- CN215108811U CN215108811U CN202120735657.8U CN202120735657U CN215108811U CN 215108811 U CN215108811 U CN 215108811U CN 202120735657 U CN202120735657 U CN 202120735657U CN 215108811 U CN215108811 U CN 215108811U
- Authority
- CN
- China
- Prior art keywords
- drilling rod
- tunnel construction
- connector link
- thick bamboo
- location section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a drilling rod fixer is executed in tunnel construction, including a location section of thick bamboo, the internal diameter more than or equal to drilling rod external diameter of a location section of thick bamboo, the outer wall of a location section of thick bamboo is fixed with at least three connector link along circumference distribution, and the outside of every connector link all corresponds and is provided with pre-buried horizontal pole, through turn-buckle fixed connection between connector link and the pre-buried horizontal pole that corresponds, the coupling hook at turn-buckle both ends hooks respectively and locates on connector link and the pre-buried horizontal pole. The method solves the problem that the existing construction method is difficult to ensure the positioning precision of the drilling. Belongs to the field of tunnel construction.
Description
Technical Field
The utility model relates to a tunnel construction is executed and is bored drilling rod fixer belongs to the tunnel construction field.
Background
At present, drill rod positioning in tunnel construction is a big difficulty, and the drill rod positioning can only be guaranteed by means of stable drilling of an operator to control the drill rod in the existing method, but the mode is extremely unstable, the problems of drilling deviation and the like can often occur, and the drilling precision cannot be guaranteed.
Disclosure of Invention
The utility model provides a drilling rod fixer is bored in tunnel construction to it is difficult to guarantee the problem of drilling positioning accuracy to solve current construction method.
For realizing above-mentioned purpose, plan to adopt such a tunnel construction to execute and bore drilling rod fixer, including a location section of thick bamboo, the internal diameter more than or equal to drilling rod external diameter of a location section of thick bamboo, the outer wall of a location section of thick bamboo is fixed with at least three connector link along circumference distribution, and the outside of every connector link all corresponds and is provided with pre-buried horizontal pole, through turn-buckle fixed connection between connector link and the pre-buried horizontal pole that corresponds, the coupling hook at turn-buckle both ends hooks respectively on locating connector link and pre-buried horizontal pole.
In the drill rod fixer, the inner diameter of the positioning cylinder is 5-30mm larger than the outer diameter of the drill rod;
in the drill rod fixer, the embedded cross rods are embedded in the tunnel face;
in the drill rod fixer, a steel plate is welded and fixed on the outer wall of the positioning cylinder, and the connecting fastener is a connecting hole formed in the steel plate or a steel fastener welded and fixed on the steel plate;
in the drill rod fixer, the connecting buckles are all arranged on the same cross section of the positioning cylinder;
among the aforementioned drilling rod fixer, the outer wall of a location section of thick bamboo is provided with three connector link along circumference equidistant distribution, and three pre-buried horizontal pole one-to-one sets up in the outside of three connector link.
Compared with the prior art, the utility model discloses in tunnel construction, confirm the drilling position of drilling rod earlier, use drilling as the center again, select three position along circumference distribution ground, it is pre-buried to pre-buried horizontal pole on the face, aim at the location of drilling with a location section of thick bamboo again, the connector link in the location section of thick bamboo outside is respectively through the turn-buckle connection pre-buried horizontal pole, tighten up the turn-buckle, keep a location section of thick bamboo aim at drilling and with drilling coaxial can, it can to pass the location section of thick bamboo with the drilling rod again and carry out the drilling operation, can guarantee the precision of drilling position well, and can also effectively avoid the drilling rod to beat partially under the condition that a location section of thick bamboo has certain length, suitable popularization and application.
Drawings
Fig. 1 is a schematic plan view of the present invention;
fig. 2 is a bottom view of fig. 1.
Detailed Description
To further clarify the objects, technical solutions and advantages of the present invention, a more particular description of the invention will be rendered by reference to the appended drawings, which are illustrated in the appended drawings.
Examples
Referring to fig. 1 and 2, this embodiment provides a drilling rod fixer is executed in tunnel construction, including a location section of thick bamboo 1, the internal diameter of a location section of thick bamboo 1 is 20mm bigger than the drilling rod external diameter, and the outer wall of a location section of thick bamboo 1 is fixed with three connector link 2 along circumference equidistant distribution, and the outer wall welded fastening of a location section of thick bamboo 1 has steel sheet 5, connector link 2 is for offering connecting hole or the steel knot of welded fastening on the steel sheet 5, and connector link 2 all sets up in the same cross section department of a location section of thick bamboo 1 to guarantee location section of thick bamboo 1 axial stability, the outside of every connector link 2 all corresponds and is provided with pre-buried horizontal pole 3, and the one end of pre-buried horizontal pole 3 is all pre-buried on the face, through 4 fixed connection of turn-buckle between connector 2 and the pre-buried horizontal pole 3 that corresponds, and the hook respectively on connector link 2 and pre-buried horizontal pole 3.
During the use, confirm the drilling position of drilling rod earlier, use drilling as the center again, select three position along circumference distribution ground, it is pre-buried to pre-buried horizontal pole on the face, aim at the location section of thick bamboo drilling location again, the connector link in the location section of thick bamboo outside connects pre-buried horizontal pole through the turn-buckle respectively, tighten up the turn-buckle, keep the location section of thick bamboo aim at drilling and with the drilling coaxial can, pass the drilling rod again the location section of thick bamboo carry out the drilling operation can, can guarantee the precision of drilling position well, and then guarantee construction precision and accuracy.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.
Claims (6)
1. The utility model provides a drilling rod fixer is bored in tunnel construction which characterized in that: including a location section of thick bamboo (1), the internal diameter more than or equal to drilling rod external diameter of a location section of thick bamboo (1), the outer wall of a location section of thick bamboo (1) is fixed with at least three connector link (2) along circumference distribution, the outside of every connector link (2) all corresponds and is provided with pre-buried horizontal pole (3), through turn-buckle (4) fixed connection between connector link (2) and the pre-buried horizontal pole (3) that correspond, the coupling hook at turn-buckle (4) both ends is hooked respectively and is located on connector link (2) and pre-buried horizontal pole (3).
2. The drilling rod fixer for tunnel construction according to claim 1, wherein: the inner diameter of the positioning cylinder (1) is 5-30mm larger than the outer diameter of the drill rod.
3. The drilling rod fixer for tunnel construction according to claim 1, wherein: the embedded cross rods (3) are embedded in the tunnel face.
4. The drilling rod fixer for tunnel construction according to claim 3, wherein: the outer wall welded fastening of a location section of thick bamboo (1) has steel sheet (5), connector link (2) are for seting up the connecting hole on steel sheet (5) or welded fastening in the steel knot on steel sheet (5).
5. The drilling rod fixer for tunnel construction according to claim 1, wherein: the connecting buckles (2) are all arranged on the same cross section of the positioning cylinder (1).
6. The drilling rod fixer for tunnel construction according to claim 1, wherein: the outer wall of a positioning cylinder (1) is provided with three connecting buckles (2) along the circumferential equidistant distribution, and three pre-buried horizontal poles (3) are arranged on the outer sides of the three connecting buckles (2) in a one-to-one correspondence manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120735657.8U CN215108811U (en) | 2021-04-12 | 2021-04-12 | Drilling rod fixer for tunnel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120735657.8U CN215108811U (en) | 2021-04-12 | 2021-04-12 | Drilling rod fixer for tunnel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215108811U true CN215108811U (en) | 2021-12-10 |
Family
ID=79264719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120735657.8U Expired - Fee Related CN215108811U (en) | 2021-04-12 | 2021-04-12 | Drilling rod fixer for tunnel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215108811U (en) |
-
2021
- 2021-04-12 CN CN202120735657.8U patent/CN215108811U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109098358A (en) | A kind of self-locking reinforcing bar connection grout sleeve | |
CN204826426U (en) | Grout sleeve for steel bar connection | |
CN109736438A (en) | A kind of concrete filled steel tube connects with steel tube device and its construction method | |
CN105064625A (en) | Grout sleeve for reinforcement connection and reinforcement connecting method | |
CN212153366U (en) | Concrete pipe pile connecting structure | |
CN215108811U (en) | Drilling rod fixer for tunnel construction | |
CN107059911A (en) | A kind of prefabricated assembled basis and its assemble method | |
CN208884849U (en) | A kind of self-locking reinforcing bar connection grout sleeve | |
CN2568815Y (en) | Strengthening slip casting anchor stock | |
CN108240132A (en) | A kind of reinforced concrete pole flange component | |
CN204431470U (en) | A kind of concrete pipe pile tensioning system | |
CN206916941U (en) | A kind of steel structure column | |
CN214144410U (en) | Reinforced concrete barrel structure | |
CN106978852A (en) | A kind of embedded system of standardization and the construction method for standardizing built-in fitting | |
CN203081952U (en) | Drive pin fastening and connecting device | |
CN106759304B (en) | Quick connecting device and method for follow-up pipe pile while drilling | |
CN209724350U (en) | A kind of anchor drawing light-duty tunnel portal of armored concrete | |
CN209457273U (en) | Reinforcing bar ferrule connector | |
CN216041115U (en) | Pile foundation steel reinforcement cage interfacing apparatus | |
CN205329859U (en) | Normalized pre -buried system | |
CN206554596U (en) | A kind of reinforced concrete pole flange component | |
CN205684960U (en) | The pulling device of welding hybrid reinforcement prestressed pipe pile cages | |
CN204475317U (en) | A kind of precast square pile reinforcing cage is with connecting positioning disk | |
CN220013652U (en) | Steel pile casing | |
CN216949098U (en) | Combined steel pipe concrete column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211210 |