CN215110918U - Water supply and drainage engineering construction device for building construction - Google Patents

Water supply and drainage engineering construction device for building construction Download PDF

Info

Publication number
CN215110918U
CN215110918U CN202121077872.XU CN202121077872U CN215110918U CN 215110918 U CN215110918 U CN 215110918U CN 202121077872 U CN202121077872 U CN 202121077872U CN 215110918 U CN215110918 U CN 215110918U
Authority
CN
China
Prior art keywords
frame
fixedly connected
shaped
water supply
drainage engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121077872.XU
Other languages
Chinese (zh)
Inventor
刘小宁
马威
闫军平
刘鑫
赵国栋
胡晓莹
卢要军
焦杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121077872.XU priority Critical patent/CN215110918U/en
Application granted granted Critical
Publication of CN215110918U publication Critical patent/CN215110918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a water supply and drainage engineering construction device for building construction relates to building water and electricity field. This building construction feedwater drainage engineering construction equipment includes U-shaped pipe frame and U-shaped pole frame, two pole activities of U-shaped pole frame are pegged graft in two sets of lumens of U-shaped pipe frame, be equipped with the position chucking mechanism corresponding with U-shaped pole frame on the U-shaped pipe frame, the both ends department fixedly connected with fixed block of U-shaped pipe frame and U-shaped pole frame, the bottom fixedly connected with peg graft pole of fixed block, the bottom of peg graft pole is equipped with most advanced, two sets of slip side pipes, two sets of fixedly connected with sliding plates between the slip side pipe have been cup jointed in the activity on the U-shaped pipe frame. This water supply and drainage engineering construction equipment is built to building guarantees to rule the position accuracy for marking off easy operation makes location marking off tool bit and ground keep laminating simultaneously, even ground is uneven, also can guarantee the marking off effect, makes to rule clearly.

Description

Water supply and drainage engineering construction device for building construction
Technical Field
The utility model relates to a building water and electricity technical field specifically is a water supply and drainage engineering construction equipment is built to building.
Background
In the construction process of the water supply and drainage engineering for building construction, cables need to be laid, the general simple ditches are dug out and then the water pipe wires are buried when the pipelines are laid, the pipeline pre-embedded positioning device can be used in the construction of the building water and electricity engineering, two parallel lines are cut out in the ditches for positioning when the main application is used for digging the ditches, and the ditches with better levelness and convenient pre-embedded pipelines are conveniently dug by constructors.
Among the prior art, after carrying out the marking off operation, confirm the direction usually, still need continuous use ruler to confirm, ensure to mark off accurately, however this kind of marking off mode appears marking off the direction very easily and appears the skew, leads to marking off the position inaccurate, and ground is uneven moreover, still can lead to tool bit and ground not laminating for it is unclear to mark off, inaccurate, to prior art's not enough, the utility model discloses a building construction water supply and drainage engineering construction equipment to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
To the not enough of prior art, the utility model discloses a water supply and drainage engineering construction equipment is built to the problem of proposing in solving above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a construction device for water supply and drainage engineering in building construction comprises a U-shaped pipe frame and a U-shaped rod frame, wherein two rods of the U-shaped rod frame are movably inserted in two groups of pipe cavities of the U-shaped pipe frame, a position clamping mechanism corresponding to the U-shaped rod frame is arranged on the U-shaped pipe frame, two corners of the U-shaped pipe frame and the U-shaped rod frame are fixedly connected with fixed blocks, the bottom of each fixed block is fixedly connected with an insertion rod, the bottom of each insertion rod is provided with a tip end, two groups of sliding square pipes are movably sleeved on the U-shaped pipe frame, a sliding plate is fixedly connected between the two groups of sliding square pipes, two groups of limiting square pipes are fixedly connected with the top of the sliding plate, a fixed cylinder is fixedly connected with the top of the sliding plate, the top of the fixed cylinder is fixedly connected with a top plate, a lifting plate is slidably connected on the fixed cylinder, and two groups of springs are fixedly connected with the top of the lifting plate, the top of the spring is fixedly connected to the bottom of the top plate, the bottom of the lifting plate is fixedly connected with two groups of positioning scribing bits, the positioning scribing bits are connected in the limiting square pipe in a sliding mode, and the bottom of the positioning scribing bits penetrates through the sliding plate and extends downwards.
Preferably, the position clamping mechanism comprises a nut seat, the nut seat is fixedly connected to the top of the U-shaped pipe frame, a clamping bolt is in threaded connection with the axis of the nut seat, and the bottom of the clamping bolt penetrates through the U-shaped pipe frame and abuts against the top of the U-shaped rod frame.
Preferably, the side wall of the lifting plate is fixedly connected with a second handle, and a through hole corresponding to the fixing cylinder is formed in the center of the top of the lifting plate.
Preferably, the side wall of the top plate is fixedly connected with a connecting rod, and the bottom of the connecting rod is fixedly connected with a first handle.
Preferably, the length of the U-shaped rod frame is the same as the length of the U-shaped tube frame.
Preferably, the number of the insertion rods is four, and the heights of the four groups of the insertion rods are the same.
The utility model discloses a water supply and drainage engineering construction equipment is built to building, its beneficial effect who possesses as follows:
1. the construction device for water supply and drainage engineering in building construction can facilitate pre-embedding, positioning and marking of water and electricity pipelines in a site area when in use, can firstly carry out corresponding measurement on the site, determine the marking direction after the measurement, align the whole device body to the marking direction, then place the positioning and marking tool bit at an initial position, further push a first handle to carry out marking operation, lift a second handle upwards and attach the second handle to the first handle after the positioning and marking tool bit moves to a maximum distance, then slide a sliding plate to the initial position, unscrew a clamping bolt, transversely slide a U-shaped rod frame, slide a fixed block along the U-shaped rod frame, move the whole sliding plate forwards, then unscrew the clamping bolt, continue the marking operation, and repeatedly carry out the operation in such a way that the marking direction does not deviate, and guarantee to rule the position accuracy for rule easy operation satisfies the user demand.
2. This water supply and drainage engineering construction equipment is built to building, the spring that sets up is in compression state, and its elasticity can guarantee to have a thrust downwards to the lifter plate for the location marking off tool bit keeps laminating with ground, even ground is uneven, also can guarantee the marking off effect, makes to mark off clearly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a perspective view of the device body of the present invention;
FIG. 3 is a structural diagram of the positioning scribing head of the present invention;
fig. 4 is a structural diagram of the U-shaped rod frame of the present invention.
In the figure: 1. a U-shaped pipe frame; 101. a nut seat; 102. clamping the bolt; 2. a U-shaped rod frame; 3. a fixed block; 4. a plug rod; 5. sliding the square tube; 6. a sliding plate; 7. limiting the square tube; 8. fixing the cylinder; 9. a top plate; 10. a connecting rod; 11. a first handle; 12. a lifting plate; 13. a spring; 14. positioning the scribing cutter head; 15. a second handle.
Detailed Description
The embodiment of the utility model discloses a construction device for water supply and drainage engineering in building construction, as shown in figure 1-4, comprising a U-shaped pipe frame 1 and a U-shaped rod frame 2, two rods of the U-shaped rod frame 2 are movably inserted in two groups of pipe cavities of the U-shaped pipe frame 1, a position clamping mechanism corresponding to the U-shaped rod frame 2 is arranged on the U-shaped pipe frame 1, two corners of the U-shaped pipe frame 1 and the U-shaped rod frame 2 are fixedly connected with fixed blocks 3, the bottom of the fixed blocks 3 is fixedly connected with an insertion rod 4, the bottom of the insertion rod 4 is provided with a tip, two groups of sliding square pipes 5 are movably sleeved on the U-shaped pipe frame 1, a sliding plate 6 is fixedly connected between the two groups of sliding square pipes 5, two groups of limiting square pipes 7 are fixedly connected at the top of the sliding plate 6, a fixed cylinder 8 is fixedly connected at the center of the top of the sliding plate 6, and a top plate 9 is fixedly connected at the top of the fixed cylinder 8, the fixed cylinder 8 is connected with a lifting plate 12 in a sliding way, the top of the lifting plate 12 is fixedly connected with two groups of springs 13, the top of each spring 13 is fixedly connected with the bottom of the top plate 9, the bottom of the lifting plate 12 is fixedly connected with two groups of positioning scribing heads 14, the positioning scribing heads 14 are connected in the limiting square tubes 7 in a sliding way, the bottoms of the positioning scribing heads 14 penetrate through the sliding plate 6 and extend downwards, when the device is used, the pre-buried positioning scribing of the water and electricity pipelines can be conveniently carried out on the site area, firstly, corresponding measurement can be carried out on the site, the scribing direction is determined after the measurement, the whole device body is aligned to the scribing direction, then, the positioning scribing heads 14 are arranged at the initial position, the first handle 11 can be pushed to carry out scribing operation, when the positioning scribing heads 14 move to the maximum distance, the second handle 15 can be lifted upwards and attached to the first handle 11, then slide plate 6 slides to initial position, can unscrew chucking bolt 102 this moment, then transversely slide U-shaped pole frame 2, slide fixed block 3 along U-shaped pole frame 2, can move whole slide plate 6 forward this moment, then can screw up chucking bolt 102, continue to mark the line operation, the operation can be gone on repeatedly like this for the direction of marking a line can not take place the skew, guarantees moreover to mark the position accuracy, makes to mark the line easy operation, satisfies user's demand.
As a technical optimization scheme of the utility model, position chucking mechanism includes nut seat 101, and nut seat 101 fixed connection is at the top of U-shaped pipe frame 1, and the axle center department threaded connection of nut seat 101 has chucking bolt 102, and the bottom of chucking bolt 102 is passed U-shaped pipe frame 1 and is offseted with the top of U-shaped rod frame 2, and the chucking mechanism simple structure of setting, convenient to use is not fragile, satisfies the user demand.
As a technical optimization scheme of the utility model, the lateral wall fixedly connected with second handle 15 of lifter plate 12, the top center department of lifter plate 12 offer with the corresponding through-hole of stationary cylinder 8, the second handle 15 of setting is convenient for the user and slides lifter plate 12.
As a technical optimization scheme of the utility model, the lateral wall fixedly connected with connecting rod 10 of roof 9, the bottom fixedly connected with the first in command 11 of connecting rod 10, the first in command 11 person in command sliding connection pole 10 and roof 9 that set up.
As a technical optimization scheme of the utility model, the length of U-shaped pole frame 2 is the same with the length of U-shaped pipe frame 1, and the quantity of peg rod 4 is four groups, and the high samely of four groups of peg rod 4, the peg rod 4 of setting can support the device main part, and the pointed end that the bottom set up can make the device main part insert subaerially for it is fixed effectual to support.
When the utility model is used, the utility model is convenient for the pre-buried positioning and marking of water and electricity pipelines in the field area, firstly, the corresponding measurement can be carried out on the field, after the measurement, the marking direction is determined, the whole device body is aligned to the marking direction, then the positioning and marking tool bit 14 is arranged at the initial position, and then the first handle 11 can be pushed to carry out the marking operation, the first handle 11 drives the connecting rod 10 to move, the connecting rod 10 drives the top plate 9 to move, the top plate 9 drives the fixed cylinder 8 to move, the fixed cylinder 8 drives the sliding plate 6 to move, the sliding plate 6 drives the spacing square tube 7 to move, and simultaneously, the sliding square tube 5 is also driven to slide along the U-shaped tube frame 1, the spacing square tube 7 drives the positioning and marking tool bit 14 to move, the positioning and marking tool bit 14 carries out the marking operation on the ground, the spring 13 arranged at the top is in the compression state, the elasticity of the spring can ensure that there is a downward thrust to the lifting plate 12, the positioning scribing cutter head 14 is attached to the ground, scribing effect can be guaranteed even if the ground is uneven, after the positioning scribing cutter head 14 moves to the maximum distance, the second handle 15 can be lifted upwards and attached to the first handle 11 at the moment, the sliding plate 6 slides to the initial position, the clamping bolt 102 can be unscrewed at the moment, the U-shaped rod frame 2 transversely slides, the fixing block 3 slides along the U-shaped rod frame 2, the whole sliding plate 6 can be moved forwards at the moment, the clamping bolt 102 can be screwed, scribing operation is continued, deviation in direction cannot occur, and scribing operation is simple.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a building construction water supply and drainage engineering construction equipment, includes U-shaped pipe frame (1) and U-shaped pole frame (2), its characterized in that: two rods of the U-shaped rod frame (2) are movably inserted into two groups of tube cavities of the U-shaped tube frame (1), a position clamping mechanism corresponding to the U-shaped rod frame (2) is arranged on the U-shaped tube frame (1), two corners of the U-shaped tube frame (1) and the U-shaped rod frame (2) are fixedly connected with fixed blocks (3), the bottom of each fixed block (3) is fixedly connected with an insertion rod (4), the bottom of each insertion rod (4) is provided with a tip end, two groups of sliding square tubes (5) are movably sleeved on the U-shaped tube frame (1), a sliding plate (6) is fixedly connected between the two groups of sliding square tubes (5), the top of each sliding plate (6) is fixedly connected with two groups of limiting square tubes (7), the top center of each sliding plate (6) is fixedly connected with a fixed cylinder (8), and the top of each fixed cylinder (8) is fixedly connected with a top plate (9), sliding connection has lifter plate (12) on fixed cylinder (8), two sets of springs (13) of top fixedly connected with of lifter plate (12), the top fixed connection of spring (13) is in the bottom of roof (9), two sets of location marking off tool bits (14) of bottom fixedly connected with of lifter plate (12), location marking off tool bit (14) sliding connection is in spacing side pipe (7), sliding plate (6) and downwardly extending are passed to the bottom of location marking off tool bit (14).
2. The water supply and drainage engineering construction device for building construction according to claim 1, wherein: the position clamping mechanism comprises a nut seat (101), the nut seat (101) is fixedly connected to the top of the U-shaped pipe frame (1), a clamping bolt (102) is in threaded connection with the axis of the nut seat (101), and the bottom of the clamping bolt (102) penetrates through the U-shaped pipe frame (1) and abuts against the top of the U-shaped rod frame (2).
3. The water supply and drainage engineering construction device for building construction according to claim 1, wherein: the side wall of the lifting plate (12) is fixedly connected with a second handle (15), and the center of the top of the lifting plate (12) is provided with a through hole corresponding to the fixed cylinder (8).
4. The water supply and drainage engineering construction device for building construction according to claim 1, wherein: the side wall of roof (9) fixedly connected with connecting rod (10), the bottom fixedly connected with first in command (11) of connecting rod (10).
5. The water supply and drainage engineering construction device for building construction according to claim 1, wherein: the length of the U-shaped rod frame (2) is the same as that of the U-shaped pipe frame (1).
6. The water supply and drainage engineering construction device for building construction according to claim 1, wherein: the number of the insertion rods (4) is four, and the heights of the four groups of insertion rods (4) are the same.
CN202121077872.XU 2021-05-19 2021-05-19 Water supply and drainage engineering construction device for building construction Active CN215110918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121077872.XU CN215110918U (en) 2021-05-19 2021-05-19 Water supply and drainage engineering construction device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121077872.XU CN215110918U (en) 2021-05-19 2021-05-19 Water supply and drainage engineering construction device for building construction

Publications (1)

Publication Number Publication Date
CN215110918U true CN215110918U (en) 2021-12-10

Family

ID=79297993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121077872.XU Active CN215110918U (en) 2021-05-19 2021-05-19 Water supply and drainage engineering construction device for building construction

Country Status (1)

Country Link
CN (1) CN215110918U (en)

Similar Documents

Publication Publication Date Title
CN213177042U (en) Guiding device for pipe jacking construction
CN215110918U (en) Water supply and drainage engineering construction device for building construction
CN104018505B (en) The embedding series of rocks system of pre-manufactured steel cage guiding and using method
CN214666871U (en) Survey and drawing engineering survey and drawing is with sighting rod convenient to fix
CN102747954A (en) Hole-drilling guiding positioning system suitable for inclined rock surface and construction method
CN217270093U (en) Core picking and placing device for geological exploration
CN208996476U (en) The more size isolated footing bed course unwrapping wire auxiliary tools of Simple portable
CN212643722U (en) Novel municipal pipeline lays fixedly device
CN211178495U (en) Civil engineering measurement pay-off
CN102979458A (en) Rock wall beam oblique surface smooth blasting punching guiding and positioning device
CN204529148U (en) Cement electric pole press-rod apparatus
CN111441224B (en) Road subsidence layering detection device
CN107606430B (en) Tripod for lofting of building site total station
CN210564350U (en) Geophysical prospecting is with boring native device
CN208415255U (en) Pile pulling device
CN214831739U (en) Simple loose thickness measuring device
CN219731622U (en) Easy-to-use floating bridge
CN213419033U (en) Horizontal directional drilling machine front end fixable support
CN211740196U (en) Leveling rod handrail capable of being stretched and removed
CN215630223U (en) Building foundation detection device with good stability
CN210920742U (en) Land measuring device applicable to different terrains
CN203657798U (en) Ground surface settlement measuring leveling rod for largely irregular surface
CN203960872U (en) Pre-manufactured steel cage guiding embedding series of rocks system
CN215718524U (en) Quick interfacing apparatus of notch formula drilling rod
CN214644842U (en) Device for positioning and grooving building blocks

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant