CN215106622U - Prefabricated pier stud locating rack structure for steel reinforcement cage - Google Patents

Prefabricated pier stud locating rack structure for steel reinforcement cage Download PDF

Info

Publication number
CN215106622U
CN215106622U CN202121546188.1U CN202121546188U CN215106622U CN 215106622 U CN215106622 U CN 215106622U CN 202121546188 U CN202121546188 U CN 202121546188U CN 215106622 U CN215106622 U CN 215106622U
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
pier stud
support
prefabricated pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121546188.1U
Other languages
Chinese (zh)
Inventor
徐磊
刘向前
付书生
彭申凯
刘晓晗
崔健
沈维成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202121546188.1U priority Critical patent/CN215106622U/en
Application granted granted Critical
Publication of CN215106622U publication Critical patent/CN215106622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a prefabricated pier stud locating rack structure for steel reinforcement cage, including the locating support, the locating support is two sets of altogether, sets up at the bilateral symmetry of steel reinforcement cage, the holding ring is installed to the inboard of locating support, be fixed with the ring rail on the medial surface of holding ring, the cover has a plurality of steel reinforcement sleeve of group on the ring rail, the lower terminal surface of two sets of locating supports all is fixed with removes the seat, it has screw-nut to remove seat internally mounted. The utility model discloses a prefabricated pier stud steel reinforcement cage uses the locating rack structure, through rotating the lead screw, move the seat and drive the locating support and move about, the locating support of being convenient for finds suitable position and fixes a position, can adapt to the steel reinforcement cage of different sizes and the actual regulation needs in later stage; design a plurality of groups steel reinforcement sleeve, can overlap admittedly to the reinforcing bar on the steel reinforcement cage, appear the skew when preventing the reinforcing bar location on the one hand, more accurate, on the other hand avoids the extrusion friction between holding ring and the reinforcing bar, brings better use prospect.

Description

Prefabricated pier stud locating rack structure for steel reinforcement cage
Technical Field
The utility model relates to a road construction technical field, in particular to prefabricated pier stud locating rack structure for steel reinforcement cage.
Background
The reinforcement cage mainly plays a role similar to the stress of the longitudinal reinforcement of the column, and mainly plays a role of tensile strength, and the compressive strength of the concrete is high but the tensile strength is very low. The pile body concrete is restrained, so that the pile body concrete can bear a certain horizontal force, piling according to the requirement, namely punching by a machine and drilling by a water mill, wherein the hole depth meets the design requirement, then a steel reinforcement cage is placed down to the pile hole, then a conduit is inserted for concrete pouring, in the process of welding the prefabricated pier column steel reinforcement cage, in order to ensure the consistency of the size, a positioning frame is needed, however, most of the existing prefabricated pier stud reinforcement cage positioning frames adopt fixed structures, one positioning frame can only perform positioning welding operation on one prefabricated pier stud reinforcement cage structure, the positioning welding operation is not adjustable, the application range is limited, the fixing effect on the reinforcement cage is not good, certain adverse effect is brought in the use process, and for this reason, we provide a prefabricated pier stud locating rack structure for steel reinforcement cage.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a prefabricated pier stud locating rack structure for steel reinforcement cage can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a prefabricated pier stud locating rack structure for steel reinforcement cage, includes the locating support, the locating support is two sets of altogether, sets up at steel reinforcement cage's bilateral symmetry, the holding ring is installed to the inboard of locating support, be fixed with the ring rail on the medial surface of holding ring, the cover has a plurality of groups steel reinforcement sleeve on the ring rail, the lower terminal surface of two sets of locating supports all is fixed with removes the seat, it has screw-nut to remove seat internally mounted, the inside horizontal installation of screw-nut has the lead screw, the lead screw passes collateral branch seat and middle seat from a left side right side in proper order, seat and two sets of side supports all set up on the base in the middle of two sets of.
Preferably, one end of the screw rod close to the side support is provided with a handle, and one side of the handle is sleeved with a chain wheel.
Preferably, the screw rods on the same side are sleeved with chain wheels and connected through chains.
Preferably, the steel bar sleeve is sleeved on the ring rail by a ring sleeve and moves on the ring rail.
Preferably, the base is in a fixed state, and the movable seat drives the positioning support to move left and right.
Preferably, the screw nut is provided with no screw thread at the parts of the side support and the middle seat, and an inner bearing is arranged for positioning.
Compared with the prior art, the utility model discloses following beneficial effect has: according to the positioning frame structure for the prefabricated pier stud reinforcement cage, the movable seat drives the positioning support to move left and right by rotating the screw rod, so that the positioning support can find a proper position for positioning conveniently, and the positioning frame structure can adapt to reinforcement cages with different sizes and later actual adjustment requirements; a plurality of groups of steel bar sleeves are designed, so that steel bars on a steel bar cage can be sleeved and fixed, on one hand, the steel bars are prevented from being deviated and more accurate in positioning, and on the other hand, the extrusion friction between the positioning rings and the steel bars is avoided; whole structural design is simple, convenient operation, and the effect of use is better for traditional mode, and the part that does not involve in this device all is the same with prior art or can adopt prior art to realize.
Drawings
Fig. 1 is a schematic view of the overall structure of the positioning frame structure for the prefabricated pier stud reinforcement cage of the present invention;
fig. 2 is the utility model relates to a side view of prefabricated pier stud locating rack structure for steel reinforcement cage.
In the figure: 1. positioning the bracket; 2. a positioning ring; 3. a circular rail; 4. a steel bar sleeve; 5. a movable seat; 6. a feed screw nut; 7. a screw rod; 8. a side support; 9. a middle seat; 10. a base; 11. a sprocket; 12. and a chain.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in fig. 1-2, a positioning frame structure for a prefabricated pier stud reinforcement cage comprises two groups of positioning supports 1, wherein the two groups of positioning supports 1 are symmetrically arranged on two sides of the reinforcement cage, positioning rings 2 are arranged on the inner sides of the positioning supports 1, ring rails 3 are fixed on the inner side surfaces of the positioning rings 2, a plurality of groups of reinforcement sleeves 4 are sleeved on the ring rails 3, moving seats 5 are fixed on the lower end surfaces of the two groups of positioning supports 1, screw nuts 6 are arranged in the moving seats 5, screw rods 7 are horizontally arranged in the screw nuts 6, the screw rods 7 sequentially penetrate through side supporting seats 8 and middle seats 9 from left to right, and the two groups of middle seats 9 and the two groups of side supporting seats 8 are arranged on a base 10;
a handle is arranged at one end of the screw rod 7 close to the side support 8, and a chain wheel 11 is sleeved at one side of the handle; the screw rods 7 on the same side are sleeved with chain wheels 11 and are connected by chains 12 to realize synchronous transmission; the steel bar sleeve 4 is sleeved on the ring rail 3 by a ring sleeve and moves on the ring rail 3; the base 10 is in a fixed state, and the movable seat 5 drives the positioning bracket 1 to move left and right; the parts of the feed screw nut 6 located on the side seats 8 and the intermediate seat 9 are free of feed screw threads and are provided with internal bearings for positioning.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a prefabricated pier stud locating rack structure for steel reinforcement cage, includes locating support (1), its characterized in that: the utility model discloses a steel reinforcement cage, including locating support (1), holding ring (2), ring rail (3), lead screw nut (6) inside horizontal installation have lead screw (7), lead screw (7) pass side support (8) and middle seat (9) from a left side to the right side in proper order, two sets of middle seat (9) and two sets of side support (8) all set up on base (10), holding ring (2) are installed to the inboard of locating support (1), be fixed with ring rail (3) on the medial surface of holding ring (2), the cover has a plurality of groups steel sleeve (4) on ring rail (3), the lower terminal surface of two sets of locating support (1) all is fixed with removes seat (5), remove seat (5) internally mounted have lead screw nut (6), lead screw nut (6) inside horizontal installation has lead screw (7), lead screw (7) pass side support (8) and middle seat (9) from a left side to the right side in proper order, two sets of middle seat (9) and two sets of side support (8) all set up on base (10).
2. The prefabricated pier stud steel reinforcement cage locating rack structure of claim 1, which is characterized in that: and a handle is arranged at one end of the screw rod (7) close to the side support (8), and a chain wheel (11) is sleeved at one side of the handle.
3. The prefabricated pier stud steel reinforcement cage positioning frame structure of claim 2, which is characterized in that: the screw rods (7) on the same side are all sleeved with chain wheels (11) and are connected through chains (12).
4. The prefabricated pier stud steel reinforcement cage locating rack structure of claim 3, wherein: the steel bar sleeve (4) is sleeved on the ring rail (3) by a ring sleeve and moves on the ring rail (3).
5. The prefabricated pier stud steel reinforcement cage locating rack structure of claim 4, wherein: the base (10) is in a fixed state, and the movable seat (5) drives the positioning support (1) to move left and right.
6. The prefabricated pier stud steel reinforcement cage locating rack structure of claim 5, wherein: the part of the feed screw nut (6) positioned on the side support (8) and the middle support (9) is free of feed screw threads, and an inner bearing is arranged for positioning.
CN202121546188.1U 2021-07-08 2021-07-08 Prefabricated pier stud locating rack structure for steel reinforcement cage Active CN215106622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121546188.1U CN215106622U (en) 2021-07-08 2021-07-08 Prefabricated pier stud locating rack structure for steel reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121546188.1U CN215106622U (en) 2021-07-08 2021-07-08 Prefabricated pier stud locating rack structure for steel reinforcement cage

Publications (1)

Publication Number Publication Date
CN215106622U true CN215106622U (en) 2021-12-10

Family

ID=79314575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121546188.1U Active CN215106622U (en) 2021-07-08 2021-07-08 Prefabricated pier stud locating rack structure for steel reinforcement cage

Country Status (1)

Country Link
CN (1) CN215106622U (en)

Similar Documents

Publication Publication Date Title
CN205464082U (en) Construction steel bar cutting device
CN215393559U (en) Positioning anti-deviation mechanism for welding spiral welded pipe
CN215106622U (en) Prefabricated pier stud locating rack structure for steel reinforcement cage
CN102179648B (en) Automatic longitudinal bar charging mechanism of reinforcing bar mesh welding production line
CN208067034U (en) A kind of bender for steel pipe's production
CN211715917U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN215053295U (en) Rubber waterstop installation fixed bolster
CN211420408U (en) Adjusting device for spinning roller
CN211466227U (en) Bearing gear mounting structure
CN105268869A (en) 1500T expanding machine
CN107457516B (en) A kind of auxiliary device for pipe support end plate and steel-pipe welding
CN220575118U (en) Mounting fixture is used in screw steel skeleton welding process
CN206256388U (en) A kind of bridge jig structure
CN214868409U (en) Pipeline welding supports slider
CN205253933U (en) 1500T expanding machine
CN216632357U (en) Pipe clamping and conveying device for machining seamless steel pipes
CN220593577U (en) Pretensioned I-beam pedestal suitable for deep silt layer condition
CN217018379U (en) Steel reinforcement cage manufacturing device
CN215787725U (en) Special welding rotating tire for aluminum structure
CN220533361U (en) Lifting adjusting device
CN212704175U (en) Single-row type guide mechanism of steel reinforcement framework
CN213446020U (en) Handling device is used in construction of building water supply pipe
CN215199401U (en) Numerical control reinforcing steel bar bending device for producing prefabricated parts
CN214643395U (en) Workbench for machining deformed steel bar
CN218933616U (en) Raft foundation guide wall hanging die supporting limiting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant