CN215064523U - Green building surveying and mapping total station - Google Patents

Green building surveying and mapping total station Download PDF

Info

Publication number
CN215064523U
CN215064523U CN202120221722.5U CN202120221722U CN215064523U CN 215064523 U CN215064523 U CN 215064523U CN 202120221722 U CN202120221722 U CN 202120221722U CN 215064523 U CN215064523 U CN 215064523U
Authority
CN
China
Prior art keywords
total station
fixed block
fixedly connected
rod
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120221722.5U
Other languages
Chinese (zh)
Inventor
刘浩正
杨智聪
孙保成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Zhongcheng Construction Engineering Surveying And Testing Co ltd
Original Assignee
Foshan Zhongcheng Construction Engineering Surveying And Testing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Zhongcheng Construction Engineering Surveying And Testing Co ltd filed Critical Foshan Zhongcheng Construction Engineering Surveying And Testing Co ltd
Priority to CN202120221722.5U priority Critical patent/CN215064523U/en
Application granted granted Critical
Publication of CN215064523U publication Critical patent/CN215064523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a green building survey and drawing total powerstation, including the support, fixedly connected with fixed block in the middle of the support bottom, and the fixed block left and right sides has cup jointed the head rod. Under the cooperation through setting up fixed block, head rod and threaded rod is used, through changeing loose threaded rod, because the fixed block bottom is circular-arcly, be convenient for let head rod and total station drop downwards through gravity, make total station perpendicular to ground to through screwing up the threaded rod, it is fixed with connecting rod and total station, cause the total station perpendicular to ground all the time, convenient operation improves the precision that the total station measured.

Description

Green building surveying and mapping total station
Technical Field
The utility model relates to a monitoring facilities technical field specifically is a green building survey and drawing total powerstation.
Background
The total station, i.e. the total station type electronic distance measuring instrument, is a high-tech measuring instrument integrating light, machine and electricity into one body, and is a surveying and mapping instrument system integrating horizontal angle, vertical angle, distance (slant distance and flat distance) and height difference measuring functions into one body.
When the total station is used for surveying, the total station needs to be placed horizontally, but the working ground is uneven, so that when the total station is placed, whether the total station is level or not needs to be measured by using the protractor, and in the measuring process, the total station needs to be adjusted for many times, the operation is complex, time and labor are wasted in the measuring process, the distance between the total station and the ground needs to be adjusted on a support, and the distance between the total station and the ground needs to be measured.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a green building surveying and mapping total station.
In order to achieve the above object, the utility model provides a following technical scheme: a green building surveying and mapping total station comprises a bracket, wherein a fixed block is fixedly connected in the middle of the bottom of the bracket, first connecting rods are sleeved on the left side and the right side of the fixed block, a threaded rod is arranged at the top of each first connecting rod and the middle of the fixed block in a penetrating manner, three groups of first supporting rods are movably connected at the bottom of the bracket through a rotating shaft, bolts are arranged at the bottoms of the supporting rods, a second supporting rod is embedded and installed at the bottom of each first supporting rod, a second connecting rod is movably connected at the right side of the bottom of the second supporting rod through a rotating shaft, the bottom of each first connecting rod is fixedly connected with the total station, a fixed plate is fixedly connected at the bottom of the total station, a placing groove is formed in the inner side of the fixed plate, clamping grooves are formed in the two sides of the inner wall of the fixed plate, a tape is fixedly connected at the inner side of the fixed plate, a tape is arranged on one side of the top of the tape, and a balancing weight is embedded and installed at the inner side of the fixed plate, and the left side and the right side of the balancing weight are fixedly connected with clamping blocks.
Preferably, the number of the second connecting rods is three, and the other ends of the three second connecting rods are movably connected with each other through a rotating shaft.
Preferably, the bolt penetrates through and extends into the first supporting rod to be in contact with the second supporting rod.
Preferably, the bottom of the fixed block is arc-shaped, and the gap between the bottom of the fixed block and the bottom of the total station is 5 cm.
Preferably, the first connecting rod is in a "Z" shape.
Preferably, the middle of the bottom of the fixed block and the top of the first connecting rod are provided with threaded holes corresponding to the threaded rods.
Preferably, the other end of the ruler strip is fixedly connected with the top of the balancing weight.
Preferably, the clamping block corresponds to the clamping groove in position and is matched with the clamping groove, the outer side of the clamping block is arc-shaped, and the clamping block is made of plastic.
For overcoming the problem that exists among the background art, this use is novel to be provided, possesses following beneficial effect:
(1) this green building survey and drawing total powerstation uses down through the cooperation that sets up fixed block, head rod and threaded rod, and through changeing loose threaded rod, because the fixed block bottom is circular-arcly, it is static to be convenient for let head rod and total powerstation receive gravity natural droop, makes total powerstation perpendicular to ground to through screwing up the threaded rod, it is fixed with head rod and total powerstation, cause the total powerstation perpendicular to ground all the time, convenient operation improves the measuring precision of total powerstation.
(2) This green building survey and drawing total powerstation uses down through the cooperation that sets up chi strip and balancing weight, when the distance on total powerstation and ground needs to be measured, through taking out the balancing weight, makes the balancing weight drop downwards through gravity, with the ground contact, meanwhile, the balancing weight drops downwards and drives chi strip downstream, and is perpendicular with the total powerstation through the chi strip, measures according to the scale in the chi strip, and convenient operation measures comparatively accurately.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is the schematic diagram of the structure of the counterweight block after stretching out.
Fig. 3 is a schematic view of the top-view cross-sectional structure of the fixing plate of the present invention.
Fig. 4 is an enlarged schematic view of the fixing block, the first connecting rod and the threaded rod of the present invention.
Fig. 5 is the left side structure diagram of the fixing block of the present invention.
In the figure: 1-a scaffold; 2, fixing blocks; 3-a first connecting rod; 4-a threaded rod; 5-total station, 501-fixing plate, 5011-placing groove, 5012-clamping groove, 502-measuring tape, 5021-measuring strip, 503-balancing weight and 5031-clamping block; 6-first support bar, 601-bolt; 7-a second support bar; 8-second connecting rod.
Detailed Description
As shown in fig. 1-3, the utility model provides a technical solution: a green building surveying and mapping total station comprises a support 1, wherein a fixed block 2 is fixedly connected in the middle of the bottom of the support 1, first connecting rods 3 are sleeved on the left side and the right side of the fixed block 2, a threaded rod 4 penetrates through the top of each first connecting rod 3 and the middle of the fixed block 2, three groups of first supporting rods 6 are movably connected to the bottom of the support 1 through a rotating shaft, bolts 601 are arranged at the bottoms of the supporting rods 6, a second supporting rod 7 is embedded and installed at the bottom of each first supporting rod 6, a second connecting rod 8 is movably connected to the right side of the bottom of each second supporting rod 7 through a rotating shaft, a total station 5 is fixedly connected to the bottom of each first connecting rod 3, a fixed plate 501 is fixedly connected to the bottom of each total station 5, a placing groove 5011 is formed in the inner side of the fixed plate 501, clamping grooves 5012 are formed in the two sides of the inner wall of the fixed plate 501, a measuring tape 502 is fixedly connected to the inner side of the fixed plate 501, a measuring tape 5021 is arranged on one side of the top of the measuring tape, and a balancing weight 503 is embedded and installed in the inner side of the fixed plate 501, and the left and right sides of the weight block 503 are fixedly connected with the fixture blocks 5031.
The number of the second connecting rods 8 is three, the other ends of the three second connecting rods 8 are movably connected with each other through a rotating shaft, the three second connecting rods 8 are straightened by outwards rotating the first connecting rods 6 and the second connecting rods 7, the second connecting rods 6 and the first connecting rods 7 are outwards spread, and the support 1 is supported.
Wherein, bolt 601 runs through and stretches into in the first bracing piece 6 and contact with second bracing piece 7, stretches out the back downwards as second connecting rod 7, fixes second connecting rod 7 through screwing up bolt 601, prevents that second connecting rod 7 from sliding from top to bottom.
Wherein, 2 bottoms of fixed block are circular-arc, and 2 bottoms of fixed block and 5 bottom clearances of total powerstation are 5cm, when needing to make total powerstation 5 and ground level perpendicular, through turning loose screw rod 4, let total powerstation 5 rotate along 2 bottoms of fixed block through gravity, make total powerstation 5 and ground perpendicular.
Wherein, the first connecting rod 3 is in a 'Z' shape, and when the total station 5 rotates through gravity, the two first connecting rods 3 prevent the fixed block 2 from influencing the rotation of the total station 5.
Wherein, all set up the screw hole that corresponds with threaded rod 4 positions with head rod 3 top in the middle of the 2 bottoms of fixed block, screw up and unscrew threaded rod 4 through the screw thread, fixed or loosen head rod 3 and total powerstation 5.
Wherein, the ruler strip 5021 other end and balancing weight 503 top fixed connection, when the height between ground and the total powerstation 5 need be measured, shift out balancing weight 503 to drop downwards through gravity, make balancing weight 503 drive ruler strip 5021 remove, when balancing weight 503 drops to ground, through the spring in tape measure 502, tighten up ruler strip 5021, through observing ruler strip 5021, measure.
The clamping block 5031 corresponds to and fits with the slot 5012, the outer side of the clamping block 5031 is arc-shaped, and the clamping block 5031 is made of plastic, so that the plastic has certain toughness, and the clamping block 5031 can slide into and out of the slot 5012, thereby facilitating fixing and taking out of the balancing weight 503.
In use, the three second support rods 7 are firstly placed on the ground, the length of the second support rods 7 which are drawn out downwards is fixed by screwing the bolts 601 according to the height required to support, the first support rods 6 and the second support rods 7 are outwards supported, the three second connecting rods 8 are straightened, the bracket 1 is supported, then the threaded rods 4 are unscrewed, the total station 5 rotates along the fixed block 2 through the first connecting rod 3 by gravity, the total station 5 is perpendicular to the ground, the surveying precision is improved, the total station 5 and the first connecting rod 3 are convenient to rotate due to the arc-shaped bottom of the fixed block 2, the total station 5 is prevented from colliding with the fixed block 2 when rotating, after the total station 5 is stabilized, the total station 5 is fixed by screwing the threaded rods 4, then the balancing weight 503 is taken out, and the clamping block 5031 is arc-shaped and made of rubber, and has certain toughness due to the rubber material, the clamping block 5031 can conveniently slide out of the clamping groove 5012, the balancing weight 503 can fall downwards through gravity, when the balancing weight 503 contacts the ground, the ruler strip 5021 is driven to move downwards, the ruler strip 5021 and the balancing weight 503 are lifted, the bottom of the balancing weight 503 contacts the ground, the top of the balancing weight 503 is suspended, the ruler strip 5021 is compared with the bottom of the total station 5, the height of the total station 5 and the ground can be conveniently measured, and the whole process is completed.

Claims (8)

1. The utility model provides a green building survey and drawing total powerstation, includes support (1), its characterized in that: the middle of the bottom of the support (1) is fixedly connected with a fixed block (2), the left side and the right side of the fixed block (2) are respectively sleeved with a first connecting rod (3), a threaded rod (4) penetrates through the top of each first connecting rod (3) and the middle of the corresponding fixed block (2), the bottom of the support (1) is movably connected with three groups of first supporting rods (6) through rotating shafts, bolts (601) are arranged at the bottoms of the supporting rods (6), second supporting rods (7) are embedded in the bottoms of the first supporting rods (6), second connecting rods (8) are movably connected to the right sides of the bottoms of the second supporting rods (7) through rotating shafts, a total station (5) is fixedly connected to the bottom of each first supporting rod (3), a fixed plate (501) is fixedly connected to the bottom of the total station (5), a standing groove (5011) is formed in the inner side of each fixed plate (501), and clamping grooves (5012) are formed in the two sides of the inner wall of each fixed plate (501), the inner side of the fixing plate (501) is fixedly connected with a tape measure (502), a tape strip (5021) is arranged on one side of the top of the tape measure (502), a balancing weight (503) is embedded into the inner side of the fixing plate (501), and clamping blocks (5031) are fixedly connected to the left side and the right side of the balancing weight (503).
2. The green architectural surveying and mapping total station of claim 1, wherein: the number of the second connecting rods (8) is three, and the other ends of the three second connecting rods (8) are movably connected with each other through a rotating shaft.
3. The green architectural surveying and mapping total station of claim 1, wherein: the bolt (601) penetrates through and extends into the first supporting rod (6) to be in contact with the second supporting rod (7).
4. The green architectural surveying and mapping total station of claim 1, wherein: the bottom of the fixed block (2) is arc-shaped, and the gap between the bottom of the fixed block (2) and the bottom of the total station (5) is 5 cm.
5. The green architectural surveying and mapping total station of claim 1, wherein: the first connecting rod (3) is Z-shaped.
6. The green architectural surveying and mapping total station of claim 1, wherein: and threaded holes corresponding to the threaded rods (4) are formed in the middle of the bottom of the fixing block (2) and the top of the first connecting rod (3).
7. The green architectural surveying and mapping total station of claim 1, wherein: the other end of the ruler strip (5021) is fixedly connected with the top of the balancing weight (503).
8. The green architectural surveying and mapping total station of claim 1, wherein: the clamping block (5031) corresponds to the clamping groove (5012) in position and is matched with the clamping groove, the outer side of the clamping block (5031) is arc-shaped, and the clamping block (5031) is made of plastic.
CN202120221722.5U 2021-01-27 2021-01-27 Green building surveying and mapping total station Active CN215064523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120221722.5U CN215064523U (en) 2021-01-27 2021-01-27 Green building surveying and mapping total station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120221722.5U CN215064523U (en) 2021-01-27 2021-01-27 Green building surveying and mapping total station

Publications (1)

Publication Number Publication Date
CN215064523U true CN215064523U (en) 2021-12-07

Family

ID=79252713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120221722.5U Active CN215064523U (en) 2021-01-27 2021-01-27 Green building surveying and mapping total station

Country Status (1)

Country Link
CN (1) CN215064523U (en)

Similar Documents

Publication Publication Date Title
CN215064523U (en) Green building surveying and mapping total station
CN113639712A (en) Perpendicularity detection device with multiple measurement modes for building engineering
WO2021068343A1 (en) Ceramic tile flatness detection device
CN211576180U (en) Novel verticality measuring scale
CN216385400U (en) Thickness detection device for road engineering supervision
CN210071581U (en) Device for testing high-temperature flowability of water-swellable rubber
CN215893599U (en) Level measuring instrument for road investigation
CN206162952U (en) Friction experiment device for mechanics
CN211824416U (en) Building energy conservation engineering measuring apparatu
CN212158448U (en) Detection apparatus for be used for building roughness
CN209802377U (en) House wall body straightness detection device that hangs down
CN110081871B (en) Error calibration device for building engineering quality detection
CN213274241U (en) Horizontal support is used in survey and drawing with regulatory function
CN218724046U (en) Electronic measuring instrument
CN210426529U (en) Levelness measuring device convenient to adjust and used for anti-static terrace
CN216620939U (en) Wall body detection device
CN218349467U (en) Combined type surveying and mapping device for constructional engineering
CN217686932U (en) Coal-winning machine helical drum measures detection device
CN221123398U (en) Wall perpendicularity measuring device
CN216523982U (en) Verticality detection device for measuring hydraulic engineering
CN216049630U (en) Building engineering wall straightness detection device that hangs down
CN214702289U (en) Automatic change equipment fixing straightness detection device that hangs down
CN220057883U (en) Silt depth measurer
CN217005809U (en) Building engineering technical measurement device
CN220980817U (en) Concrete surface quality monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant