CN215105557U - Prefabricated tubular pile straightness that hangs down examines transfer device - Google Patents

Prefabricated tubular pile straightness that hangs down examines transfer device Download PDF

Info

Publication number
CN215105557U
CN215105557U CN202120856244.5U CN202120856244U CN215105557U CN 215105557 U CN215105557 U CN 215105557U CN 202120856244 U CN202120856244 U CN 202120856244U CN 215105557 U CN215105557 U CN 215105557U
Authority
CN
China
Prior art keywords
sheet steel
steel frame
tubular pile
precast tubular
long screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120856244.5U
Other languages
Chinese (zh)
Inventor
付书生
徐磊
盛弘钊
崔健
沈维成
危明
刘晓晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202120856244.5U priority Critical patent/CN215105557U/en
Application granted granted Critical
Publication of CN215105557U publication Critical patent/CN215105557U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a precast tubular pile hangs down straightness and examines accent device, including last sheet steel frame, lower sheet steel frame and pole setting, pole setting is totally four groups and is used for connecting sheet steel frame and lower sheet steel frame, the edge of going up sheet steel frame and lower sheet steel frame utilizes the angle bar to consolidate, four face intermediate positions of going up sheet steel frame run through and install adjustable nut, adjustable nut supplies the long screw to pass, the one end welding of long screw has the hand wheel, inherent stop nut is twisted to the other end of long screw. The device for detecting and adjusting the verticality of the precast tubular pile, provided by the utility model, has the advantages that four groups of long bolts are designed, so that the position can be flexibly adjusted, and the adjustment can be carried out according to different pile diameters; put down naturally from precast tubular pile's upper portion, if the in-process of putting down appears the card pause phenomenon, explain precast tubular pile straightness that hangs down here has the problem, exert external force to it and do the fine setting, until not blocking pause, make this device continue the whereabouts again and detect, be suitable for different operating conditions, bring better use prospect.

Description

Prefabricated tubular pile straightness that hangs down examines transfer device
Technical Field
The utility model relates to a public road bridge roof beam technical field, in particular to precast tubular pile hangs down straightness and examines transfer device.
Background
The precast tubular pile mainly comprises a concrete precast pile and a steel pile, wherein the concrete precast pile can bear larger load, is firm and durable and has high construction speed, and is one of widely applied pile types, but the construction of the precast tubular pile has larger influence on the surrounding environment, and a concrete solid square pile and a prestressed concrete hollow tubular pile are commonly used; in the process of static pressure construction of the precast tubular pile, if the precast tubular pile is not vertical enough, when the slope is larger than 1%, the precast tubular pile must be pulled out for correction, currently, a positioning ruler is mainly adopted to be matched with a plumb line for detection in the actual construction process, the steps are complex, the efficiency is low, and the precast tubular pile is not suitable for simultaneously detecting a plurality of groups of pile bodies.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a prefabricated tubular pile hangs down straightness and examines accent device can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a precast tubular pile hangs down straightness and examines transfer device, includes steel sheet frame, lower steel sheet frame and pole setting, the pole setting is four groups altogether and is used for connecting steel sheet frame and lower steel sheet frame, the edge department of going up steel sheet frame and lower steel sheet frame utilizes the angle bar to consolidate, four face intermediate positions of going up the steel sheet frame run through and install adjustable nut, adjustable nut supplies the long screw to pass, the one end welding of long screw has the hand wheel, inherent stop nut is twisted to the other end of long screw.
Preferably, the upper steel plate frame and the lower steel plate frame are made of four groups of steel plates through welding, and the vertical rods are made of steel plates.
Preferably, the adjustable nut is welded inside the upper steel plate frame and extends outwards.
Preferably, the screw face of the long screw is provided with a length scale.
Compared with the prior art, the utility model discloses following beneficial effect has: the perpendicularity detecting and adjusting device for the precast tubular pile is provided with four groups of long bolts, the position can be flexibly adjusted, adjustment can be performed according to different pile diameters, the operation is simple, and the applicability is high; the prefabricated pipe pile is naturally put down from the upper part of the prefabricated pipe pile, if the prefabricated pipe pile is stuck in the putting down process, the verticality of the prefabricated pipe pile is indicated to be in a problem, external force is applied to the prefabricated pipe pile for fine adjustment until the prefabricated pipe pile is not stuck, and then the device is continuously dropped for detection; the whole device is simple in design, convenient to operate, better in using effect compared with a traditional mode, and the parts which are not involved in the device are the same as or can be realized by adopting the prior art.
Drawings
Fig. 1 is a schematic view of the overall structure of the device for detecting and adjusting the perpendicularity of the precast tubular pile of the present invention;
fig. 2 is the utility model relates to a precast tubular pile hangs down straightness and examines concrete structure chart of transferring device long screw rod.
In the figure: 1. feeding a steel plate frame; 2. a steel plate frame is arranged; 3. erecting a rod; 4. angle iron; 5. an adjustable nut; 6. a long screw; 7. a hand wheel; 8. and a limiting nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in fig. 1-2, a prefabricated pipe pile perpendicularity detecting and adjusting device comprises an upper steel plate frame 1, a lower steel plate frame 2 and upright rods 3, wherein the upright rods 3 are four groups in total and are used for connecting the upper steel plate frame 1 and the lower steel plate frame 2, the corners of the upper steel plate frame 1 and the lower steel plate frame 2 are reinforced by angle iron 4, adjustable nuts 5 are penetratingly arranged at the middle positions of four surfaces 1 of the upper steel plate frame 1, the adjustable nuts 5 are used for allowing long screws 6 to pass through, a hand wheel 7 is welded at one end of each long screw 6, and a limit nut 8 is screwed at the other end of each long screw 6;
the upper steel plate frame 1 and the lower steel plate frame 2 are both made of four groups of steel plates by welding, and the upright rods 3 are made of steel plates; the adjustable nut 5 is welded inside the upper steel plate frame 1 and extends outwards; the screw rod surface of the long screw rod 6 is provided with length scales.
It should be noted that, the utility model relates to a precast tubular pile straightness inspection and regulation device that hangs down, when using, adjust four groups of long screw 6's position through rotating hand wheel 7 to see accurate scale, confirm the stake footpath size, at precast tubular pile static pressure in-process, can put down naturally through the device of this similar hole inspection ware from precast tubular pile's upper portion, if card pause phenomenon appears at the in-process of putting down, explain precast tubular pile straightness that hangs down here has a problem, apply external force to it and do the fine setting, until not blocking, make this device continue the whereabouts and detect again, and is comparatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides a precast tubular pile straightness that hangs down examines transfer device which characterized in that: including last sheet steel frame (1), lower sheet steel frame (2) and pole setting (3), pole setting (3) are four groups altogether and are used for connecting sheet steel frame (1) and lower sheet steel frame (2), go up the edge of sheet steel frame (1) and lower sheet steel frame (2) and utilize angle bar (4) to consolidate, go up (1) four face intermediate positions of sheet steel frame (1) and run through and install adjustable nut (5), adjustable nut (5) supply long screw (6) to pass, the one end welding of long screw (6) has hand wheel (7), inherent stop nut (8) are twisted to the other end of long screw (6).
2. The precast tubular pile perpendicularity detecting and adjusting device according to claim 1, characterized in that: the upper steel plate frame (1) and the lower steel plate frame (2) are made of four groups of steel plates through welding, and the vertical rods (3) are made of steel plates.
3. The precast tubular pile perpendicularity detecting and adjusting device according to claim 1, characterized in that: the adjustable nut (5) is welded in the upper steel plate frame (1) and extends outwards.
4. The precast tubular pile perpendicularity detecting and adjusting device according to claim 1, characterized in that: the screw rod surface of the long screw rod (6) is provided with length scales.
CN202120856244.5U 2021-04-25 2021-04-25 Prefabricated tubular pile straightness that hangs down examines transfer device Active CN215105557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120856244.5U CN215105557U (en) 2021-04-25 2021-04-25 Prefabricated tubular pile straightness that hangs down examines transfer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120856244.5U CN215105557U (en) 2021-04-25 2021-04-25 Prefabricated tubular pile straightness that hangs down examines transfer device

Publications (1)

Publication Number Publication Date
CN215105557U true CN215105557U (en) 2021-12-10

Family

ID=79271455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120856244.5U Active CN215105557U (en) 2021-04-25 2021-04-25 Prefabricated tubular pile straightness that hangs down examines transfer device

Country Status (1)

Country Link
CN (1) CN215105557U (en)

Similar Documents

Publication Publication Date Title
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN203603586U (en) Equipment support regulating device
CN110219326B (en) Reverse construction method one-column one-pile underwater verticality adjusting construction process
CN206986916U (en) A kind of pre-buried fixing device of foundation bolt
CN103352476B (en) Large-scale bolt high-precision pre-burying construction method
CN210216479U (en) Positioning device for pre-embedding large foundation bolt group
CN210238595U (en) One-column one-pile underwater verticality adjusting construction device by reverse construction method
CN111502307A (en) Multidirectional positioning device and positioning method for underground embedded steel pipe column
CN216428331U (en) Assembled piping lane mid-board positioner
CN215105557U (en) Prefabricated tubular pile straightness that hangs down examines transfer device
CN218466604U (en) Soft foundation monitoring middle and deep layer settlement monitoring device
CN209605803U (en) A kind of easy road grade measuring device
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN214219300U (en) Pavement construction elevation control tool
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN113048961A (en) Measuring tool for independent foundation positioning and using method
CN110984258A (en) Drilling, pile cutting and inclination correcting construction device and method for existing super high-rise building
CN206737445U (en) The vertical dual-purpose adjuster of Simple horizontal
CN210032688U (en) Quick accurate positioning auxiliary device of prefabricated wallboard
CN221031676U (en) Supporting device and bearing platform reinforcing steel bar
CN210828396U (en) Supporting system for installing prefabricated wallboard
CN216641459U (en) Vibrating beam with adjustable foundation construction
CN217414419U (en) Coordinate positioning device for prefabricated box girder corrugated pipe
CN214583263U (en) Measuring tool for positioning independent foundation
CN110748175A (en) Assembled wallboard structure positioning auxiliary device with scales and manufacturing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant