CN215105538U - Subway station movement joint seepage drainage structures - Google Patents

Subway station movement joint seepage drainage structures Download PDF

Info

Publication number
CN215105538U
CN215105538U CN202120828646.4U CN202120828646U CN215105538U CN 215105538 U CN215105538 U CN 215105538U CN 202120828646 U CN202120828646 U CN 202120828646U CN 215105538 U CN215105538 U CN 215105538U
Authority
CN
China
Prior art keywords
subway station
subway
bottom plate
water
escape canal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120828646.4U
Other languages
Chinese (zh)
Inventor
陈远洲
石端文
张涵
傅萃清
王华兵
谢俊
向贤华
林作忠
董俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN202120828646.4U priority Critical patent/CN215105538U/en
Application granted granted Critical
Publication of CN215105538U publication Critical patent/CN215105538U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a subway station deformation joint leakage water drainage structure, which comprises a subway station main body structure and a subway station auxiliary structure, wherein a deformation joint exists between the subway station main body structure and the subway station auxiliary structure, and a first water retaining ridge and a second water retaining ridge are respectively positioned at two sides of the deformation joint; set up the escape canal in subway major structure's the bottom plate bed course, the escape canal pass behind the first manger plate bank with the movement joint intercommunication, the escape canal keep away from the one end of movement joint with what set up on the subway major structure is from the wall ditch intercommunication, what the subway major structure was last to set up is provided with the outlet from the wall ditch in, the outlet with the drainage channel intercommunication on subway station major structure's the platform layer, the bottom plate fitment level in the top of bottom plate bed course is and cover the escape canal. The utility model discloses set up the manger plate bank in movement joint both sides and avoid the outflow of percolating water, set up the escape canal, introduce the percolating water from the wall ditch, through the outlet drainage, avoid producing ponding.

Description

Subway station movement joint seepage drainage structures
Technical Field
The utility model belongs to subway station structure field, more specifically relates to a subway station movement joint seepage drainage structures.
Background
The deformation joint is generally arranged between the main body and the auxiliary body of the subway station structure, so that structural cracking caused by uneven settlement is avoided, and although waterproof measures are taken for the deformation joint, the deformation joint still has a serious water seepage phenomenon due to factors such as difficult actual construction conditions, construction quality, side wall water seepage and wall separation ditch blockage.
The floor tiles on the decoration layer at the deformation joint often have the phenomena of water seepage, wet stain and the like, and the passing and the attractiveness of pedestrians are seriously influenced. The construction for remedying the water seepage problem is quite difficult, and the durability and the reliability of the construction quality are difficult to ensure. Therefore, effective measures are needed to reduce the accumulation of leakage water and to drain it as quickly as possible.
At present, a subway channel structure adopts an off-wall ditch, and deformation joints adopt buried water stops. A buried rubber water stop is mainly used for water stop products arranged in concrete such as concrete deformation joints, expansion joints and the like, and has the capability of adapting to the expansion and contraction deformation of the concrete by using the elasticity and the structural form of rubber materials. The buried rubber water stop is correctly laid at the deformation joint position of the subway station, so that the water stop function can be better played. The side wall and the deformation joint leakage water flow into the station main body structure from the wall ditch and flow into the station water collecting well from the station hall layer water drainage hole. Although the deformation joint adopts the waterproof measure of the buried water stop belt, the phenomenon of serious water seepage still occurs in the deformation joint in practice, and the phenomena of water seepage, wet stain and the like often occur in the deformation joint.
SUMMERY OF THE UTILITY MODEL
To the above defect of prior art or improve the demand, the utility model provides a subway station movement joint seepage water drainage structures, it sets up the manger plate bank in movement joint both sides and avoids the outflow of percolating water, sets up the escape canal, introduces the percolating water and leaves the wall ditch, through the discharge of outlet, avoids the gathering of water.
For realizing above-mentioned purpose, according to the utility model discloses an aspect provides a subway station movement joint seepage water drainage structures, including subway station major structure and subway station additional structure, there is movement joint, its characterized in that between subway station major structure and the subway station additional structure:
a first water retaining ridge and a second water retaining ridge are respectively arranged in the bottom plate decoration layer of the subway main body structure and the bottom plate decoration layer of the subway channel structure, and the first water retaining ridge and the second water retaining ridge are respectively positioned on two sides of the deformation joint;
set up the escape canal in subway major structure's the bottom plate bed course, the escape canal pass behind the first manger plate bank with the movement joint intercommunication, the escape canal keep away from the one end of movement joint with what the subway major structure was last to set up from the wall ditch intercommunication, what the subway major structure was last to set up is provided with the outlet from the wall ditch, the outlet with the drainage channel intercommunication on subway station major structure's the platform layer, wherein, bottom plate fitment level in the top of bottom plate bed course is and cover the escape canal.
Preferably, the floor finishing layer is provided with floor tiles at positions corresponding to the drainage ditches.
Preferably, the drain is provided with a plurality of strips.
Preferably, the gutters are parallel to each other.
Preferably, the drainage hole is provided in plurality.
Preferably, the subway station auxiliary structure is a subway station passage structure.
Preferably, the first water retaining bank and the bottom plate of the subway main body structure are poured synchronously.
Preferably, the second water retaining ridge and the bottom plate of the subway station auxiliary structure are poured synchronously.
Generally, through the utility model discloses above technical scheme who conceives compares with prior art, can gain following beneficial effect:
the utility model discloses a set up the manger plate bank respectively in the both sides of movement joint, prevent that ponding in the movement joint from spilling over the bottom plate fitment layer and the condition that the infiltration appears, first waterproof structure has been established together to these twice manger plate bank, in addition the utility model discloses still be provided with the escape canal in the bottom plate bed course and arrange the water in coming the movement joint from the wall ditch in, prevent that the interior ponding of movement joint is serious, can solve the seepage difficult problem of movement joint well, both be applicable to newly-built project, also be suitable for the maintenance of current station structure.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. Furthermore, the technical features mentioned in the embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
Referring to fig. 1, a subway station movement joint seepage water drainage structures, including subway station major structure 1 and subway station additional structure 2, subway station additional structure 2 is subway station access structure. A deformation joint 3 exists between the subway station main body structure 1 and the subway station auxiliary structure 2, a first water retaining ridge 4 and a second water retaining ridge 5 are respectively arranged in a bottom plate decoration layer of the subway main body structure and a bottom plate decoration layer of the subway channel structure, and the first water retaining ridge 4 and the second water retaining ridge 5 are respectively positioned on two sides of the deformation joint 3; thereby first manger plate bank 4 and second manger plate bank 5 can prevent that the rivers in the movement joint 3 from producing the infiltration and influencing current in the bottom plate fitment layer to the bottom plate fitment layer, first manger plate bank 4 and second manger plate bank 5 have constructed first waterproof construction jointly.
Set up escape canal 6 in subway major structure's the bottom plate bed course, escape canal 6 passes behind the first manger plate bank 4 with 3 intercommunications of movement joint, water in the movement joint 3 can be arranged in 6 in the escape canal, and the size of a dimension and the quantity in escape canal 6 should satisfy the requirement of quick drainage for the condition of ponding can not appear in the movement joint 3. One end of the drainage ditch 6 far away from the deformation joint 3 is communicated with a wall-separating ditch 7 arranged on the subway main body structure. From the wall ditch is along the drainage trench of subway wall, and its itself also is the trench of a drainage, itself also can play the effect of drainage and dredging pipe way, consequently, it uses after communicateing together with escape canal 6, can form the very long trench of length to can promote the capacity, effectively reduce oozing of water, let water can pass through escape canal 6 and flow from the wall ditch. Water in the deformation joint 3 can be discharged to the wall ditch 7 through the escape canal 6 in, what the subway major structure set up is provided with the outlet 8 in the wall ditch 7 and is used for sluicing, outlet 8 with the drainage channel intercommunication of the platform layer of subway station major structure 1, the quantity, position and the size of a dimension of outlet 8 should satisfy the drainage requirement for the condition that can not appear ponding in the wall ditch 7. The water drainage holes 8 can drain water in the wall ditch 7 in time, wherein the bottom plate decoration layer is positioned above the bottom plate cushion layer and covers the drainage ditch 6.
Further, the bottom plate fitment layer is corresponding to the position of escape canal 6 sets up the ceramic tile, and escape canal 6 is if appearing blockking up, and the accessible is got rid of the ceramic tile and is cleared up, makes the maintenance and the mediation of escape canal 6 more convenient like this.
Further, the drainage ditch 6 is provided with a plurality of drainage ditches 6, and these drainage ditches 6 are parallel to each other, so can improve the discharge efficiency of the water in the deformation joint 3, moreover the outlet 8 is a plurality of, is convenient for discharge water to the platform layer fast.
Further, the first water retaining ridge 4 and the bottom plate of the subway main structure are synchronously poured, and the second water retaining ridge 5 and the bottom plate of the subway station auxiliary structure 2 are synchronously poured, so that the construction efficiency is improved, and cracks caused by asynchronous pouring are prevented. In addition, the heights of the first water retaining ridge 4 and the second water retaining ridge 5 should not affect the paving of the floor tiles.
The utility model discloses a set up the manger plate bank in the bottom plate fitment in the 3 both sides of station major structure and station additional structure movement joint, avoid the percolating water outflow, set up multichannel escape canal 6 between movement joint 3 and station major structure, introduce the major structure from wall ditch 7 with the percolating water through escape canal 6, set up outlet 8 in time with the platform layer of drainage in station major structure from wall ditch 7, avoid producing ponding. Before the manger plate bank construction of this drainage structures, should clean up around, avoid the infiltration, 6 inner walls in escape canal should be smooth, do benefit to the drainage. The utility model discloses a leak water of movement joint 3 is got rid of to the mode of bright row, and the drainage effect is obvious.
It is to be understood that the foregoing are many different embodiments or examples of the different features of the present embodiments. Specific examples of components and arrangements are described above to simplify the illustrative embodiments. These are, of course, merely examples and are not intended to limit the embodiments, and for example, device dimensions are not limited to the ranges or values disclosed, but may depend on processing conditions and/or desired properties of the device.
Moreover, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed interposing the first and second features, such that the first and second features may not be in direct contact, although the various features may be drawn arbitrarily to varying proportions for simplicity and clarity of illustration.
Spatially relative terms, such as "under," "below," "lower," "above," "upper," and the like, may be used herein to describe one element or feature's relationship to another element or feature(s) as illustrated in the figures.
It will be understood by those skilled in the art that the foregoing is merely a preferred embodiment of the present invention, and is not intended to limit the invention to the particular forms disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

Claims (8)

1. The utility model provides a subway station movement joint seepage water drainage structures, includes subway station major structure (1) and subway station additional structure (2), there are movement joint (3), its characterized in that between subway station major structure (1) and subway station additional structure (2):
a first water retaining ridge (4) and a second water retaining ridge (5) are respectively arranged in the bottom plate decoration layer of the subway main body structure and the bottom plate decoration layer of the subway channel structure, and the first water retaining ridge (4) and the second water retaining ridge (5) are respectively positioned at two sides of the deformation joint (3);
set up escape canal (6) in subway major structure's the bottom plate bed course, escape canal (6) pass behind first manger plate bank (4) with movement joint (3) intercommunication, escape canal (6) keep away from movement joint (3) one end with what set up on the subway major structure is from wall ditch (7) intercommunication, what set up on the subway major structure is provided with outlet (8) from wall ditch (7), outlet (8) with the drainage channel intercommunication on the platform layer of subway station major structure (1), wherein, bottom plate fitment level in the top of bottom plate bed course covers escape canal (6).
2. A subway station deformation joint leakage water drainage structure as claimed in claim 1, wherein said floor finishing layer is provided with floor tiles at positions corresponding to said drainage ditches (6).
3. A subway station deformation joint leakage water drainage structure as claimed in claim 1, wherein said drain ditch (6) is provided with a plurality of strips.
4. A subway station deformation joint seepage drainage structure as claimed in claim 3, wherein said gutters (6) are parallel to each other.
5. The subway station deformation joint leakage water drainage structure according to claim 1, wherein said drain hole (8) is plural.
6. The subway station deformation joint leakage water drainage structure according to claim 1, wherein said subway station auxiliary structure (2) is a subway station passage structure.
7. The subway station deformation joint leakage water drainage structure according to claim 1, wherein said first water retaining ridge (4) is cast synchronously with the bottom plate of said subway main structure.
8. The subway station deformation joint water leakage discharge structure according to claim 1, wherein said second water dam (5) is cast in synchronization with the bottom plate of said subway station auxiliary structure (2).
CN202120828646.4U 2021-04-21 2021-04-21 Subway station movement joint seepage drainage structures Active CN215105538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120828646.4U CN215105538U (en) 2021-04-21 2021-04-21 Subway station movement joint seepage drainage structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120828646.4U CN215105538U (en) 2021-04-21 2021-04-21 Subway station movement joint seepage drainage structures

Publications (1)

Publication Number Publication Date
CN215105538U true CN215105538U (en) 2021-12-10

Family

ID=79270608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120828646.4U Active CN215105538U (en) 2021-04-21 2021-04-21 Subway station movement joint seepage drainage structures

Country Status (1)

Country Link
CN (1) CN215105538U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673243A (en) * 2022-04-19 2022-06-28 山东轨道交通勘察设计院有限公司 Rail transit existing station structure seam drainage structure and construction method
CN117166504A (en) * 2023-11-01 2023-12-05 中铁九局集团第四工程有限公司 Construction method of subway water-rich stratum structure deformation joint water leakage drainage system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673243A (en) * 2022-04-19 2022-06-28 山东轨道交通勘察设计院有限公司 Rail transit existing station structure seam drainage structure and construction method
CN117166504A (en) * 2023-11-01 2023-12-05 中铁九局集团第四工程有限公司 Construction method of subway water-rich stratum structure deformation joint water leakage drainage system
CN117166504B (en) * 2023-11-01 2024-01-19 中铁九局集团第四工程有限公司 Construction method of subway water-rich stratum structure deformation joint water leakage drainage system

Similar Documents

Publication Publication Date Title
CN215105538U (en) Subway station movement joint seepage drainage structures
CN212835493U (en) Underground cast-in-place concrete structure movement joint water drainage preventing structure
CN209837281U (en) Basement outer wall and bottom plate corner waterproof node
CN107740708B (en) Construction structure and construction method for preventing leakage of tunnel arch wall foot
CN110777856A (en) Back water-proof structure of basement bottom plate and construction method thereof
CN210177363U (en) Longitudinal and transverse drainage device capable of draining seeped water in bridge deck pavement layer
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN207145004U (en) A kind of constructing structure of tunnel arch wall pin anti-seep water
CN214401904U (en) Hydrophobic dampproofing structure of basement bottom plate
CN111058467B (en) Basement backwater surface waterproof drainage structure and construction method
CN211849708U (en) Water film waterscape
CN210151514U (en) Drainage floor tile
CN211689726U (en) Permeable pavement
CN211395229U (en) Square drainage structure
CN210315913U (en) Floor drain mounting structure
CN210621879U (en) Steel construction vestibule drainage structures system
CN206784755U (en) A kind of roofing waterproof heat insulation structure
CN208950004U (en) A kind of same-floor drainage riser Water-logged draining device
CN208473931U (en) A kind of percolating water ejectment structure for tunnel
CN117166504B (en) Construction method of subway water-rich stratum structure deformation joint water leakage drainage system
CN217652035U (en) A hidden drainage structures for face brick seam
CN216920471U (en) Waterproof structure of post-cast strip of basement bottom plate
CN212835462U (en) Prefabricated type seepage-proofing and leakage-preventing subway station wall-separating ditch structure
CN221052688U (en) High water level basement bottom plate drainage structures
CN219569388U (en) Roof slope finding waterproof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant