CN215106403U - Stainless steel decorative adapter for unit curtain wall - Google Patents

Stainless steel decorative adapter for unit curtain wall Download PDF

Info

Publication number
CN215106403U
CN215106403U CN202120853278.9U CN202120853278U CN215106403U CN 215106403 U CN215106403 U CN 215106403U CN 202120853278 U CN202120853278 U CN 202120853278U CN 215106403 U CN215106403 U CN 215106403U
Authority
CN
China
Prior art keywords
curtain wall
adapter
stainless steel
pipe
adaptor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120853278.9U
Other languages
Chinese (zh)
Inventor
陈猛
闻静
刘黎明
尚坤
李东婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Original Assignee
Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lingyun Hongda Curtain Wall Engineering Co ltd filed Critical Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Priority to CN202120853278.9U priority Critical patent/CN215106403U/en
Application granted granted Critical
Publication of CN215106403U publication Critical patent/CN215106403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The application relates to a stainless steel decoration adapter for a unit curtain wall, which relates to the field of curtain wall decoration and comprises a first adapter, wherein the first adapter is used for connecting a unit curtain wall stand column and a vertical decoration pipe, and the first adapter comprises a first fixing plate, a first mounting assembly and a first connecting assembly; the first fixing plate is installed on the unit body curtain wall stand column, the first connecting piece is used for connecting the first fixing plate with the first installation assembly, and the first installation assembly is arranged in the vertical decorative pipe. The application has the effects that the adaptor can be hidden and installed, and the installation precision is improved.

Description

Stainless steel decorative adapter for unit curtain wall
Technical Field
The application relates to the field of curtain wall decoration, in particular to a stainless steel decoration adaptor for a unit curtain wall.
Background
With the wide application of the unit curtain wall, in order to better show the characteristics of the building, more and more decorations are added on the unit curtain wall, and particularly, the mutual connection among different materials makes the processing of unit curtain wall plates become more and more complex, so that a lot of potential safety hazards are caused, and therefore, the fixation of decoration parts on the unit curtain wall is particularly important, and not only is the safety and reliability ensured, but also the appearance effect is considered.
When the traditional curtain wall decoration is fixedly installed, due to the fact that the decoration is made of different materials and different body types, the adaptor of the unit curtain wall is large, or the decoration and the unit curtain wall are connected in a point mode; the adapter cannot be hidden and installed well due to the fact that the adapter is large, installation accuracy is low, and appearance effect is affected; the point connection makes the installation of the stainless steel round pipe on the unit body curtain wall insecure.
In view of the above-mentioned related art, the inventor believes that there is a defect that the conventional connector is too large to be concealed in installation.
SUMMERY OF THE UTILITY MODEL
In order to improve the technical problem that traditional connecting piece size is on the large side and leads to can not hide the installation, this application provides a adaptor is decorated to cell cube curtain stainless steel. The application provides a pair of adaptor is decorated to cell cube curtain stainless steel adopts following technical scheme:
a stainless steel decorative adapter for a unit curtain wall comprises a first adapter, wherein the first adapter is used for connecting a unit curtain wall stand column and a vertical decorative pipe and comprises a first fixing plate, a first mounting assembly and a first connecting assembly; the first fixing plate is installed on the unit body curtain wall stand column, the first connecting piece is used for connecting the first fixing plate with the first installation assembly, and the first installation assembly is arranged in the vertical decorative pipe.
Through adopting above-mentioned technical scheme, vertical decoration pipe is through first adaptor fixed mounting on cell cube curtain stand, and first installation component is hidden to be installed in vertical decoration pipe for the area of being connected of first installation component and vertical decoration pipe increases, makes vertical decoration pipe firm in the installation on cell cube curtain stand, improves the installation accuracy, in addition, still satisfies the outward appearance effect, makes the outward appearance graceful.
Optionally, the one end that first fixed plate kept away from first installation component sets up the arch, protruding along the length direction of first fixed plate extends, protruding with the notch joint cooperation of cell cube curtain stand.
Through adopting above-mentioned technical scheme, protruding notch phase-match on with cell cube curtain stand for first fixed plate can be earlier simple fixed mounting on cell cube curtain stand, thereby conveniently carry out further fixed mounting to first fixed plate, make first fixed plate and cell cube curtain stand fixed connection become a whole, make first fixed plate installation more firm.
Optionally, a plurality of pairs of threaded holes are formed in the first mounting assembly, and the first mounting assembly is connected with the vertical decorative pipe through bolts.
Through adopting above-mentioned technical scheme, first installation component and vertical decoration pipe bolted connection for vertical decoration pipe installation simple and the installation is firm.
Optionally, a gasket is arranged between the first mounting assembly and the vertical decorative tube.
Through adopting above-mentioned technical scheme, the gap department between first installation component and vertical decoration pipe is filled to the gasket for first installation component is difficult for rocking in vertical decoration pipe, guarantees the stability of first installation component at the intraductal installation of vertical decoration.
Optionally, a plurality of pairs of clamping strips are arranged on the first mounting assembly.
Through adopting above-mentioned technical scheme for the area of contact increase of first installation component and gasket, thereby make the gasket at the intraductal installation of vertical decoration firm.
Optionally, the curtain wall assembly further comprises a second adapter, wherein the second adapter is used for connecting the unit curtain wall upright and the transverse decorative pipe, and comprises a second fixing plate, a second mounting assembly and a second connecting assembly used for connecting the second fixing plate and the second mounting assembly; the second fixing plate is installed on the unit body curtain wall stand column, the second installation assembly is arranged in the transverse decorative pipe, the threaded hole is also formed in the second installation assembly, and the second installation assembly is connected with the transverse decorative pipe through a bolt.
Through adopting above-mentioned technical scheme, use the second adaptor with horizontal decoration pipe fixed mounting on cell cube curtain stand for the form of decorating the pipe is diversified with the stainless steel of cell cube curtain stand installation, and the second installation component also hides to be installed in horizontal decoration pipe, has improved the installation accuracy of horizontal decoration pipe, and the outward appearance is pleasing to the eye.
Optionally, a mounting bar is fixedly arranged on the second mounting assembly, and the threaded hole penetrates through the mounting bar.
Through adopting above-mentioned technical scheme, the second installation component is worn to establish in horizontal decoration pipe, sets up the mounting bar on the second installation component for one side that the second installation component was kept away from to the mounting bar and the inner wall butt of horizontal decoration pipe, thereby make the second installation component be difficult for rocking in horizontal decoration pipe, thereby improved the installation accuracy of second installation component.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the vertical decorative pipe is fixedly arranged on the unit curtain wall stand column through the first adaptor, and the first mounting assembly is mounted in the vertical decorative pipe in a hidden mode, so that the connecting area of the first mounting assembly and the vertical decorative pipe is increased, the vertical decorative pipe is stably mounted on the unit curtain wall stand column, mounting accuracy is improved, in addition, the appearance effect is met, and the appearance is attractive;
2. the bulges are matched with the notches on the unit curtain wall stand columns, so that the first fixing plate can be simply and fixedly arranged on the unit curtain wall stand columns, further fixed installation of the first fixing plate is facilitated, the first fixing plate and the unit curtain wall stand columns are fixedly connected into a whole, and the first fixing plate is more stably arranged;
3. first installation component and vertical decoration pipe bolted connection for vertical decoration pipe installation is simple and the installation is firm.
Drawings
FIG. 1 is a schematic view of the installation of a vertical decorative tube and a unit curtain wall pillar.
FIG. 2 is a schematic view of the installation of the transverse decorative tubes and the unit curtain wall posts.
Fig. 3 is a schematic structural diagram of the first adapter.
Fig. 4 is a schematic structural view of the second adaptor.
Description of reference numerals: 1. a first transfer member; 11. a first fixing plate; 111. a protrusion; 112. sinking a circular hole; 12. a first mounting assembly; 121. a channel; 122. a threaded hole; 123. clamping the strip; 13. a first connection assembly; 131. a connecting rod; 132. a connecting plate; 2. a second adaptor; 21. a second fixing plate; 22. a second mounting assembly; 221. mounting a bar; 23. a second connection assembly; 3. the unit curtain wall upright posts; 31. a notch; 4. a vertical decorative tube; 41. a gasket; 5. a transverse decorative tube.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses adaptor is decorated to cell cube curtain stainless steel. Referring to fig. 1 and 2, a stainless steel decorative adaptor for a unit curtain wall comprises a first adaptor 1 and a second adaptor 2; first adaptor 1 is used for connecting cell cube curtain stand 3 and vertical decoration pipe 4, and second adaptor 2 is used for connecting cell cube curtain stand 3 and horizontal decoration pipe 5 for the stainless steel is decorated and is installed firmly on cell cube curtain stand 3, and satisfies the outward appearance effect.
Example 1
Referring to fig. 1 and 3, the first coupling member 1 includes a first fixing plate 11, a first mounting assembly 12, and a first connecting assembly 13 disposed between the first fixing plate 11 and the first mounting assembly 12; first fixed plate 11 is kept away from the one end and the unit body curtain stand 3 installation cooperation of first connecting assembly 13, and fixed connection is decorated with the stainless steel to first installation component 12 to make vertical decoration pipe 4 fixed mounting on unit body curtain stand 3.
Referring to fig. 1 and 3, the first fixing plate 11 is rectangular, and a slope is arranged on one side of the first fixing plate 11 close to the unit curtain wall upright 3 and faces the unit curtain wall upright 3; still be provided with protruding 111 on the first fixed plate 11, protruding 111 extends along the length direction that first fixed plate 11 is close to cell cube curtain stand 3 one side, and protruding 111 and cell cube curtain stand 3's notch 31 phase-match to make first fixed plate 11 install on cell cube curtain stand 3.
Referring to fig. 1 and 3, a plurality of sinking holes 112 are further formed in the first fixing plate 11, the sinking holes 112 are formed in one side of the first fixing plate 11 close to the unit curtain wall upright 3, the sinking holes 112 are uniformly formed along the length direction of the first fixing plate 11, and M8 sinking mechanism screws penetrate through the sinking holes 112, so that the first fixing plate 11 is fixedly connected with the unit curtain wall upright 3.
Referring to fig. 1 and 3, a side of the first fixing plate 11 away from the protrusion 111 is fixedly connected to the first connection assembly 13, and the first connection assembly 13 includes a connection rod 131 and a connection plate 132; the connecting rod 131 is rectangular, the thickness of the connecting rod 131 is the same as that of the first fixing plate 11, the connecting rod 131 is arranged along the height direction of the first fixing plate 11, and one end of the connecting rod 131 is flush with the bottom end of the first fixing plate 11; one side and the connecting plate 132 fixed connection of first fixed plate 11 are kept away from to connecting rod 131, and connecting plate 132 sets up along the length direction of connecting rod 131, and connecting plate 132 is perpendicular with connecting rod 131, and the right angle department of connecting plate 132 and connecting rod 131 adopts the cambered surface excessive for connecting plate 132 and connecting rod 131 are connected more firmly.
Referring to fig. 1 and 3, one side of the connecting plate 132, which is away from the connecting rod 131, is fixedly connected with the first mounting assembly 12, and the first mounting assembly 12 is fixedly arranged in the vertical decorative tube 4, so that the first mounting assembly 12 is hidden and mounted in the vertical decorative tube 4, the contact area between the first mounting assembly 12 and the vertical decorative tube 4 is increased, the mounting precision of the vertical decorative tube 4 is improved, and the vertical decorative tube 4 is stably mounted; set up gasket 41 in the vertical decoration pipe 4, fill up the space between first installation component 12 and the vertical decoration pipe 4, under the effect of outside wind-force, first installation component 12 is difficult for colliding with the inner wall of vertical decoration pipe 4, in addition, still pour into the structure glue between installation component 12 and gasket 41, reduce the clearance between installation component 12 and the gasket 41 with this, thereby reduce the swing that arouses because the installation clearance, make first installation component 12 install firmly in vertical decoration pipe 4, thereby make vertical decoration pipe 4 fixed mounting on cell cube curtain stand 3.
Referring to fig. 1 and 3, the first mounting assembly 12 is perpendicular to the connecting plate 132, and the first mounting assembly 12 is fixedly disposed at a middle position of the connecting plate 132. The first mounting assembly 12 is a rectangular parallelepiped, a channel 121 is formed in the first mounting assembly 12, the channel 121 penetrates through the first mounting assembly 12 along the length direction of the connecting plate 132, the cross section of the channel 121 is rectangular, and the channel 121 and the first mounting assembly 12 are coaxially arranged.
Referring to fig. 1 and 3, a plurality of pairs of threaded holes 122 are formed in the first mounting assembly 12, the plurality of pairs of threaded holes 122 are uniformly arranged along the length direction of the first mounting assembly 12 at intervals, each pair of threaded holes 122 includes two threaded holes 122, and the two threaded holes 122 in each pair are arranged in a right-to-right manner, the threaded holes 122 penetrate through the vertical decorative pipe 4, and M6 machine screws are arranged in the threaded holes 122 in a penetrating manner, so that the first mounting assembly 12 is fixedly connected with the vertical decorative pipe 4.
Referring to fig. 1 and 3, a plurality of pairs of clamping strips 123 are fixedly arranged on the first mounting assembly 12, the plurality of pairs of clamping strips 123 are uniformly arranged along the length direction of the first mounting assembly 12 at intervals, each pair of clamping strips 123 and each pair of threaded holes 122 are alternately arranged, each pair of clamping strips 123 comprises two clamping strips 123, the two clamping strips 123 in each pair are oppositely arranged, and the clamping strips 123 are arranged along the width direction of the first mounting assembly 12, so that the gasket 41 is stably installed in the vertical decorative tube 4, and the first mounting assembly 12 and the vertical decorative tube 4 are more stably installed.
The implementation principle of the embodiment 1 is as follows: the first fixing plate 11 is matched with the unit curtain wall upright 3 in a clamping mode through the protrusion 111, a sunk circular hole 112 is formed in the first fixing plate 11, and a machine-made bolt penetrates through the sunk circular hole 112, so that the first fixing plate 11 is fixedly installed on the unit curtain wall upright 3; first installation component 12 wears to establish in vertical decoration pipe 4, with vertical decoration pipe 4 bolted connection for the area of contact increase of first installation component 12 and vertical decoration pipe 4, thereby make first installation component 12 hide to install in vertical decoration pipe 4, not only guaranteed the steadiness of vertical decoration pipe 4 installation, still satisfy the outward appearance effect, in addition, first installation component 12 forms a rectangle atress face with connecting plate 132 quality testing, has improved this position and has resisted the intensity of side force.
Example 2
Referring to fig. 2 and 4, the second adaptor 2 includes a second fixing plate 21, a second mounting assembly 22, and a second connecting assembly 23 disposed between the second fixing plate 21 and the second mounting assembly 22; one end of the second fixing plate 21, which is far away from the second connecting component 23, is matched with the unit curtain wall upright 3 in an installing manner, and the second mounting component 22 is fixedly connected with the stainless steel decoration, so that the transverse decorative pipe 5 is fixedly arranged on the unit curtain wall upright 3.
Referring to fig. 2 and 4, the second fixing plate 21 has the same structure as the first fixing plate 11; the second connecting assembly 23 is a rectangular parallelepiped, one end of the second connecting assembly 23 is fixedly connected to one side of the second fixing plate 21 away from the protrusion 111, the second connecting assembly 23 is perpendicular to the second fixing plate 21, and a right angle formed by the second connecting assembly 23 and the second fixing plate 21 is provided with an inclined surface for transition, so that the second connecting assembly 23 is stably connected with the second fixing plate 21.
Referring to fig. 2 and 4, a second mounting assembly 22 is disposed at one end of the second connecting assembly 23 away from the second fixing plate 21, the second mounting assembly 22 is perpendicular to the second connecting assembly 23, and the second mounting assembly 22 and the second fixing plate 21 are respectively located at two sides of the second connecting assembly 23. The fixed setting of second installation component 22 is in horizontal decoration pipe 5, twice mounting bar 221 has set firmly on the second installation component 22, twice mounting bar 221 sets up the one side that is close to second fixed plate 21 at second installation component 22, twice mounting bar 221 sets up along the vertical direction of second installation component 22, and twice mounting bar 221 sets up the both ends at second installation component 22 respectively, threaded hole 122 has also been seted up on mounting bar 221, and threaded hole 122 sets up two, two threaded hole 122 set up the both ends at mounting bar 221 respectively, threaded hole 122 runs through in second installation component 22, wear to establish the mechanism screw in the threaded hole 122, make second installation component 22 and horizontal decoration pipe 5 bolted connection.
The implementation principle of the embodiment 2 is as follows: the second fixing plate 21 is matched with the unit curtain wall upright 3 in a clamping mode through the protrusion 111, and a machine-made bolt is also arranged in the sunk round hole 112 in the second fixing plate 21 in a penetrating mode, so that the second fixing plate 21 is fixedly installed on the unit curtain wall upright 3; the second installation component 22 is arranged in the transverse decorative pipe 5 and is connected with the transverse decorative pipe 5 through bolts, so that the contact area between the second installation component 22 and the transverse decorative pipe 5 is increased, the second installation component 22 is hidden and installed in the transverse decorative pipe 5, the installation stability of the transverse decorative pipe 5 is guaranteed, and the appearance effect is also met. In addition, in order to meet the appearance effect, the vertical height of the second connecting assembly 23 is the same as that of the transverse decorative pipe 5, so that the integrity is improved; the second connecting assembly 23 is provided with a chamfer at the corner position, so that the thickness of the corner is increased, the mounting strength is improved, and the safety is ensured.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides an adaptor is decorated to cell cube curtain stainless steel which characterized in that: the curtain wall decoration structure comprises a first adapter (1), wherein the first adapter (1) is used for connecting a unit curtain wall upright post (3) and a vertical decoration pipe (4), and the first adapter (1) comprises a first fixing plate (11), a first mounting assembly (12) and a first connecting assembly (13); first fixed plate (11) are installed on cell cube curtain stand (3), first connecting piece is used for connecting first fixed plate (11) with first installation component (12), first installation component (12) set up in vertical decoration pipe (4).
2. The stainless steel decorative adaptor of unit curtain wall according to claim 1, wherein: keep away from first fixed plate (11) the one end of first installation component (12) sets up arch (111), arch (111) are along the length direction of first fixed plate (11) extends, arch (111) with notch (31) joint cooperation of cell cube curtain stand (3).
3. The stainless steel decorative adaptor of unit curtain wall according to claim 2, wherein: a plurality of pairs of threaded holes (122) are formed in the first mounting assembly (12), and the first mounting assembly (12) is in bolt connection with the vertical decorative pipe (4).
4. The stainless steel decorative adaptor of unit curtain wall according to claim 3, wherein: a gasket (41) is arranged between the first mounting assembly (12) and the vertical decorative tube (4).
5. The stainless steel decorative adaptor of unit curtain wall according to claim 4, wherein: the first mounting component (12) is provided with a plurality of pairs of clamping strips (123).
6. The stainless steel decorative adaptor of unit curtain wall according to claim 1, wherein: the curtain wall structure is characterized by further comprising a second adapter (2), wherein the second adapter (2) is used for connecting the unit body curtain wall upright post (3) and the transverse decorative pipe (5), and the second adapter (2) comprises a second fixing plate (21), a second mounting assembly (22) and a second connecting assembly (23) used for connecting the second fixing plate (21) and the second mounting assembly (22); second fixed plate (21) are installed on cell cube curtain stand (3), second installation component (22) set up in horizontal decoration pipe (5), set up on second installation component (22) screw hole (122), second installation component (22) with horizontal decoration pipe (5) bolted connection.
7. The stainless steel decorative adaptor of unit curtain wall according to claim 6, wherein: and a mounting bar (221) is fixedly arranged on the second mounting component (22), and the threaded hole (122) penetrates through the mounting bar (221).
CN202120853278.9U 2021-04-24 2021-04-24 Stainless steel decorative adapter for unit curtain wall Active CN215106403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120853278.9U CN215106403U (en) 2021-04-24 2021-04-24 Stainless steel decorative adapter for unit curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120853278.9U CN215106403U (en) 2021-04-24 2021-04-24 Stainless steel decorative adapter for unit curtain wall

Publications (1)

Publication Number Publication Date
CN215106403U true CN215106403U (en) 2021-12-10

Family

ID=79271506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120853278.9U Active CN215106403U (en) 2021-04-24 2021-04-24 Stainless steel decorative adapter for unit curtain wall

Country Status (1)

Country Link
CN (1) CN215106403U (en)

Similar Documents

Publication Publication Date Title
CN108118815B (en) Slotting system stone dry-hanging system
CN108691378B (en) Keel structure of glass curtain wall and installation method
CN215106403U (en) Stainless steel decorative adapter for unit curtain wall
CN210563213U (en) GRC component mounting structure
CN207998934U (en) A kind of solid wood component modelled after an antique wears a tree, used in making timber for boats and concrete walls plane connection structure
CN214089619U (en) Assembled aluminum alloy railing
CN216007541U (en) Steel construction cross post connection structure
CN210369486U (en) Large-span glass curtain wall
CN201190393Y (en) Connecting aluminium alloy sections between major ingredient and decorative strip of construction curtain wall
CN111287356B (en) Glass curtain wall's sunken wall body system of decorating
CN210122776U (en) Glass curtain wall erection joint stand
CN210917887U (en) Connecting structure for middle cross beam and upright post of glass curtain wall
CN210177742U (en) Wallboard angle sign indicating number structure based on assembled ecological bathroom
CN203452454U (en) Guardrail connecting element
CN209082789U (en) A kind of building body curtain wall construction
CN213508906U (en) Frame connecting structure
CN210216833U (en) Dry hanging fixing device for stone curtain wall
CN219863565U (en) Assembled curtain wall component
CN209891618U (en) Panel corner connecting piece
CN218714521U (en) Wall decoration is with novel structure of hanging futilely
CN216475784U (en) Structure for preventing unit body pendant from moving laterally
CN219672352U (en) Assembled fence
CN212002671U (en) Splicing fence for golf game
CN211447386U (en) Connecting piece for decorating curtain wall
CN213508950U (en) Stand and crossbeam interlude connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant