suit engaging gear (4) and the off-centre bearing up pulley (5) of stopping.
7, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said swing arm change gear (10) is the splined hole wheel, be fixedly set on the pivot shaft (2), clamping plate (11) upper end is fixed together with swing arm change gear (10), the lower end clips swing arm guide wheel (12) and is sleeved on the swing arm wheel shaft (13), and fastening with groove nut (14), pass in the clamping plate (11) of derrick line (16) between swing arm change gear (10) and swing arm wheel shaft (13).
8, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said two engaging gears (3) are in engagement all the time, when derrick line (16) tension, make swing arm swing 45 be strained condition, driving engaging gear (4) by pivot shaft (2) rotates, extension spring (7) tension, simultaneously the off-centre bearing up pulley (5) of stopping rotates intermediate gaps is increased, unclamp safety rope (9), when derrick line (16) ruptures or is in relaxation state, swing arm partly is in the nature upright position, extension spring (7) drives pivot shaft (2) with engaging gear (4) pulling revolution, gear wheel shaft (3) rotates, and makes the off-centre bearing up pulley (5) of stopping recover initial position, the gap dwindles, jam-packed safety rope (9).
9, according to the described building hanging basket automatic safety of claim 1, it is characterized in that said support section, insurance part, swing arm part respectively are two covers, be installed in respectively on the building hanging basket both sides steel pipe frames (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93230254 CN2151123Y (en) | 1993-02-23 | 1993-02-23 | Self safety unit of lifting basket for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 93230254 CN2151123Y (en) | 1993-02-23 | 1993-02-23 | Self safety unit of lifting basket for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2151123Y true CN2151123Y (en) | 1993-12-29 |
Family
ID=33806955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 93230254 Expired - Fee Related CN2151123Y (en) | 1993-02-23 | 1993-02-23 | Self safety unit of lifting basket for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2151123Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495561A (en) * | 2014-12-29 | 2015-04-08 | 龚柱 | Anti-falling unit of elevator |
CN104627771A (en) * | 2014-12-29 | 2015-05-20 | 龚柱 | Designing method for anti-falling elevator |
CN109484943A (en) * | 2018-12-12 | 2019-03-19 | 宁津汇丰消声器有限公司 | A kind of carriage tenesmus deceleration device |
CN114476956A (en) * | 2022-04-18 | 2022-05-13 | 启东市德立神起重运输机械有限公司 | Hoist and mount hoist safety arrangement |
-
1993
- 1993-02-23 CN CN 93230254 patent/CN2151123Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495561A (en) * | 2014-12-29 | 2015-04-08 | 龚柱 | Anti-falling unit of elevator |
CN104627771A (en) * | 2014-12-29 | 2015-05-20 | 龚柱 | Designing method for anti-falling elevator |
CN109484943A (en) * | 2018-12-12 | 2019-03-19 | 宁津汇丰消声器有限公司 | A kind of carriage tenesmus deceleration device |
CN114476956A (en) * | 2022-04-18 | 2022-05-13 | 启东市德立神起重运输机械有限公司 | Hoist and mount hoist safety arrangement |
CN114476956B (en) * | 2022-04-18 | 2022-06-21 | 启东市德立神起重运输机械有限公司 | Hoist and mount hoist safety arrangement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201411635Y (en) | Construction trolley of safety barrier template | |
CN111017718B (en) | Hoisting device is assisted to super high-rise creeping formwork | |
CN2151123Y (en) | Self safety unit of lifting basket for construction | |
CN201546439U (en) | Adhesive lifting scaffolding | |
CN101672103B (en) | Attached support structure | |
CN2761564Y (en) | Wall supported type lifting device | |
CN113738089A (en) | Hanging basket integral installation construction method of specially-made hanging mechanism device | |
CN107215784A (en) | The crane of Split rotary crane is installed | |
CN2658128Y (en) | Device for controlling and regulating steering of hook of crane | |
CN117208735A (en) | Device for hoisting steel structural member | |
CN2548982Y (en) | Guide rope and weight rope device for elevator | |
CN212024607U (en) | Lifting appliance for steel bar truss floor bearing plate | |
CN214942221U (en) | Hanging basket for outer wall construction | |
CN212687327U (en) | Lifting device for coal mine maintenance equipment | |
CN208716741U (en) | A kind of lifting appliance that construction uses | |
CN209969974U (en) | 360-degree turnover frame | |
CN111457144A (en) | Hoist type hoist | |
CN207001972U (en) | The hand-barring of elevator traction machine | |
CN206122344U (en) | Roll installation of line detection device and use arm | |
CN2502005Y (en) | Chain oil pumping unit | |
CN205870266U (en) | Button bit sharpening machine's two -way rack counter weight elevating gear | |
CN216844934U (en) | Support stable outer quick-witted support frame of air conditioner | |
CN220845140U (en) | Hoisting device | |
CN2856379Y (en) | Detectable rope suspension means | |
CN219045406U (en) | Tower type lower power pumping unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |