CN215068331U - Intelligent human-computer interaction construction optimization management and control system - Google Patents
Intelligent human-computer interaction construction optimization management and control system Download PDFInfo
- Publication number
- CN215068331U CN215068331U CN202023089238.6U CN202023089238U CN215068331U CN 215068331 U CN215068331 U CN 215068331U CN 202023089238 U CN202023089238 U CN 202023089238U CN 215068331 U CN215068331 U CN 215068331U
- Authority
- CN
- China
- Prior art keywords
- control equipment
- construction
- intelligent
- data
- computer interaction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses an intelligence human-computer interaction construction optimization management and control system, include: the system comprises a cloud platform, safety control equipment, remote control equipment, data control equipment, a transmission network and a human-computer interaction unit, wherein the safety control equipment is in communication connection with the cloud platform, the safety control equipment comprises a passive digital tag and an intelligent gate, a radio frequency identifier for reading the passive digital tag is arranged on the intelligent gate, the remote control equipment comprises a construction camera, a mobile terminal and a communication device, the data control equipment comprises a plurality of intelligent data collectors distributed on a construction site, the transmission network comprises a mobile signal base station arranged on the construction site, and the mobile signal base station is used for conveying collected data of the safety control equipment, the remote control equipment and the data control equipment to the cloud platform for storage. The utility model discloses can accomplish effective management and control and optimization to the job site.
Description
Technical Field
The utility model relates to a construction management technical field especially relates to an intelligence human-computer interaction construction optimization management and control system.
Background
With the comprehensive arrival of the intelligent era and the continuous promotion of smart cities, the pace of informatization transformation of the traditional industry is rapidly increasing. The enormous construction scale promotes the exploration and research and development of intelligent construction sites. In China, smart cities are well-trained. Utilize wisdom building site management and control platform to add the brick and tile for this reason, new step is gone up again in helping hand city development.
Traditional job site management and control often all relies on the manpower, and personnel administrative cost is high to because in present engineering quality and the safety control work because the information transmission channel is not smooth, hardly accomplish effective management and control to the job site.
SUMMERY OF THE UTILITY MODEL
In order to overcome the not enough of prior art, the utility model aims at providing an intelligence human-computer interaction construction optimization management and control system can accomplish effective management and control and optimization to the job site.
The utility model discloses a following technical scheme realizes: intelligent human-computer interaction construction optimization management and control system includes:
the system comprises a cloud platform, safety control equipment, remote control equipment, data control equipment, a transmission network and a human-computer interaction unit, wherein the safety control equipment, the remote control equipment, the data control equipment, the transmission network and the human-computer interaction unit are in communication connection with the cloud platform;
the safety control equipment comprises a passive digital tag embedded into an employee safety helmet or safety shoes and an intelligent gate, wherein a radio frequency identifier for reading the passive digital tag is arranged on the intelligent gate;
the remote control equipment comprises a construction camera, a man-machine interaction unit, a mobile terminal and a communication device, wherein the construction camera comprises a 1 st monitoring camera for shooting a construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera, a GPS positioning module is arranged in the mobile terminal, and the mobile terminal is in communication connection with the communication device;
the data management and control equipment comprises a plurality of intelligent data collectors distributed on a construction site, and each intelligent data collector is provided with a two-dimensional code tag used for storing basic information of the intelligent data collector;
the transmission network comprises a mobile signal base station arranged on a construction site, and the mobile signal base station is used for transmitting the collected data of the safety control equipment, the remote control equipment and the data control equipment to the cloud platform;
the man-machine interaction unit comprises a touch display screen, a fingerprint sensor is installed at one end of the touch display screen, the fingerprint sensor is electrically connected with a fingerprint management module arranged in the touch display screen, a safety control button is arranged on the touch display screen, and the safety control button is used for controlling the transmission network to execute a corresponding data transmission function when the fingerprint management module judges that a fingerprint comparison result is correct.
Further, the 1 st surveillance camera head is high definition panorama camera, the 2 nd surveillance camera head is high definition detail camera.
Further, the construction camera also comprises a 3 rd monitoring camera, wherein the 3 rd monitoring camera is an infrared monitoring camera.
Furthermore, the intelligent data acquisition unit comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a visual sensor and a reading-writing device.
Further, the human-computer interaction unit is a touch screen display.
Further, the cloud platform is also connected with a printing device.
Further, the mobile terminal comprises one or more of a handheld PAD, a tablet computer and a notebook computer.
Compared with the prior art, the beneficial effects of the utility model reside in that:
(1) intelligent management is carried out, and non-construction personnel are prevented from entering a construction site;
(2) the construction site data can be uploaded to the cloud platform, the world of waste in page-by-page browsing of a large number of paper data is saved, the untimely updating of the data is reduced, and the behaviors of collection, arrangement and classification are disordered;
(3) detecting various construction data of a construction site in real time, and grasping construction information in time;
(4) the access of many cameras can realize the no dead angle supervision in construction place, can effectively stop the operation violating the regulations of construction site, can also realize detecting the night of construction area through infrared surveillance camera, prevents the loss of valuable property in construction area part place.
Drawings
Fig. 1 is a block diagram of the present invention.
Detailed Description
The embodiments of the present invention will be further described with reference to the accompanying drawings and the detailed description,
as shown in FIG. 1, management and control system is optimized in intelligent human-computer interaction construction, include:
the system comprises a cloud platform, safety control equipment, remote control equipment, data control equipment and a transmission network, wherein the safety control equipment, the remote control equipment, the data control equipment and the transmission network are in communication connection with the cloud platform;
the safety control equipment comprises a passive digital tag and an intelligent gate, wherein a radio frequency identifier for reading the passive digital tag is arranged on the intelligent gate;
in the embodiment, the passive digital tag can be embedded into a safety helmet or a safety shoe of an employee, and the content of the passive digital tag is read and recorded through the radio frequency identifier, so that the employee can accurately record when entering and leaving a construction site. The technology is mainly realized by storing basic information of employees in a database and matching safety helmets or safety shoes used by the employees, so that the management is intelligent and efficient. Except that can be at computer end import data, also can carry out attendance management after cell-phone APP networking. Staff need not to wear safety helmet and safety shoes simultaneously, as long as dress one of them equipment, just can match information, carries out identity verification, and personnel management is more convenient.
The remote control equipment comprises a construction camera, a mobile terminal and a communication device, wherein the construction camera comprises a 1 st monitoring camera for shooting the construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera, a GPS positioning module is arranged in the mobile terminal, and the mobile terminal is in communication connection with the communication device;
the 1 st monitoring camera is a high-definition panoramic camera, and the 2 nd monitoring camera is a high-definition detail camera. A panoramic camera with a large visual angle is accessed to realize panoramic monitoring; and a small-range detail camera is accessed to monitor details. The cooperation through panoramic camera and detail camera can help managers better know the behavior in construction area, can effectively stop the transmission of job site operation violating regulations.
Further, the network camera also comprises a 3 rd monitoring camera, and the 3 rd monitoring camera is an infrared monitoring camera. The infrared monitoring camera is arranged because the common high-definition camera at night is often difficult to effectively monitor the construction area, people can be detected to come in and go out at night when the infrared monitoring camera is arranged, the valuable articles in partial areas are prevented from being stolen, and the infrared monitoring camera can be selectively arranged at the key positions of some construction areas.
Preferably, the mobile terminal comprises one or more of a handheld PAD, a tablet computer and a notebook computer, and the mobile terminal is used for positioning the position of the constructor.
The data management and control equipment comprises a plurality of intelligent data collectors distributed on a construction site, and each intelligent data collector is provided with a two-dimensional code tag used for storing basic information of the intelligent data collector.
As a value, the daily inspection, operation and maintenance, etc. of the intelligent data collector and the matched field instrument and equipment are generally performed by an operator and a maintainer referring to a reference file placed on the field, such as a use instruction of an equipment manufacturer, a field operation rule, etc. It is understood that these documents and records are all made with paper as the basic medium, and when not yet incorporated into the management of the automated information system, there may be loss and damage of part of the data, there is no detailed maintenance record, and it is impossible to refer to the inspection, and it will certainly affect the subsequent use of the intelligent data collector.
The intelligent data acquisition unit comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a vision sensor and a reading and writing device, and can detect the data of a construction site in real time and know the construction state of the construction site in time.
The transmission network comprises a mobile signal base station arranged on a construction site, and the mobile signal base station is used for transmitting data collected by the safety control equipment, the remote control equipment and the data control equipment to the cloud platform for storage.
The man-machine interaction unit comprises a touch display screen, a fingerprint sensor is installed at one end of the touch display screen, the fingerprint sensor is electrically connected with a fingerprint management module arranged in the touch display screen, a safety control button is arranged on the touch display screen, and the safety control button is used for controlling the transmission network to execute a corresponding data transmission function when the fingerprint management module judges that a fingerprint comparison result is correct.
It should be noted that, in order to prevent that the construction site data from being leaked at will and causing adverse effect to the construction site, this embodiment manages the uploading of construction data through fingerprint sensing equipment, prevents that other useful persons from stealing construction data, causes the loss to the construction site.
Preferably, the cloud platform is further connected with a printing device, so that a user can conveniently look up and browse collected data.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are all within the protection scope of the present invention.
Claims (7)
1. The utility model provides an intelligence human-computer interaction construction optimization management and control system which characterized in that includes:
the system comprises a cloud platform, safety control equipment, remote control equipment, data control equipment and a transmission network, wherein the safety control equipment, the remote control equipment, the data control equipment and the transmission network are in communication connection with the cloud platform;
the safety control equipment comprises a passive digital tag embedded into an employee safety helmet or safety shoes and an intelligent gate, wherein a radio frequency identifier for reading the passive digital tag is arranged on the intelligent gate;
the remote control equipment comprises a construction camera, a man-machine interaction unit, a mobile terminal and a communication device, wherein the construction camera comprises a 1 st monitoring camera for shooting a construction area from a high place and 1 or more 2 nd monitoring cameras lower than the shooting position of the 1 st monitoring camera, a GPS positioning module is arranged in the mobile terminal, and the mobile terminal is in communication connection with the communication device;
the data management and control equipment comprises a plurality of intelligent data collectors distributed on a construction site, and each intelligent data collector is provided with a two-dimensional code tag used for storing basic information of the intelligent data collector;
the transmission network comprises a mobile signal base station arranged on a construction site, and the mobile signal base station is used for transmitting the collected data of the safety control equipment, the remote control equipment and the data control equipment to the cloud platform;
the man-machine interaction unit comprises a touch display screen, a fingerprint sensor is installed at one end of the touch display screen, the fingerprint sensor is electrically connected with a fingerprint management module arranged in the touch display screen, a safety control button is arranged on the touch display screen, and the safety control button is used for controlling the transmission network to execute a corresponding data transmission function when the fingerprint management module judges that a fingerprint comparison result is correct.
2. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the 1 st monitoring camera is a high-definition panoramic camera, and the 2 nd monitoring camera is a high-definition detail camera.
3. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the construction cameras further comprise a 3 rd monitoring camera, and the 3 rd monitoring camera is an infrared monitoring camera.
4. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the intelligent data collector comprises a radiation temperature sensor, a wind pressure difference sensor, a temperature and humidity sensor, an air quality sensor, a vision sensor and a read-write device.
5. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the human-computer interaction unit is a touch screen display.
6. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the cloud platform is further connected with a printing device.
7. The intelligent human-computer interaction construction optimization management and control system of claim 1, wherein the mobile terminal comprises one or more of a handheld PAD, a tablet computer, and a notebook computer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023089238.6U CN215068331U (en) | 2020-12-18 | 2020-12-18 | Intelligent human-computer interaction construction optimization management and control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023089238.6U CN215068331U (en) | 2020-12-18 | 2020-12-18 | Intelligent human-computer interaction construction optimization management and control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215068331U true CN215068331U (en) | 2021-12-07 |
Family
ID=79215340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023089238.6U Active CN215068331U (en) | 2020-12-18 | 2020-12-18 | Intelligent human-computer interaction construction optimization management and control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215068331U (en) |
-
2020
- 2020-12-18 CN CN202023089238.6U patent/CN215068331U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101127670B (en) | A coal mine under-well secure integration management system | |
CN106447143A (en) | Intelligent material evidence management system | |
CN102695045B (en) | Video intelligent tracing system for RFID (Radio Frequency Identification Device) | |
CN101419455B (en) | Coal mine downhole safety integrated management system and management method thereof | |
CN204515864U (en) | A kind of hand-held inspection device for power industry | |
CN101196505A (en) | Passageway security checking terminal system and security checking method using the same | |
CN103310300A (en) | Mobile checking management method and system of power assets | |
CN112511648A (en) | Intelligent information acquisition display device and system for epidemic situation prevention and control | |
CN201413534Y (en) | Digitized transformation patrolling device | |
CN106886738A (en) | Substation equipment intelligent management system based on Quick Response Code identification | |
CN114399265A (en) | Electric power engineering construction project overall process management and control system | |
CN110334969A (en) | A kind of special equipment detecting instrument management system and its application method | |
CN210052214U (en) | Device for identifying personnel identity information in oil field operation area | |
CN116505660A (en) | Energy storage operation and maintenance system and operation and maintenance method | |
CN205176919U (en) | Power plant removes operation management system | |
CN114358698A (en) | Intelligent tool room control system | |
CN201138488Y (en) | Safety detection apparatus for entrance and exit | |
CN215068331U (en) | Intelligent human-computer interaction construction optimization management and control system | |
CN117612107A (en) | Method for detecting abnormal personnel in place | |
CN203689576U (en) | Mobile intelligent information collection terminal | |
CN103489148A (en) | Mobile intelligent information collection terminal and mobile information collection contrasting method | |
CN205193864U (en) | Engineering construction quality real time monitoring's PDA system | |
CN104793547A (en) | Diversified mobile terminal equipment for power generation | |
CN110750068A (en) | Hierarchical management intelligent tool cabinet | |
CN206819497U (en) | A kind of bicycle theft management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |