CN215106893U - Large-scale paving structure for floor heating floor - Google Patents

Large-scale paving structure for floor heating floor Download PDF

Info

Publication number
CN215106893U
CN215106893U CN202022359544.0U CN202022359544U CN215106893U CN 215106893 U CN215106893 U CN 215106893U CN 202022359544 U CN202022359544 U CN 202022359544U CN 215106893 U CN215106893 U CN 215106893U
Authority
CN
China
Prior art keywords
floor
floor heating
paving
mating formation
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022359544.0U
Other languages
Chinese (zh)
Inventor
何啸宇
王艳伟
张恩玖
孔繁旭
孙龙祥
余慧来
徐阿坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiusheng Wood Co ltd
Original Assignee
Jiusheng Wood Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiusheng Wood Co ltd filed Critical Jiusheng Wood Co ltd
Priority to CN202022359544.0U priority Critical patent/CN215106893U/en
Application granted granted Critical
Publication of CN215106893U publication Critical patent/CN215106893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a structure of mating formation of warm floor scale, including the module of mating formation (1), evenly distributed is gone up in the module of mating formation (1) has a plurality of bellyings, warms up passageway (2) between the adjacent bellyings to form. The utility model discloses a cooperation of module of mating formation and surface bellying makes floor heating pipe can lay along the floor heating passageway between the bellying when the installation, and both sides bellying then can carry out spacing to floor heating pipe, avoids the "dead book" problem in its installation, reduces the installation degree of difficulty to floor heating pipe; meanwhile, the paving structure does not need to backfill and level the paving module, reduces the paving cost of the floor heating floor and improves the paving efficiency and stability of the floor heating floor.

Description

Large-scale paving structure for floor heating floor
Technical Field
The utility model relates to a floor structure of mating formation, especially a warm floor scale structure of mating formation.
Background
At present, the mainstream floor heating floor paving mode is that fasteners such as a floor heating pipeline clamp are firstly installed on the leveling ground, then backfilling and leveling are carried out above the floor heating pipeline, and finally the installation of the keel and the floor heating floor is completed on the upper layer leveling surface. However, the paving structure of the floor heating floor needs to backfill and level the ground twice, and the leveling process has higher cost and longer construction time. Meanwhile, the floor heating pipeline is easy to be fixed by the clamping nails during installation, namely, the pipeline cannot pass water flow due to excessive bending, so that the installation difficulty of the floor heating pipeline is increased, and the floor heating pipeline has higher requirements on handcrafts and experiences of operators. In addition, in the installation of fossil fragments and ground heating floor, because ground heating pipe is hidden in the screed-coat after being backfilled for installer can cause the phenomenon that the ground heating pipe was directly penetrated to the floor nail when fixed because of can't observing pipeline position and the not smart problem of skill, has further increased the degree of difficulty of mating formation to ground heating floor. Therefore, the existing paving mode for the floor heating floor has the problems of high paving cost and high paving difficulty.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a structure of mating formation of warm-ground floor scale. The floor heating floor can effectively reduce the paving cost and the paving difficulty of the floor heating floor.
The technical scheme of the utility model: the utility model provides a structure of mating formation of warm floor scale, is including the module of mating formation, and evenly distributed has a plurality of bellyings on the module of mating formation, warms up the passageway between the adjacent bellyings.
In the large-scale paving structure of the floor heating floor, the protruding parts comprise a first protruding part and a second protruding part, the first protruding part and the second protruding part are respectively arranged on the front side and the back side of the paving module, and the first protruding part and the second protruding part are arranged in a staggered manner; and a floor heating channel is formed between the adjacent first bosses.
In the large-scale paving structure of the floor heating floor, the air heat preservation channel is formed between the adjacent second convex parts.
In the large-scale paving structure of the floor heating floor, the first protruding portion and the second protruding portion have the same structure and are both in a circular truncated cone shape.
In the large-scale paving structure of the floor heating floor, the end parts of the first protruding part and the second protruding part are respectively provided with the mounting hole.
Compared with the prior art, the utility model discloses a cooperation of module of mating formation and surface bellying makes floor heating pipe can lay along the floor heating passageway between the bellying when the installation, and both sides bellying can carry out spacing to floor heating pipe, realizes the fixed effect to floor heating pipe; under the cooperation, the floor heating pipeline is not required to be fixed by the staple bolt, so that the problem of 'dead fold' in the installation process can be avoided, and the installation difficulty of the floor heating pipeline is reduced; through evenly distributed on the module of mating formation and be located the bellying of floor heating pipe upper end, can also realize fixing to fossil fragments as the installation face, make fossil fragments need not to backfill the module of mating formation of laying floor heating pipe before the installation and make level, thereby reduced one to the backfill process on ground and made installer can audio-visually grasp the position of floor heating channel at the in-process of mating formation, avoid follow-up the in-process of mating formation to the damage of floor heating channel, reduced the cost of mating formation to floor heating floor and improved efficiency and the stability of mating formation to floor heating floor.
In addition, the utility model discloses a cooperation of second bellying can also make the module of mating formation adjust the height and the levelness of the module of mating formation through the mode of installing the gasket additional in second bellying bottom, can guarantee the stability of mating formation of the module of mating formation and the effect of mating formation of fossil fragments on the one hand, on the other hand can reduce the required levelness of bottom alignment, further reduced the degree of difficulty of mating formation to the floor heating floor; through the air heat preservation channel between the second protruding parts, the heat energy loss of the floor heating pipeline in use can be reduced; the floor can also be alleviated the cracking deformation of the floor caused by the change of the moisture content through the overhead structure below the floor heating, so that the warping phenomenon of the floor is reduced, and the service life of the floor is prolonged. Therefore, the utility model discloses can effectively reduce the cost of mating formation and the degree of difficulty of mating formation of floor heating floor.
Drawings
FIG. 1 is an external view of the present invention;
fig. 2 is a cross-sectional view of the present invention.
The labels in the figures are: 1-paving module, 2-floor heating channel, 3-first bulge, 4-second bulge, 5-air heat preservation channel and 6-mounting hole.
Detailed Description
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
Examples are given. The utility model provides a structure of mating formation in scale of ground heating floor, constitutes as shown in figure 1, including the module 1 of mating formation, the module 1 of mating formation can adopt high strength composite material or high strength polymer to make, and the module 1 of mating formation evenly distributed has a plurality of bellyings, forms ground between the adjacent bellyings and warms up passageway 2.
The protruding parts comprise a first protruding part 3 and a second protruding part 4, the first protruding part 3 and the second protruding part 4 are respectively arranged on the front surface and the back surface of the paving module 1, and the first protruding part 3 and the second protruding part 4 are arranged in a staggered mode in the horizontal direction; and a floor heating channel 2 is formed between the adjacent first bulges 3.
And an air insulation channel 5 is formed between the adjacent second convex parts 4.
The first protruding part 3 and the second protruding part 4 have the same structure and are both in a truncated cone shape.
The end parts of the first protruding part 3 and the second protruding part 4 are provided with mounting holes 6.
The utility model discloses a theory of operation: the utility model discloses when mating formation, the subaerial module 1 that will mat formation of making level and heat preservation preparation has been accomplished earlier and has been covered, then utilizes the mounting hole 6 that the screw passed second bellying 4 to fix the module 1 of mating formation. When the module 1 of mating formation appears unevenness or height deviation's problem, the accessible carries out height control at the mode of the bottom increase gasket of second bellying 4 for the module 1 of mating formation can guarantee unified high position after mating formation. After the paving module 1 is fixed, paving the floor heating pipeline along the floor heating channel 2 between the first bulges 3; the first boss 3 through the round platform shape can be suitable for floor heating pipelines of different sizes, and is limited after the floor heating pipeline is laid, so that the floor heating pipeline is not required to be fixed through a clamp nail when being installed, and the fixed damage of the floor heating pipeline is reduced. After the floor heating pipeline is laid, the keel and the floor heating floor can be directly laid on the top of the first protruding part 3; the paving module 1 does not need to be backfilled and leveled, and the needed paving cost and the paving time are reduced. When the floor heating pipeline is used, the air heat preservation channel 5 can play a role of a heat preservation layer, and heat energy loss of the floor heating pipeline is reduced. Meanwhile, the structure which is arranged under the floor in an overhead mode can reduce cracking deformation of the floor caused by changes of water content of the ground.
The module 1 of mating formation can also set up different size specification as required when production to be convenient for make and the installation concatenation, and be applicable to a plurality of warm products and various use occasions that lead to the company, improve the utility model discloses an application scope.

Claims (1)

1. The utility model provides a structure of mating formation of ground heating floor scale which characterized in that: the floor heating system comprises a paving module (1), wherein a plurality of convex parts are uniformly distributed on the paving module (1), and a floor heating channel (2) is formed between every two adjacent convex parts; the paving module comprises a paving module body (1), wherein the paving module body is provided with a plurality of protruding parts, each protruding part comprises a first protruding part (3) and a second protruding part (4), the first protruding parts (3) and the second protruding parts (4) are respectively arranged on the front side and the back side of the paving module body (1), and the first protruding parts (3) and the second protruding parts (4) are arranged in a staggered mode; a floor heating channel (2) is formed between the adjacent first bulges (3); the first protruding part (3) and the second protruding part (4) are identical in structure and are both in a truncated cone shape; mounting holes (6) are formed in the end parts of the first protruding part (3) and the second protruding part (4); an air heat-preservation channel (5) is formed between the adjacent second convex parts (4); one side of the paving module (1) is provided with a gasket positioned at the bottom of the second bulge part (4).
CN202022359544.0U 2020-10-21 2020-10-21 Large-scale paving structure for floor heating floor Active CN215106893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022359544.0U CN215106893U (en) 2020-10-21 2020-10-21 Large-scale paving structure for floor heating floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022359544.0U CN215106893U (en) 2020-10-21 2020-10-21 Large-scale paving structure for floor heating floor

Publications (1)

Publication Number Publication Date
CN215106893U true CN215106893U (en) 2021-12-10

Family

ID=79262812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022359544.0U Active CN215106893U (en) 2020-10-21 2020-10-21 Large-scale paving structure for floor heating floor

Country Status (1)

Country Link
CN (1) CN215106893U (en)

Similar Documents

Publication Publication Date Title
CN204059844U (en) Indoor wall, ground decoration keel frame
CN215106893U (en) Large-scale paving structure for floor heating floor
CN204498051U (en) A kind of photovoltaic board mount
CN104018627A (en) Solar building roof
CN201817165U (en) Adjustable guide rail bracket for lifter
CN108824759B (en) Indoor split low-temperature hot water floor mounting structure
CN204645500U (en) A kind of anchoring piece linkage adopting upset bolt
CN210685112U (en) Steel-concrete combined prefabricated bottom plate assembly for laminated slab and wall
CN2821019Y (en) Formwork for radiation heating
CN209780132U (en) Laying structure of assembled ceramic tile
CN114687532B (en) Overhead floor with upper pipe and lower pipe and assembling method thereof
CN205829097U (en) A kind of temporary cable hanging hook assembly
CN204681026U (en) The cable fixture of cable shaft and junction, cable tunnel
CN207063427U (en) A kind of heat-insulated underground heat of heat insulating ability is mated formation panel assembly
CN205024923U (en) Energy -conserving furred ceiling of papermaking factory building wet end of machine
CN107676897B (en) Air supply pipeline structure
CN115126188B (en) Self-facing raised floor and installation method thereof
CN215889190U (en) Overhead structure for floor heating installation
CN216530475U (en) Cable trench
CN203213322U (en) Deformation joint construction structure of thermoplastic elastic rubber plate of building ground
CN219175746U (en) Building engineering floor comprehensive assembly system
CN210217033U (en) Assembled ground system of mating formation
CN217383072U (en) Dry-type underfloor heating system
CN217326263U (en) Dry-type underfloor heating system
CN216765888U (en) Land wind power shaping and assembling type heat-preservation maintenance cotton

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant